Roadbed structure capable of preventing softening

By setting up anti-softening mechanisms in the roadbed structure, including roadside slopes, asphalt layers, concrete layers and hollow steel trough frames, the softening problem caused by poor drainage of the roadbed is solved, achieving higher drainage efficiency and overall strength, and extending the Extend the service life of the roadbed and reduce safety hazards.

CN221877577UActive Publication Date: 2024-10-22JIANGXI DONGTONG TRANSPORTATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323399198.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2024-10-22
Estimated Expiration
2033-12-13

AI Technical Summary

Technical Problem

The existing roadbed has poor drainage effect after being laid, causing rainwater and domestic sewage to seep in, and the groundwater level to rise, causing the roadbed to soften and the road surface to collapse, affecting safe use.

Method used

An anti-softening structure including roadside slope, asphalt layer, concrete layer, filling layer, gravel layer and hollow steel channel frame was designed. Drainage pipes and reinforcing ribs were set up to improve drainage capacity and overall strength.

Benefits of technology

Effectively drain rainwater, reduce roadbed soaking, improve the service life and safety of the roadbed, and reduce the risk of road collapse.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877577U_ABST
    Figure CN221877577U_ABST
Patent Text Reader

Abstract

The utility model relates to a roadbed structure capable of preventing softening, which comprises road side slopes on two sides and an asphalt layer, a softening preventing mechanism is arranged between the road side slopes on the two sides, the softening preventing mechanism comprises a concrete layer laid at the bottom of the asphalt layer, a filling layer is laid at the bottom of the concrete layer, a gravel layer is laid at the bottom of the filling layer, and the gravel layer is laid at the bottom of the filling layer. A hollowed-out steel groove frame is fixedly installed at the bottom of the gravel layer. According to the roadbed structure capable of preventing softening, through the arrangement of the softening-preventing mechanism, under the mutual cooperation of structures between road slopes, rainwater endured by a roadbed during use can be discharged in time, rainwater permeating into the roadbed can be dredged, and therefore the phenomenon that the roadbed is soaked is reduced, and under the reinforcing effect of reinforcing ribs, the roadbed structure can be prevented from being softened. The overall strength of the roadbed is improved, and the roadbed softening possibility is reduced as much as possible, so that the service life of the roadbed is prolonged, and potential safety hazards in the use process of the roadbed are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction, in particular to a roadbed structure capable of preventing softening. Background Art

[0002] The roadbed is the foundation of the track or road surface. It is a geotechnical structure formed by excavation or filling. The main function of the roadbed is to provide necessary conditions for track or road surface laying and train or vehicle operation, and to bear the static and dynamic loads of the track and locomotive vehicles or road surface and traffic loads, while transferring and diffusing the loads deep into the foundation. In the longitudinal section, the roadbed must ensure the required elevation of the line; in the plane, the roadbed is connected with bridges and tunnels to form a complete through line. In civil engineering, the roadbed occupies an important position in terms of construction quantity, land area and investment.

[0003] The existing roadbed is usually laid as a whole by machine during paving. The drainage effect of the paved roadbed is poor, which causes rainwater and domestic sewage to penetrate into the roadbed and the groundwater level to rise, resulting in the roadbed being in a wet state for a long time, thereby causing the roadbed to soften. In severe cases, it may also cause the road surface to collapse, affecting the safety of the roadbed, which is not conducive to long-term safe use and reduces the practicality of the roadbed. Therefore, a roadbed structure that can prevent softening is proposed to solve the above technical problems. Utility Model Content

[0004] In view of the deficiencies in the prior art, the utility model provides a roadbed structure that can prevent softening, has the advantages of good drainage effect, high safety performance, etc., and solves the problem that the roadbed is usually laid as a whole by machine, and the drainage effect of the laid roadbed is poor, which allows rainwater and domestic sewage to penetrate into the roadbed and the groundwater level to rise, causing the roadbed to be in a wet state for a long time, thereby causing the roadbed to soften. In severe cases, it may also cause the road surface to collapse, affecting the safety of the roadbed, being unfavorable for long-term and safe use, and reducing the practicality of the roadbed.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a roadbed structure capable of preventing softening, comprising roadside slopes and asphalt layers on both sides, and an anti-softening mechanism is arranged between the roadside slopes on both sides;

[0006] The anti-softening mechanism comprises a concrete layer laid on the bottom of the asphalt layer, a filling layer is laid on the bottom of the concrete layer, and a crushed stone layer is laid on the bottom of the filling layer;

[0007] A hollow steel trough frame is fixedly installed at the bottom of the gravel layer, a first drainage pipe extending to the inside of the roadside slope is fixedly installed inside the asphalt layer, a mesh plate is fixedly installed on the top of the first drainage pipe, transverse reinforcement ribs are arranged inside the concrete layer, and vertical reinforcement ribs fixedly connected to the transverse reinforcement ribs are arranged inside the concrete layer, the filling layer and the gravel layer.

[0008] Furthermore, a cross reinforcement rib is fixedly installed on the side opposite to the vertical reinforcement rib, and a connecting pipe extending to the inside of the roadside slope is arranged inside the hollow steel trough frame, and both ends of the connecting pipe are fixedly connected to a second drain pipe fixedly connected to the bottom of the first drain pipe.

[0009] Furthermore, a mounting groove is provided on the top of the asphalt layer, and the mesh plate is fixedly connected to the first drainage pipe through the mounting groove.

[0010] Furthermore, a connecting groove is provided inside the roadside slope, and the first drainage pipe passes through the roadside slope through the connecting groove.

[0011] Furthermore, a plurality of water pipes are arranged inside the hollow steel trough frame, and the water pipes are all connected to the connecting pipes.

[0012] Furthermore, the transverse reinforcing ribs, vertical reinforcing ribs and cross reinforcing ribs are all welded together with steel bars of similar thickness, and a triangle shape is formed between the vertical reinforcing ribs and the cross reinforcing ribs.

[0013] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0014] The anti-softening roadbed structure, through the anti-softening mechanism, can timely discharge the rainwater experienced by the roadbed during use and dredge the rainwater that penetrates into the interior through the cooperation between the structures between the roadside slopes, thereby reducing the phenomenon of the roadbed being soaked, and with the reinforcement of the reinforcing ribs, the overall strength of the roadbed is improved, and the possibility of softening of the roadbed is reduced as much as possible, thereby increasing the service life of the roadbed and reducing the safety hazards of the roadbed during use. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a side cross-sectional schematic diagram of the structure of the utility model;

[0016] Figure 2 It is a schematic top view of the structure of the utility model.

[0017] In the figure: 1. Roadside slope; 2. Asphalt layer; 3. Concrete layer; 4. Filling layer; 5. Gravel layer; 6. Hollow steel trough frame; 7. First drainage pipe; 8. Mesh plate; 9. Horizontal reinforcement ribs; 10. Vertical reinforcement ribs; 11. Cross reinforcement ribs; 12. Connecting pipe; 13. Second drain pipe. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0019] See also Figure 1-2 In this embodiment, a roadbed structure capable of preventing softening includes roadside slopes 1 and asphalt layers 2 on both sides, and an anti-softening mechanism is arranged between the roadside slopes 1 on both sides.

[0020] See also Figure 1 and Figure 2 The anti-softening mechanism includes a concrete layer 3 laid at the bottom of the asphalt layer 2, a filling layer 4 is laid at the bottom of the concrete layer 3, and the filling layer 4 is filled with soil and gravel to improve the compressive resistance of the roadbed. A crushed stone layer 5 is laid at the bottom of the filling layer 4, and the water that penetrates into the roadbed can be precipitated through the crushed stone layer 5, so as to facilitate subsequent discharge.

[0021] Among them, a hollow steel trough frame 6 is fixedly installed at the bottom of the gravel layer 5, and a first drainage pipe 7 extending to the inside of the roadside slope 1 is fixedly installed inside the asphalt layer 2. A connecting groove is opened inside the roadside slope 1. The first drainage pipe 7 passes through the roadside slope 1 through the connecting groove, which makes it convenient for the first drainage pipe 7 to drain the accumulated water on the road surface, thereby preventing the asphalt layer 2 from being soaked for a long time.

[0022] Among them, a mesh plate 8 is fixedly installed on the top of the first drainage pipe 7, and a mounting groove is opened on the top of the asphalt layer 2. The mesh plate 8 is fixedly connected to the first drainage pipe 7 through the mounting groove, which is convenient for installing the mesh plate 8 through the mounting groove. It not only prevents the mesh plate 8 from protruding on the road surface and posing a safety hazard to pedestrians and cars on the road, but also can block impurities and avoid clogging the drainage pipe.

[0023] Among them, transverse reinforcement ribs 9 are arranged inside the concrete layer 3, and vertical reinforcement ribs 10 fixedly connected to the transverse reinforcement ribs 9 are arranged inside the concrete layer 3, the filling layer 4 and the gravel layer 5. Cross reinforcement ribs 11 are fixedly installed on the side opposite to the vertical reinforcement ribs 10. The transverse reinforcement ribs 9, the vertical reinforcement ribs 10 and the cross reinforcement ribs 11 are all welded with steel bars of similar thickness. A triangular shape is formed between the vertical reinforcement ribs 10 and the cross reinforcement ribs 11, which facilitates the improvement of the overall strength of the roadbed through the transverse reinforcement ribs 9, the vertical reinforcement ribs 10 and the cross reinforcement ribs 11, thereby reducing the possibility of roadbed softening, improving the service life of the roadbed and reducing safety hazards.

[0024] Among them, a connecting pipe 12 extending to the inside of the roadside slope 1 is arranged inside the hollow steel trough frame 6, and a number of water pipes are arranged inside the hollow steel trough frame 6, and the water pipes are all connected to the connecting pipe 12, so as to facilitate the discharge of the infiltrated water through the connecting pipe 12, thereby avoiding the accumulation of water soaking the inside of the roadbed for a long time. Both ends of the connecting pipe 12 are fixedly connected with a second drain pipe 13 fixedly connected to the bottom of the first drain pipe 7. While the first drain pipe 7 is diverted by the second drain pipe 13, the rainwater that has infiltrated into the inside of the roadbed can also be discharged in time.

[0025] It should be noted that the anti-softening roadbed structure, through the anti-softening mechanism, can timely discharge the rainwater that the roadbed is subjected to during use, and also dredge the rainwater that penetrates into the interior through the cooperation between the structures between the roadside slopes 1, thereby reducing the phenomenon of the roadbed being soaked, and with the reinforcement of the reinforcing ribs, the overall strength of the roadbed is improved, and the possibility of roadbed softening is reduced as much as possible, thereby increasing the service life of the roadbed and reducing the safety hazards of the roadbed during use.

[0026] The working principle of the above embodiment is:

[0027] During the construction of the roadbed, the anti-softening roadbed structure casts and lays the hollow steel trough frame 6, the gravel layer 5, the filling layer 4, the concrete layer 3 and the asphalt layer 2 at one time, and installs the first drainage pipe 7, the connecting pipe 12 and the second drain pipe 13 during the laying process, and installs the welded transverse reinforcement ribs 9, the vertical reinforcement ribs 10 and the cross reinforcement ribs 11 at the same time. When the roadbed is eroded by rainwater, the rainwater infiltrated on the surface and inside is discharged through the first drainage pipe 7 and the second drain pipe 13, thereby reducing the phenomenon of the roadbed being soaked, further improving the stability of the roadbed during use, and thus improving the overall practicality of the roadbed.

[0028] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A roadbed structure capable of preventing softening, comprising roadside slopes (1) and an asphalt layer (2) on both sides, characterized in that: An anti-softening mechanism is provided between the roadside slopes (1) on both sides; The anti-softening mechanism comprises a concrete layer (3) laid on the bottom of the asphalt layer (2), a filling layer (4) is laid on the bottom of the concrete layer (3), and a crushed stone layer (5) is laid on the bottom of the filling layer (4); A hollow steel trough frame (6) is fixedly installed at the bottom of the crushed stone layer (5), a first drainage pipe (7) extending to the inside of the roadside slope (1) is fixedly installed inside the asphalt layer (2), a mesh plate (8) is fixedly installed on the top of the first drainage pipe (7), a transverse reinforcement rib (9) is arranged inside the concrete layer (3), and vertical reinforcement ribs (10) fixedly connected to the transverse reinforcement rib (9) are arranged inside the concrete layer (3), the filling layer (4) and the crushed stone layer (5).

2. The anti-softening roadbed structure according to claim 1, characterized in that: A cross reinforcement rib (11) is fixedly installed on the side opposite to the vertical reinforcement rib (10), and a connecting pipe (12) extending to the inside of the roadside slope (1) is arranged inside the hollow steel trough frame (6), and both ends of the connecting pipe (12) are fixedly connected to a second drainage pipe (13) fixedly connected to the bottom of the first drainage pipe (7).

3. The anti-softening roadbed structure according to claim 1, characterized in that: A mounting groove is provided on the top of the asphalt layer (2), and the mesh plate (8) is fixedly connected to the first drainage pipe (7) via the mounting groove.

4. The anti-softening roadbed structure according to claim 1, characterized in that: The roadside slope (1) is provided with a connecting groove inside, and the first drainage pipe (7) passes through the connecting groove and penetrates the roadside slope (1).

5. The anti-softening roadbed structure according to claim 2, characterized in that: A plurality of water pipes are arranged inside the hollow steel trough frame (6), and the water pipes are all connected to the connecting pipe (12).

6. The anti-softening roadbed structure according to claim 2, characterized in that: The transverse reinforcing ribs (9), the vertical reinforcing ribs (10) and the cross reinforcing ribs (11) are all welded together by steel bars of similar thickness, and a triangle shape is formed between the vertical reinforcing ribs (10) and the cross reinforcing ribs (11).