Water riprap container type temporary wharf structure
The water riprap container-type temporary wharf structure solves the material waste and environmental protection problems of the existing temporary wharf, achieves a high degree of assembly and effective utilization of resources, reduces construction costs and waste generation after demolition, and is quickly set up and adjusted, in line with Environmental protection concept.
Patent Information
- Application Number
- CN202323416969.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-13
AI Technical Summary
Existing temporary wharves have problems such as material waste, environmental protection issues and high construction costs during the construction and dismantling process. In particular, the dismantling process of gravity wharfs is time-consuming and generates a large amount of construction waste, making it difficult to achieve effective utilization of resources.
It adopts a water riprap container-type temporary wharf structure, including a riprap bed, a container group and rear backfill. The container group is fixedly connected by three containers through I-beams. The filler is block stones and two pieces of stone. The rear backfill is made of block stones and two pieces of stone. Composed, materials can be reused and the construction process is simplified, reducing reliance on large ships.
It achieves a high degree of assembly of the wharf structure, reuses materials, reduces construction costs and waste generation after dismantling, and quickly builds and adjusts, saving the construction cycle and conforming to the concept of environmental protection.
Smart Images

Figure CN221877945U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of temporary wharf structures, in particular to an on-water riprap container-type temporary wharf structure. Background Art
[0002] The construction of large deepwater port terminals is an important part of the country's economic development. They are often characterized by a high degree of assembly, complex structure, and many major components. When building such large terminals, temporary facilities such as shipping terminals are required to meet the requirements for shipping heavy and large prefabricated components. The geological conditions of the port are complex. Choosing a suitable, economical, and environmentally friendly shipping terminal can be of great help to the cost-effectiveness, energy-saving, and consumption-reducing work of the project, and it also conforms to the concept of the country's "green project".
[0003] Temporary docks are generally gravity-type or high-pile-type:
[0004] (1) Gravity docks are a type of port facility with a wide range of application value. They have the advantages of high bearing capacity, high stability, long service life, and low construction cost. They are mostly composed of gravity prefabricated caissons, gravity blocks and other structures. The concrete volume is large, and large installation ships such as semi-submersible barges and crane ships are generally required for installation, which places high requirements on the water depth at the front of the dock. When dismantling gravity caissons or block temporary docks, the dismantling process takes a long time due to the large amount of concrete involved. In addition, the dismantling operation will generate a large amount of construction waste, which is contrary to the concept of environmental protection. At the same time, the reusability of these materials is low, and it is impossible to achieve effective utilization of resources.
[0005] (2) The construction of high-pile pier beam-slab temporary pier is fast and can adapt to other complex geological conditions. However, the pile making requires a professional pile making factory and the pile making and transportation time is long.
[0006] In addition, after most shipping terminals are demolished, it is difficult to turn over materials, and all concrete materials are disposable and cannot be reused. Utility Model Content
[0007] The technical problem to be solved by the utility model is to provide a temporary riprap container-type dock structure on water in view of the above shortcomings.
[0008] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0009] A temporary riprap container-type wharf structure on water comprises a riprap base, a container group and rear backfill, wherein the riprap base is arranged on the surface of a soft soil foundation, the container group is arranged on the top of the riprap base, and the upper surface of the container group is above the water surface, the rear backfill is arranged on the side of the container group away from the water surface, the upper surface of the rear backfill comprises a connecting area and a slope area, the connecting area is connected to the upper surface of the container group, and the connecting area is flush with the top surface of the container group, and the slope area is arranged on the side of the connecting area away from the water surface.
[0010] Furthermore, the container group includes three containers, wherein fillers are arranged in the containers, two containers are arranged on the lower layer, and one container is arranged on the upper layer, and the three containers are fixedly connected by I-beams.
[0011] Furthermore, the filler includes block stones and two-piece stones.
[0012] Furthermore, a plurality of lifting lugs are provided on the top of the container group.
[0013] Furthermore, the riprap base bed includes a crushed stone layer laid on the surface of the soft soil foundation.
[0014] Furthermore, the rear backfill includes a filling layer and a protective top layer, the filling layer is arranged on a side of the container group away from the water surface, and the protective top layer is arranged on the top of the filling layer.
[0015] Furthermore, the filling layer is made of stone blocks, and the protective top layer is made of two pieces of stone.
[0016] Compared with the prior art, the utility model has the following advantages after adopting the above technical solution:
[0017] The overall structure, stress conditions and load principle of the dock of the utility model are the same as those of the traditional gravity dock, and the construction materials can be reused. After demolition, no large amount of construction waste will be generated. The construction cost is low, and effective utilization of resources can be achieved. It is made of common materials, such as containers, I-beams, backfill materials, etc., which do not need to be customized and can be purchased directly, which can greatly save the construction period and quickly complete the construction of the temporary dock; the overall assembly degree is high, and the container can be directly hoisted after being filled with stones, which is convenient for adjustment and installation; and most of the processes can be completed on land, without the need for large ships to enter the site, saving costs.
[0018] The utility model is described in detail below with reference to the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the structure of the utility model under low water level condition;
[0020] Figure 2It is a schematic diagram of the structure of the utility model under high water level condition;
[0021] Figure 3 This is the front view of the container assembly of the utility model;
[0022] Figure 4 It is a side view of the container group of the present utility model.
[0023] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0024] 1. Riprap bed; 2. Container group; 21. Container; 22. I-beam; 23. Lifting lug; 3. Rear backfill; 3a connection area; 3b. Slope area; 31. Filling layer; 32. Top protection layer; 4. Sand filling layer; 5. Second top protection layer; 6. Sand bag cofferdam. DETAILED DESCRIPTION
[0025] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0026] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", "clockwise" and "counterclockwise" etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0027] like Figure 1 As shown, a temporary riprap container-type wharf structure on water includes a riprap base 1, a container group 2 and a rear backfill 3, wherein the riprap base 1 is arranged on the surface of a soft soil foundation, the container group 2 is arranged on the top of the riprap base 1, and the upper surface of the container group 2 is above the water surface, the rear backfill 3 is arranged on the side of the container group 2 away from the water surface, the upper surface of the rear backfill 3 includes a connecting area 3a and a slope area 3b, the connecting area 3a is connected to the upper surface of the container group 2, and the connecting area 3a is flush with the top surface of the container group 2, and the slope area 3b is arranged on the side of the connecting area 3a away from the water surface.
[0028] The utility model is made of common materials, and the container group can be made in advance in the factory and fixed by welding, which can greatly save the construction period and will not leave a large amount of construction waste after dismantling.
[0029] like Figure 3 and Figure 4As shown, as an embodiment, the container group 2 includes three containers 21, and fillers are arranged in the containers 21. Two containers 21 are arranged on the lower layer, and one container 21 is arranged on the upper layer. The three containers 21 are fixedly connected by I-beams 22. The fillers include blocks and two pieces of stone. A plurality of lifting ears 23 are arranged on the top of the container group 2.
[0030] As an embodiment, the riprap base bed 1 includes a crushed stone layer laid on the surface of a soft soil foundation.
[0031] As an embodiment, the rear backfill 3 includes a filling layer 31 and a protective layer 32, wherein the filling layer 31 is arranged on the side of the container group 2 away from the water surface, and the protective layer 32 is arranged on the top of the filling layer 31. The filling layer 31 is made of blocks of stone, and the protective layer 32 is made of two pieces of stone.
[0032] Embodiment 1:
[0033] like Figure 1 As shown in the figure, the elevation selection of the low-water dock surface and the schematic diagram of the overall structural layout require the use of grab buckets to dig out the berthing area on the original mud surface. Figure 1 The middle section line area needs to be excavated. After the foundation trench is excavated, a certain thickness of riprap is laid on the surface of the foundation trench, generally 0.5m thick (the thickness of the riprap bed is calculated based on parameters such as the impact force of the berthed ship). The riprap is made of 50mm to 100mm crushed stone, fed by a 150t crawler with a hopper, and then leveled (generally manually leveled by divers underwater) to form a riprap bed with high bearing capacity1.
[0034] like Figure 3 and Figure 4As shown, three containers 21 are arranged on a cross section of the container group 2, the purpose is to fully transmit the impact force of the ship when berthing to the backfill at the rear through the container, so as to offset the force and maintain the overall stability. Generally, a standard container of 12.2×5.2×4.8m is used as the carrier of the filler, and a total of 2 layers and 3 boxes are arranged from top to bottom. The sides of the container are all connected horizontally with I25 I-beams 22, with a spacing of 1600mm. I25 I-beams 22 are used and ribbed for vertical fixation, with a spacing of 3050mm (1700mm). The plate surface of the container 21 and the inner layer of I25 I-beams 22 are welded in sections; the welding between the second layer of the container group 2 and the inner layer of I25 I-beams 22 is full welding; the welding of the front and side I-beams 22 of the second layer of the container group 2 is full welding; the weld height is 6mm. Lifting ears 23 are welded at the rib ends, and four lifting ears 23 are set on the top of the container group 2 to facilitate overall lifting; a berthing structure is installed on the waterfront of the container group 2, such as welded berthing piers, rubber fenders, etc., to reduce the impact force of the ship. Fillers are set in the container 2, and the fillers include 10 to 100 kg of blocks of stone. Two pieces of stone are backfilled between the gaps of the blocks to fill them. The weight of a single container after filling is 40 to 50 tons, which is equivalent to a 200 cubic meter reinforced concrete block structure. The container can be arranged longitudinally according to this section to extend the front line of the dock according to the purpose.
[0035] The rear backfill 3 is pushed and filled with 10-100kg boulders to form a filling layer 31 between the container group 2 and the shore. The top layer of boulders is protected by two 500mm stones to form a protective layer 32. The thickness of the protective layer 32 is 0.5m, leaving a platform flush with the dock surface, and then the slope is cut at 1:1.5.
[0036] A sand filling layer 4 is further provided behind the filling layer 31 , the top of the sand filling layer 4 is covered with a layer of geotextile, a second protective top layer 5 with a thickness of 0.5 m is provided on the top of the geotextile, and a sand bag cofferdam 6 is provided behind the sand filling layer 5 .
[0037] Embodiment 2:
[0038] like Figure 2 As shown, a schematic diagram of the selection of the elevation of the high-water dock surface and the overall structural layout is shown. Under high water conditions, there is no need to dig a foundation trench. A certain thickness of riprap can be directly laid on the surface of the soft soil foundation to obtain a riprap base bed. The subsequent structure is roughly the same as that of Example 1.
[0039] The construction process of this utility model:
[0040] 1. Underwater surface clearing and onshore dredging;
[0041] 2. Lay riprap and level and compact the riprap base bed 1;
[0042] 3. Determine the wharf length and elevation as required, process the container group 2 on land, backfill the containers (the backfill materials are purchased in advance), and then install the prepared container group 2 on the riprap bed 1;
[0043] 4. Fill the block stone and the second piece stone in sequence from bottom to top to obtain the backfill 3;
[0044] 5. Normal use;
[0045] 6. Demolition upon expiration;
[0046] 7. The materials are circulated until the next temporary dock is built.
[0047] The above is an example of the best implementation of the utility model, and the parts not described in detail are common knowledge of ordinary technicians in this field. The protection scope of the utility model is based on the content of the claims, and any equivalent transformation based on the technical inspiration of the utility model is also within the protection scope of the utility model.
Claims
1. A temporary container-type riprap dock structure on water, characterized in that: The invention comprises a riprap base (1), a container group (2) and a rear backfill (3), wherein the riprap base (1) is arranged on the surface of a soft soil foundation, the container group (2) is arranged on the top of the riprap base (1), and the upper surface of the container group (2) is above the water surface, the rear backfill (3) is arranged on the side of the container group (2) away from the water surface, the upper surface of the rear backfill (3) comprises a connection area (3a) and a slope area (3b), the connection area (3a) is connected to the upper surface of the container group (2), and the connection area (3a) is flush with the top surface of the container group (2), and the slope area (3b) is arranged on the side of the connection area (3a) away from the water surface.
2. The water riprap container-type temporary wharf structure according to claim 1 is characterized in that: The container group (2) comprises three containers (21), wherein fillers are arranged inside the containers (21), two containers (21) are arranged on the lower layer, and one container (21) is arranged on the upper layer, and the three containers (21) are fixedly connected by I-beams (22).
3. The temporary riprap container-type wharf structure on water according to claim 2 is characterized in that: The filler includes block stones and two-piece stones.
4. The above-water riprap container-type temporary wharf structure according to claim 1 is characterized in that: A plurality of lifting ears (23) are arranged on the top of the container group (2).
5. The above-water riprap container-type temporary wharf structure according to claim 1 is characterized in that: The riprap base bed (1) comprises a crushed stone layer laid on the surface of a soft soil foundation.
6. The above-water riprap container-type temporary wharf structure according to claim 1 is characterized in that: The rear backfill (3) comprises a filling layer (31) and a protective layer (32); the filling layer (31) is arranged on a side of the container group (2) away from the water surface, and the protective layer (32) is arranged on the top of the filling layer (31).
7. The on-water riprap container-type temporary wharf structure according to claim 6 is characterized in that: The filling layer (31) is made of stone blocks, and the protective top layer (32) is made of two pieces of stone.