Hard embankment ecological reconstruction structure capable of purifying quality of drained water entering river

By designing stepped ecological purification units and diversion units on hard embankments, combined with aquatic plants and energy-dissipation structures, the problem that existing technology cannot effectively purify drainage into the river is solved, and the degradation of pollutants and water purification are achieved, improving It improves the ecological connectivity function and landscape effect of the embankment.

CN221877966UActive Publication Date: 2024-10-22YUANCHAO ECOLOGICAL CONSTRUCTION (SHANXI) CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420262383.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-02
Publication Date
2024-10-22
Estimated Expiration
2034-02-02

AI Technical Summary

Technical Problem

The existing hard embankments cannot effectively purify the water quality of the drainage into the river, affecting the water quality of the water body, and are incompatible with the construction of ecological civilization.

Method used

Design a hard embankment ecological transformation structure including a stepped ecological purification unit, a diversion unit, a slag basket and an energy dissipation structure. Wastewater treatment is carried out through different levels of slag baskets and ecological purification units. The diversion unit and aquatic Plants degrade pollutants and adapt to drainage conditions with different flows.

Benefits of technology

It achieves full degradation of pollutants and purification of water bodies, improves the landscape effect of embankments, restores the connectivity function of aquatic and land ecosystems, and enhances the self-purification effect of water bodies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877966U_ABST
    Figure CN221877966U_ABST
Patent Text Reader

Abstract

The utility model relates to a hard embankment ecological reconstruction structure capable of purifying the quality of drained water entering a river, a plurality of ecological purification units are arranged on the inner side of an embankment and below a rainwater and sewage discharge port in a stepped and suspended mode, and a flow guide unit is arranged at the bottom of each ecological purification unit. A slag blocking basket is arranged at a sewage falling point of the rain sewage discharge port on each ecological purification unit; and an energy dissipation structure is arranged below the lowest ecological purification unit. The method has the beneficial effects that ecological transformation is carried out on the vertical face space of the hard embankment, design is carried out according to different conditions according to drainage of different flows, the residence time of small-flow drainage is longest, and pollutants are fully degraded in the ecological purification unit; large-flow drained water crosses the uppermost layer of ecological purification unit and flows in the baffling direction from the middle layer of ecological purification unit; extra-large-flow drained water crosses the ecological purification unit and directly falls into a river, aeration and oxygenation are carried out, the water power of a receiving water body is improved, and the self-purification effect of the water body is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of hard bank ecological transformation, in particular to a hard bank ecological transformation structure capable of purifying water quality discharged into a river. Background Art

[0002] With the rapid expansion of cities and towns, the space of water systems such as rivers has been continuously occupied. In order to meet the requirements of flood control, the embankments have been hardened and the cross-sections have been narrowed, which has rigidly divided the water and land space and cut off the exchange of materials, energy and information between the water and land ecosystems. With the continuous deepening of ecological civilization construction, the existing hard embankments are incompatible with the concept of ecological civilization construction. Therefore, the ecological transformation of hard embankments can not only improve the original appearance of the embankments and achieve good landscape effects, but also restore the ecological "bridge" function of the embankments and provide a breeding habitat for amphibious organisms on land and water.

[0003] Storm and sewage outlets are the main source of supply for rivers and other water systems besides upstream water. Since their water quality is disparate from the assessment requirements of receiving water bodies, it has become an important factor affecting the water quality of water bodies. Therefore, its purification is particularly important. Utility Model Content

[0004] The technical problem to be solved by the utility model is to provide a hard bank ecological transformation structure which can purify the water quality discharged into the river, so as to overcome the deficiencies in the above-mentioned prior art.

[0005] The technical solution of the utility model to solve the above-mentioned technical problems is as follows: a hard embankment ecological transformation structure capable of purifying the water quality discharged into a river, comprising: a plurality of ecological purification units are suspended in a stepped manner on the inner side of the embankment below the rain and sewage outlets, close to the embankment, a diversion unit is arranged at the bottom of each ecological purification unit, a slag basket is arranged on each ecological purification unit at the sewage falling point of the rain and sewage outlet, the slag basket of the bottom layer is for front water discharge, and the slag baskets of other layers are for left and right water discharge; an energy dissipation structure is arranged below the ecological purification unit of the bottom layer.

[0006] The beneficial effects of the utility model are:

[0007] Initial rainwater (or sewage in the dry season) with low rainfall intensity has a high pollutant concentration and a small flow rate. The small flow of drainage falls into the topmost slag basket, and then flows into the topmost ecological purification unit from the left and right sides after the slag is filtered out by the slag basket. It then passes through the ecological purification units below in turn for purification and then overflows into the river. The pollutants in the drainage are fully degraded after the longest contact with the ecological purification unit.

[0008] The initial rainwater with high rainfall intensity or the mixed rainwater and sewage with large water volume has slightly higher pollutant concentration and large flow. The sewage with large flow uses the original kinetic energy in the drainage pipe to directly jump over the top slag basket and the ecological purification unit and directly fall into the middle slag basket, and then flow into the ecological purification unit of this layer from the left and right through the middle slag basket. The sewage can overflow into the river at this layer or enter the ecological purification unit of the lower layer, and then overflow into the river after being purified by other ecological purification units in the lower layer;

[0009] In case of rainfall with greater intensity or late rainwater or late rainwater mixed with sewage, the pollutant concentration is the lowest and the flow rate is extremely large. The sewage with extremely large flow rate uses the original kinetic energy in the drainage pipe to fall to the bottom slag basket, and directly discharges from the front of the bottom slag basket without passing through any ecological purification unit, overflows to the inner side of the energy dissipation structure in the river channel and directly enters the river. The bottom slag basket acts as an energy dissipator, and the water falls multiple times, which increases the agility of the water body while increasing aeration and oxygenation;

[0010] The vertical space of the hard embankment is ecologically transformed. The diversion units under each layer of ecological purification units guide the incoming water to bend on the vertical surface of the embankment to extend the residence time, so as to help the ecological purification units reduce pollutants entering the river. In addition, it can also improve the landscape effect of the existing hard embankment and give full play to its due ecological interconnection function. At the same time, the structure is designed for drainage with different flow rates. The small flow drainage has the longest residence time, and the pollutants are fully degraded in the ecological purification unit; the large flow drainage bypasses the top ecological purification unit and flows in the direction of the bend from the middle ecological purification unit; the extra-large flow drainage bypasses the ecological purification unit and directly falls into the river, aeration and oxygenation are increased, the hydrodynamics of the receiving water body is improved, and the self-purification effect of the water body is enhanced. In addition, since the drainage of this design enters the river by waterfall, an energy dissipation structure is also set for this purpose.

[0011] On the basis of the above technical solution, the present invention can also be improved as follows.

[0012] Furthermore, the ecological purification unit includes: an ecological planting frame and a filler layer, a water-permeable mesh pad and aquatic plants which are sequentially arranged in the ecological planting frame from bottom to top.

[0013] The above further beneficial effects are: after the sewage enters the ecological purification unit, the pollutants are degraded and purified through absorption by plant roots, degradation by microorganisms in the filler area, adsorption by the filler, filtration and interception, and the total amount is reduced.

[0014] Furthermore, the water seepage mesh pad is fixed by a fixing rod.

[0015] Furthermore, the water seepage mesh pad adopts a plant fiber pad or a composite material pad with a thickness of 50mm and an opening rate of 70%.

[0016] Furthermore, the guide unit is a guide plate, the slope of the guide plate is 0.5% to 1%, and the lowest point of the guide plate is provided with a guide hole.

[0017] Furthermore, the diameter of the guide holes on the guide plate is not less than De63.

[0018] Furthermore, the guide plate is made of corrosion-resistant steel plate.

[0019] Furthermore, the slag lifting basket includes: a frame, a slag lifting grid arranged inside the frame, a water diversion fence arranged below the slag lifting grid inside the frame, the slag lifting basket located at the bottom layer of all the slag lifting baskets has a water outlet at a position corresponding to the water diversion fence on the front side of the frame, and the slag lifting baskets on other layers have water outlets at positions corresponding to the water diversion fence on the left and right sides of the frame.

[0020] The above further beneficial effect is that after the sewage enters the slag basket, the scum is first filtered out by the slag grille, and then enters the water diversion fence, and the water is distributed by the water diversion fence. The water entering the bottom slag basket passes through the water diversion fence and flows out from the front, while the water entering the other layers of the slag basket passes through the water diversion fence and flows out from the left and right sides.

[0021] Furthermore, the gap of the slag grid is 5mm to 10mm.

[0022] Furthermore, the energy dissipation structure includes: energy dissipation gravel located below the lowest ecological purification unit, and energy dissipation blocks located outside the lowest ecological purification unit; the energy dissipation gravel has a particle size of 4cm to 8cm and is fixed with cement mortar; the energy dissipation blocks have a particle size of not less than 30cm and are fixed with cement mortar.

[0023] The above further beneficial effects are: small flow and large flow waterfalls use gravel to dissipate energy, and extra-large flow waterfalls use block stones to dissipate energy. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a side view of the ecological transformation structure of a vertical hard embankment with a rectangular cross section;

[0025] Figure 2 It is a side view of the ecological transformation structure of the sloped hard embankment with a trapezoidal cross section;

[0026] Figure 3 This is a specific coordination diagram of the ecological purification unit and the diversion unit;

[0027] Figure 4 This is the structural diagram of the non-lowest slag basket;

[0028] Figure 5 This is the structural diagram of the bottom slag basket;

[0029] Figure 6 Plane of the hard bank ecological transformation structure Figure 1 ;

[0030] Figure 7 Plane of the hard bank ecological transformation structure Figure 2 ;

[0031] Figure 8 This is a diagram of water flow direction at different flow rates.

[0032] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0033] 1. Ecological purification unit, 110. Ecological planting frame, 120. Filling layer, 130. Seepage mesh pad, 140. Aquatic plants, 2. Diversion unit, 3. Slag basket, 310. Frame, 320. Slag grille, 330. Water diversion fence, 4. Energy dissipation structure, 410. Energy dissipation gravel, 420. Energy dissipation block stone, 5. Embankment, 510. Rainwater and sewage outlet. DETAILED DESCRIPTION

[0034] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.

[0035] Example 1

[0036] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 As shown, a hard embankment ecological transformation structure capable of purifying the water discharged into a river comprises: a plurality of ecological purification units 1 are suspended in a stepped manner on the inner side of the embankment 5 below the rainwater and sewage outlet 510 and close to the embankment 5, that is, there is an overlapping area between the ecological purification units 1 located at the upper layer and the ecological purification units 1 located at the lower layer;

[0037] A diversion unit 2 is arranged at the bottom of each ecological purification unit 1, and a slag basket 3 is arranged at the sewage drop point of the rainwater and sewage outlet 510 on each ecological purification unit 1. The slag basket 3 of the bottom layer is for front water discharge, and the slag baskets 3 of other layers are for left and right water discharge. An energy dissipation structure 4 is arranged below the ecological purification unit 1 of the bottom layer;

[0038] like Figure 8 As shown, the initial rainwater (or sewage in the dry season) with a small rainfall intensity has a high pollutant concentration and a small flow rate. The small flow of drainage falls into the topmost slag basket 3, and then flows into the topmost ecological purification unit 1 from the left and right sides after the slag is filtered out by the slag basket 3, and then flows into the river after being purified by the ecological purification unit 1 below. The pollutants in the drainage are fully degraded after staying in contact with the ecological purification unit 1 for the longest time.

[0039] The initial rainwater with a large rainfall intensity or the mixed rainwater and sewage with a large amount of water has a slightly higher pollutant concentration and a large flow rate. The sewage with a large flow rate uses the original kinetic energy in the drainage pipe to directly jump over the top slag basket 3 and the ecological purification unit 1 and directly fall into the middle layer slag basket 3, and then flow into the ecological purification unit 1 of this layer from the left and right sides through the slag basket 3. The sewage can overflow into the river through the waterfall on this layer, or enter the ecological purification unit 1 on the lower layer, and then be purified in other ecological purification units 1 on the lower layer in turn and overflow into the river through the waterfall;

[0040] Greater rainfall or late rain or late rain mixed with sewage has the lowest pollutant concentration and a very large flow. The sewage with a very large flow uses the original kinetic energy in the drainage pipe to fall to the bottom slag basket 3, and does not pass through any ecological purification unit 1 directly from the front of the bottom slag basket 3, overflows to the inside of the energy dissipation structure 4 in the river channel and directly enters the river. The bottom slag basket 3 acts as an energy dissipator, and has multiple falls, which increases the agility of the water body while aerating and increasing oxygen.

[0041] Example 2

[0042] like Figure 3 As shown, this embodiment is a further improvement on the basis of embodiment 1, and the details are as follows:

[0043] The ecological purification unit 1 comprises: an ecological planting frame 110 and a filler layer 120, a water-permeable mesh pad 130 and aquatic plants 140 which are sequentially arranged in the ecological planting frame 110 from bottom to top;

[0044] The sewage enters the planting area of ​​aquatic plants 140 of the ecological purification unit 1, then enters the filler layer 120 through the seepage mesh pad 130, and finally flows to the guide unit 2 through the filler layer 120.

[0045] In this embodiment, the aquatic plants 140 are selected from emergent plants that are suitable for the local climate and have strong decontamination capabilities, such as reeds, cattails, loosestrife, lily, iris, water plantain, etc.

[0046] The water-permeable mesh pad 130 is fixed by a fixing rod.

[0047] The water seepage mesh pad 130 is made of plant fiber pad or composite material pad, with a thickness of 50 mm and an opening rate of 70%.

[0048] The filler layer 120 can be made of porous strong denitrification and dephosphorization filler, volcanic rock, bentonite, zeolite, etc.

[0049] Example 3

[0050] like Figure 3As shown, this embodiment is a further improvement on the basis of Embodiment 1 or 2, and the details are as follows:

[0051] The guide unit 2 is a guide plate with a slope of 0.5% to 1%. The lowest point of the guide plate is provided with guide holes, which are usually set in even numbers. The hole diameter is set according to the discharge flow rate and usually shall not be less than De63. The guide plate is preferably made of anti-corrosion steel plate.

[0052] Example 4

[0053] like Figure 4 , Figure 5 As shown, this embodiment is a further improvement on the basis of Embodiment 1, 2 or 3, and the details are as follows:

[0054] The slag-blocking basket 3 comprises: a frame 310, a slag-blocking grille 320 is arranged in the frame 310, a water-dividing fence 330 is arranged below the slag-blocking grille 320 in the frame 310, and a water outlet is provided at a position corresponding to the water-dividing fence 330 on the front of the frame 310, such as Figure 5 As shown, the slag baskets 3 of other layers are provided with water outlets at the positions corresponding to the water diversion fences 330 on the left and right sides of the enclosure 310, such as Figure 4 As shown, the slag-blocking basket 3 at the bottom layer discharges water from the front, while the slag-blocking baskets 3 at other layers discharge water from the left and right sides.

[0055] Furthermore, the gap between the slag-blocking grille 320 is 5 mm to 10 mm, and the height of the slag-blocking basket 3 is determined according to the water output of the rainwater and sewage outlet 510 .

[0056] Example 5

[0057] like Figure 1 , Figure 2 , Figure 6 , Figure 7 As shown, this embodiment is a further improvement on any one of Embodiments 1 to 4, and the details are as follows:

[0058] The energy dissipation structure 4 includes: energy dissipation gravel 410 located below the lowest ecological purification unit 1, and energy dissipation block stone 420 located outside the lowest ecological purification unit 1; the energy dissipation gravel 410 has a particle size of 4cm to 8cm and is fixed with cement mortar; the energy dissipation block stone 420 has a particle size of not less than 30cm and is fixed with cement mortar.

[0059] Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A hard bank ecological transformation structure that can purify the water discharged into the river. It is characterized in that include: A plurality of ecological purification units (1) are suspended and arranged in a stepped manner on the inner side of the embankment (5) below the rainwater and sewage outlet (510), close to the embankment (5), a diversion unit (2) is arranged at the bottom of each ecological purification unit (1), and a slag basket (3) is arranged on each ecological purification unit (1) at the sewage drop point of the rainwater and sewage outlet (510), the slag basket (3) of the bottom layer is for front water discharge, and the slag baskets (3) of other layers are for left and right water discharge; an energy dissipation structure (4) is arranged below the ecological purification unit (1) of the bottom layer.

2. A hard bank ecological transformation structure capable of purifying the water discharged into the river according to claim 1, It is characterized in that The ecological purification unit (1) comprises: an ecological planting frame (110), and a filler layer (120), a water-permeable mesh pad (130), and aquatic plants (140) which are sequentially located in the ecological planting frame (110) from bottom to top.

3. A hard bank ecological transformation structure capable of purifying the water discharged into the river according to claim 2, It is characterized in that The water-permeable mesh pad (130) is fixed by a fixing rod.

4. A hard bank ecological transformation structure capable of purifying the water discharged into the river according to claim 2, It is characterized in that The water seepage mesh pad (130) is made of a plant fiber pad or a composite material pad, with a thickness of 50 mm and an opening rate of 70%.

5. A hard bank ecological transformation structure capable of purifying the water discharged into the river according to claim 1, It is characterized in that The flow guide unit (2) is a flow guide plate, the slope of the flow guide plate is 0.5% to 1%, and the lowest point of the flow guide plate is provided with a flow guide hole.

6. A hard bank ecological transformation structure capable of purifying the water discharged into the river according to claim 5, It is characterized in that The diameter of the guide holes on the guide plate is not less than De63.

7. A hard bank ecological transformation structure capable of purifying water discharged into a river according to claim 5, It is characterized in that The guide plate is made of anti-corrosion steel plate.

8. A hard bank ecological transformation structure capable of purifying water discharged into a river according to claim 1, It is characterized in that The slag-blocking lifting basket (3) comprises: a frame (310), a slag-blocking grille (320) arranged in the frame (310), a water-dividing fence (330) arranged in the frame (310) below the slag-blocking grille (320), a water outlet being provided at a position corresponding to the water-dividing fence (330) on the front side of the frame (310) on the slag-blocking lifting basket (3) at the bottom layer of all the slag-blocking lifting baskets (3), and slag-blocking lifting baskets (3) at other layers having water outlets at positions corresponding to the water-dividing fence (330) on the left and right sides of the frame (310).

9. A hard bank ecological transformation structure capable of purifying the water discharged into a river according to claim 8, It is characterized in that The gap of the slag blocking grid (320) is 5 mm to 10 mm.

10. A hard bank ecological transformation structure capable of purifying water discharged into a river according to claim 1, It is characterized in that The energy dissipation structure (4) comprises: energy dissipation gravel (410) located below the lowest ecological purification unit (1), and energy dissipation block stones (420) located outside the lowest ecological purification unit (1); the energy dissipation gravel (410) has a particle size of 4 cm to 8 cm and is fixed by cement mortar; the energy dissipation block stones (420) have a particle size of not less than 30 cm and are fixed by cement mortar.

Citation Information

Cited By

  • Rainwater outlet purification device suitable for hard upright revetment and purification method of rainwater outlet purification device

    CN119371024A