Settlement ratio monitoring device for aerobic system of integrated sewage treatment equipment
By designing an aerobic system sedimentation ratio monitoring device for integrated sewage treatment equipment and using automatic sampling and liquid level gauges to calculate the sedimentation ratio, the problem of insufficient sedimentation ratio monitoring in small sewage treatment equipment is solved and precise monitoring of the sewage treatment system is achieved. .
Patent Information
- Application Number
- CN202420446316.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-08
AI Technical Summary
Among the existing sewage treatment equipment, especially small sewage treatment stations and small integrated treatment equipment, there is a lack of sedimentation ratio monitoring means, resulting in unstable system operation.
An integrated sedimentation ratio monitoring device for the aerobic system of sewage treatment equipment is designed, including a sampling device, a sampling pipe, a first control switch, a mud level gauge and a control device. The sedimentation ratio is calculated through automatic sampling and liquid level data, and is suitable for non-sewage treatment equipment. Manned sewage treatment station.
It achieves precise monitoring of the sedimentation ratio of the aerobic tank without supervision, provides important operating parameters, and is especially suitable for sewage treatment stations in remote areas.
Smart Images

Figure CN221876767U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of sewage treatment equipment monitoring, and in particular relates to a sedimentation ratio monitoring device for an aerobic system of an integrated sewage treatment equipment. Background Art
[0002] At present, the activated sludge method is the most commonly used in sewage treatment systems. A key link is to observe the activated sludge every day to evaluate the status of the activated sludge and determine whether nutrients need to be added or whether excess sludge needs to be discharged to ensure that the aerobic system can operate continuously and stably. In the activated sludge method for treating sewage, the sedimentation ratio is an important indicator for evaluating the sedimentation effect. Therefore, it is necessary to monitor the sedimentation ratio in a timely and accurate manner.
[0003] At present, the main method for monitoring sedimentation ratio is manual sampling monitoring. Large sewage treatment plants will arrange professional laboratory technicians to conduct sampling monitoring every day, but for small sewage treatment stations or small integrated treatment equipment, no dedicated personnel will be arranged to be on duty, which will lead to insufficient monitoring of the system. Utility Model Content
[0004] In view of this, the utility model aims to propose an integrated sewage treatment equipment aerobic system sedimentation ratio monitoring device to solve the problem of insufficient sedimentation ratio monitoring of some existing sewage treatment equipment.
[0005] In order to solve the above technical problems, the technical solutions provided by the utility model are as follows:
[0006] Integrated sewage treatment equipment aerobic system sedimentation ratio monitoring device, including:
[0007] Sampling device, sampling tube, first control switch, mud level meter and control device;
[0008] The sampling device is provided with a sampling port at the upper part and an exhaust port at the lower part;
[0009] One end of the sampling tube is connected to the sampling port, and the other end is connected to the middle of the aerobic tank of the integrated sewage treatment equipment;
[0010] The first control switch is arranged on the sampling tube;
[0011] The mud level meter is installed in the sampling device;
[0012] The first control switch and the mud level meter are both connected to the control device.
[0013] Further, it also includes: an exhaust pipe;
[0014] One end of the drain pipe is connected to the drain port, and the other end is connected to the raw water pool area of the integrated sewage treatment equipment.
[0015] Furthermore, an overflow port is also provided at the upper portion of the sampling device.
[0016] Further, it also includes: an overflow pipe;
[0017] One end of the overflow pipe is connected to the overflow port, and the other end is connected to the drain pipe.
[0018] Furthermore, it also includes: a second control switch and a third control switch;
[0019] The second control switch is arranged on the drain pipe;
[0020] The third control switch is arranged on the overflow pipe.
[0021] Furthermore, the first control switch, the second control switch and the third control switch are all solenoid valves.
[0022] Furthermore, a detachable sealing cover is also provided on the upper part of the sampling device.
[0023] Furthermore, the sampling device is a transparent plastic barrel.
[0024] Furthermore, it also includes: a fixing bracket;
[0025] The fixed bracket is arranged on the lower end surface of the sampling device, and the fixed bracket is fixedly connected to the aerobic tank of the integrated sewage treatment equipment.
[0026] Furthermore, the control device adopts a PLC controller.
[0027] In summary, the utility model provides a device for monitoring the sedimentation ratio of an aerobic system of an integrated sewage treatment equipment, including a sampling device, a sampling tube, a first control switch, a mud level meter and a control device; the upper part of the sampling device is provided with a sampling port, and the lower part is provided with an emptying port; one end of the sampling tube is connected to the sampling port, and the other end is connected to the middle of the aerobic tank of the integrated sewage treatment equipment; the first control switch is arranged on the sampling tube; the mud level meter is installed in the sampling device; the first control switch and the mud level meter are both connected to the control device. The utility model utilizes a control device to automatically sample from the aerobic system of the integrated sewage treatment equipment, and reads the liquid level data in the sampling device through the mud level meter, and calculates the sedimentation ratio based on the liquid level data. By utilizing the monitoring device, it is possible to obtain the sedimentation ratio data of the aerobic tank without human intervention, which provides important parameters for the precise monitoring of the operation of the system, and is particularly suitable for unmanned sewage treatment stations in remote areas. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0029] Figure 1 A schematic diagram of the structure of a sedimentation ratio monitoring device for an aerobic system of an integrated sewage treatment equipment provided in an embodiment of the utility model.
[0030] In the attached figure: 1-air inlet pipe of blower, 2-microporous aerator of aerobic tank, 3-solenoid valve of sampling pipe, 4-sampling pipe, 5-mud level meter, 6-detachable sealing cover, 7-overflow pipe, 8-solenoid valve of overflow pipe, 9-solenoid valve of drain pipe, 10-drain pipe, 11-fixed bracket, 12-sampling device. DETAILED DESCRIPTION
[0031] In order to make the purpose, features and advantages of the utility model more obvious and easy to understand, the technical scheme in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the embodiment described below is only a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0032] See also Figure 1 The embodiment of the utility model provides a settling ratio monitoring device for an aerobic system of an integrated sewage treatment equipment, the device comprising a sampling device 12, a sampling tube 4, a first control switch, a mud level meter 5 and a control device.
[0033] The sampling device 12 is provided with a sampling port at the top and an emptying port at the bottom. One end of the sampling tube 4 is connected to the sampling port, and the other end is connected to the middle opening of the aerobic tank of the aerobic tank integrated sewage treatment equipment. The sampling device 12 collects liquid from the aerobic tank through the sampling tube 4, and discharges the original liquid through the emptying port. The mud level meter 5 is installed in the sampling device 12, and is used to obtain the liquid level data of the liquid collected in the sampling device 12. An aerobic tank microporous aerator 2 is installed inside the aerobic tank, and a blower air inlet pipeline 1 is installed at the upper end.
[0034] Since the monitoring device is intended to be applied to unmanned small-scale sewage treatment plants or small-scale integrated treatment equipment to realize automatic monitoring of the aerobic system, the monitoring device is also designed with a first control switch and a control device.
[0035] The first control switch is arranged on the sampling tube 4 to control the on-off of the sampling tube 4. The control device is used to control the operation of the first control switch and the mud level meter 5. At the same time, the control device should also be configured with a data processing function, that is, to calculate the sedimentation ratio data of the monitored aerobic system based on the data of the mud level meter 5.
[0036] The aerobic system sedimentation ratio monitoring device provided by the utility model has the following working process in actual application: the first control switch is controlled by the control device to be turned on, and is closed after the liquid in the sampling device 12 is filled, at which time the control device performs the first timing. After the set time has passed in the first timing, the liquid level data of the mud level meter 5 is read once, and then all the liquid in the sampling device 12 is discharged through the drain port. The above operation is repeated 1-3 times, and the average value of the mud level data of these sampling times is h. The height of the sampling device 12 is recorded as H, and the sedimentation ratio = h / H*100% is calculated and recorded through data processing by the control device.
[0037] In addition, in order to achieve better remote monitoring and management of unmanned small sewage treatment plants or small integrated treatment equipment, the data calculated by the control device can be transmitted to the mobile phone APP through the Internet of Things, and the operator can view the sedimentation ratio data on the APP at any time. The above process of calculating the sedimentation ratio through the monitoring device can be repeated every 24 hours.
[0038] The utility model provides a settling ratio monitoring device for an aerobic system of an integrated sewage treatment equipment, which automatically samples from the aerobic system of the integrated sewage treatment equipment by using a control device, reads the liquid level data in the sampling device 12 by a mud level meter 5, and calculates the settling ratio based on the liquid level data. By using the monitoring device, it is possible to obtain the settling ratio data of the aerobic tank without human intervention, which provides important parameters for the accurate monitoring of the operation of the system, and is particularly suitable for unmanned sewage treatment stations in remote areas.
[0039] The following combination Figure 1 Some other embodiments of the monitoring device provided in this embodiment are introduced.
[0040] like Figure 1 As shown, in a preferred embodiment, the monitoring device is also provided with a drain pipe 10 specifically used to discharge the liquid in the sampling device 12. One end of the drain pipe 10 is connected to the drain port, and the other end is connected to the raw water pool area of the integrated sewage treatment equipment.
[0041] In a further embodiment, an overflow port is further provided on the upper portion of the sampling device 12. The function of the overflow port is to prevent the liquid from overflowing from the sampling device 12 without restriction, thereby causing damage to the device.
[0042] like Figure 1As shown, in a further embodiment, it also includes: an overflow pipe 7; one end of the overflow pipe 7 is connected to the overflow port, and the other end is connected to the drain pipe 10.
[0043] In a further embodiment, it further includes: a second control switch and a third control switch; the second control switch is arranged on the drain pipe 10; and the third control switch is arranged on the overflow pipe 7.
[0044] Based on the above three control switches, in this embodiment, the working process of the monitoring device is as follows:
[0045] (1) The control device controls the three control switches to be turned on, and after a certain period of time (e.g., 30 seconds), the second control switch is turned off;
[0046] (2) After a certain period of time (about 2 minutes) (the sampling device 12 is completely filled and begins to overflow), the third control switch is closed and the control device starts timing;
[0047] (3) After the control device counts a certain time (which may be 30 minutes), it reads the liquid level data of the mud level meter 5 once, and then opens the solenoid valve 9. After about 5 minutes, the three control devices are closed.
[0048] (4) Repeat the above steps and calculate the average value of the mud level data of multiple samplings, and calculate the sedimentation ratio based on the average value.
[0049] In a further embodiment, the first control switch, the second control switch and the third control switch are all electromagnetic valves. Figure 1 As shown, the three control switches are respectively a sampling pipeline solenoid valve 3, an overflow pipeline solenoid valve 8 and an emptying pipeline solenoid valve 9.
[0050] like Figure 1 As shown, in a preferred embodiment, a removable sealing cover 6 is also provided on the upper part of the sampling device 12. The sampling device 12 can also be a transparent plastic bucket. The control device can be a PLC controller, which controls various switches and performs data processing.
[0051] In addition, if Figure 1 As shown, the monitoring device may also be provided with a fixed bracket 11. The fixed bracket 11 is provided on the lower end surface of the sampling device 12, and the fixed bracket 11 is fixedly connected to the aerobic tank of the integrated sewage treatment equipment.
[0052] The integrated sewage treatment equipment aerobic system sedimentation ratio monitoring device provided by any of the above embodiments has the following advantages:
[0053] 1. The device can be used normally at temperatures above 0°C;
[0054] 2. The device cost is low and the integrated equipment is easy to install;
[0055] 3. It can realize unattended operation and obtain the sedimentation ratio data of the aerobic tank, which provides important parameters for the accurate monitoring of system operation, and is particularly suitable for unattended sewage treatment stations in remote areas.
[0056] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. Integrated sewage treatment equipment aerobic system sedimentation ratio monitoring device, characterized in that: include: Sampling device, sampling tube, first control switch, mud level meter and control device; The sampling device is provided with a sampling port at the upper part and an emptying port at the lower part; One end of the sampling tube is connected to the sampling port, and the other end is connected to the middle of the aerobic tank of the integrated sewage treatment equipment; The first control switch is arranged on the sampling tube; The mud level meter is installed in the sampling device; The first control switch and the mud level meter are both connected to the control device.
2. The integrated sewage treatment equipment aerobic system sedimentation ratio monitoring device according to claim 1 is characterized in that: Also includes: Drain pipe; One end of the drain pipe is connected to the drain port, and the other end is connected to the raw water pool area of the integrated sewage treatment equipment.
3. The integrated sewage treatment equipment aerobic system sedimentation ratio monitoring device according to claim 2 is characterized in that: An overflow port is also provided on the upper portion of the sampling device.
4. The integrated sewage treatment equipment aerobic system sedimentation ratio monitoring device according to claim 3 is characterized in that: Also includes: Overflow pipe; One end of the overflow pipe is connected to the overflow port, and the other end is connected to the drain pipe.
5. The integrated sewage treatment equipment aerobic system sedimentation ratio monitoring device according to claim 4 is characterized in that: Also includes: a second control switch and a third control switch; The second control switch is arranged on the drain pipe; The third control switch is arranged on the overflow pipe.
6. The integrated sewage treatment equipment aerobic system sedimentation ratio monitoring device according to claim 5, characterized in that: The first control switch, the second control switch and the third control switch are all solenoid valves.
7. The integrated sewage treatment equipment aerobic system sedimentation ratio monitoring device according to claim 1, characterized in that: A detachable sealing cover is also provided on the upper part of the sampling device.
8. The integrated sewage treatment equipment aerobic system sedimentation ratio monitoring device according to claim 1, characterized in that: The sampling device is a transparent plastic barrel.
9. The integrated sewage treatment equipment aerobic system sedimentation ratio monitoring device according to claim 1, characterized in that: Also includes: Fixed bracket; The fixed bracket is arranged on the lower end surface of the sampling device, and the fixed bracket is fixedly connected to the aerobic tank of the integrated sewage treatment equipment.
10. The integrated sewage treatment equipment aerobic system sedimentation ratio monitoring device according to claim 1, characterized in that: The control device adopts a PLC controller.