Water conservancy pipeline laying traction device

By designing a water conservancy pipeline laying traction device with guide slopes, conveyor belts and clamping components, the problems of low loading and unloading efficiency and poor traction stability of cement pipes in the existing technology are solved, and fast loading, stable traction and efficient unloading of cement pipes are achieved.

CN221875289UActive Publication Date: 2024-10-22HUBEI HAIHE WATER CONSERVANCY & HYDROPOWER ENG CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420541765.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-10-22
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

The existing water conservancy pipeline laying traction device is inefficient when loading, transporting and unloading cement pipes, and the cement pipes are easy to slide, resulting in poor traction stability.

Method used

A traction device for laying water conservancy pipes is designed, including a guide slope, a conveyor belt, a baffle, a placement platform, a limit frame and a splint assembly. The conveyor belt drives the baffle to push the cement pipe to the placement platform, and uses a worm gear, worm and screw system. Achieve stable clamping and traction of cement pipes.

Benefits of technology

It improves the loading and unloading efficiency and traction stability of cement pipes, ensuring that cement pipes can move quickly and stably during loading and unloading.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221875289U_ABST
    Figure CN221875289U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of water conservancy pipeline laying traction, and particularly relates to a water conservancy pipeline laying traction device which comprises a supporting plate, a containing table is welded to the supporting plate, two sets of guide plates are symmetrically welded to the side wall of the containing table, and a first rotating shaft and a second rotating shaft are rotationally installed on an installation frame through bearings. A conveying belt sleeves the two sets of rollers, a baffle is welded to the conveying belt, four sets of pulleys are installed on the bottom side of the supporting plate, the cement pipe rolls to the guide plate from the guide slope, then the conveying belt drives the baffle to rotate to the position below the cement pipe, and at the moment, the baffle pushes the cement pipe till the cement pipe is pushed to the containing table; rapid truck loading and carrying of the cement pipes are achieved; the cement pipe is pushed to the guide plate, at the moment, the cement pipe moves downwards along with the baffle, then the cement pipe rolls down to the ground from the guide slope, unloading and burying of the cement pipe are achieved, loading, carrying and unloading and burying of the cement pipe are facilitated through the structure, and the loading and unloading efficiency of the cement pipe is improved advantageously.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy pipeline laying and traction, in particular to a water conservancy pipeline laying and traction device. Background Art

[0002] When constructing a sponge city, it is necessary to lay various drainage pipes to divert and guide the various waters in the city. When laying cement pipes, a traction device is needed to pull the cement pipes to the ground for laying.

[0003] A Chinese patent with publication number CN215950567U discloses a traction device for laying water conservancy pipelines, which relates to the field of water conservancy pipelines. A traction device for laying water conservancy pipelines includes a shell, and the front and rear sides of the top of the shell are both provided with fixing plates. The utility model provides a traction device for laying water conservancy pipelines, which places the pipeline on the top of the shell, fixes the pipeline by an arc-shaped clamping plate, and protects both sides of the pipeline again by setting a mounting plate to prevent the pipeline from shaking due to bumps during traction, causing the pipeline to fall off, affecting the traction effect of the device, and when protecting pipelines of different sizes, the dual-axis electric push rod is started by an external controller, and the dual-axis electric push rod drives the bracket and the pulley to slide in the inner cavity of the shell, and the bracket drives the slide plate to move. The slide plate is set by a sliding column, so that it can be more stable when moving, which increases the stability of the slide plate when moving.

[0004] The existing traction device pulls the cement pipe to the laying site for laying. Since the cement pipe is heavy, it is not conducive to loading and unloading and burying, resulting in low loading and unloading efficiency of the cement pipe. Therefore, a traction device for laying water conservancy pipelines is proposed to solve the above problems. Utility Model Content

[0005] In order to make up for the deficiencies of the prior art and solve the problems existing in the prior art, the utility model proposes a water conservancy pipeline laying traction device.

[0006] The technical solution adopted by the utility model to solve its technical problems is: a water conservancy pipeline laying traction device of the utility model comprises a support plate, a placing platform is welded on the support plate, a control panel is installed on the side wall of the placing platform, two groups of guide plates are symmetrically welded on the side wall of the placing platform, a guide slope is welded on the bottom side of the guide plate, a tripod is welded on the support plate, two groups of mounting frames are welded on the tripod, the outer wall of the mounting frame is fixedly connected to the side wall of the guide plate, a first rotating shaft and a second rotating shaft are rotatably installed on the mounting frame through bearings, rollers are fixedly sleeved on the first rotating shaft and the second rotating shaft, conveyor belts are sleeved on the two groups of rollers, a baffle is welded on the conveyor belt, a driving wheel is fixedly sleeved on the first rotating shaft, a driven wheel is fixedly sleeved on the second rotating shaft, and a transmission wheel is commonly sleeved on the driving wheel and the driven wheel Chain, a stepper motor is installed on the side wall of the mounting frame through a machine base, the output shaft of the stepper motor is fixedly connected to the first rotating shaft, the stepper motor is connected to the control panel through an internal circuit, four sets of pulleys are installed on the bottom side of the support plate, and a handle is installed on the side wall of the placement table. The cement pipe is rolled from the guide slope to the guide plate, and then the conveyor belt drives the baffle to rotate to the bottom of the cement pipe. At this time, the baffle pushes the cement pipe until the cement pipe is pushed to the placement table, thereby realizing rapid loading and transportation of the cement pipe; by pushing the cement pipe onto the guide plate, the cement pipe moves downward with the baffle, and then the cement pipe rolls from the guide slope to the ground, thereby realizing the unloading and burying of the cement pipe. This structure is convenient for loading and unloading of the cement pipe, which is beneficial to improving the loading and unloading efficiency of the cement pipe.

[0007] Preferably, a pipe groove is provided on the placing table, two groups of limit frames are symmetrically welded on the placing table, two groups of square grooves are symmetrically provided on the placing table, a sliding groove is provided in the placing table below the square groove, an assembly groove is provided in the placing table below the sliding groove, a screw rod is rotatably installed on the bottom wall of the assembly groove through a bearing, the screw rod is located in the sliding groove and the assembly groove, a sliding block is installed in the sliding groove, the sliding block slides with the screw rod through a thread, a connecting plate is welded on the top side of the sliding block, a splint is welded on the top side of the connecting plate, the splint and the connecting plate are assembled in the square groove, a worm gear is fixedly sleeved on the screw rod, the worm gear is assembled in the assembly groove, a rod groove is provided on one side of the assembly groove in the placing table, two groups of worm gears are rotatably installed on the two inner walls of the rod groove through bearings, and the two groups of worm gears are connected by a The connecting rod is fixedly connected, and the two groups of worms are respectively meshed with the two groups of worm wheels. A handwheel is welded on one of the worms, which is located in the pipe groove of the placement table through the cement pipe. The handwheel is turned to drive the two groups of worms to rotate at the same time, and the two groups of worms push the two groups of worm wheels to rotate at the same time, and the worm wheels drive the lead screw to rotate, and the lead screw drives the sliding block thereon to move vertically upward, and the sliding block drives the connecting plate to move vertically upward, and the connecting plate drives the splint to move vertically upward, that is, the two groups of splints move vertically upward at the same time, and the two groups of splints lift the cement pipe until the top side of the cement pipe contacts the two groups of limit frames. At this time, the two groups of splints and the two groups of limit frames clamp and fix the cement pipe, thereby achieving stable clamping of the cement pipe and avoiding sliding of the cement pipe when pulling the cement pipe, which is beneficial to improving the stability of traction.

[0008] The utility model is beneficial in that:

[0009] 1. The utility model makes the cement pipe roll from the guide slope to the guide plate, and then the conveyor belt drives the baffle to rotate to the bottom of the cement pipe. At this time, the baffle pushes the cement pipe until the cement pipe is pushed to the placement table, thereby realizing the rapid loading and transportation of the cement pipe; by pushing the cement pipe onto the guide plate, the cement pipe moves downward with the baffle, and then the cement pipe rolls from the guide slope to the ground, thereby realizing the unloading and burying of the cement pipe. This structure is convenient for loading and unloading of the cement pipe, and is beneficial to improving the loading and unloading efficiency of the cement pipe.

[0010] 2. The utility model places the cement pipe in the pipe groove of the placement table, rotates the hand wheel, drives the two groups of worms to rotate at the same time, the two groups of worms push the two groups of worm wheels to rotate at the same time, the worm wheels drive the lead screw to rotate, the lead screw drives the sliding block thereon to move vertically upward, the sliding block drives the connecting plate to move vertically upward, the connecting plate drives the clamping plate to move vertically upward, that is, the two groups of clamping plates move vertically upward at the same time, the two groups of clamping plates lift the cement pipe until the top side of the cement pipe contacts the two groups of limit frames, at this time, the two groups of clamping plates and the two groups of limit frames clamp and fix the cement pipe, realize stable clamping of the cement pipe, avoid sliding of the cement pipe when pulling the cement pipe, and help to improve the stability of traction. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0012] Figure 1 It is a schematic diagram of a three-dimensional structure from a first-person perspective;

[0013] Figure 2 It is a schematic diagram of the three-dimensional structure at the conveyor belt;

[0014] Figure 3 It is a schematic diagram of the three-dimensional structure of the splint;

[0015] Figure 4 It is a schematic diagram of the three-dimensional structure of the placement table.

[0016] In the figure: 1. support plate; 2. placement table; 3. control panel; 4. guide plate; 5. guide slope; 6. tripod; 7. mounting frame; 8. first rotating shaft; 9. second rotating shaft; 10. roller; 11. conveyor belt; 12. baffle; 13. driving wheel; 14. driven wheel; 15. transmission chain; 16. stepping motor; 17. pipe groove; 18. limit frame; 19. square groove; 21. assembly groove; 22. screw rod; 23. sliding block; 24. connecting plate; 25. splint; 26. worm gear; 27. worm; 28. handwheel; 29. ​​pulley; 30. handle. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0018] See also Figure 1-2As shown, a traction device for laying water conservancy pipelines includes a support plate 1, a placing platform 2 is welded on the support plate 1, a control panel 3 is installed on the side wall of the placing platform 2, two groups of guide plates 4 are symmetrically welded on the side wall of the placing platform 2, a guide slope 5 is welded on the bottom side of the guide plate 4, a tripod 6 is welded on the support plate 1, two groups of mounting frames 7 are welded on the tripod 6, the outer wall of the mounting frame 7 is fixedly connected to the side wall of the guide plate 4, a first rotating shaft 8 and a second rotating shaft 9 are rotatably installed on the mounting frame 7 through a bearing, rollers 10 are fixedly sleeved on the first rotating shaft 8 and the second rotating shaft 9, a conveyor belt 11 is sleeved on the two groups of rollers 10, a baffle 12 is welded on the conveyor belt 11, a driving wheel 13 is fixedly sleeved on the first rotating shaft 8, a driven wheel 14 is fixedly sleeved on the second rotating shaft 9, a transmission chain 15 is jointly sleeved on the driving wheel 13 and the driven wheel 14, a stepping motor 16 is installed on the side wall of the mounting frame 7 through a machine base, the output shaft of the stepping motor 16 is fixedly connected to the first rotating shaft 8, and the stepping motor 16 is connected to the control panel 3 through an internal circuit, four groups of pulleys 29 are installed on the bottom side of the support plate 1, and a handle 30 is installed on the side wall of the placement table 2; when working, the existing traction device pulls the cement pipe to the laying place for laying. Due to the heavy weight of the cement pipe, it is very unfavorable for loading, transporting and unloading, resulting in low loading and unloading efficiency of the cement pipe. The stepper motor 16 is controlled by the control panel 3 to operate, and the stepper motor 16 drives the first rotating shaft 8 to rotate counterclockwise, the first rotating shaft 8 drives the driving wheel 13 to rotate counterclockwise, the driving wheel 13 drives the transmission chain 15 to rotate counterclockwise, the transmission chain 15 drives the driven wheel 14 to rotate counterclockwise, and the driven wheel 14 drives the second rotating shaft 9 to rotate counterclockwise, that is, the first rotating shaft 8 and the second rotating shaft 9 rotate counterclockwise synchronously, the first rotating shaft 8 and the second rotating shaft 9 drive the two groups of rollers 10 to rotate counterclockwise synchronously, the two groups of rollers 10 drive the conveyor belt 11 to rotate counterclockwise, and the conveyor belt 11 drives the baffle 12 thereon to rotate counterclockwise;

[0019] When the conveyor belt 11 drives the baffle plate 12 to rotate downward, the cement pipe is pushed to roll, so that the cement pipe rolls from the guide slope 5 to the guide plate 4, and then the conveyor belt 11 drives the baffle plate 12 to rotate to the bottom of the cement pipe. At this time, the baffle plate 12 pushes the cement pipe until the cement pipe is pushed onto the placement table 2, and then the cement pipe rolls onto the pipe groove 17 of the placement table 2, thereby realizing the rapid loading and transportation of the cement pipe;

[0020] After the cement pipe is clamped and fixed by the clamping assembly in the placing table 2, the handle 30 is pushed, the pulley 29 rolls on the ground, and the device drives the cement pipe to move, thereby pulling the cement pipe to the laying place;

[0021] The stepper motor 16 is controlled to operate in reverse through the control panel 3, and the stepper motor 16 drives the first rotating shaft 8 to rotate clockwise, that is, the conveyor belt 11 drives the baffle 12 thereon to rotate clockwise. When the baffle 12 rotates to the highest point above, the cement pipe is pushed onto the guide plate 4. At this time, the cement pipe moves downward with the baffle 12, and then the cement pipe rolls from the guide slope 5 to the ground, realizing the unloading and burying of the cement pipe. This structure is convenient for loading and unloading of the cement pipe and is beneficial to improving the loading and unloading efficiency of the cement pipe.

[0022] See also Figure 3-4 As shown, a pipe groove 17 is opened on the placing table 2, two groups of limit frames 18 are symmetrically welded on the placing table 2, two groups of square grooves 19 are symmetrically opened on the placing table 2, a sliding groove is opened below the square groove 19 in the placing table 2, and an assembly groove 21 is opened below the sliding groove in the placing table 2. A screw rod 22 is rotatably installed on the bottom wall of the assembly groove 21 through a bearing, and the screw rod 22 is located in the sliding groove and the assembly groove 21. A sliding block 23 is assembled in the sliding groove, and the sliding block 23 is connected to the sliding groove by a thread. The screw rod 22 slides together, a connecting plate 24 is welded on the top side of the sliding block 23, a clamping plate 25 is welded on the top side of the connecting plate 24, the clamping plate 25 and the connecting plate 24 are assembled in the square groove 19, a worm gear 26 is fixedly sleeved on the screw rod 22, and the worm gear 26 is assembled in the assembly groove 21. A rod groove is opened on one side of the assembly groove 21 in the placing table 2, and two groups of worms 27 are rotatably installed on the two inner walls of the rod groove through bearings. The two groups of worms 27 are fixedly connected by a connecting rod. The two groups of worms 27 are divided into The two worm gears 26 are respectively meshed with the two groups of worm gears 26, and a hand wheel 28 is welded on one of the worm gears 27. During operation, when the existing traction device is traction of the cement pipe, the cement pipe is prone to slip, resulting in poor traction stability. The cement pipe is located in the pipe groove 17 of the placement table 2, and the hand wheel 28 is rotated to drive the two groups of worm gears 27 to rotate at the same time. The two groups of worm gears 27 simultaneously push the two groups of worm gears 26 to rotate, and the worm gear 26 drives the screw rod 22 to rotate, and the screw rod 22 drives the sliding block 23 thereon to move vertically upward, and the sliding block 23 drives the connecting plate 24 to move vertically upward, and the connecting plate 24 drives the clamping plate 25 to move vertically upward, that is, the two groups of clamping plates 25 move vertically upward at the same time, and the two groups of clamping plates 25 lift the cement pipe until the top side of the cement pipe contacts the two groups of limiting frames 18. At this time, the two groups of clamping plates 25 and the two groups of limiting frames 18 clamp and fix the cement pipe, thereby achieving stable clamping of the cement pipe, avoiding sliding of the cement pipe when traction, and being conducive to improving the traction stability.

[0023] Working principle: the existing traction device pulls the cement pipe to the laying site for laying. Due to the heavy weight of the cement pipe, it is not conducive to loading and unloading and burying, resulting in low loading and unloading efficiency of the cement pipe. The stepper motor 16 is controlled by the control panel 3 to operate, and the stepper motor 16 drives the first rotating shaft 8 to rotate counterclockwise, the first rotating shaft 8 drives the driving wheel 13 to rotate counterclockwise, the driving wheel 13 drives the transmission chain 15 to rotate counterclockwise, the transmission chain 15 drives the driven wheel 14 to rotate counterclockwise, and the driven wheel 14 drives the second rotating shaft 9 to rotate counterclockwise, that is, the first rotating shaft 8 and the second rotating shaft 9 rotate counterclockwise synchronously, the first rotating shaft 8 and the second rotating shaft 9 drive the two groups of rollers 10 to rotate counterclockwise synchronously, the two groups of rollers 10 drive the conveyor belt 11 to rotate counterclockwise, and the conveyor belt 11 drives the baffle 12 thereon to rotate counterclockwise;

[0024] When the conveyor belt 11 drives the baffle plate 12 to rotate downward, the cement pipe is pushed to roll, so that the cement pipe rolls from the guide slope 5 to the guide plate 4, and then the conveyor belt 11 drives the baffle plate 12 to rotate to the bottom of the cement pipe. At this time, the baffle plate 12 pushes the cement pipe until the cement pipe is pushed onto the placement table 2, and then the cement pipe rolls onto the pipe groove 17 of the placement table 2, thereby realizing the rapid loading and transportation of the cement pipe; when the existing traction device is traction, the cement pipe is prone to slippage, resulting in traction. The stability is poor. The cement pipe is located in the pipe groove 17 of the placement table 2. The hand wheel 28 is turned to drive the two groups of worms 27 to rotate at the same time. The two groups of worms 27 simultaneously push the two groups of worm wheels 26 to rotate. The worm wheels 26 drive the screw rod 22 to rotate. The screw rod 22 drives the sliding block 23 thereon to move vertically upward. The sliding block 23 drives the connecting plate 24 to move vertically upward. The connecting plate 24 drives the splint 25 to move vertically upward. That is, the two groups of splints 25 move vertically upward at the same time, and the two groups of splints 25 lift the cement pipe. Until the top side of the cement pipe contacts the two groups of limit frames 18, at this time, the two groups of clamps 25 and the two groups of limit frames 18 clamp and fix the cement pipe, thereby achieving stable clamping of the cement pipe and avoiding sliding of the cement pipe when the cement pipe is towed, which is beneficial to improving the stability of traction; after the cement pipe is clamped and fixed by the clamping assembly in the placement table 2, the pulley 29 is rolled on the ground by pushing the handle 30, and the device drives the cement pipe to move, thereby achieving traction of the cement pipe to the laying place; the stepper motor 16 is controlled to operate in reverse through the control panel 3, and the stepper motor 16 drives the first rotating shaft 8 to rotate clockwise, that is, the conveyor belt 11 drives the baffle 12 thereon to rotate clockwise, and when the baffle 12 rotates to the highest point above, the cement pipe is pushed onto the guide plate 4, and at this time the cement pipe moves downward with the baffle 12, and then the cement pipe rolls from the guide slope 5 to the ground, thereby achieving unloading and burying of the cement pipe, and this structure is convenient for loading and unloading of the cement pipe, which is beneficial to improving the loading and unloading efficiency of the cement pipe.

[0025] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.

Claims

1. A traction device for laying water conservancy pipelines, characterized in that The invention comprises a support plate (1), a placing platform (2) is welded on the support plate (1), a control panel (3) is installed on the side wall of the placing platform (2), two groups of guide plates (4) are symmetrically welded on the side wall of the placing platform (2), a guide slope (5) is welded on the bottom side of the guide plate (4), a tripod (6) is welded on the support plate (1), two groups of mounting frames (7) are welded on the tripod (6), the outer wall of the mounting frame (7) is fixedly connected to the side wall of the guide plate (4), a first rotating shaft (8) and a second rotating shaft (9) are rotatably installed on the mounting frame (7) through bearings, rollers (10) are fixedly sleeved on the first rotating shaft (8) and the second rotating shaft (9), and the two groups of rollers (10) are A conveyor belt (11) is sleeved thereon, a baffle (12) is welded to the conveyor belt (11), a driving wheel (13) is fixedly sleeved on the first rotating shaft (8), a driven wheel (14) is fixedly sleeved on the second rotating shaft (9), a transmission chain (15) is sleeved on the driving wheel (13) and the driven wheel (14), a stepping motor (16) is mounted on the side wall of the mounting frame (7) through a base, an output shaft of the stepping motor (16) is fixedly connected to the first rotating shaft (8), the stepping motor (16) is connected to the control panel (3) through an internal circuit, four groups of pulleys (29) are mounted on the bottom side of the support plate (1), and a handle (30) is mounted on the side wall of the placement table (2).

2. A hydraulic pipeline laying traction device according to claim 1, characterized in that: The placement table (2) is provided with a pipe groove (17), and two groups of limit frames (18) are symmetrically welded on the placement table (2).

3. A hydraulic pipeline laying traction device according to claim 1, characterized in that: Two groups of square grooves (19) are symmetrically provided on the placement platform (2), and a sliding groove is provided in the placement platform (2) below the square grooves (19).

4. A hydraulic pipeline laying traction device according to claim 1, characterized in that: An assembly groove (21) is provided in the placement platform (2) below the sliding groove, and a screw rod (22) is rotatably mounted on the bottom wall of the assembly groove (21) via a bearing.

5. A hydraulic pipeline laying traction device according to claim 4, characterized in that: The screw rod (22) is located in the sliding groove and the assembly groove (21), and a sliding block (23) is assembled in the sliding groove.

6. A hydraulic pipeline laying traction device according to claim 5, characterized in that: The sliding block (23) slides in cooperation with the screw rod (22) via a thread, and a connecting plate (24) is welded to the top side of the sliding block (23).

7. A hydraulic pipeline laying traction device according to claim 6, characterized in that: A clamping plate (25) is welded to the top side of the connecting plate (24), and the clamping plate (25) and the connecting plate (24) are assembled in the square groove (19).

8. A hydraulic pipeline laying traction device according to claim 4, characterized in that: A worm wheel (26) is fixedly sleeved on the lead screw (22), and the worm wheel (26) is assembled in the assembly groove (21). A rod groove is opened in the placement table (2) on one side of the assembly groove (21), and two groups of worms (27) are rotatably mounted on the two inner walls of the rod groove through bearings. The two groups of worms (27) are fixedly connected by a connecting rod, and the two groups of worms (27) are respectively meshed with the two groups of worm wheels (26), and a hand wheel (28) is welded to one of the worms (27).

Citation Information

Cited By

  • Pipeline laying traction device for water conservancy construction

    CN119683211A

  • A pipeline laying traction device for water conservancy construction

    CN119683211B