Large-span concrete-filled steel tube arch bridge
By using integral diagonal braces, boom-assisted racks and arch rib splicing auxiliary devices in the construction of long-span concrete-filled steel tube arch bridges, the problems of long brace erection time and low boom installation accuracy in traditional construction methods are solved, achieving Efficient and safe construction results.
Patent Information
- Application Number
- CN202323397544.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-13
AI Technical Summary
In the construction of long-span concrete-filled steel tube arch bridges, the traditional method of bracket erection takes a long time and labor costs are high. It is difficult to install steel tube arches at high altitudes, and there are accuracy problems in the positioning and installation of booms.
An integral diagonal bracing frame, boom-assisted tire frame and arch rib splicing auxiliary device are used. Steel pipe piles and Bailey beams are used as temporary supports to set up arch rib installation brackets, and the boom-assisted tire frame is used in the installation of the boom. Improve construction efficiency and accuracy.
It improves construction efficiency and safety, meets strength, stiffness and stability requirements, simplifies the boom installation process, and improves construction quality and accuracy.
Smart Images

Figure CN221877707U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of bridge construction, in particular to a large-span steel tube concrete arch bridge. Background Art
[0002] With the rapid development of my country's modernization, the country's railways, highways and urban transportation lines are well connected. As an important part of the transportation lines, bridge construction has also flourished and achieved brilliant results.
[0003] The application of prestressed systems and steel tube concrete in bridge structures has enhanced the adaptability of arch bridges to foundations and increased the span, so steel tube concrete arch bridges have developed rapidly. Steel tube concrete arch bridges are widely used due to their strong spanning capacity, low deadweight, and low tie rod cost. However, with the increase in the span of steel tube concrete tied arch bridges and the decrease in the width-to-span ratio, the difficulty coefficient of on-site construction is also increasing.
[0004] In traditional construction, it often takes a lot of time and labor costs to set up the bracket segments. When installing the steel pipe arch at high altitude, it is very easy to encounter problems such as difficulty in aerial positioning. At the same time, there are also problems such as difficulty in accurate positioning and installation during the construction of the suspender. Utility Model Content
[0005] The utility model aims to overcome the deficiencies in the prior art and provide a large-span steel tube concrete arch bridge.
[0006] The large-span steel tube concrete arch bridge comprises a steel tube arch, an arch foot, a tie beam, an integral diagonal brace, a cap beam, a steel tube pile, a Bailey beam, an arch rib splicing auxiliary device, and a hanger auxiliary frame. Temporary steel tube pile supports are arranged at the bottom of the arch foot and the bottom of the tie beam on one side of the cap beam, a bottom formwork of the arch foot is arranged at the top of the temporary steel tube pile support, a tie beam is arranged between the two arch feet, a steel tube arch is arranged between the two arch feet above the tie beam, a hanger is arranged between the tie beam and the steel tube arch, and the top of the hanger is fixed to the steel arch frame by a steel tube arch clamp; hanger auxiliary frames are arranged on both sides of the bottom of the hanger, an arch rib splicing auxiliary device is arranged at the lower part of the steel tube arch, and a steel tube arch installation bracket is arranged below the arch rib splicing auxiliary device.
[0007] Preferably, a channel steel upper bracket is provided at the lower part of the bottom mold, a supporting angle steel and a positioning support frame are provided at the lower part of the channel steel upper bracket, a channel steel beam with an angle steel positioning tube is provided at the bottom of the supporting angle steel, a double-piece I-beam is provided at the bottom of the channel steel beam, limiting short steel bars and angle steel are provided on the outer side of the double-piece I-beam, an I-beam shelving groove is provided at the bottom of the double-piece I-beam, the I-beam shelving groove is placed on the top of the steel pipe pile, the positioning support frame is placed at the variable elevation of the bottom mold, a butterfly card adjusting screw is provided on the upper part of the positioning support frame for adjusting the elevation, a steel pipe arch positioning plate is provided at the end of the arch foot, and is fixed to the arch foot by positioning embedded bolts.
[0008] Preferably, the tie beam end is provided with an arch foot, both arch feet are laterally provided with end cross beams, the arch feet are on the cap beam, a wet joint is provided between the arch foot and the tie beam, a wet joint formwork is provided on the outside of the wet joint, a wet joint tension bolt is provided on the top of the wet joint formwork, a formwork reinforcement channel steel is provided on the surface of the wet joint formwork, and a bottom formwork screw is provided at the bottom of the wet joint formwork.
[0009] Preferably, a distribution beam is provided at the bottom of the tie beam, the distribution beam is placed on the Bailey beam, a longitudinal load-bearing beam is provided at the bottom of the Bailey beam, a transverse load-bearing beam is provided at the bottom of the longitudinal load-bearing beam, a sand box is provided at the bottom of the transverse load-bearing beam, a sand box shelving groove is provided on the top surface of the temporary steel pipe pile support below the sand box, the sand box is placed on the sand box shelving groove, the temporary steel pipe pile support includes steel pipe piles, integral diagonal braces are provided between the steel pipe piles, and the ends of the integral diagonal braces are fixed to the steel pipe piles by auxiliary welding through wedge-shaped auxiliary welding blocks.
[0010] Preferably, a steel tube arch mounting bracket is provided on the transverse load-bearing beam, the steel tube arch mounting bracket comprises a steel tube column, an integral cross support frame is provided between the two steel tube columns, a ladder is provided inside the steel tube arch mounting bracket, a clamp support plate is provided on the steel tube column for positioning the integral cross support, a plug weld is provided between the steel tube column and the integral cross support, a distribution beam support is provided on the top surface of the steel tube column, a steel tube arch distribution beam is placed on the upper part of the distribution beam support, and an arch rib splicing auxiliary device is provided on the steel tube arch distribution beam.
[0011] Preferably, a steel tube arch distribution beam is provided on the top of the steel tube arch mounting bracket, and the arch rib splicing auxiliary device is placed on the steel tube arch distribution beam. An inward-inclined limiting I-beam and an anti-inward-inclined support are provided at one end of the steel tube arch distribution beam, and two vertical jacks are provided at the other end through the vertical jack base. A limiting angle steel is provided on one side of the vertical jack, and a transverse jack base is provided on the limiting angle steel. A transverse jack is provided on the transverse jack base, and a top support is provided on the top of the vertical jack base and the transverse jack top, and an arc-shaped steel plate is provided on the top of the arch rib splicing auxiliary device.
[0012] Preferably, the hanger is placed at the lower part of the steel arch frame, and the top section of the hanger is provided with a hanger support plate, the hanger support plate is provided with a lower rotary hinge, a rotary rod is provided on the lower rotary hinge, an upper rotary hinge is provided on the top of the rotary rod, and the upper rotary hinge is connected with a steel pipe arch clamp, the steel pipe arch clamp is U-shaped, and a steel pipe arch clamp tension screw is provided at the bottom of the steel pipe arch clamp, and a hanger hoop is provided at the bottom section of the hanger. A tire frame I-beam is provided on the outside of the hanger hoop, and the tire frame I-beam is placed on the top surface of the hanger auxiliary tire frame, and a cross bar adjustment groove is provided at the bottom of the hanger auxiliary tire frame, and an I-beam hanging rod is provided in the cross bar adjustment groove, and a double-piece I-beam is suspended on the I-beam hanging rod through an I-beam hanging rope, and a pulley is provided at the bottom of the hanger auxiliary tire frame.
[0013] The beneficial effects of the utility model are:
[0014] 1) Arrange integral diagonal brace quick connections in the temporary support system to improve construction efficiency and meet the requirements of strength, rigidity and stability.
[0015] 2) A cast-in-place tie beam support system was established in the navigable waters. The tie beam support uses steel pipe piles as temporary piers of temporary supports, steel sections and Bailey beams as distribution load-bearing components, and navigation holes are reserved to improve the overall construction safety.
[0016] 3) By extending the steel pipe piles and setting up arch rib installation brackets, the requirements of strength, rigidity and stability are met, and aerial splicing auxiliary devices are added to the arch rib brackets to effectively improve the speed and accuracy of arch rib aerial installation.
[0017] 4) The use of a boom-assisted tire frame for boom installation improves the construction quality and efficiency of boom installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is an overall schematic diagram of the construction of a long-span steel tube concrete arch bridge;
[0019] Figure 2 It is a schematic diagram of the arch foot structure;
[0020] Figure 3 It is an enlarged schematic diagram of the arch foot structure;
[0021] Figure 4 It is a schematic diagram of the steel pipe column structure of the steel pipe arch splicing auxiliary device;
[0022] Figure 5 yes Figure 4 Schematic diagram of tie beam support in section AA;
[0023] Figure 6 yes Figure 5 Enlarged view of area B;
[0024] Figure 7 is a schematic diagram of a splicing auxiliary device;
[0025] Figure 8 It is an enlarged view of the splicing auxiliary device;
[0026] Fig. 9 It is a schematic diagram of the boom installation;
[0027] Fig.10 This is the structural diagram of the boom-assisted tire frame.
[0028] Among them: 1. Steel pipe arch 2. Arch foot 3. Wet joint formwork tension bolts 4. Formwork reinforcement channel steel 5. Wet joint formwork 6. Tie beam 7. Bottom form screw 8. Support angle steel 9. Angle steel positioning cylinder 10. Channel steel beam 11. Steel pipe pile 12. Integral diagonal support frame 13. Wedge-shaped auxiliary welding block 14. Adjustment support rod 15. Channel steel upper bracket 16. Cap beam 17. End beam 18. Bottom form 19. Butterfly card adjustment screw 20. Angle steel 21. I-beam shelving groove 22. Double I-beam 23. Limit short steel bar 24. Steel pipe arch positioning plate 25. Positioning embedded bolts 26. Sandbox shelving groove 27. Longitudinal load-bearing beam 28. Bailey beam 29. Distribution beam 30. Arch rib splicing auxiliary device 31. Integral cross support frame 32. Ladder 33. Plug weld 34. Hoop support plate 35. Steel pipe column 36. Steel pipe arch distribution beam 37. Distribution beam support 38. Hanger 39. Horizontal load-bearing beam 40. Sand box 41. Vertical jack 42. Horizontal jack base 43. Arc steel plate 44. Top support 45. Horizontal jack 46. Limit angle steel 47. Vertical jack base 48. Inward limit I-beam 49. Anti-inward tilt support 50. Hanger auxiliary tire frame 51. Crossbar adjustment groove 52. Hanger hoop 53. Hanger support plate 54. Steel pipe arch hoop tension screw 55. Steel pipe arch hoop 56. Upper rotary hinge 57. Lower rotary hinge 58. Tire frame I-beam 59. I-beam hanging rod 60. Pulley 61. Hanger base 62. I-beam hanging rope 63. Double I-beam in place. DETAILED DESCRIPTION
[0029] The utility model is further described below in conjunction with the embodiments. The description of the following embodiments is only used to help understand the utility model. It should be pointed out that for ordinary people in this technical field, the utility model can also be modified in some ways without departing from the principle of the utility model, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.
[0030] As an example, Figures 1 to 10 As shown, this large-span steel tube concrete arch bridge includes a steel tube arch 1, an arch foot 2, a tie beam 6, an integral diagonal brace 12, a cap beam 16, a steel tube pile 11, a Bailey beam 28, an arch rib splicing auxiliary device 30, and a hanger auxiliary tire frame 50. Temporary steel tube pile supports are provided at the bottom of the arch foot 2 on one side of the cap beam 16 and the bottom of the tie beam 6. A bottom mold 18 of the arch foot 2 is provided on the top of the temporary steel tube pile support. A tie beam 6 is provided between the two arch feet 2. A steel tube arch 1 is provided between the two arch feet 2 above the tie beam 6. A hanger 38 is provided between the tie beam 6 and the steel tube arch 1. The top of the hanger 38 is fixed to the steel arch frame 1 by a steel tube arch clamp 55. Hanger auxiliary tire frames 50 are provided on both sides of the bottom of the hanger 38. An arch rib splicing auxiliary device 30 is provided at the lower part of the steel tube arch 1, and a steel tube arch mounting bracket is provided below the arch rib splicing auxiliary device 30.
[0031] A channel steel upper bracket 15 is provided at the lower part of the bottom mold 18, and a supporting angle steel 8 and a positioning support frame 14 are provided at the lower part of the channel steel upper bracket 15. A channel steel beam 10 with an angle steel positioning tube 9 is provided at the bottom of the supporting angle steel 8, and a double-piece I-beam 22 is provided at the bottom of the channel steel beam 10. The outer side of the double-piece I-beam 22 is provided with a limiting short steel bar 23 and an angle steel 20, and an I-beam shelving groove 21 is provided at the bottom of the double-piece I-beam 22. The I-beam shelving groove 21 is placed on the top of the steel pipe pile 11. The positioning support frame 14 is placed at the variable elevation of the bottom mold 18, and a butterfly card adjusting screw 19 is provided on the upper part of the positioning support frame 14 for adjusting the elevation. A steel pipe arch positioning plate 24 is provided at the end of the arch foot 2, and is fixed to the arch foot 2 by a positioning embedded bolt 25.
[0032] The end of the tie beam 6 is provided with an arch foot 2, and both arch feet 2 are transversely provided with an end cross beam 17. The arch foot 2 is on the cap beam 16. A wet joint is provided between the arch foot 2 and the tie beam 6. A wet joint template 5 is provided on the outside of the wet joint. A wet joint tension bolt 3 is provided on the top of the wet joint template 5. A template reinforcement channel steel 4 is provided on the surface of the wet joint template 5. A bottom mold screw 7 is provided at the bottom of the wet joint template 5.
[0033] like Figure 4-8 As shown, a distribution beam 29 is provided at the bottom of the tie beam 6, and the distribution beam 29 is placed on the Bailey beam 28. A longitudinal load-bearing beam 27 is provided at the bottom of the Bailey beam 28, and a transverse load-bearing beam 39 is provided at the bottom of the longitudinal load-bearing beam 27. A sand box 40 is provided at the bottom of the transverse load-bearing beam 39. A sand box shelving groove 26 is provided on the top surface of the temporary support for steel pipe piles below the sand box 40, and the sand box 40 is placed on the sand box shelving groove 26. The temporary support for steel pipe piles includes steel pipe piles 11, and integral diagonal braces 12 are provided between the steel pipe piles 11. The ends of the integral diagonal braces 12 are fixed to the steel pipe piles 11 by auxiliary welding through wedge-shaped auxiliary welding blocks 13.
[0034] The transverse load-bearing beam 39 is provided with a steel tube arch mounting bracket, which includes a steel tube column 35. An integral cross support frame 31 is provided between the two steel tube columns 35. A ladder 32 is provided inside the steel tube arch mounting bracket. A clamping plate 34 is provided on the steel tube column 35 for positioning the integral cross support 31. A plug weld 33 is provided between the steel tube column 35 and the integral cross support 31. A distribution beam support 37 is provided on the top surface of the steel tube column 35. A steel tube arch distribution beam 36 is placed on the upper part of the distribution beam support 37. An arch rib splicing auxiliary device 30 is provided on the steel tube arch distribution beam 36.
[0035] like Figure 7-8As shown, a steel tube arch distribution beam 36 is provided on the top of the steel tube arch mounting bracket, and the arch rib splicing auxiliary device 30 is placed on the steel tube arch distribution beam 36. An inward-inclined limiting I-beam 48 and an anti-inward-inclined support 49 are provided at one end of the steel tube arch distribution beam 36, and two vertical jacks 41 are provided at the other end through a vertical jack base 47. A limiting angle steel 46 is provided on one side of the vertical jack 41, and a transverse jack base 42 is provided on the limiting angle steel 46. A transverse jack 45 is provided on the transverse jack base 42. A top support 44 is provided on the ends of the vertical jack base 47 and the transverse jack 45. A curved steel plate 43 is provided on the top of the arch rib splicing auxiliary device 30.
[0036] like Figure 9-10 As shown, the suspension rod 38 is placed at the lower part of the steel arch frame 1, and the top section of the suspension rod 38 is provided with a suspension rod support plate 53, and the suspension rod support plate 53 is provided with a lower rotary hinge 57, and a rotary rod is provided on the lower rotary hinge 57, and an upper rotary hinge 56 is provided on the top of the rotary rod, and the upper rotary hinge 56 is connected with a steel pipe arch clamp 55, and the steel pipe arch clamp 55 is U-shaped, and a steel pipe arch clamp tension screw 54 is provided at the bottom of the steel pipe arch clamp 55, and the bottom section of the suspension rod 38 is provided with a suspension rod clamp 52, and a tire frame I-beam 58 is provided on the outer side of the suspension rod clamp 52, and the tire frame I-beam 58 is placed on the top surface of the suspension rod auxiliary tire frame 50, and a cross bar adjustment groove 51 is provided at the bottom of the suspension rod auxiliary tire frame 50, and an I-beam hanging rod 59 is provided in the cross bar adjustment groove 51, and a double-piece I-beam 63 is suspended on the I-beam hanging rod 59 through an I-beam hanging rope 62, and a pulley 60 is provided at the bottom of the suspension rod auxiliary tire frame 50.
Claims
1. A long-span steel tube concrete arch bridge, characterized in that: It includes a steel pipe arch, an arch foot, a tie beam, an integral diagonal brace, a cap beam, a steel pipe pile, a Bailey beam, an arch rib splicing auxiliary device, and a hanger auxiliary frame. Temporary steel pipe pile supports are provided at the bottom of the arch foot and the bottom of the tie beam on one side of the cap beam, a bottom formwork of the arch foot is provided on the top of the temporary steel pipe pile support, a tie beam is provided between the two arch feet, a steel pipe arch is provided between the two arch feet above the tie beam, a hanger is provided between the tie beam and the steel pipe arch, and the top of the hanger is fixed to the steel arch frame through a steel pipe arch clamp; hanger auxiliary frames are provided on both sides of the bottom of the hanger, an arch rib splicing auxiliary device is provided at the lower part of the steel pipe arch, and a steel pipe arch mounting bracket is provided below the arch rib splicing auxiliary device.
2. The long-span steel tube concrete arch bridge according to claim 1 is characterized in that A channel steel upper bracket is provided at the lower part of the bottom mold, a supporting angle steel and a positioning support frame are provided at the lower part of the channel steel upper bracket, a channel steel beam with an angle steel positioning tube is provided at the bottom of the supporting angle steel, a double-piece I-beam is provided at the bottom of the channel steel beam, limiting short steel bars and angle steel are provided on the outer side of the double-piece I-beam, an I-beam shelving groove is provided at the bottom of the double-piece I-beam, and the I-beam shelving groove is placed on the top of the steel pipe pile, the positioning support frame is placed at the variable elevation of the bottom mold, a butterfly card adjusting screw is provided on the upper part of the positioning support frame for adjusting the elevation, a steel pipe arch positioning plate is provided at the end of the arch foot, and is fixed to the arch foot by positioning embedded bolts.
3. The long-span steel tube concrete arch bridge according to claim 1 is characterized in that The tie beam ends are provided with arch feet, both arch feet are laterally provided with end cross beams, the arch feet are on the cap beam, a wet joint is provided between the arch feet and the tie beam, a wet joint template is provided on the outside of the wet joint, a wet joint tension bolt is provided on the top of the wet joint template, a template reinforcement channel steel is provided on the surface of the wet joint template, and a bottom template screw is provided at the bottom of the wet joint template.
4. The long-span steel tube concrete arch bridge according to claim 1 is characterized in that A distribution beam is provided at the bottom of the tie beam, and the distribution beam is placed on the Bailey beam. A longitudinal load-bearing beam is provided at the bottom of the Bailey beam, and a transverse load-bearing beam is provided at the bottom of the longitudinal load-bearing beam. A sand box is provided at the bottom of the transverse load-bearing beam. A sand box shelving groove is provided on the top surface of a temporary steel pipe pile support below the sand box, and the sand box is placed on the sand box shelving groove. The temporary steel pipe pile support includes steel pipe piles, and integral diagonal braces are provided between the steel pipe piles. The ends of the integral diagonal braces are fixed to the steel pipe piles by auxiliary welding through wedge-shaped auxiliary welding blocks.
5. The long-span steel tube concrete arch bridge according to claim 4 is characterized in that A steel tube arch mounting bracket is provided on the transverse load-bearing beam, and the steel tube arch mounting bracket includes a steel tube column. An integral cross support frame is provided between the two steel tube columns. A ladder is provided inside the steel tube arch mounting bracket. A clamping plate is provided on the steel tube column for positioning the integral cross support. A plug weld is provided between the steel tube column and the integral cross support. A distribution beam support is provided on the top surface of the steel tube column. A steel tube arch distribution beam is placed on the upper part of the distribution beam support. An arch rib splicing auxiliary device is provided on the steel tube arch distribution beam.
6. The long-span steel tube concrete arch bridge according to claim 1, characterized in that A steel tube arch distribution beam is provided on the top of the steel tube arch mounting bracket, and the arch rib splicing auxiliary device is placed on the steel tube arch distribution beam. An inward-inclined limiting I-beam and an anti-inward-inclined support are provided at one end of the steel tube arch distribution beam, and two vertical jacks are provided at the other end through the vertical jack base. A limiting angle steel is provided on one side of the vertical jack, and a transverse jack base is provided on the limiting angle steel. A transverse jack is provided on the transverse jack base, and a top support is provided on the top of the vertical jack base and the transverse jack top, and an arc-shaped steel plate is provided on the top of the arch rib splicing auxiliary device.
7. The long-span steel tube concrete arch bridge according to claim 1 is characterized in that The hanger is placed at the lower part of the steel arch frame, the top section of the hanger is provided with a hanger support plate, the hanger support plate is provided with a lower rotary hinge, the lower rotary hinge is provided with a rotary rod, the top of the rotary rod is provided with an upper rotary hinge, the upper rotary hinge is connected with a steel pipe arch clamp, the steel pipe arch clamp is U-shaped, the bottom of the steel pipe arch clamp is provided with a steel pipe arch clamp tension screw, the bottom section of the hanger is provided with a hanger clamp, the outside of the hanger clamp is provided with a tire frame I-beam, the tire frame I-beam is placed on the top surface of the hanger auxiliary tire frame, the bottom of the hanger auxiliary tire frame is provided with a cross bar adjustment groove, the cross bar adjustment groove is provided with an I-beam hanging rod, the I-beam hanging rod is suspended with a double-piece I-beam through an I-beam hanging rope, and a pulley is provided at the bottom of the hanger auxiliary tire frame.