Bridge deck pavement chiseling device
By designing the bridge deck pavement chisel removal device, using a cam linkage mechanism and a hydraulically driven splitting drill rod, the problem of low bridge deck pavement removal efficiency is solved, and rapid separation and efficient bridge deck pavement removal are achieved.
Patent Information
- Application Number
- CN202420156578.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-22
- Publication Date
- 2024-10-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In bridge maintenance, since large equipment cannot be used to remove bridge deck pavement, the removal speed of small equipment is slow, the overall manpower is used more, and the efficiency is low.
A bridge deck pavement chisel removal device is designed. It uses a cam linkage mechanism to drive the air pressure piston and impact piston to achieve high-speed reciprocating motion. It combines the hammering and hydraulic drive of the splitting drill rod to quickly break the bridge deck pavement layer and pass through The rotation of the guide sleeve drives the splitting drill pipe to rotate in, and the hydraulic oil is used to push the piston head and the splitting head to expand the pavement layer from the inside.
It achieves rapid separation of bridge deck pavement, which is faster than traditional methods, does not require equipment replacement, reduces manpower usage, and improves efficiency.
Smart Images

Figure CN221877692U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge deck pavement cleaning equipment, in particular to a bridge deck pavement chiseling device. Background Art
[0002] With the vigorous development of infrastructure, some bridges that have been in use for a long time have gradually developed defects. Bridge maintenance is the basis for ensuring the safe use of bridges. Bridge beam and slab replacement is a common bridge maintenance method, which is used when bridge beams and slabs have serious defects. It is necessary to chisel off the surface pavement of the defective bridge beam and slab, and then cut off the constraints of the defective bridge, replace the defective bridge and repave the road surface.
[0003] It is strictly forbidden to use large equipment to dismantle the bridge deck pavement. Usually, a small pneumatic pick is used to avoid damaging the top plate of the main beam. After the original pavement layer is removed, high-pressure water is used to clean the surface to remove dust, and surface holes are drilled and reinforcement is planted in the original steel bar gaps according to the design.
[0004] 1. Asphalt surface layer removal: Use a small excavator assisted by humans to lift and peel off the asphalt surface layer along the concrete interface with the bridge deck pavement leveling layer, and directly transport and remove it from the site;
[0005] 2. Removal of concrete leveling layer of bridge deck pavement: It is split and removed manually using pneumatic picks and hydraulic splitters. The hydraulic splitter drives the middle wedge of the wedge block group forward through hydraulic pressure, and pushes the reverse wedge blocks to both sides to split the bridge deck pavement layer.
[0006] Since large equipment cannot be used, only small equipment can be used manually to carry out the removal, especially for the removal of the bridge deck pavement leveling layer concrete. Workers are required to first use a pneumatic chisel to chisel out suitable gaps little by little, and then use a hydraulic splitter to slowly split the concrete blocks. Since different equipment needs to be replaced and used, and the chiseling rate of small equipment is slow, there are problems such as high overall manpower usage and low efficiency. Utility Model Content
[0007] The utility model aims to provide a bridge deck pavement chiseling device, which solves the problem that when removing the bridge deck pavement of a diseased bridge, only small equipment can be used for chiseling, resulting in slow chiseling speed of small equipment, more overall manpower use, and low efficiency.
[0008] The embodiment of the utility model is realized by the following technical scheme: a bridge deck pavement chiseling device, comprising a housing, a guide sleeve, a compressed air piston, an impact piston, an impact hammer and a splitting drill rod, wherein the guide sleeve is rotatably arranged in the housing, the compressed air piston is reciprocatingly slidably arranged in the inner cavity of the guide sleeve through a cam connecting rod mechanism, and the impact piston is arranged at one end of the compressed air piston away from the cam connecting rod mechanism;
[0009] The splitting drill rod is fixedly connected to one end of the guide sleeve away from the cam-link mechanism, one end of the splitting drill rod is placed in the inner cavity of the guide sleeve, the impact hammer is slidably arranged in the inner cavity of the guide sleeve, and the impact hammer is spaced between the impact piston and the splitting drill rod;
[0010] A plurality of piston cavities are arranged at intervals on the splitting drill pipe, and a plurality of the piston cavities are arranged perpendicular to the axial direction of the splitting drill pipe. A plurality of splitting heads are telescopically arranged in the plurality of the piston cavities.
[0011] Furthermore, a piston head is provided at one end of the splitting head, the piston head is slidably arranged in the piston cavity, a guide sleeve is provided to seal the opening of the piston cavity, and the splitting head is slidably arranged in the guide sleeve;
[0012] The splitting drill pipe is provided with a first cavity and a second cavity at intervals. The first cavity and the second cavity are respectively communicated with a plurality of the piston cavities. The first cavity and the second cavity are communicated with the cavities on both sides of the piston head.
[0013] Further, the guide sleeve is provided with a plurality of first guide holes and a plurality of second guide holes in a vertical axial direction, and an annular first communicating groove and a second communicating groove are provided in the inner cavity of the guide sleeve at intervals, a plurality of the first guide holes are communicated with the second communicating groove, a plurality of the second guide holes are communicated with the second communicating groove, and the first cavity and the second cavity are communicated with the first communicating groove and the second communicating groove respectively;
[0014] The inner wall of the housing is provided with a third communicating groove and a fourth communicating groove, a plurality of the first guide holes are connected to the third communicating groove, and a plurality of the second guide holes are connected to the fourth communicating groove;
[0015] It also includes a first connecting pipe and a second connecting pipe, one end of the first connecting pipe is connected to the third connecting groove, the other end of the first connecting pipe is connected to the oil circuit block, one end of the second connecting pipe is connected to the fourth connecting groove, and the other end of the second connecting pipe is connected to the oil circuit block.
[0016] Furthermore, it also includes a driver, which is arranged in the casing and is used to drive the cam of the cam-connecting rod mechanism and the guide sleeve to rotate, and the two ends of the connecting rod of the cam-connecting rod structure are respectively hinged to the cam and the air compressor piston.
[0017] Further, the driver comprises a driving wheel, a driven wheel, a first transmission shaft and a bevel gear, the driver drives the driving wheel to rotate, the driving wheel is in transmission connection with the driven wheel, the first transmission shaft is rotatably arranged in the housing, and the driven wheel and the bevel gear are both sleeved on the first transmission shaft;
[0018] The end of the guide sleeve is surrounded by bevel teeth, and the bevel gear is meshed with the bevel teeth.
[0019] Furthermore, it also includes an adjustment rod, a bearing seat is arranged inside the housing, the first transmission shaft is rotatably arranged on the bearing seat, and the first transmission shaft is axially slidably arranged on the bearing seat;
[0020] The bearing seat is U-shaped, the driven wheel is placed in the U-shaped groove of the bearing seat, the driven wheel is keyed to the first transmission shaft, one end of the first transmission shaft away from the bevel gear is coaxially rotatably connected to the adjusting rod, one end of the adjusting rod extends out of the housing, and the adjusting rod is threadedly connected to the housing.
[0021] Furthermore, the driver further comprises a second transmission shaft, a mounting frame and two hydraulic motors, the two hydraulic motors are symmetrically arranged on the mounting frame, and the output ends of the two hydraulic motors are both provided with a first bevel gear;
[0022] The second transmission shaft is rotatably arranged on the mounting frame, the second transmission shaft is placed between the two first bevel gears, a second bevel gear is sleeved on the second transmission shaft, and the second bevel gear is meshed with the two first bevel gears;
[0023] The cam is sleeved on one end of the second transmission shaft, and the driving wheel is sleeved on the other end of the second transmission shaft;
[0024] The hydraulic oil outlet of one hydraulic motor is connected to the hydraulic oil inlet of another hydraulic motor through a connecting oil pipe, the hydraulic oil inlet of the hydraulic motor is connected to the oil circuit block through a first oil pipe, and the hydraulic oil outlet of the other hydraulic motor is connected to the oil circuit block through a second oil pipe;
[0025] The oil circuit block is connected with a hydraulic station through a hydraulic oil pipe.
[0026] Furthermore, a drill bit is provided at the end of the splitting drill rod, and a spiral groove is provided around the splitting drill rod.
[0027] Furthermore, it also includes a support handle, which is connected to an end of the casing away from the splitting drill rod through a plurality of shock absorbers.
[0028] Furthermore, it also includes a vertical handle, which is vertically arranged on the housing.
[0029] The technical solution of the embodiment of the utility model has at least the following advantages and beneficial effects:
[0030] The cam connecting rod mechanism drives the air compressor piston to make high-speed reciprocating motion at one end of the guide sleeve inner cavity, and the air compressor piston drives the impact piston to move together. When the air compressor piston and the impact piston move toward the side close to the impact hammer, the air between the impact hammer is quickly compressed, and then the impact hammer moves rapidly toward the side of the splitting drill rod, and the splitting drill rod is hammered at high speed. Then, when the air compressor piston and the impact piston move away from the impact hammer, negative pressure is generated between the impact piston and the impact hammer, and at the same time, the impact hammer returns to the initial position under the action of the rebound force of the splitting drill rod. In this way, the splitting drill rod is hammered continuously, and the pavement layer of the bridge deck is broken and hammered by the splitting drill rod. The guide sleeve is rotated and arranged in the casing, and the guide sleeve is rotated and arranged in the casing. As the sleeve rotates, it drives the splitting drill rod to rotate. When the splitting drill rod drills into the bridge deck pavement layer from the top, high-pressure hydraulic oil is pumped into the first cavity, and the return oil in the second cavity is connected. The hydraulic oil pushes the piston head to move outward, and the piston head drives the splitting head to move outward, thereby expanding the bridge deck pavement from the inside. It integrates drilling, hammering and splitting, and quickly separates the bridge deck pavement within a suitable distance range. Compared with the traditional method of first using a pneumatic pick to chisel out a gap and then splitting it with a splitter, rotary drilling is faster than a pneumatic pick. During hydraulic splitting, this solution can be faster and does not require equipment replacement. After drilling, hydraulic splitting can be performed directly, which is more efficient and uses relatively less manpower. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0032] Figure 1 A schematic diagram of the internal structure of a bridge deck pavement chiseling device provided by the utility model;
[0033] Figure 2 for Figure 1 A magnified schematic diagram of the structure at center A;
[0034] Figure 3 for Figure 1 A magnified schematic diagram of the structure at B in the middle;
[0035] Figure 4 This is a left side schematic diagram of two hydraulic motors in a bridge deck pavement chiseling device provided by the utility model;
[0036] Icons: 1. Casing, 101. Third connecting groove, 102. Fourth connecting groove, 103. First connecting pipe, 104. Second connecting pipe, 105. Bearing seat, 106. Mounting frame, 2. Guide sleeve, 21. First guide hole, 22. Second guide hole, 23. First connecting groove, 24. Second connecting groove, 25. Bevel gear, 3. Compressed air piston, 4. Impact piston, 5. Impact hammer, 6. Splitting drill pipe, 61. Piston cavity, 62. Splitting head, 63. Piston head, 64. Guide sleeve, 65. First cavity, 66. Second cavity Road, 67, drill bit, 68, spiral groove, 7, oil block, 8, driver, 81, driving wheel, 82, driven wheel, 83, first transmission shaft, 84, bevel gear, 85, hydraulic motor, 86, first bevel gear, 87, second bevel gear, 88, second transmission shaft, 9, cam, 10, connecting rod, 11, adjusting rod, 12, connecting oil pipe, 13, first oil pipe, 14, second oil pipe, 15, hydraulic oil pipe, 16, hydraulic station, 17, support handle, 18, shock absorber, 19, vertical grip, 20, thrust bearing. DETAILED DESCRIPTION
[0037] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.
[0038] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] Reference Figures 1 to 4 As shown, this embodiment provides a bridge deck pavement chiseling device, comprising a housing 1, a guide sleeve 2, a gas compressor piston 3, an impact piston 4, an impact hammer 5 and a splitting drill rod 6. The guide sleeve 2 is rotatably arranged in the housing 1, and the gas compressor piston 3 is reciprocatingly slidably arranged in the inner cavity of the guide sleeve 2 through a cam connecting rod mechanism. The impact piston 4 is arranged at one end of the gas compressor piston 3 away from the cam connecting rod mechanism.
[0040] One end of the guide sleeve 2 away from the cam connecting rod mechanism is fixedly connected with a splitting drill rod 6, one end of the splitting drill rod 6 is placed in the inner cavity of the guide sleeve 2, and the impact hammer 5 is slidably arranged in the inner cavity of the guide sleeve 2, and the impact hammer 5 is spaced between the impact piston 4 and the splitting drill rod 6;
[0041] In the specific implementation, the cam connecting rod mechanism drives the air compressor piston 3 to make high-speed reciprocating motion at one end of the inner cavity of the guide sleeve 2, and the air compressor piston 3 drives the impact piston 4 to move together. When the air compressor piston 3 and the impact piston 4 move toward the side close to the impact hammer 5, the air between the impact hammer 5 is quickly compressed, and then the impact hammer 5 moves quickly toward the side of the splitting drill rod 6, and the drill rod 6 is split by hammering at high speed. Then, when the air compressor piston 3 and the impact piston 4 move away from the impact hammer 5, negative pressure is generated between the impact piston 4 and the impact hammer 5, and at the same time, the impact hammer 5 hits the splitting drill rod. 6 returns to the initial position under the action of the rebound force of the splitting drill rod 6, and thus reciprocates to realize continuous hammering of the splitting drill rod 6, and then when cleaning the bridge deck pavement, the pavement layer of the bridge deck can be broken and hammered by the splitting drill rod 6, and the guide sleeve 2 is rotated and arranged in the casing. When the guide sleeve 2 rotates, the splitting drill rod 6 is driven to rotate, and then when the splitting drill rod 2 is chiseled, the buffer gap of the bridge deck can be cleaned first, and then the end of the bridge deck pavement close to the buffer gap can be selected, and a suitable distance can be selected to drill, and a hole of a suitable depth can be drilled on the bridge deck pavement in combination with rotation and hammering.
[0042] More specifically, Figure 1-3 As shown, a plurality of piston cavities 61 are arranged at intervals on the splitting drill pipe 6. The plurality of piston cavities 61 are arranged perpendicular to the axial direction of the splitting drill pipe 6. A plurality of splitting heads 62 are telescopically arranged in the plurality of piston cavities 61.
[0043] A piston head 63 is provided at one end of the splitting head 62. The piston head 63 is slidably disposed in the piston cavity 61. A guide sleeve 64 is provided at the cavity opening of the piston cavity 61 to seal the splitting head 62. The splitting head 62 is slidably disposed in the guide sleeve 64.
[0044] A first cavity 65 and a second cavity 66 are arranged in the splitting drill pipe 6 . The first cavity 65 and the second cavity 66 are respectively connected to a plurality of piston cavities 61 . The first cavity 65 and the second cavity 66 are connected to the cavities on both sides of the piston head 63 .
[0045] In specific implementation, after the splitting drill rod 6 is drilled into the interior of the bridge deck pavement from the top downward, it is usually drilled to the bottom of the bridge deck pavement, and high-pressure hydraulic oil is pumped into the first cavity 65, and the return oil of the second cavity 66 is connected, the hydraulic oil pushes the piston head 63 to move outward, and the piston head 63 drives the splitting head 62 to move outward. Conversely, high-pressure oil is pumped into the second cavity 66, and the first cavity 65 is connected, so that the splitting head 62 is controlled to shrink inward; through hydraulic drive, a plurality of splitting heads 62 are pushed outward, thereby expanding the bridge deck pavement from the inside, and the splitting head 62 is pushed outward at a distance of 100 meters. At the same distance at the ends (usually 15cm-50cm), the bridge deck pavement within the distance range can be quickly separated by drilling and hydraulic splitting several times at intervals. Compared with the traditional method of first using a pneumatic pick to chisel out a gap and then splitting it with a splitter, rotary drilling is faster than a pneumatic pick. During hydraulic splitting, this solution can be faster and does not require equipment replacement. After drilling, hydraulic splitting can be performed directly, which is more efficient and requires relatively less manpower. After separating the bridge deck pavement of an appropriate length, a small forklift can be used for cleaning.
[0046] It should be noted that when multiple splitting heads 62 are splitting, the extension and retraction direction of the splitting heads 62 needs to be perpendicular to the ends of the bridge deck pavement layer, so that the pavement layer to be separated can be separated in the specified direction, except for the left and right ends, but it is always necessary to ensure that the splitting heads 62 are close to one side of the end and perpendicular to it. When chiseling, it can be chiseled in a circular shape or in a straight line, from one end to the other. The most efficient method is to chisel from four directions simultaneously toward the middle. The chiseling method is selected according to the actual situation. When the gap at the end is small or there is no gap, the drilling distance can be relatively reduced. At the same time, the splitting head is parallel to the drilling direction. After chiseling a gap, chiseling operations over a larger distance can be carried out.
[0047] like Figure 1-3 As shown, the guide sleeve 2 is provided with a plurality of first guide holes 21 and a plurality of second guide holes 22 vertically and axially around it, the inner cavity of the guide sleeve 2 is provided with annular first communicating grooves 23 and second communicating grooves 24 at intervals, a plurality of first guide holes 21 are communicated with the second communicating grooves 24, a plurality of second guide holes 22 are communicated with the second communicating grooves 24, a first cavity 65 and a second cavity 66 are communicated with the first communicating grooves 23 and the second communicating grooves 24 respectively; the splitting drill pipe 6 is fixedly connected to the guide sleeve 2, the first cavity 65 and the second cavity 66 on the splitting drill pipe 6 are respectively communicated with the first guide hole 21, the first communicating groove 23 and the second guide hole 22, the second communicating groove 24 of the guide sleeve, and a hydraulic seal is provided between the splitting drill pipe 6 and the guide sleeve 2 to prevent oil leakage and maintain pressure.
[0048] At the same time, due to the first connecting groove 23 and the second connecting groove 24, the orientation requirement of the splitting drill rod 6 when connected to the guide sleeve 2 is not high, and it is only necessary for the bolt holes perpendicular to the axial direction of the guide sleeve 2 and the splitting drill rod 6 to be fixed to each other to correspond to each other. Figure 1 shown.
[0049] More specifically, the inner wall of the housing 1 is provided with a third connecting groove 101 and a fourth connecting groove 102, a plurality of first guide holes 21 are connected to the third connecting groove 101, and a plurality of second guide holes 22 are connected to the fourth connecting groove 102; since the guide sleeve 2 rotates in the housing 1, a corresponding rotating mechanism needs to be provided, such as Figure 1 As shown, a plurality of thrust bearings 20 are provided, and a corresponding shaft sleeve is also provided on the guide sleeve 2, which is rotatably connected to the housing 1. At the same time, a plurality of first guide holes 21 and a plurality of second guide holes 22 on the guide sleeve 2 respectively correspond to the third connecting groove 101 and the fourth connecting groove 102 when rotating. Since there is relative rotation here, a corresponding rotating seal needs to be provided to prevent oil leakage and pressure loss.
[0050] like Figure 1 As shown, it also includes a first connecting pipe 103 and a second connecting pipe 104, one end of the first connecting pipe 103 is connected to the third connecting groove 101, the other end of the first connecting pipe 103 is connected to the oil circuit block 7, one end of the second connecting pipe 104 is connected to the fourth connecting groove 102, and the other end of the second connecting pipe 104 is connected to the oil circuit block 7. In specific implementation, a corresponding solenoid valve is provided on the oil circuit block 7, and then the oil inlet and return of the first connecting pipe 103 and the second connecting pipe 104 are controlled by controlling the solenoid valve, thereby controlling the extension and contraction of the plurality of splitting heads 62.
[0051] like Figure 1 and 4 As shown, it also includes a driver 8, which is arranged in the casing 1. The driver 8 is used to drive the cam 9 and the guide sleeve 2 of the cam-link mechanism to rotate. The two ends of the connecting rod 10 of the cam 9-connecting rod 10 structure are hinged to the cam 9 and the air compressor piston 3 respectively.
[0052] The driver 8 includes a driving wheel 81, a driven wheel 82, a first transmission shaft 83 and a bevel gear 84. The driver 8 drives the driving wheel 81 to rotate. The driving wheel 81 is connected to the driven wheel 82 by transmission. The driving wheel 81 and the driven wheel 82 can be pulleys or sprockets. The first transmission shaft 83 is rotatably arranged in the housing 1. The driven wheel 82 and the bevel gear 84 are both sleeved on the first transmission shaft 83.
[0053] The end of the guide sleeve 2 is surrounded by a bevel gear 25, and the bevel gear 84 is meshed with the bevel gear 25; the driven wheel 82 is driven to rotate by the driving wheel 81, and the driven wheel 82 drives the bevel gear 84 to rotate through the first transmission shaft 83, and the bevel gear 84 drives the guide sleeve 2 to rotate, and then drives the splitting drill rod 6 to rotate.
[0054] More specifically, Figure 1As shown, it also includes an adjusting rod 11, a bearing seat 105 is arranged inside the housing 1, the first transmission shaft 83 is rotatably arranged on the bearing seat 105, and the first transmission shaft 83 is axially slidably arranged on the bearing seat 105;
[0055] The bearing seat 105 is U-shaped, and the driven wheel 82 is placed in the U-shaped groove of the bearing seat 105. The driven wheel 82 is key-connected to the first transmission shaft 83. When the first transmission shaft 83 moves, the driven wheel 82 is relatively located in the U-shaped groove of the bearing seat 105, ensuring a stable transmission connection with the driving wheel 81. One end of the first transmission shaft 83 away from the bevel gear 84 is coaxially connected to the adjusting rod 11 for rotation. One end of the adjusting rod 11 extends out of the housing 1, and the adjusting rod 11 is threadedly connected to the housing 1.
[0056] During specific implementation, the adjusting rod 11 is rotated, and while the adjusting rod 11 moves, it drives the first transmission shaft 83 to move, and then drives the bevel gear 84 to separate from the guide sleeve 2 through the first transmission shaft 83. Conversely, the bevel gear 84 is controlled to engage with the bevel teeth 25 of the guide sleeve 2, thereby realizing the control of the rotation and stop of the splitting drill rod 6, and the hammer function can be used alone.
[0057] More specifically, the driver 8 further includes a second transmission shaft 88, a mounting frame 106 and two hydraulic motors 85, the two hydraulic motors 85 are symmetrically arranged on the mounting frame 106, and the output ends of the two hydraulic motors 85 are both provided with a first bevel gear 86;
[0058] The second transmission shaft 88 is rotatably disposed on the mounting frame 106 , and the second transmission shaft 88 is placed between the two first bevel gears 86 . The second transmission shaft 88 is sleeved with a second bevel gear 87 , and the second bevel gear 87 is meshed with the two first bevel gears 86 ;
[0059] A cam 9 is sleeved on one end of the second transmission shaft 88, and a driving wheel 81 is sleeved on the other end of the second transmission shaft 88; Figure 1 and 4 As shown, the power source is provided by the hydraulic motor 85, and the two hydraulic motors 85 work together to drive the second transmission shaft 88 to rotate, thereby driving the cam 9 to rotate. The cam 9 drives the air compression piston 3 and the impact piston 4 to reciprocate in the guide sleeve 2 through the connecting rod 10, thereby realizing high-speed hammering of the splitting drill pipe 6.
[0060] More specifically, the hydraulic oil outlet of one hydraulic motor 85 is connected to the hydraulic oil inlet of another hydraulic motor 85 via a connecting oil pipe 12. The hydraulic oil inlet of the hydraulic motor 85 is connected to the oil circuit block 7 via a first oil pipe 13, and the hydraulic oil outlet of the other hydraulic motor 85 is connected to the oil circuit block 7 via a second oil pipe 14. Thus, the two hydraulic motors 85 can rotate relative to each other and are synchronously controlled through an oil circuit. Corresponding battery valves are also provided on the oil circuit block 7 to control the start and stop of the two hydraulic motors 85.
[0061] It should be noted that the hydraulic motor 85 is used as a power source, which has good torque. Of course, other driving parts such as electric motors can also be used as power sources.
[0062] The oil circuit block 7 is connected to a hydraulic station 16 via a hydraulic oil pipe 15. The hydraulic station 16 provides oil pressure to continuously provide high-pressure oil to the oil circuit block for slow hammering, drilling and splitting operations.
[0063] like Figure 1 and 3 As shown, a drill bit 67 is provided at the end of the splitting drill rod 6, and a spiral groove 68 is arranged around the splitting drill rod 6. The drill bit 6 can drill more conveniently, and the spiral groove 68 can bring the drilled powder out of the hole, providing a good space for subsequent splitting.
[0064] More specifically, Figure 1 As shown, it also includes a support handle 17, which is connected to the end of the casing 1 away from the splitting drill rod 6 through multiple shock absorbers 18. Since the casing 1 will generate high-frequency vibration as a whole when hammered, the shock absorber 18 is needed to reduce the impact force on the support handle 17, so as to facilitate the use of workers.
[0065] At the same time, it also includes a vertical handle 19, which is vertically arranged on the housing 1 to facilitate workers to use and transfer.
[0066] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be subject to various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A bridge deck pavement chiseling device, characterized in that: The invention comprises a casing (1), a guide sleeve (2), a gas compressor piston (3), an impact piston (4), an impact hammer (5) and a splitting drill rod (6); the guide sleeve (2) is rotatably arranged in the casing (1); the gas compressor piston (3) is reciprocatingly slidably arranged in the inner cavity of the guide sleeve (2) via a cam connecting rod mechanism; and the impact piston (4) is arranged at one end of the gas compressor piston (3) away from the cam connecting rod mechanism; The splitting drill rod (6) is fixedly connected to one end of the guide sleeve (2) away from the cam connecting rod mechanism, one end of the splitting drill rod (6) is placed in the inner cavity of the guide sleeve (2), the impact hammer (5) is slidably arranged in the inner cavity of the guide sleeve (2), and the impact hammer (5) is spaced between the impact piston (4) and the splitting drill rod (6); A plurality of piston cavities (61) are arranged at intervals on the splitting drill rod (6), the plurality of piston cavities (61) are arranged perpendicular to the axial direction of the splitting drill rod (6), and a plurality of splitting heads (62) are telescopically arranged in the plurality of piston cavities (61).
2. A bridge deck pavement chiseling device according to claim 1, characterized in that: A piston head (63) is provided at one end of the splitting head (62), and the piston head (63) is slidably arranged in the piston cavity (61). A guide sleeve (64) is sealed at the cavity opening of the piston cavity (61), and the splitting head (62) is slidably arranged in the guide sleeve (64); A first cavity (65) and a second cavity (66) are arranged in the splitting drill rod (6), and the first cavity (65) and the second cavity (66) are respectively connected to a plurality of the piston cavities (61), and the first cavity (65) and the second cavity (66) are connected to the cavities on both sides of the piston head (63).
3. A bridge deck pavement chiseling device according to claim 2, characterized in that: The guide sleeve (2) is provided with a plurality of first guide holes (21) and a plurality of second guide holes (22) vertically and axially around the guide sleeve (2); an annular first communicating groove (23) and a second communicating groove (24) are arranged in the inner cavity of the guide sleeve (2); a plurality of the first guide holes (21) are communicated with the second communicating groove (24); a plurality of the second guide holes (22) are communicated with the second communicating groove (24); the first cavity (65) and the second cavity (66) are communicated with the first communicating groove (23) and the second communicating groove (24) respectively; The inner wall of the housing (1) is provided with a third communicating groove (101) and a fourth communicating groove (102); a plurality of the first guide holes (21) are in communication with the third communicating groove (101); and a plurality of the second guide holes (22) are in communication with the fourth communicating groove (102); It also comprises a first connecting pipe (103) and a second connecting pipe (104), wherein one end of the first connecting pipe (103) is connected to the third connecting groove (101), and the other end of the first connecting pipe (103) is connected to the oil circuit block (7); one end of the second connecting pipe (104) is connected to the fourth connecting groove (102), and the other end of the second connecting pipe (104) is connected to the oil circuit block (7).
4. A bridge deck pavement chiseling device according to claim 3, characterized in that: The invention also comprises a driver (8), wherein the driver (8) is arranged in the housing (1), and is used for driving the cam (9) of the cam-connecting rod mechanism and the guide sleeve (2) to rotate, and the two ends of the connecting rod (10) of the cam (9)-connecting rod (10) structure are respectively hinged to the cam (9) and the air compressor piston (3).
5. A bridge deck pavement chiseling device according to claim 4, characterized in that: The driver (8) comprises a driving wheel (81), a driven wheel (82), a first transmission shaft (83) and a bevel gear (84); the driver (8) drives the driving wheel (81) to rotate; the driving wheel (81) is in transmission connection with the driven wheel (82); the first transmission shaft (83) is rotatably arranged in the housing (1); the driven wheel (82) and the bevel gear (84) are both sleeved on the first transmission shaft (83); The end of the guide sleeve (2) is surrounded by a bevel tooth (25), and the bevel gear (84) is meshed with the bevel tooth (25).
6. A bridge deck pavement chiseling device according to claim 5, characterized in that: It also includes an adjusting rod (11), a bearing seat (105) is arranged inside the housing (1), the first transmission shaft (83) is rotatably arranged on the bearing seat (105), and the first transmission shaft (83) is axially slidably arranged on the bearing seat (105); The bearing seat (105) is U-shaped, the driven wheel (82) is placed in the U-shaped groove of the bearing seat (105), the driven wheel (82) is key-connected to the first transmission shaft (83), one end of the first transmission shaft (83) away from the bevel gear (84) is coaxially rotatably connected to the adjustment rod (11), one end of the adjustment rod (11) extends out of the housing (1), and the adjustment rod (11) is threadedly connected to the housing (1).
7. A bridge deck pavement chiseling device according to claim 6, characterized in that: The driver (8) further comprises a second transmission shaft (88), a mounting frame (106) and two hydraulic motors (85), wherein the two hydraulic motors (85) are symmetrically arranged on the mounting frame (106), and output ends of the two hydraulic motors (85) are both provided with a first bevel gear (86); The second transmission shaft (88) is rotatably arranged on the mounting frame (106), the second transmission shaft (88) is placed between the two first bevel gears (86), a second bevel gear (87) is sleeved on the second transmission shaft (88), and the second bevel gear (87) is meshed with the two first bevel gears (86); The cam (9) is sleeved on one end of the second transmission shaft (88), and the driving wheel (81) is sleeved on the other end of the second transmission shaft (88); The hydraulic oil outlet of one hydraulic motor (85) is connected to the hydraulic oil inlet of another hydraulic motor (85) via a connecting oil pipe (12), the hydraulic oil inlet of the hydraulic motor (85) is connected to the oil circuit block (7) via a first oil pipe (13), and the hydraulic oil outlet of the other hydraulic motor (85) is connected to the oil circuit block (7) via a second oil pipe (14); The oil circuit block (7) is connected to a hydraulic station (16) via a hydraulic oil pipe (15).
8. The bridge deck pavement chiseling device according to claim 2, characterized in that: A drill bit (67) is arranged at the end of the splitting drill rod (6), and a spiral groove (68) is arranged around the splitting drill rod (6).
9. A bridge deck pavement chiseling device according to any one of claims 1 to 8, characterized in that: It also comprises a support handle (17), wherein the support handle (17) is connected to an end of the casing (1) away from the splitting drill rod (6) via a plurality of shock absorbers (18).