Roller way arrangement structure of swing shear for continuous casting and rolling of intermediate billets

By setting the first roller table after shearing to be lower than the other roller tables and the transition guide plate in the arrangement structure of the swing shearing roller table for the continuous casting and rolling intermediate billet, the problem of the head of the intermediate billet being inserted into the gap is solved, production accidents are avoided, and production accidents are ensured. Normal production of thin slabs.

CN221869722UActive Publication Date: 2024-10-22TANGSHAN DONGHUA IRON & STEEL ENTERPRISE GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420900100.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-28
Publication Date
2024-10-22
Estimated Expiration
2034-04-28

AI Technical Summary

Technical Problem

During the thin slab continuous casting and rolling production process, the head of the intermediate slab is easily inserted into the gap between the swing shear and the first roller table, causing production accidents and failure to cut the center plate, affecting normal production.

Method used

Design a swing shearing roller conveyor arrangement structure for continuous casting and rolling intermediate billets. The first roller conveyor after shearing is lower than the roller conveyor before shearing and the second roller conveyor after shearing. It is equipped with a transition guide plate and is fixed on the bracket. , the inclination angle is 2-10 degrees to prevent the head of the intermediate blank from inserting into the gap.

Benefits of technology

It effectively prevents the head of the intermediate billet from being inserted into the gap, eliminates production accidents such as rough rolling of rolled steel and continuous casting of horizontal billets, and ensures the normal production of thin slabs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221869722U_ABST
    Figure CN221869722U_ABST
Patent Text Reader

Abstract

The utility model relates to a continuous casting and rolling intermediate billet swing shear roller way arrangement structure, and belongs to the technical field of thin billet continuous casting and rolling production equipment in the metallurgical industry. According to the technical scheme, the swing shear comprises a before-shearing roller way (2), a swing shear (1) and an after-shearing roller way, the before-shearing roller way (2) and a second after-shearing roller way (4) are located on the same horizontal plane, a first after-shearing roller way (3) is lower than the before-shearing roller way (2) and the second after-shearing roller way (4), a transition guide plate (5) is arranged between the first after-shearing roller way (3) and the second after-shearing roller way (4), and the transition guide plate (5) is fixed to a support (6); the first post-shearing roller way (3) is 20-40mm lower than the pre-shearing roller way (2) and the second post-shearing roller way (4); and the bracket (6) is fixed on a post-shearing roller bed base (7). The device has the beneficial effects that the head of the middle blank after swinging shearing can be prevented from being inserted into a gap between the swinging shear and the first roller way.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a swing shear roller arrangement structure for a continuous casting and rolling intermediate billet, and belongs to the technical field of thin slab continuous casting and rolling production equipment in the metallurgical industry. Background Art

[0002] The swing shear is an important equipment in the thin slab continuous casting and rolling production line. When rolling thin-gauge products, the rough rolling must use an intermediate billet of 20-30mm, and the finishing rolling can roll thinner products. However, during the production process, if a production accident occurs, the intermediate billet in the rough rolling area needs to be cut into medium plates by the swing shear to prevent the continuous casting machine from lying flat. However, when the thinner intermediate billet passes through the swing shear, the head of the intermediate billet will buckle down. The buckle of the head of the intermediate billet is easy to be inserted into the gap between the first roller after the swing shear and the swing shear, causing the failure of cutting the middle plate, thereby leading to a series of production accidents such as rough rolling of steel and continuous casting lying billets, which seriously affect the normal production of thin slabs. Utility Model Content

[0003] The utility model aims to provide a continuous casting and rolling intermediate billet swing shear roller arrangement structure, which can prevent the intermediate billet head after swing shearing from being inserted into the gap between the swing shear and the first roller, and solve the problems existing in the background technology.

[0004] The technical solution of the utility model is:

[0005] A swing shear roller arrangement structure for a continuous casting and rolling intermediate billet comprises a pre-shear roller, a swing shear and a post-shear roller, wherein the pre-shear roller and the second post-shear roller are on the same horizontal plane, the first post-shear roller is lower than the pre-shear roller and the second post-shear roller, a transition guide is provided between the first post-shear roller and the second post-shear roller, and the transition guide is fixed on a bracket.

[0006] Furthermore, the first roller after shearing is 20-40 mm lower than the roller before shearing and the second roller after shearing.

[0007] Furthermore, the inclination angle of the transition guide plate between the first roller after shearing and the second roller after shearing is 2-10 degrees.

[0008] Furthermore, the bracket is fixed on the post-cutting roller table base.

[0009] The beneficial effect of the utility model is that it can prevent the head of the intermediate billet after swing shearing from being inserted into the gap between the swing shear and the first roller, thereby preventing production accidents such as rough rolling steel and continuous casting horizontal billets, and ensuring the normal production of thin slabs. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a schematic diagram of the structure of the utility model;

[0011] Figure 2 This is an enlarged view of point A of the utility model;

[0012] In the figure: swing shear 1, roller table before shearing 2, first roller table after shearing 3, second roller table after shearing 4, transition guide plate 5, bracket 6, roller table base after shearing 7. DETAILED DESCRIPTION

[0013] The present invention will be further described below by way of examples with reference to the accompanying drawings.

[0014] See attached Figure 1 , 2 A swing shear roller arrangement structure for a continuous casting and rolling intermediate billet comprises a pre-shear roller 2, a swing shear 1 and a post-shear roller, the pre-shear roller 2 and the second post-shear roller 4 are on the same horizontal plane, the first post-shear roller 3 is lower than the pre-shear roller 2 and the second post-shear roller 4, a transition guide plate 5 is provided between the first post-shear roller 3 and the second post-shear roller 4, and the transition guide plate 5 is fixed on a bracket 6.

[0015] In this example, refer to the attached Figure 1 , 2 The roller diameter is ф300mm. The distance between the first roller 3 after shearing and the second roller 4 after shearing is 1000mm. The first roller 3 after shearing is 30mm lower than the roller 2 before shearing and the second roller 4 after shearing.

[0016] The transition guide plate 5 is a rectangular plate with a length of 800 mm and a width that matches the length of the roller. The transition guide plate 5 is fixed on a bracket 6, and the bracket 6 is fixed on the roller base 7 after shearing. The transition guide plate 5 has one end low (close to the first roller 3) and one end high (close to the second roller 4 after shearing). Its inclination angle is 2 degrees. Figure 2 shown.

[0017] See attached Figure 1 , 2 When a thinner intermediate billet is sheared by the swing shear 1, the head of the intermediate billet will buckle down. Since the first roller 3 after shearing is lowered by 30mm, the head of the intermediate billet climbs to the second roller 4 after shearing through the transition guide 5 with a certain inclination angle, avoiding the head of the intermediate billet from being inserted into the gap between the swing shear 1 and the first roller 3 after shearing, thereby preventing a series of production accidents such as rough rolling of steel and continuous casting of horizontal billets.

Claims

1. A continuous casting and rolling intermediate billet swing shear roller arrangement structure, comprising a pre-shear roller (2), a swing shear (1) and a post-shear roller, characterized in that: The roller conveyor (2) before shearing and the second roller conveyor (4) after shearing are on the same horizontal plane, the first roller conveyor (3) after shearing is lower than the roller conveyor (2) before shearing and the second roller conveyor (4) after shearing, and a transition guide plate (5) is provided between the first roller conveyor (3) after shearing and the second roller conveyor (4) after shearing, and the transition guide plate (5) is fixed on a bracket (6).

2. The swing shear roller arrangement structure for continuous casting and rolling intermediate billet according to claim 1 is characterized in that: The first roller conveyor (3) after shearing is 20-40 mm lower than the roller conveyor (2) before shearing and the second roller conveyor (4) after shearing.

3. The swing shear roller arrangement structure for continuous casting and rolling intermediate billet according to claim 2 is characterized in that: The transition guide plate (5) between the first roller conveyor (3) after shearing and the second roller conveyor (4) after shearing has an inclination angle of 2-10 degrees.

4. The swing shear roller arrangement structure for continuous casting and rolling intermediate billet according to claim 1 is characterized in that: The bracket (6) is fixed on the post-shear roller table base (7).