Device for pier column construction in foundation pit

By erecting beams and operating platform components on the outside of the piers in the foundation pit, the problem of difficulty in ensuring the height-to-width ratio of the buckled scaffolding in the deep foundation pit was solved, the construction work surface was quickly established, the construction progress was improved, and the construction safety was ensured.

CN221878749UInactive Publication Date: 2024-10-22CCCC FIRST HIGHWAY XIAMEN ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420338731.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-23
Publication Date
2024-10-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In bridge construction projects, it is difficult to ensure the height of the buckled scaffolding in deep foundation pits, resulting in insufficient or too high construction heights, increasing safety hazards, and the installation and disassembly processes are cumbersome, affecting the construction progress.

Method used

Design a device for the construction of piers in foundation pits, including cross beams and operating platform components. The cross beams are erected on the foundation pit supporting purlins. The operating platform components are formed by a combination of multiple pre-welded platforms, with horizontal frames, Columns, panels, hoisting channels, diagonal braces, horizontal braces, protective nets and cables can be used to quickly establish a construction working surface outside the piers and improve the turnover rate and stability of the operating platform.

Benefits of technology

It achieves the rapid establishment of a construction working surface on the foundation pit, improves the turnover rate of the operating platform, ensures construction progress, and reduces construction risks by enhancing structural stability and safety measures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221878749U_ABST
    Figure CN221878749U_ABST
Patent Text Reader

Abstract

The utility model provides a device for pier column construction in a foundation pit. The device comprises a cross beam and an operation platform assembly. The cross beams are distributed outside the foundation pit pier columns and erected on the foundation pit supporting enclosing purlins. The operation platform assembly abuts against the cross beam and is arranged on the outer side of a foundation pit pier column in a surrounding mode. The operation platform assembly at least comprises two operation platforms, and the operation platforms are overlapped in the height direction of the foundation pit pier column. The operation platform is provided with transverse frames, stand columns, a panel and a hoisting channel for pier columns to penetrate through, the transverse frames are arranged in a layered mode, the stand columns are arranged between the transverse frames, the two ends of each stand column are connected with the transverse frames respectively, and the panel is arranged on the outer side of the hoisting channel and fixedly connected with the transverse frames. A construction working face can be rapidly built on the outer side of the pier column on the foundation pit, the turnover rate of the operation platform is improved, and the construction progress of the pier column in the foundation pit is further accelerated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction engineering, in particular to a device used for pier column construction in a foundation pit. Background Art

[0002] During the construction of deep foundation pit piers in bridge construction projects, the disc-lock scaffolding is usually selected as a temporary construction platform in the deep foundation pit due to its simple installation and disassembly principle and strong and stable structure. The disc-lock scaffolding erected in the deep foundation pit often uses the top surface of the cap as the support foundation and is assembled in an orderly manner. However, due to the limitation of the erection space in the deep foundation pit, on the one hand, the height-to-width ratio of the scaffolding cannot be guaranteed. If the scaffolding height is insufficient, it cannot meet the height requirements of the pier construction; if the scaffolding height is too high, the construction risk is greatly increased, which is prone to safety hazards and threatens the personal safety of the construction workers on the scaffolding. On the other hand, the installation and disassembly process of a single disc-lock scaffolding takes a lot of time and the steps are cumbersome, which is not conducive to the turnover and reuse of the disc-lock scaffolding in the same foundation pit, further affecting the construction progress of the pier in the foundation pit. Utility Model Content

[0003] The main technical problem to be solved by the utility model is to provide a device for pier column construction in a foundation pit, which can quickly establish a construction working surface outside the pier column on the foundation pit and improve the turnover rate of the operating platform.

[0004] In order to solve the above-mentioned technical problems, the utility model provides a device for the construction of piers in a foundation pit, comprising a crossbeam and an operating platform assembly; the crossbeam is distributed outside the foundation pit pier and is erected on the foundation pit supporting purlin; the operating platform assembly abuts the crossbeam and is arranged around the outside of the foundation pit pier; the operating platform assembly includes at least two operating platforms, which are superimposed along the height direction of the foundation pit pier; the operating platform is provided with a cross frame, a column, a panel and a lifting channel for the pier to pass through, the cross frames are arranged in layers, the columns are arranged between the cross frames, and the two ends of the columns are respectively connected to the cross frames, and the panel is arranged outside the lifting channel and fixedly connected to the cross frame.

[0005] In a preferred embodiment: the operating platform is further provided with an oblique brace; the oblique brace and the column are arranged at an angle, and both ends of the oblique brace are respectively fixed to the connection position between the cross frame and the column.

[0006] In a preferred embodiment: the operating platform is further provided with a horizontal brace parallel to the horizontal frame; the horizontal brace is fixedly connected to two adjacent columns.

[0007] In a preferred embodiment: the operating platform is also provided with a protective net for preventing people from falling; the protective net is perpendicular to the horizontal frame and connects two adjacent columns.

[0008] In a preferred embodiment: the operating platform is also provided with a ladder for personnel to go up and down; the ladder is parallel to the column and connected to the upper and lower cross frames.

[0009] In a preferred embodiment: it also includes a connecting member; the connecting member is located on the outside of the operating platform assembly, and the connecting member connects and fixes the crossbeam.

[0010] In a preferred embodiment: the panel is formed by connecting scaffolding boards end to end.

[0011] In a preferred embodiment: it also includes a cable for improving the stability of the operating platform assembly and a ground anchor for fixing the cable; one end of the cable is connected to the operating platform, and the other end is connected to the ground anchor; the ground anchor is arranged on the ground.

[0012] Compared with the prior art, the technical solution of the utility model has the following beneficial effects:

[0013] 1. The utility model provides a device for the construction of piers in foundation pits, wherein a crossbeam is erected on a foundation pit supporting purlin, and an operating platform assembly is arranged on the crossbeam and around the outside of the piers. The operating platform assembly is formed by a plurality of pre-welded operating platforms stacked and combined, and a construction work surface can be quickly established on the outside of the piers in the foundation pit, thereby improving the turnover rate of the operating platform and further accelerating the construction progress of the piers in the foundation pit.

[0014] 2. The utility model provides a device for pier construction in a foundation pit, which improves the stability of the operating platform structure by welding multiple horizontal braces, diagonal braces and protective nets on the operating platform to ensure the safety of construction workers working at high altitudes. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a side schematic diagram of the device described in the preferred embodiment 1 of the utility model;

[0016] Figure 2 It is a side schematic diagram of the operating platform assembly described in the preferred embodiment 1 of the utility model;

[0017] Figure 3 This is a front view schematic diagram of the device in the preferred embodiment 1 of the utility model being erected on a foundation pit;

[0018] Figure 4 for Figure 3 A partial enlarged view of the middle A;

[0019] Figure 5It is a schematic diagram of the top surface of the device in the preferred embodiment 1 of the utility model erected on the foundation pit;

[0020] Figure 6 for Figure 5 A partial enlarged view of point B in the middle. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model; it is obvious that the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the utility model without making creative work are within the scope of protection of the utility model.

[0022] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top / bottom" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0023] In the description of the present utility model, it should be noted that, unless otherwise clearly stipulated and limited, the terms "installed", "provided with", "installed / connected", "connected", etc. should be understood in a broad sense. For example, "connection" can be a wall-mounted connection, a detachable connection, or an integral connection. It can be a mechanical connection or an electrical connection. It can be a direct connection or an indirect connection through an intermediate medium. It can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the utility model can be understood according to the specific circumstances.

[0024] Example 1

[0025] refer to Figure 1-Figure 6The present embodiment provides a device for the construction of piers in a foundation pit, comprising a crossbeam 1 and an operating platform assembly 2; the crossbeam 1 is distributed outside the foundation pit pier and is erected on the foundation pit supporting purlin; the operating platform assembly 2 abuts against the crossbeam 1 and is arranged around the outside of the foundation pit pier; the operating platform assembly 2 comprises at least two operating platforms 21, which are superimposed along the height direction of the foundation pit pier; the operating platform 21 is provided with a cross frame 211, a column 212, a panel 213 and a hoisting channel 214 for the pier to pass through, the cross frames 211 are arranged in layers, the columns 212 are arranged between the cross frames 211, and the two ends of the columns 212 are respectively connected to the cross frames 211, and the panel 213 is arranged outside the hoisting channel 214 and fixedly connected to the cross frame 211.

[0026] To be more specific, in this embodiment, the device for the construction of piers in a foundation pit includes a crossbeam 1 and an operating platform assembly 2. The crossbeam 1 is distributed outside the foundation pit pier and is mounted on the foundation pit support purlin. The crossbeams 1 are symmetrically distributed outside the foundation pit pier. Specifically, in order for the crossbeam 1 to provide more support to the operating platform assembly 2 and ensure that the crossbeam 1 can carry the operating platform assembly 2, two crossbeams 1 are arranged on both sides of the foundation pit pier. The crossbeam 1 spans the foundation pit and is mounted on the foundation pit support purlin. The device for the construction of piers in a foundation pit also includes a connector 3, which is located on the outside of the operating platform assembly 2, and the connector 3 connects and fixes the crossbeam 1. In detail, the connector 3 is welded in the middle of two adjacent crossbeams 1 to improve the overall stability of the crossbeam 1.

[0027] The operating platform assembly 2 abuts against the crossbeam 1 and is disposed around the outside of the foundation pit pier; the operating platform assembly 2 includes at least two operating platforms, which are stacked along the height direction of the foundation pit pier. Figure 1 and 2 The operating platform assembly 2 includes three operating platforms. A plurality of operating platforms are sequentially stacked on the operating platform 21 according to the height requirements of the pier construction.

[0028] The operating platform 21 is provided with a cross frame 211, a column 212, a panel 213 and a hoisting passage 214 for the pier to pass through. The cross frame 211 is arranged in layers, the column 212 is arranged between the cross frames 211, and the two ends of the column 212 are respectively connected to the cross frame 211 to form the overall frame outline of the operating platform 21. In this embodiment, the cross frame 211 is a quadrilateral, and the two quadrilaterals parallel to each other are connected by four columns 212. The hoisting passage 214 is located in the middle area of ​​the operating platform 21, and the hoisting passage 214 allows the pier to pass through it. The panel 213 is arranged outside the hoisting passage 214 and is fixed to the cross frame 211. The panel 213 is formed by connecting the scaffolding boards end to end. The panel 213 is 0.7m wide, and the scaffolding boards are fully paved with pressed steel mesh.

[0029] The operating platform 21 is also provided with an oblique brace 216 and a horizontal brace 215 parallel to the horizontal frame 211; the horizontal brace 215 is fixed to two adjacent columns 212. The oblique brace 216 is arranged at an angle with the column 212, and the two ends of the oblique brace 216 are respectively fixed to the connection position between the horizontal frame 211 and the column 212. In order to improve the stability of the device, each operating platform 21 is equipped with at least four oblique braces 216 and four horizontal braces 215. Considering the risk factor of construction workers working at high altitude, the operating platform 21 is also provided with a protective net 217 for preventing people from falling; the protective net 217 is perpendicular to the horizontal frame 211 and connects two adjacent columns 212. The height of the protective net 217 is not less than half the height of the column 212. The operating platform 21 is also provided with a ladder 218 for people to go up and down; the ladder 218 is parallel to the column 212 and connected to the upper and lower horizontal frames 211.

[0030] In this embodiment, the device for pier construction in a foundation pit further includes a cable 4 and a ground anchor 5. The cable 4 is used to improve the stability of the operating platform assembly 2, and the ground anchor 5 is used to fix the cable 4. It is inevitable to encounter strong wind interference of different levels during the pier construction operation. The cable 4 and the ground anchor 5 can improve the wind resistance of the device and further ensure the safety performance of the device. One end of the cable 4 is connected to the operating platform 21, and the other end is connected to the ground anchor 5. In detail, the four corners of the operating platform 21 are respectively connected to the cable 4, and the other end of the cable 4 is connected to the ground anchor 5. The ground anchor 5 is arranged on the ground outside the operating platform assembly 2. In this embodiment, the number of ground anchors 5 arranged outside the operating platform assembly 2 is 4. It can be understood that in order to achieve a good fixing effect, the number of the cable 4 and the ground anchor 5 is equal. The cable 4 is made of steel wire rope. The ground anchor 5 uses a precast concrete block, and a round steel is provided on the top of the ground anchor 5 to connect the cable 4.

[0031] In this embodiment, it should be noted that each operating platform 21 is 2m high, the columns 212 and the cross frame 211 are made of L75×5 channel steel; the diagonal braces 216 and the ladder 218 are made of L50×5 channel steel; the crossbeam 1 is made of I 30 I-beam; and the connecting piece 3 is made of 20# channel steel.

[0032] When the size of the pedestal in the foundation pit is too small to provide basic support for the operating platform assembly 2, or when the steel support in the foundation pit blocks the operating platform assembly 2 from entering the interior of the foundation pit, then the first supporting purlin in the foundation pit is followed by a buckle scaffolding, and the first supporting purlin is suitable for the device described in this embodiment. The crossbeam 1 is set up on the first supporting purlin of the foundation pit, and then the operating platform assembly 2 is installed on the crossbeam 1. It should be emphasized that before hoisting the operating platform assembly 2 onto the crossbeam 1, the construction personnel first measure the height of the pier to be constructed above the first supporting purlin of the foundation pit, so as to determine how many operating platforms 21 need to be designed in advance. In this embodiment, the operating platform 21 can be put into use after welding is completed on the same day. After the pouring, curing and demolding of the pier body in the foundation pit are completed, the operating platform assembly 2 can be hoisted as a whole to the next pier body working surface for flow operation.

[0033] The above is only a preferred specific implementation method of the utility model, but the design concept of the utility model is not limited to this. Any technician familiar with the technical field who uses this concept to make non-substantial changes to the utility model within the technical scope disclosed by the utility model shall be deemed to infringe the protection scope of the utility model.

Claims

1. A device for pier construction in a foundation pit, characterized in that: It includes a crossbeam and an operating platform assembly; the crossbeam is distributed outside the foundation pit pier and is erected on the foundation pit supporting purlin; the operating platform assembly abuts the crossbeam and is arranged around the outside of the foundation pit pier; the operating platform assembly includes at least two operating platforms, and the operating platforms are superimposed along the height direction of the foundation pit pier; the operating platform is provided with a cross frame, a column, a panel and a hoisting channel for the pier to pass through, the cross frame is arranged in layers, the column is arranged between the cross frames, and the two ends of the column are respectively connected to the cross frame, and the panel is arranged outside the hoisting channel and fixed to the cross frame.

2. A device for pier construction in a foundation pit according to claim 1, characterized in that: The operating platform is also provided with an oblique brace; the oblique brace is arranged at an angle to the column, and the two ends of the oblique brace are respectively fixed to the connection position between the cross frame and the column.

3. The device for pier construction in a foundation pit according to claim 1, characterized in that: The operating platform is also provided with a horizontal brace parallel to the horizontal frame; the horizontal brace is fixedly connected to two adjacent columns.

4. The device for pier construction in a foundation pit according to claim 1, characterized in that: The operating platform is also provided with a protective net for preventing people from falling; the protective net is perpendicular to the horizontal frame and connects two adjacent columns.

5. The device for pier construction in a foundation pit according to claim 1, characterized in that: The operating platform is also provided with a ladder for people to go up and down; the ladder is parallel to the column and connected to the upper and lower horizontal frames.

6. The device for pier construction in a foundation pit according to claim 1, characterized in that: It also includes a connecting piece; the connecting piece is located on the outside of the operating platform assembly, and the connecting piece is connected and fixed to the crossbeam.

7. The device for pier construction in a foundation pit according to claim 1, characterized in that: The panel is formed by connecting scaffolding boards end to end.

8. The device for pier construction in a foundation pit according to claim 1, characterized in that: It also includes a cable for improving the stability of the operating platform assembly and a ground anchor for fixing the cable; one end of the cable is connected to the operating platform, and the other end is connected to the ground anchor; the ground anchor is arranged on the ground.