High-toughness underground comprehensive pipe gallery comprehensive system

By using a U-shaped jacket and cylinder structure in the underground comprehensive pipe gallery, combined with the isolation layer and cushioning layer of waste tires and rubber particles, the problem of insufficient seismic performance of the traditional underground pipe gallery is solved, and higher seismic resistance and Structural stability and the use of waste resources to reduce pollution.

CN221878165UActive Publication Date: 2024-10-22YANSHAN UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322984746.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-06
Publication Date
2024-10-22
Estimated Expiration
2033-11-06

AI Technical Summary

Technical Problem

Traditional underground comprehensive pipe corridors have deficiencies in seismic performance. The structural design and construction methods fail to effectively cope with seismic loads, resulting in pipe displacement, settlement or fracture, affecting urban infrastructure and citizens' lives.

Method used

It adopts a U-shaped jacket and underground comprehensive pipe gallery cylindrical combined structure, with an isolation layer and a cushioning layer inside. The isolation layer is composed of waste tires and fine sand, and the cushioning layer is composed of rubber particles and fine sand. Through elastic deformation and friction force absorbs earthquake energy and enhances structural stability.

Benefits of technology

It effectively blocks the transmission of seismic energy, reduces impact force and acceleration, reduces the scope of damage, improves the stability of the overall structure, and uses waste resources to reduce environmental pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221878165U_ABST
    Figure CN221878165U_ABST
Patent Text Reader

Abstract

The utility model discloses a high-toughness underground comprehensive pipe gallery comprehensive system, which relates to the field of municipal engineering structures, and comprises a U-shaped jacket and an underground comprehensive pipe gallery cylinder, and the rectangular or circular underground comprehensive pipe gallery cylinder is arranged in the U-shaped jacket. A shock insulation layer is arranged between the bottom of the underground comprehensive pipe gallery barrel and the inner wall of the bottom of the U-shaped outer sleeve, shock buffering layers are arranged between the two outer side walls of the underground comprehensive pipe gallery barrel and the inner side wall of the U-shaped outer sleeve, and the shock insulation layer is formed by combining waste tires and fine sand. And the cushioning layer is formed by combining rubber particles and fine sand. According to the utility model, the shock insulation layer hinders the energy transfer of the seismic longitudinal waves through the elastic deformation of the junked tires and the elastic-plastic deformation of the fine sand, and the cushioning layer consumes the impact force and acceleration caused by the seismic transverse waves through the friction force between the fine sand particles and the rubber particles, so that the shock resistance and the overall stability of the underground utility tunnel are improved; and waste resources are fully utilized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of municipal engineering structures, in particular to a high-toughness underground comprehensive pipe gallery comprehensive system. Background Art

[0002] Earthquakes can cause displacement, subsidence or rupture of underground pipeline systems, which in turn can lead to pipeline ruptures and water leaks, causing serious impacts on urban infrastructure and citizens’ lives. Existing underground utility corridors face some challenges in terms of seismic performance, the main problem being the inadequacies in the structural design and construction methods of underground utility corridors.

[0003] First, traditional underground utility corridors mostly use masonry or concrete structures, which have relatively low structural stiffness and are difficult to withstand ground vibrations caused by earthquakes. Second, traditional underground utility corridors often fail to fully consider the effects of seismic loads during the design and construction process, and lack seismic design and reinforcement measures. In addition, the beam-column structure strength of traditional underground utility corridors is low, and the connection nodes are not strong enough to effectively absorb and disperse seismic energy, making them prone to structural damage and collapse.

[0004] Therefore, technical personnel in this field need to provide a high-toughness underground comprehensive pipeline corridor comprehensive system to improve the seismic resistance of the underground comprehensive pipeline corridor and improve the overall stability of the underground comprehensive pipeline corridor. Utility Model Content

[0005] The purpose of the utility model is to provide a high-toughness underground comprehensive pipeline corridor comprehensive system, improve the seismic resistance of the underground comprehensive pipeline corridor, and improve the overall stability of the underground comprehensive pipeline corridor.

[0006] In order to solve the above technical problems, the utility model adopts the following technical solutions:

[0007] The utility model discloses a high-toughness underground comprehensive pipe gallery comprehensive system, comprising a U-shaped outer shell and an underground comprehensive pipe gallery cylinder, wherein a rectangular or circular underground comprehensive pipe gallery cylinder is arranged inside the U-shaped outer shell, a seismic isolation layer is arranged between the bottom of the underground comprehensive pipe gallery cylinder and the inner wall of the bottom of the U-shaped outer shell, a shock absorbing layer is arranged between the two outer side walls of the underground comprehensive pipe gallery cylinder and the inner side wall of the U-shaped outer shell, the seismic isolation layer is mainly made of a combination of waste tires and fine sand, and the shock absorbing layer is mainly made of a combination of rubber particles and fine sand.

[0008] Preferably, the top of the two side walls of the U-shaped jacket and the top of the shock-absorbing layer are at the same horizontal height as the top of the underground integrated pipe gallery cylinder.

[0009] Preferably, the waste tires are arranged in a matrix, with 4 to 6 waste tires placed in each row in the seismic isolation layer, the diameter of the waste tires is 0.5 to 1.5 meters, and the height of the waste tires is 0.2 to 0.5 meters.

[0010] Preferably, the rubber particles are prepared from the waste tires, and the volume of the rubber particles is 10% to 20% of the volume of the fine sand in the shock absorbing layer.

[0011] Preferably, the outer length of the cross section of the U-shaped jacket is 8 to 10 meters, the outer height of the cross section of the U-shaped jacket is 7 to 9 meters, the inner length of the cross section of the U-shaped jacket is 7 to 9 meters, and the inner height of the cross section of the U-shaped jacket is 6 to 8 meters.

[0012] Preferably, the outer length of the cross-section of the rectangular underground comprehensive pipeline gallery cylinder is 5 to 7 meters, the outer height of the cross-section of the rectangular underground comprehensive pipeline gallery cylinder is 4 to 6 meters, the inner length of the cross-section of the rectangular underground comprehensive pipeline gallery cylinder is 4 to 6 meters, and the inner height of the cross-section of the rectangular underground comprehensive pipeline gallery cylinder is 3 to 5 meters; the outer diameter of the cross-section of the circular underground comprehensive pipeline gallery cylinder is 4 to 6 meters, and the inner diameter of the cross-section of the circular underground comprehensive pipeline gallery cylinder is 3 to 5 meters.

[0013] Preferably, the thickness of the seismic isolation layer is 1 to 1.5 meters; the width of the shock absorbing layer is 1 to 1.5 meters.

[0014] Preferably, the U-shaped outer casing and the underground integrated pipe gallery cylinder are both made of reinforced concrete.

[0015] Compared with the prior art, the beneficial technical effects of the utility model are:

[0016] (1) The seismic isolation layer at the bottom of the underground utility corridor can hinder the transmission of seismic longitudinal wave energy through the elastic deformation of waste tires and the elastoplastic deformation of fine sand, reduce the impact force and acceleration caused by the earthquake, and reduce the scope of damage to the underground utility corridor caused by the earthquake; the shock-absorbing layer on both sides of the underground utility corridor can consume the impact force and acceleration brought by the seismic transverse wave through the friction between fine sand particles and rubber particles, thereby reducing the structural stress.

[0017] (2) The utility model adopts a design of the same horizontal height so that the outer jacket structure and the underground comprehensive pipeline corridor cylinder are closely combined under the connection effect of the shock-absorbing layer and the seismic isolation layer, thereby enhancing the overall structural stability.

[0018] (3) The utility model uses waste tires as materials for the seismic isolation layer and the shock absorbing layer, which makes full use of waste resources and reduces environmental pollution. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The utility model will be further described below in conjunction with the accompanying drawings.

[0020] Figure 1 It is a schematic diagram of the comprehensive system structure of the rectangular underground comprehensive pipe gallery of the utility model;

[0021] Figure 2 It is a cross-sectional view of a rectangular underground comprehensive pipe gallery comprehensive system of the utility model;

[0022] Figure 3 It is a schematic diagram of the comprehensive system structure of the circular underground comprehensive pipe gallery of the utility model;

[0023] Figure 4 It is a cross-sectional view of the circular underground comprehensive pipe gallery comprehensive system of the utility model;

[0024] Figure 5 This is a top view of the seismic isolation layer of the utility model;

[0025] Figure 6 It is a side view of the shock absorbing layer of the utility model.

[0026] Explanation of the accompanying reference numerals: 1. U-shaped jacket; 2. Underground integrated pipe gallery cylinder; 3. Seismic isolation layer; 4. Shock-absorbing layer; 5. Waste tires; 6. Rubber particles; 7. Fine sand. DETAILED DESCRIPTION

[0027] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0028] like Figures 1 to 6 As shown, a high-toughness underground comprehensive pipeline corridor integrated system includes a U-shaped jacket 1 and an underground comprehensive pipeline corridor cylinder 2, wherein a rectangular or circular underground comprehensive pipeline corridor cylinder 2 is arranged inside the U-shaped jacket 1, an isolation layer 3 is arranged between the bottom of the underground comprehensive pipeline corridor cylinder 2 and the bottom inner wall of the U-shaped jacket 1, a shock-absorbing layer 4 is arranged between the two outer walls of the underground comprehensive pipeline corridor cylinder 2 and the inner wall of the U-shaped jacket 1, the isolation layer 3 is mainly made of a combination of waste tires 5 and fine sand 7, and the shock-absorbing layer 4 is mainly made of a combination of rubber particles 6 and fine sand 7.

[0029] The top of the two side walls of the U-shaped jacket 1 and the top of the shock absorbing layer 4 are at the same level as the top of the underground integrated pipe gallery cylinder 2. Specifically, the same level is not strictly the same height, and the height can fluctuate up and down according to the on-site construction conditions, process and other conditions.

[0030] like Figure 3 As shown, the waste tires 5 are arranged in a matrix, 4 to 6 waste tires 5 are placed in each row in the seismic isolation layer 3, the diameter of the waste tires 5 is 0.5 to 1.5 meters, and the height of the waste tires 5 is 0.2 to 0.5 meters.

[0031] The rubber particles 6 are prepared from the waste tires 5 , and the volume of the rubber particles 6 is 10% to 20% of the volume of the fine sand 7 in the shock absorbing layer 4 .

[0032] The outer length of the cross section of the U-shaped jacket 1 is 8 to 10 meters, the outer height of the cross section of the U-shaped jacket 1 is 7 to 9 meters, the inner length of the cross section of the U-shaped jacket 1 is 7 to 9 meters, and the inner height of the cross section of the U-shaped jacket 1 is 6 to 8 meters.

[0033] The outer length of the cross-section of the rectangular underground comprehensive pipeline gallery cylinder 2 is 5 to 7 meters, the outer height of the cross-section of the rectangular underground comprehensive pipeline gallery cylinder 2 is 4 to 6 meters, the inner length of the cross-section of the rectangular underground comprehensive pipeline gallery cylinder 2 is 4 to 6 meters, and the inner height of the cross-section of the rectangular underground comprehensive pipeline gallery cylinder 2 is 3 to 5 meters; the outer diameter of the cross-section of the circular underground comprehensive pipeline gallery cylinder 2 is 4 to 6 meters, and the inner diameter of the cross-section of the circular underground comprehensive pipeline gallery cylinder 2 is 3 to 5 meters.

[0034] The thickness of the seismic isolation layer 3 is 1 to 1.5 meters; the width of the shock absorbing layer 4 is 1 to 1.5 meters.

[0035] The U-shaped jacket 1 and the underground integrated pipe gallery cylinder 2 are both made of reinforced concrete.

[0036] The use process of the utility model is as follows:

[0037] First, excavate the foundation pit, the cross-sectional dimensions of which are 10 to 12 meters long and 9 to 11 meters deep.

[0038] Secondly, the U-shaped jacket 1 is placed on the foundation pit by a crane, and then a 1-1.5 meter thick seismic isolation layer 3 is laid on the inner wall of the horizontal bottom of the U-shaped jacket 1, and the waste tires 5 are buried in the seismic isolation layer 3 in a matrix arrangement, with 4-6 tires placed in each row, and then fine sand 7 is filled around the waste tires.

[0039] Afterwards, the underground comprehensive pipeline gallery cylinder 2 is placed above the seismic isolation layer 3 by a crane, and rubber particles 6 and fine sand 7 are filled in layers in the spaces on both sides formed by the U-shaped jacket 1 and the underground comprehensive pipeline gallery cylinder 2, and then the shock-absorbing layer 4 is compacted.

[0040] Finally, after completing the above process, the foundation pit is backfilled.

[0041] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0042] The embodiments described above are only descriptions of the preferred methods of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the protection scope determined by the claims of the present invention.

Claims

1. A high-toughness underground integrated pipe gallery integrated system, characterized by: It comprises a U-shaped outer shell (1) and an underground integrated pipe gallery cylinder (2), wherein a rectangular or circular underground integrated pipe gallery cylinder (2) is arranged inside the U-shaped outer shell (1), a seismic isolation layer (3) is arranged between the bottom of the underground integrated pipe gallery cylinder (2) and the bottom inner wall of the U-shaped outer shell (1), and a shock absorbing layer (4) is arranged between the two outer side walls of the underground integrated pipe gallery cylinder (2) and the inner side wall of the U-shaped outer shell (1); The waste tires (5) are buried in the seismic isolation layer (3) in a matrix arrangement, and fine sand (7) is filled around the waste tires; The spaces on both sides formed by the U-shaped outer shell (1) and the underground comprehensive pipe gallery cylinder (2) are filled with rubber particles (6) and fine sand (7) in layers.

2. According to claim 1, a high-toughness underground integrated pipe gallery integrated system is characterized by: The top ends of the two side walls of the U-shaped outer shell (1) and the top end of the shock absorbing layer (4) are both located at the same level as the top of the underground integrated pipe gallery cylinder (2).

3. According to claim 1, a high-toughness underground comprehensive pipe gallery comprehensive system is characterized by: The waste tires (5) are placed in a row of 4 to 6 in the seismic isolation layer (3); the diameter of the waste tires (5) is 0.5 to 1.5 m; and the height of the waste tires (5) is 0.2 to 0.5 m.

4. The high-toughness underground integrated pipe gallery integrated system according to claim 1 is characterized by: The outer length of the cross section of the U-shaped jacket (1) is 8 to 10 meters, the outer height of the cross section of the U-shaped jacket (1) is 7 to 9 meters, the inner length of the cross section of the U-shaped jacket (1) is 7 to 9 meters, and the inner height of the cross section of the U-shaped jacket (1) is 6 to 8 meters.

5. The high-toughness underground integrated pipe gallery integrated system according to claim 1 is characterized by: The outer length of the cross section of the rectangular underground comprehensive pipeline gallery cylinder (2) is 5 to 7 meters, the outer height of the cross section of the rectangular underground comprehensive pipeline gallery cylinder (2) is 4 to 6 meters, the inner length of the cross section of the rectangular underground comprehensive pipeline gallery cylinder (2) is 4 to 6 meters, and the inner height of the cross section of the rectangular underground comprehensive pipeline gallery cylinder (2) is 3 to 5 meters; the outer diameter of the cross section of the circular underground comprehensive pipeline gallery cylinder (2) is 4 to 6 meters, and the inner diameter of the cross section of the circular underground comprehensive pipeline gallery cylinder (2) is 3 to 5 meters.

6. The high-toughness underground integrated pipe gallery integrated system according to claim 1 is characterized by: The thickness of the seismic isolation layer (3) is 1 to 1.5 meters; the width of the seismic buffer layer (4) is 1 to 1.5 meters.

7. The high-toughness underground integrated pipe gallery integrated system according to claim 1 is characterized by: The U-shaped outer shell (1) and the underground integrated pipe gallery cylinder (2) are both made of reinforced concrete.