Wind turbine generator experiment platform and test system
Through the design of the wind turbine experimental platform, the use of drag motors and grid simulators combined with energy storage converters and isolation transformers solves the authenticity and cost issues of the primary frequency modulation experiment of wind turbines, and achieves effective evaluation and evaluation of wind turbine performance. Economic simulation.
Patent Information
- Application Number
- CN202323477616.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-19
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-19
AI Technical Summary
At present, the primary frequency regulation experiment of wind turbines is limited by on-site debugging, which cannot fully verify the technology. Moreover, the existing power grid simulator is high-cost and has limited scope of application, making it impossible to truly evaluate the frequency regulation performance of wind turbines.
Design a wind turbine experimental platform, including a drag motor and a grid simulator. The grid simulator simulates the grid environment, drags the tested generator, and combines the energy storage converter and isolation transformer to achieve real grid abnormality simulation and performance. Evaluate.
It realizes the real simulation of wind speed and grid environment under abnormal power grid conditions, evaluates the primary frequency regulation performance of wind turbines, reduces the cost of the grid simulator, and expands the scope of application.
Smart Images

Figure CN221879610U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of wind power testing technology, and in particular to a wind turbine test platform and a test system. Background Art
[0002] With the continuous promotion of renewable energy power generation, wind turbines are responsible for primary frequency regulation when connected to the grid. The participation of wind turbines in primary frequency regulation is of great significance to the safe operation of wind power grid connection. Primary frequency regulation refers to the frequency of the power grid that can be adjusted by adjusting the active power output of wind turbines.
[0003] At present, the primary frequency regulation of wind turbines is still in the theoretical stage, and the experiments of wind turbines can only rely on on-site commissioning of wind farms. However, the commissioning of wind farms is subject to the influence of power grid simulation, and it is impossible to fully verify the primary frequency regulation technology of wind turbines. In addition, the test bench uses a full-power grid simulator, which has the problems of high cost and limited scope of application. Utility Model Content
[0004] In view of this, the present application provides a wind turbine experimental platform and a test system, which can truly evaluate the primary frequency regulation performance of the wind turbine.
[0005] The present application provides a wind turbine experimental platform, including: a traction motor and a power grid simulator;
[0006] The first end of the traction motor is connected to the first end of the tested generator of the wind turbine generator set;
[0007] The second end of the traction motor is connected to the power grid simulator;
[0008] The first end of the power generation converter of the wind turbine generator set is connected to the second end of the tested generator, and the second end of the power generation converter is connected to the power grid simulator.
[0009] Preferably, it also includes: an energy storage converter;
[0010] The second end of the traction motor is connected to the power grid simulator through the energy storage converter.
[0011] Preferably, it also includes: an energy storage battery;
[0012] The DC side of the energy storage converter is connected to the energy storage battery;
[0013] The first AC side of the energy storage converter is connected to the power grid simulator, and the second AC side of the energy storage converter is connected to the traction motor.
[0014] Preferably, it also includes: an isolation transformer;
[0015] The first side of the isolation transformer is connected to the power grid simulator;
[0016] The second side of the isolation transformer is connected to the first AC side of the energy storage converter.
[0017] Preferably, the power generation converter comprises a first rectifier circuit and a first inverter circuit;
[0018] The first end of the first rectifier circuit is connected to the generator under test, the second end of the first rectifier circuit is connected to the first end of the first inverter circuit, and the second end of the first inverter circuit is connected to the power grid simulator.
[0019] Preferably, the energy storage converter comprises a second inverter circuit;
[0020] The first end of the second inverter circuit is connected to the energy storage battery, and the second end of the second inverter circuit is connected to the traction motor.
[0021] Preferably, the wind turbine generator set includes any one of the following: direct drive mode, semi-direct drive mode or double-fed mode.
[0022] Preferably, the first side of the isolation transformer is a delta connection, and the second side of the isolation transformer is a star connection.
[0023] Preferably, the power of the power grid simulator is smaller than the power of the wind turbine generator set.
[0024] The present application also provides a testing system, including: a wind turbine generator set and the wind turbine generator set experimental platform introduced above.
[0025] It can be seen that this application has the following beneficial effects:
[0026] The experimental platform provided by the embodiment of the present application includes a traction motor and a power grid simulator; the power grid simulator can be used to simulate the power grid well, and the power grid simulator can provide electric energy to the traction motor, so that the traction motor drives the tested generator to generate electricity, thereby simulating the normal operation of the wind turbine. In this way, various operating parameters of the wind turbine can be tested, thereby completing the experiment of the wind turbine. This technical solution can provide an experimental platform that can always truly simulate the on-site wind speed and evaluate the primary frequency regulation performance of the wind turbine when the power grid is abnormal. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 A schematic diagram of a wind turbine test platform provided in an embodiment of the present application;
[0028] Figure 2 A schematic diagram of another wind turbine test platform provided in an embodiment of the present application;
[0029] Figure 3 A schematic diagram of a test system provided in an embodiment of the present application. DETAILED DESCRIPTION
[0030] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, the embodiments of the present application are further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0031] See also Figure 1 , which is a schematic diagram of a wind turbine experimental platform provided in an embodiment of the present application.
[0032] The wind turbine experimental platform for a primary frequency modulation experiment provided in the embodiment of the present application comprises: a traction motor 100 and a power grid simulator 200;
[0033] The wind turbine generator set under test includes: a tested generator 300 and a power generation converter 400 .
[0034] The tested generator 300 is a wind turbine experimental sample, which drives the motor to rotate through mechanical transmission to generate electricity.
[0035] The power generation converter 400 is an experimental sample of the wind turbine being tested.
[0036] The first end of the traction motor 100 is connected to the first end of the tested generator 300 of the wind turbine generator set.
[0037] The second end of the traction motor 100 is connected to the power grid simulator 200;
[0038] A first end of the power generation converter 400 of the wind turbine generator set is connected to a second end of the tested generator 300 , and a second end of the power generation converter 400 is connected to the power grid simulator 200 .
[0039] The main function of the traction motor 100 is to simulate the rotation of the impeller and transmit the mechanical energy to the generator 300 under test.
[0040] The main functions of the power grid simulator 200 are as follows:
[0041] 1. Used to absorb energy from the power grid and provide the loss power of the traction motor 100 to drive the tested generator 300;
[0042] 2. Used to simulate the power grid capacity of different short-circuit ratio SCRs and to verify the experimental procedures; the short-circuit ratio (SCR) refers to the short-circuit capacity of the system divided by the equipment capacity, so when the short-circuit ratio is large, it means that the switching of the equipment does not have a great impact on the system. The short-circuit capacity is numerically equal to the system admittance value under unit voltage, which is the reciprocal of the system's Thevenin equivalent impedance. The larger the short-circuit capacity, the smaller the system's Thevenin equivalent resistance, and the switching of loads, parallel capacitors or reactors will not cause a large change in the voltage amplitude, so the system is relatively strong.
[0043] 3. Used to simulate different power grid faults, such as high voltage ride-through or low voltage ride-through in the power grid.
[0044] As wind turbines become larger and larger, the capacity of the power grid simulator is gradually increasing along with the installed capacity of the wind turbine. If this trend is followed, the grid access permit for wind turbines will require a higher experimental cost. The technical solution provided by the utility model only provides lossy power grid simulation, which is highly economical.
[0045] Due to the wind turbine test platform for the primary frequency regulation experiment provided in the embodiment of the present application, the power grid simulator 200 is connected to the traction motor 100. As a consumable power grid simulator, the power can be smaller than the power of the actual wind turbine. Therefore, there is no need to configure a power grid simulator with the same power as the actual wind turbine. This can reduce the cost of the power grid simulator. For example, when the power of the wind turbine is 20MW, the power of the power grid simulator can be 5MW. It should be understood that the above values are only examples, and power grid simulators of other powers can also be used. In short, the power grid simulator of the present application can use a power grid simulator with less power than the power of the wind turbine.
[0046] The wind turbine experimental platform for primary frequency regulation experiment provided in the embodiment of the present application includes a traction motor 100 and a power grid simulator 200; the power grid simulator 200 can be used to simulate the power grid well, and the power grid simulator 200 can provide electric energy to the traction motor 100, so that the traction motor 100 can drive the tested generator 300 to generate electricity, thereby simulating the normal operation of the wind turbine. In this way, various operating parameters of the wind turbine can be tested, thereby completing the experiment of the wind turbine. This technical solution can provide an experimental platform that can always truly simulate the on-site wind speed and evaluate the primary frequency regulation performance of the wind turbine when the power grid is abnormal.
[0047] In addition, in order to compensate for the loss of mechanical energy of the traction motor caused by a power grid failure, and to compensate for the lack of energy absorbed by the power grid under special experimental conditions, such as low voltage ride-through, the wind turbine test platform for a primary frequency modulation experiment provided in the embodiment of the present application is specifically referred to in Figure 2 , which is a schematic diagram of another wind turbine experimental platform for primary frequency modulation experiments provided in an embodiment of the present application, the experimental platform provided in this embodiment also includes: an energy storage converter 500;
[0048] The second end of the traction motor 100 is connected to the power grid simulator 200 via the energy storage converter 500 .
[0049] The experimental platform may also include: energy storage battery BAT;
[0050] The DC side of the energy storage converter 500 is connected to the energy storage battery BAT;
[0051] The first AC side of the energy storage converter 500 is connected to the power grid simulator 200 , and the second AC side of the energy storage converter 500 is connected to the traction motor 100 .
[0052] The experimental platform provided in the embodiment of the present application drives the traction motor 100 to continue running by replenishing energy with the energy storage battery BAT. The wind speed of the simulated wind field will not cause mechanical energy loss due to power grid failure or other circumstances. It is used to truly evaluate the actual operating status of the test generator 300 and the power generation inverter 400 under different power grids.
[0053] In order to perform voltage transformation and isolation of interference signals, the experimental platform provided in the embodiment of the present application also includes: an isolation transformer 600; the isolation transformer 600 isolates the driving system from the test system to prevent mutual coupling between the two systems.
[0054] The first side of the isolation transformer 600 is connected to the power grid simulator 200;
[0055] The second side of the isolation transformer 600 is connected to the first AC side of the energy storage converter 500 .
[0056] The first side of the isolation transformer 600 is a delta connection, and the second side of the isolation transformer 600 is a star connection.
[0057] In a possible implementation, the power generation converter 400 includes a first rectifier circuit and a first inverter circuit;
[0058] The first end of the first rectifier circuit is connected to the generator under test, and the first rectifier circuit is used to rectify the AC power output by the generator under test into DC power; the second end of the first rectifier circuit is connected to the first end of the first inverter circuit, and the second end of the first inverter circuit is connected to the power grid simulator. The first inverter circuit is used to convert the DC power output by the first rectifier circuit into AC power for grid connection.
[0059] In a possible implementation, the energy storage converter 500 includes a second inverter circuit;
[0060] The first end of the second inverter circuit is connected to the energy storage battery BAT, and the second end of the second inverter circuit is connected to the traction motor 100. The second inverter circuit can convert the DC power provided by the energy storage battery BAT into AC power and provide it to the traction motor 100, so that the traction motor 100 can traction the generator 300 under test.
[0061] The experimental platform provided in the embodiment of the present application does not specifically limit the working mode of the wind turbine generator set. For example, the wind turbine generator set includes any one of the following: direct drive mode, semi-direct drive mode or double-fed mode.
[0062] Based on the wind turbine test platform for primary frequency modulation experiment provided in the above embodiment, the embodiment of the present application also provides a test system, which is described in detail below with reference to the accompanying drawings.
[0063] See also Figure 3 , which is a schematic diagram of a test system provided in an embodiment of the present application.
[0064] The test system provided in the embodiment of the present application includes: a wind turbine 2000 and the wind turbine experimental platform 1000 introduced in the above embodiment.
[0065] Since the test system provided by the embodiment of the present application includes the wind turbine experimental platform for the primary frequency modulation experiment described above, the experimental platform includes a traction motor and a power grid simulator; the power grid simulator can be used to simulate the power grid well, and the power grid simulator can provide electric energy to the traction motor, so that the traction motor drives the tested generator to generate electricity, thereby simulating the normal operation of the wind turbine. Therefore, various operating parameters of the wind turbine can be tested, thereby completing the experiment of the wind turbine.
[0066] It should be noted that the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments, and the same or similar parts between the various embodiments can be referred to each other. For the system or device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description.
[0067] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A wind turbine test platform, characterized in that: include: Traction motor and power grid simulator; The first end of the traction motor is connected to the first end of the tested generator of the wind turbine generator set; The second end of the traction motor is connected to the power grid simulator; The first end of the power generation converter of the wind turbine generator set is connected to the second end of the tested generator, and the second end of the power generation converter is connected to the power grid simulator; Also included: energy storage converter; The second end of the traction motor is connected to the power grid simulator through the energy storage converter Also includes: energy storage batteries; The DC side of the energy storage converter is connected to the energy storage battery; The first AC side of the energy storage converter is connected to the power grid simulator, and the second AC side of the energy storage converter is connected to the traction motor.
2. The experimental platform according to claim 1, characterized in that: Also includes: Isolation transformer; The first side of the isolation transformer is connected to the power grid simulator; The second side of the isolation transformer is connected to the first AC side of the energy storage converter.
3. The experimental platform according to claim 1, characterized in that: The power generation converter includes a first rectifier circuit and a first inverter circuit; The first end of the first rectifier circuit is connected to the generator under test, the second end of the first rectifier circuit is connected to the first end of the first inverter circuit, and the second end of the first inverter circuit is connected to the power grid simulator.
4. The experimental platform according to claim 3, characterized in that: The energy storage converter comprises a second inverter circuit; The first end of the second inverter circuit is connected to the energy storage battery, and the second end of the second inverter circuit is connected to the traction motor.
5. The experimental platform according to any one of claims 1 to 4, characterized in that: The wind turbine generator set includes any one of the following: direct drive mode, semi-direct drive mode or double-fed mode.
6. The experimental platform according to claim 2, characterized in that: The first side of the isolation transformer is a delta connection, and the second side of the isolation transformer is a star connection.
7. The experimental platform according to any one of claims 1 to 4, characterized in that: The power of the power grid simulator is less than the power of the wind turbine generator set.
8. A testing system, characterized in that: include: A wind turbine generator set and a wind turbine generator set experimental platform as described in any one of claims 1 to 7.