Tunnel construction drainage structure
By designing a drainage structure including the tunnel base, seepage pipes, transverse blind pipes, aqueducts, drainage pipes and waterproof reinforcement layers during tunnel construction, the problem of incomplete drainage in tunnel construction in the existing technology is solved and better drainage effects are achieved. and tunnel base layer protection, extending the service life of the tunnel.
Patent Information
- Application Number
- CN202420598742.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-26
AI Technical Summary
The drainage structure of the existing tunnel construction has a single function and cannot effectively reduce the erosion of the tunnel by formation water, affecting the service life and operation safety of the tunnel.
A drainage structure including the tunnel base, seepage pipes, transverse blind pipes, aqueducts, drainage pipes and waterproof reinforcement layers is designed. Through the setting of drainage holes, seepage pipes, transverse blind pipes, aqueducts and drainage pipes, comprehensive drainage is achieved , and set a waterproof reinforcement layer on the outside of seepage pipes, horizontal blind pipes, aqueducts and drainage pipes to enhance protection.
It significantly improves the drainage effect of the tunnel, enhances the protection of the tunnel base, extends the service life of the tunnel and improves construction safety.
Smart Images

Figure CN221879494U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy construction, in particular to a tunnel construction drainage structure. Background Art
[0002] In order to ensure the service life and operation safety of the tunnel, water seepage and gushing are often encountered during the tunnel construction process, causing the road surface in the tunnel to soften and the working area to be flooded, which has a huge impact on the construction process and construction safety. In order to ensure the service life and operation safety of the tunnel, a drainage system must be set up during the tunnel construction process. The existing drainage structure has a single function and incomplete drainage. It cannot effectively reduce the erosion of the tunnel itself caused by the formation water during use. There is a water seepage problem, which seriously affects the service life of the tunnel and has poor protection and practicality. Utility Model Content
[0003] The purpose of the utility model is to solve the problems raised in the above background technology, and then propose a tunnel construction drainage structure.
[0004] The technical solution adopted by the utility model to solve its technical problems is:
[0005] A tunnel construction drainage structure comprises a tunnel base, a seepage pipe, a transverse blind pipe, a water guide pipe, a drainage pipe and a waterproof reinforcement layer; a plurality of groups of drainage holes arranged in a ring are arranged on the annular surface of the tunnel base, and each group of drainage holes forms an arched drainage channel; each group of drainage channels is connected to a seepage pipe so that the water in the drainage channel can enter the seepage pipe; ports of a plurality of seepage pipes on the same side are connected to a transverse blind pipe so that the water in the seepage pipe can enter the transverse blind pipe; two transverse blind pipes are respectively connected to a drainage pipe through a plurality of water guide pipes, and both ends of the two drainage pipes extend to the outside of the tunnel base opening to discharge the water; a waterproof reinforcement layer is also provided on the annular surface of the tunnel base, and the waterproof reinforcement layer is arranged on the outside of the seepage pipe, the transverse blind pipe, the water guide pipe and the drainage pipe.
[0006] Furthermore, the waterproof reinforcement layer includes geotextile, waterproof board, reinforced lining and concrete layer; the geotextile is arranged on the annular surface of the tunnel base and is located outside the seepage pipe, transverse blind pipe, water guide pipe and drainage pipe, and the waterproof board, reinforced lining and concrete layer are arranged in sequence outside the geotextile.
[0007] Furthermore, the geotextile is nailed on the annular surface of the tunnel base using a nail gun.
[0008] Furthermore, a hot-melt gasket is provided between the geotextile and the waterproof board and is welded by an ultrasonic welding machine.
[0009] Furthermore, the reinforcement lining is a steel structure to play a reinforcing support role.
[0010] Furthermore, the seepage pipe body is provided with a plurality of water receiving holes which are the same in number and correspond one to one with the drainage holes, and the water receiving holes are connected to the drainage holes and are sealed by a sealing waterproof glue.
[0011] Furthermore, the two transverse blind pipes are horizontally arranged along the tunnel base and are parallel to each other.
[0012] Furthermore, the water conduit is arranged to be inclined and the inclination angle is 30-60°.
[0013] Furthermore, the two drainage pipes are horizontally arranged along the tunnel base and are parallel to each other.
[0014] Furthermore, an interception net is provided at the outlet of the drainage pipe to prevent impurities from affecting subsequent drainage work and prevent them from flowing into the external environment with the water body and causing pollution.
[0015] Compared with the prior art, the beneficial effects of the utility model are:
[0016] The utility model greatly improves the drainage effect of the tunnel through the arrangement of drainage holes, seepage pipes, transverse blind pipes, water guide pipes and drainage pipes, and the drainage is more comprehensive; and through the arrangement of the waterproof reinforcement layer, it plays a protective role on the tunnel base and has a better use effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure of the utility model;
[0018] Figure 2 This is a schematic diagram of the installation of the interception net;
[0019] Among them: 1. Tunnel base; 11. Drainage hole; 2. Seepage pipe; 3. Horizontal blind pipe; 4. Water guide pipe; 5. Drainage pipe; 51. Interception net; 6. Geotextile; 7. Waterproof board; 8. Reinforced lining; 9. Concrete layer. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. The utility model is further described in combination with the drawings and embodiments:
[0021] See attached Figure 1 As shown, a tunnel construction drainage structure includes a tunnel base 1, a seepage pipe 2, a transverse blind pipe 3, a water guide pipe 4, a drainage pipe 5 and a waterproof reinforcement layer;
[0022] A plurality of drainage holes 11 arranged in a ring shape are provided on the annular surface of the tunnel base 1, and each group of drainage holes 11 forms an arched drainage channel; each group of drainage channels is connected to a seepage pipe 2 so that the water in the drainage channel enters the seepage pipe 2; the ports of the plurality of seepage pipes 2 on the same side are commonly connected to a transverse blind pipe 3 so that the water in the seepage pipe 2 enters the transverse blind pipe 3; two transverse blind pipes 3 are respectively connected to a drainage pipe 5 through a plurality of water guide pipes 4, and both ends of the two drainage pipes 5 extend to the outside of the opening of the tunnel base 1 to realize the discharge of water; a waterproof reinforcement layer is also provided on the annular surface of the tunnel base 1, and the waterproof reinforcement layer is arranged on the outside of the seepage pipe 2, the transverse blind pipe 3, the water guide pipe 4 and the drainage pipe 5.
[0023] Specifically, the waterproof reinforcement layer includes geotextile 6, waterproof board 7, reinforced lining 8 and concrete layer 9; the geotextile 6 is arranged on the annular surface of the tunnel base 1 and is located on the outside of the seepage pipe 2, the transverse blind pipe 3, the water guide pipe 4 and the drainage pipe 5, and the waterproof board 7, the reinforced lining 8 and the concrete layer 9 are arranged on the outside of the geotextile 6 in sequence.
[0024] In the above scheme, the geotextile 6 is nailed on the annular surface of the tunnel base 1 by a nail gun, and a hot-melt gasket is arranged between the geotextile 6 and the waterproof board 7 and welded by an ultrasonic welding machine; the reinforcement lining 8 is a steel structure to play a reinforcing and supporting role.
[0025] Specifically, the seepage pipe 2 is provided with a plurality of water receiving holes (not shown in the figure) which are the same in number and correspond one to one with the drainage holes 11 , and the water receiving holes are connected to the drainage holes 11 and are sealed by a sealing waterproof glue.
[0026] Specifically, two transverse blind pipes 3 are horizontally arranged along the tunnel base 1 and are parallel to each other.
[0027] Specifically, the water conduit 4 is tilted and the tilt angle is 30-60°.
[0028] Specifically, two drainage pipes 5 are horizontally arranged along the tunnel base 1 and are parallel to each other.
[0029] Among them, there will be impurities in the drainage pipe 5 during the drainage process. In order to prevent the impurities from affecting the subsequent drainage work and prevent them from flowing into the external environment with the water body and causing pollution, refer to the attached Figure 2 As shown, an interception net 51 is provided at the outlet of the drainage pipe 5.
[0030] The above shows and describes the basic principles, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions in the specification are only to illustrate the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the protection required by the utility model. The scope of protection required by the utility model is defined by the attached claims and their equivalents.
Claims
1. A tunnel construction drainage structure, characterized in that: It comprises a tunnel base (1), a water seepage pipe (2), a transverse blind pipe (3), a water guide pipe (4), a drainage pipe (5) and a waterproof reinforcement layer; The annular surface of the tunnel base (1) is provided with a plurality of groups of drainage holes (11) arranged in an annular shape, and each group of drainage holes (11) forms an arched drainage channel; Each set of drainage channels is connected to a water seepage pipe (2); The ports of a plurality of seepage pipes (2) on the same side are connected to a transverse blind pipe (3); The two transverse blind pipes (3) are respectively connected to a drainage pipe (5) through a plurality of water guide pipes (4), and both ends of the two drainage pipes (5) extend to the outside of the opening along the tunnel base (1); The annular surface of the tunnel base (1) is also provided with a waterproof reinforcement layer, and the waterproof reinforcement layer is arranged outside the seepage pipe (2), the transverse blind pipe (3), the water guide pipe (4) and the drainage pipe (5).
2. A tunnel construction drainage structure according to claim 1, characterized in that: The waterproof reinforcement layer comprises a geotextile (6), a waterproof board (7), a reinforcement lining (8) and a concrete layer (9); The geotextile (6) is arranged on the annular surface of the tunnel base (1) and is located outside the seepage pipe (2), the transverse blind pipe (3), the water conduit (4) and the drainage pipe (5). A waterproof board (7), a reinforcement lining (8) and a concrete layer (9) are arranged in sequence outside the geotextile (6).
3. A tunnel construction drainage structure according to claim 2, characterized in that: The geotextile (6) is nailed onto the annular surface of the tunnel base (1) using a nail gun.
4. A tunnel construction drainage structure according to claim 2, characterized in that: A hot-melt gasket is provided between the geotextile (6) and the waterproof board (7) and is welded using an ultrasonic welding machine.
5. A tunnel construction drainage structure according to claim 2, characterized in that: The reinforcement lining (8) is a steel structure.
6. A tunnel construction drainage structure according to claim 1, characterized in that: The seepage pipe (2) is provided with a plurality of water receiving holes, the number of which is the same as that of the drainage holes (11) and which correspond one to one. The water receiving holes are connected to the drainage holes (11) and are sealed by a sealing waterproof glue.
7. A tunnel construction drainage structure according to claim 1, characterized in that: The two transverse blind pipes (3) are arranged horizontally along the tunnel base (1) and are parallel to each other.
8. A tunnel construction drainage structure according to claim 1, characterized in that: The water guide pipe (4) is arranged tilted and the tilt angle is 30-60°.
9. A tunnel construction drainage structure according to claim 1, characterized in that: The two drainage pipes (5) are arranged horizontally along the tunnel base (1) and are parallel to each other.
10. A tunnel construction drainage structure according to claim 1, characterized in that: An interception net (51) is provided at the outlet of the drainage pipe (5).