Concrete floor thickness controller
By designing a concrete floor thickness controller with a simple structure, easily available components and adjustable thickness, the problem of complex existing tools and unadjustable thickness is solved, achieving precise control of the thickness of concrete floor slabs and improving construction quality.
Patent Information
- Application Number
- CN202420262363.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-02
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-02-02
AI Technical Summary
The existing concrete floor thickness control tools have a complex structure and are cumbersome to make. The components are not commonly used and the thickness cannot be adjusted. As a result, the elevation and thickness control during construction are not strict, making it difficult to meet strict delivery acceptance standards.
A concrete floor thickness controller including upper pads, lower pads and support components is designed. The support component consists of upper support rods, lower support rods and casings, which are fixed by locking bolts. The structure is simple and the components are easy to obtain. and use, and the thickness is adjustable.
It achieves precise control of the thickness of concrete floor slabs, improves construction quality, avoids quality defects, has strong applicability, and simplifies the construction process.
Smart Images

Figure CN221878875U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building construction, in particular to a concrete floor thickness controller. Background Art
[0002] As an important component of the building structure, the concrete floor slab is the main load-bearing part of the floor structure and plays a vital role in structural safety. The control of the thickness and elevation of the concrete floor slab is the focus of construction, but workers often neglect the control of this part during construction, or do not strictly control it during the process, resulting in deviations in the elevation and thickness of the floor slab.
[0003] The acceptance inspection for residential project delivery is becoming more and more strict. There are more and more inspections by construction units, supervision units and monitoring units, and the inspections are becoming more and more strict. Inadequate control of floor elevation and thickness will result in difficulties in delivery and maintenance.
[0004] Before construction, it was found that the floor slab was quite thick and its location was widely dispersed. The previous inspection method of measuring elevation control lines, process hanging lines + thickness controllers could easily lead to inadequate control of concrete thickness and lack of obvious marking. Checking one elevation control point could not effectively radiate the surrounding elevation control.
[0005] There are also some concrete floor thickness control tools and devices in the existing technology. For example, patent CN111980259A discloses a thickness control device for cast-in-place concrete floor and steel bar protective layer, which includes an adjustable cylinder and a fixed base. The upper end of the adjustable cylinder is used to support the upper steel bar nodes, and the lower end of the adjustable cylinder is threadedly connected to the upper end of the fixed base. A notch is horizontally opened in the lower section of the fixed base, and the lower edge of the notch is used to support the lower steel bar nodes.
[0006] However, most tools have a complex structure and are difficult to make. Many of their components are not commonly used on construction sites and cannot be obtained at construction sites. In addition, the thickness of some tools cannot be adjusted or adjusted. Utility Model Content
[0007] The utility model provides a concrete floor thickness controller, which can solve the problems pointed out in the background technology.
[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a concrete floor thickness controller, comprising an upper pad block and a lower pad block, at least one support assembly is provided between the upper pad block and the lower pad block, the support assembly comprises an upper support rod, a lower support rod and a sleeve, the lower end of the sleeve is fixedly connected to the upper end of the lower support rod, the lower end of the lower support rod is connected to the lower pad block, the upper end of the sleeve is sleeve-connected to the lower end of the upper support rod and is locked and fixed by a locking bolt, and the upper end of the upper support rod is connected to the upper pad block.
[0009] Preferably, the upper pad block and the lower pad block are both concrete blocks, the upper support rod and the lower support rod are both steel bars, and the sleeve is a steel pipe.
[0010] Beneficial effects: The utility model provides a concrete floor thickness controller, which has a simple structure, and its components can be easily obtained at the construction site, which is easy to manufacture and use, and its thickness can be adjusted within a certain range, so it has strong applicability, can improve the quality of the project, and avoid unnecessary quality defects. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a structural schematic diagram of the utility model;
[0012] Description of reference numerals:
[0013] Numbers in the figure: upper pad 1; lower pad 2; upper support rod 3; lower support rod 4; sleeve 5; locking bolt 6. DETAILED DESCRIPTION
[0014] A specific implementation of the present utility model is described in detail below in conjunction with the accompanying drawings, but it should be understood that the protection scope of the present utility model is not limited by the specific implementation mode.
[0015] Embodiment 1:
[0016] like Figure 1 As shown, the concrete floor thickness controller includes an upper pad block 1 and a lower pad block 2, at least one support assembly is provided between the upper pad block 1 and the lower pad block 2, the support assembly includes an upper support rod 3, a lower support rod 4 and a sleeve 5, the lower end of the sleeve 5 is fixedly connected to the upper end of the lower support rod 4, the lower end of the lower support rod 4 is connected to the lower pad block 2, the upper end of the sleeve 5 is sleeved and connected to the lower end of the upper support rod 3, and is locked and fixed by a locking bolt 6, and the upper end of the upper support rod 3 is connected to the upper pad block 1.
[0017] Specifically, the upper pad block 1 and the lower pad block 2 are both concrete blocks, the upper support rod 3 and the lower support rod 4 are both steel bars, and the sleeve 5 is a steel pipe.
[0018] The production steps of this utility model are as follows:
[0019] According to the thickness of the floor slab and the required quantity, the steel bar heads (i.e., the upper support rod 3 and the lower support rod 4) are cut using steel bar waste. The diameter of the steel bar is 10-14 mm. Steel bars of this diameter have sufficient rigidity, and the construction operation is convenient without causing waste of materials. The length of the steel bar is 15-20 mm shorter than the thickness of the floor slab, which facilitates sufficient protective layers on both sides and avoids problems such as missing bars and rust spots.
[0020] Make a PVC pipe as a template: Use the waste pipes pre-buried by water and electricity, and cut the PVC pipe with a diameter of 8-11cm into short pieces with a height of 3cm. When cutting, ensure that one end is flush to facilitate the elevation control of the concrete control pads (i.e. upper pad 1 and lower pad 2).
[0021] Pouring concrete: Lay a film on the ground and place the cut PVC pipe on the film. Use the remaining concrete from the construction layer to pour concrete. The concrete strength must not be less than the concrete strength of the use part. Use a trowel to knock slowly during pouring to ensure the density of the concrete and the visual quality of the bottom surface. The ground should be flat, and a water-stop steel plate or waste formwork can be used as the foundation.
[0022] Inserting steel bars: After the concrete surface is smoothed, insert the steel bars into the concrete. When inserting one end of the steel bar, the insertion position should be controlled and it must not be inserted to the bottom of the concrete to prevent leakage of steel bars, rust, etc. in the future. The other end of the pad 2 under the steel bar is welded to the steel pipe to form a whole.
[0023] Concrete curing: After the concrete control pad is made, people should be arranged to sprinkle water and cover it with film for curing, or it can be placed in a standard curing room for curing.
[0024] Remove the PVC pipe after the strength is qualified: When the concrete control pad reaches a certain strength, that is, when the formwork is removed without damaging the corners, the PVC pipe can be removed.
[0025] Assembly: Place the lower pad 2 with the steel pipe on the ground, and place the upper pad 1 on it, insert the steel bars into the steel pipe, adjust the position according to the height requirements, and tighten the screws to fix it so that the total height of the concrete control block is consistent with the thickness of the concrete floor.
[0026] The dimensions in the embodiment are not limited to the dimensions defined above, and those skilled in the art may make appropriate settings according to actual working conditions, which will not be described in detail here.
[0027] When using the concrete floor thickness controller, place the device on the formwork according to the height requirements, and pull the line to check whether the upper elevation of the concrete control pad meets the requirements. If the elevation does not meet the requirements, the formwork should be adjusted in time. When the formwork span is large and arching is required, a device should be placed at the highest point of the arch.
[0028] When pouring concrete, use scrapers and concrete control pads to control the concrete elevation.
[0029] The above disclosures are only several specific embodiments of the present invention. However, the embodiments of the present invention are not limited thereto. Any changes that can be conceived by those skilled in the art should fall within the protection scope of the present invention.
Claims
1. Concrete floor thickness controller, characterized by: The invention comprises an upper pad (1) and a lower pad (2), wherein at least one supporting assembly is arranged between the upper pad (1) and the lower pad (2), wherein the supporting assembly comprises an upper supporting rod (3), a lower supporting rod (4) and a sleeve (5), wherein the lower end of the sleeve (5) is fixedly connected to the upper end of the lower supporting rod (4), the lower end of the lower supporting rod (4) is connected to the lower pad (2), the upper end of the sleeve (5) is sleeve-connected to the lower end of the upper supporting rod (3) and is locked and fixed by a locking bolt (6), and the upper end of the upper supporting rod (3) is connected to the upper pad (1).
2. The concrete floor thickness controller according to claim 1, characterized in that: The upper pad (1) and the lower pad (2) are both concrete blocks, the upper support rod (3) and the lower support rod (4) are both steel bars, and the sleeve (5) is a steel pipe.