Building engineering board lifting device

By designing the vertical movement of the stacking box and the internal carrier plate, combined with the horizontal adjustment of the splints, the problem of safety and low efficiency of plate lifting in the existing technology is solved, and the stable lifting and efficient transportation of multiple plates are achieved.

CN221876309UInactive Publication Date: 2024-10-22BAOLI (HANGZHOU) REAL ESTATE DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420659987.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-10-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When the existing construction engineering plate lifting device lifts multiple plates, it is difficult to ensure safety, the lifting efficiency is low, and the limit mechanism can only limit the horizontal movement of the bottom plate, which poses a great safety hazard.

Method used

A lifting device including a stacking box, a carrier plate, a cross hinge, a linkage rod, a displacement mechanism, a splint and a distance adjustment mechanism is designed. Through the vertical movement of the carrier plate and the horizontal adjustment of the splint, the stable stacking of multiple plates is achieved. and safety improvement, which improves the lifting efficiency and safety of the plate.

Benefits of technology

This device can lift multiple boards at one time, improving the lifting efficiency. Through the limit and distance adjustment mechanism of the splints, it ensures the stability and safety of the boards during the lifting process, avoids collision and shaking of the boards, and improves the overall lifting. Safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221876309U_ABST
    Figure CN221876309U_ABST
Patent Text Reader

Abstract

The utility model discloses a constructional engineering board lifting device which comprises a stacking box, the inner wall of the stacking box is connected with a carrying plate in a sliding mode, crossed hinge frames are hinged between the lower surface of the carrying plate and the inner bottom face of the stacking box in a front-back symmetrical mode, and linkage rods are rotationally connected between the two crossed hinge frames in an up-down symmetrical mode. A moving block is arranged at the position, located below the carrying plate, in the stacking box through a displacement mechanism, a push-pull rod is fixedly arranged between the moving block and the linkage rod below the moving block, and a side groove is formed in the left side wall of the carrying plate. A plurality of plates can be stacked and placed in the stacking box, the plates are lifted at a time by lifting the stacking box, the plate lifting efficiency is improved, after the plates are lifted to the preset height, the plates are ejected out of the stacking box one by one by intermittently adjusting the height of the carrying plate, the plates can be conveniently taken out of the stacking box, and the discharging efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of construction engineering, and in particular relates to a construction engineering plate lifting device. Background Art

[0002] Different types of building boards are used in the construction of construction projects. Building boards are flat rectangular building material boards of standard size and are widely used in the construction industry. When building boards are installed, scaffolding needs to be set up for installation. Some building boards are often required to be lifted to a specified height. At present, when building engineering boards are lifted, they are generally lifted by lifting equipment. When the building boards are lifted to the specified height, they are lifted together to complete the construction and installation of the boards.

[0003] The utility model with authorization announcement number CN220596906U provides a construction engineering board lifting device, which has the characteristics of stable lifting, preventing shaking, convenient scaffolding to take out construction boards and preventing construction boards from hitting scaffolding.

[0004] The lifting device in the above patent achieves the purpose of lifting the plate by lifting and lowering the rollers. However, when multiple plates are stacked and placed on several rollers, the plate limiting mechanism can only limit the horizontal movement of the bottom plate, and the safety of the remaining plates is difficult to ensure, which poses a great safety hazard. Therefore, the above patent can only lift one plate at a time, and the lifting efficiency of the plates is low. For this reason, we propose a lifting device for construction engineering plates. Utility Model Content

[0005] The purpose of the utility model is to provide a construction engineering plate lifting device to solve the problems raised in the above background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering plate lifting device, including a stacking box, a carrier plate slidably connected to the inner wall of the stacking box, a cross hinge frame is symmetrically hinged between the lower surface of the carrier plate and the bottom surface of the stacking box, a linkage rod is symmetrically connected to the two cross hinge frames for rotation up and down, a moving block is provided at a position below the carrier plate in the stacking box through a displacement mechanism, a push-pull rod is fixed between the moving block and the linkage rod below, a side groove is provided on the left side wall of the carrier plate, a splint is slidably connected to the inner wall of the side groove, and a distance adjustment mechanism is provided between the splint and the side wall of the stacking box, and a lifting assembly is provided on the top of the stacking box.

[0007] Preferably, the hoisting assembly includes movable grooves symmetrically opened on the front and rear of the stacking box, and the inner walls of the two movable grooves are slidably connected with movable plates, and the upper surfaces of the movable plates are fixedly provided with sleeve frames.

[0008] Preferably, the displacement mechanism includes a screw rod rotatably connected to the side wall of the stacking box, the moving block is threadedly connected to the circumferential outer wall of the screw rod, the right end of the screw rod extends to the outside of the stacking box and is fixed with a crank, the inner wall of the stacking box is symmetrically fixed with guide rods front and back, and the moving block is movably mounted on the outer walls of the two guide rods.

[0009] Preferably, the distance adjustment mechanism includes a threaded rod threadedly connected to the left side wall of the stacking box, and the right end of the threaded rod is rotatably connected to the left side wall of the clamp, a knob is fixed to the left end of the threaded rod, and extension rods are symmetrically fixed to the left side wall of the clamp, and the left ends of the two extension rods pass through the left side wall of the stacking box and extend to the outside of the stacking box.

[0010] Preferably, the outer circumferential walls of the two linkage rods are both symmetrically sleeved with guide frames, the upper two guide frames are fixed to the lower surface of the carrier plate, and the lower two guide frames are fixed to the inner bottom surface of the stacking box.

[0011] Preferably, the movable plate and the inner wall of the sleeve frame and the inner wall of the stacking box are located on the same vertical plane, and a lifting ring is fixed above the two sleeve frames through a pull rope, and a lifting device is connected above the lifting ring.

[0012] Preferably, the lower end of the clamping plate is located between two cross hinges, and the linkage rod is located on the right side of the side groove.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] (1) The construction engineering board lifting device can stack multiple boards and place them inside the stacking box by providing a stacking box and a vertically movable carrier plate inside the stacking box. Multiple boards can be lifted at one time by lifting the stacking box, thereby improving the board lifting efficiency. After the boards are lifted to a predetermined height, the height of the carrier plate is intermittently adjusted to push the boards out of the stacking box one by one, thereby facilitating the removal of multiple boards from the stacking box and improving the material unloading efficiency.

[0015] (2) The construction engineering board lifting device, by providing side grooves, clamping plates and a distance adjustment mechanism, can horizontally adjust the position of the clamping plates after stacking boards of the same specification in the stacking box, so that the clamping plates cooperate with the inner wall of the stacking box to clamp and limit the boards, thereby improving the stability of the multiple boards in the stacking box. By adjusting the position of the sleeve frame, the stacking box can be kept in a vertical state during the lifting process, thereby improving the safety of the multiple boards during the lifting process. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0017] Figure 2 It is a front cutaway perspective view of the stacking box of the utility model;

[0018] Figure 3 It is a side cutaway perspective view of the stacking box of the utility model;

[0019] Figure 4 It is a structural schematic diagram of the movable plate and the sleeve frame of the utility model.

[0020] In the figure: 1. stacking box; 2. carrier plate; 3. cross hinge; 4. linkage rod; 5. push-pull rod; 6. screw rod; 7. guide rod; 8. moving block; 9. crank; 10. guide frame; 11. side groove; 12. clamping plate; 13. extension rod; 14. threaded rod; 15. knob; 16. movable groove; 17. movable plate; 18. sleeve; 19. pull rope; 20. lifting ring; 21. lifting equipment. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figure 1-Figure 4 The utility model provides a construction engineering plate lifting device, including a stacking box 1, a carrier plate 2 is slidably connected to the inner wall of the stacking box 1, a cross hinge 3 is symmetrically hinged between the lower surface of the carrier plate 2 and the inner bottom surface of the stacking box 1, and a linkage rod 4 is symmetrically connected to the upper and lower sides of the two cross hinges 3, a moving block 8 is provided at a position below the carrier plate 2 in the stacking box 1 through a displacement mechanism, a push-pull rod 5 is fixedly provided between the moving block 8 and the lower linkage rod 4, a side groove 11 is opened on the left side wall of the carrier plate 2, a clamping plate 12 is slidably connected to the inner wall of the side groove 11, and a distance adjustment mechanism is provided between the clamping plate 12 and the side wall of the stacking box 1, and a lifting assembly is provided on the top of the stacking box 1.

[0023] In this embodiment, preferably, the lifting assembly includes movable grooves 16 symmetrically opened on the front and back of the stacking box 1, and the inner walls of the two movable grooves 16 are slidably connected with movable plates 17, and the upper surface of the movable plate 17 is fixedly provided with a sleeve 18. By moving the movable plate 17 horizontally along the inner wall of the movable groove 16, the position of the sleeve 18 on the upper surface of the stacking box 1 can be adjusted, and then after the plates are stacked and placed inside the stacking box 1, the position of the sleeve 18 is adjusted to keep the stacking box 1 in a vertical state during the lifting process.

[0024] In this embodiment, preferably, the displacement mechanism includes a screw rod 6 rotatably connected to the side wall of the stacking box 1, and a moving block 8 is threadedly connected to the circumferential outer wall of the screw rod 6. The right end of the screw rod 6 extends to the outside of the stacking box 1 and is fixedly provided with a crank 9. The inner wall of the stacking box 1 is symmetrically fixed with guide rods 7 front and back, and the moving block 8 is movably mounted on the outer walls of the two guide rods 7. When the screw rod 6 is twisted by holding the crank 9, the moving block 8 is threadedly connected to the screw rod 6 and the moving block 8, so that the moving block 8 moves horizontally under the guidance of the two guide rods 7.

[0025] In this embodiment, preferably, the distance adjusting mechanism includes a threaded rod 14 threadedly connected to the left side wall of the stacking box 1, and the right end of the threaded rod 14 is rotatably connected to the left side wall of the splint 12, and a knob 15 is fixed to the left end of the threaded rod 14, and extension rods 13 are fixed symmetrically on the left side wall of the splint 12, and the left ends of the two extension rods 13 both penetrate the left side wall of the stacking box 1 and extend to the outside of the stacking box 1. When the knob 15 is held and the threaded rod 14 is turned, the part of the threaded rod 14 inside the stacking box 1 is extended or shortened, thereby driving the splint 12 to move horizontally under the guidance of the two extension rods 13.

[0026] In the present embodiment, preferably, the circumferential outer walls of the two linkage rods 4 are symmetrically and movably sleeved with guide frames 10, the upper two guide frames 10 are fixed to the lower surface of the carrier plate 2, and the lower two guide frames 10 are fixed to the inner bottom surface of the stacking box 1, and the guide frames 10 guide the linkage rods 4, so that the lower linkage rods 4 can only move horizontally, and the upper linkage rods 4 are slidably connected to the carrier plate 2, so that the carrier plate 2 can only move vertically.

[0027] In this embodiment, preferably, the inner walls of the movable plate 17 and the frame 18 are located on the same vertical plane as the inner wall of the stacking box 1, and a lifting ring 20 is fixed above the two frames 18 through a pull rope 19, and a lifting device 21 is connected above the lifting ring 20, and the stacking box 1 can be lifted upward as a whole through the lifting device 21.

[0028] In this embodiment, preferably, the lower end of the splint 12 is located between the two cross hinges 3, and during the lifting and lowering of the carrier plate 2, the splint 12 does not contact the two cross hinges 3. The linkage rod 4 is located on the right side of the side groove 11, and during the horizontal movement of the linkage rod 4, it does not contact the splint 12.

[0029] The working principle and use process of the utility model are as follows: when the device is used, a plurality of plates of the same specification are stacked and placed inside the stacking box 1, the bottom plate abuts against the upper surface of the carrier plate 2, and the top plate is not higher than the upper surface of the clamping plate 12. The knob 15 is held and the threaded rod 14 is turned to extend the threaded rod 14 in the stacking box 1, driving the clamping plate 12 to move horizontally in the direction close to the plate under the guidance of the two extension rods 13, until the clamping plate 12 abuts against the left side wall of several plates, and the right side wall of several plates abuts against the inner wall of the stacking box 1, so that the clamping plate 12 cooperates with the inner wall of the stacking box 1 to clamp and limit the plates, and the movable plate 17 is moved horizontally along the inner wall of the movable groove 16 to adjust the position of the sleeve frame 18 on the upper surface of the stacking box 1, and then the lifting device 21 is started, such as the authorization announcement number CN 218290242 The utility model of U provides a lifting equipment for construction, which, after the hook is connected with the lifting ring 20, lifts the stacking box 1 as a whole upward to the plate installation height, and the worker holds the crank 9 to turn the screw rod 6, and the screw rod 6 is connected to the moving block 8 through a thread, so that the moving block 8 moves horizontally toward the direction close to the clamping plate 12 under the guidance of the two guide rods 7, and the moving block 8 drives the lower linkage rod 4 to move horizontally under the guidance of the guide frame 10 through the push-pull rod 5, and the two cross hinges 3 extend synchronously, driving the carrier plate 2 to move vertically upward. When the uppermost plate moves to the top of the stacking box 1, the worker pulls it out from the top of the stacking box 1, and so on, until all the plates in the stacking box 1 are taken out, completing the lifting and transportation of the plates.

[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction engineering plate lifting device, comprising a stacking box (1), characterized in that: The inner wall of the stacking box (1) is slidably connected to a carrier plate (2); a cross hinge (3) is symmetrically hinged between the lower surface of the carrier plate (2) and the inner bottom surface of the stacking box (1); a linkage rod (4) is symmetrically rotatably connected up and down between the two cross hinges (3); a moving block (8) is provided at a position below the carrier plate (2) in the stacking box (1) through a displacement mechanism; a push-pull rod (5) is fixedly provided between the moving block (8) and the linkage rod (4) below; a side groove (11) is provided on the left side wall of the carrier plate (2); a clamping plate (12) is slidably connected to the inner wall of the side groove (11); a distance adjustment mechanism is provided between the clamping plate (12) and the side wall of the stacking box (1); and a lifting assembly is provided on the top of the stacking box (1).

2. A construction engineering plate lifting device according to claim 1, characterized in that: The lifting assembly comprises movable grooves (16) symmetrically arranged on the front and rear of the stacking box (1), the inner walls of the two movable grooves (16) are slidably connected with movable plates (17), and the upper surfaces of the movable plates (17) are fixed with sleeve frames (18).

3. A construction engineering plate lifting device according to claim 1, characterized in that: The displacement mechanism comprises a screw rod (6) rotatably connected to the side wall of the stacking box (1), the moving block (8) is threadedly connected to the circumferential outer wall of the screw rod (6), the right end of the screw rod (6) extends to the outside of the stacking box (1) and is fixedly provided with a crank (9), the inner wall of the stacking box (1) is symmetrically fixed with guide rods (7) at the front and rear, and the moving block (8) is movably sleeved on the outer walls of the two guide rods (7).

4. A construction engineering plate lifting device according to claim 1, characterized in that: The distance adjustment mechanism comprises a threaded rod (14) threadedly connected to the left side wall of the stacking box (1), and the right end of the threaded rod (14) is rotatably connected to the left side wall of the clamping plate (12), and a knob (15) is fixedly arranged at the left end of the threaded rod (14). The left side wall of the clamping plate (12) is symmetrically fixed with extension rods (13) in the front and rear directions, and the left ends of the two extension rods (13) both penetrate the left side wall of the stacking box (1) and extend to the outside of the stacking box (1).

5. The construction engineering plate lifting device according to claim 1, characterized in that: The outer circumferential walls of the two linkage rods (4) are both symmetrically sleeved with guide frames (10), the upper two guide frames (10) are fixed to the lower surface of the carrier plate (2), and the lower two guide frames (10) are fixed to the inner bottom surface of the stacking box (1).

6. A construction engineering board lifting device according to claim 2, characterized in that: The inner walls of the movable plate (17) and the sleeve (18) are located on the same vertical plane as the inner wall of the stacking box (1). A lifting ring (20) is fixed above the two sleeves (18) via a pull rope (19), and a lifting device (21) is connected above the lifting ring (20).

7. The construction engineering plate lifting device according to claim 1, characterized in that: The lower end of the clamping plate (12) is located between the two cross hinges (3), and the linkage rod (4) is located on the right side of the side groove (11).