Telescopic assembly type far-shore steel tower hoisting measurement platform
By designing a telescopically assembled far-shore steel tower hoisting measurement platform, the instrument height adjustment is realized by using anchor plates, stiffening ribs and telescopic components, which solves the problems of small space at the top of the tower and difficulty in adjusting the welded steel frame, and improves measurement efficiency and accuracy. , ensuring construction safety and quality.
Patent Information
- Application Number
- CN202420062841.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-10
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-01-10
AI Technical Summary
During the hoisting process of the steel tower in the water on the far shore, the space at the top of the tower is small, making it difficult to ensure the stability and safety of the measuring instruments. Moreover, the traditional welded steel frame cannot avoid obstacles when adjusting the height, affecting the measurement efficiency and quality.
A telescopically assembled far-shore steel tower hoisting measurement platform is designed, including anchor plates, stiffening ribs, horizontal telescopic base frames, vertical lifting support frames and walkway protection platforms, which are realized through transverse rod telescopic components and diagonal brace telescopic components. The height adjustment and stability of the instrument provide adjustable installation height and a safe working platform.
It achieves the stability and safety of the instrument, improves the efficiency and accuracy of steel tower positioning measurement, avoids the risk of instrument slipping and falling, reduces the welding process, reduces material costs, and ensures the quality of steel tower construction. .
Smart Images

Figure CN221880749U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of segmented hoisting, positioning and measuring of offshore underwater steel towers, and in particular relates to a telescopic assembled offshore steel tower hoisting and measuring platform. Background Art
[0002] With the continuous development of the national economy and science and technology, the navigation and transportation in rivers are busy day and night. In order to reduce the impact of bridges on shipping, the span of cross-river bridges is getting larger and larger, the height of cable towers is getting larger and larger, and the structural forms are becoming more and more diversified. Steel towers have the characteristics of light weight, good seismic performance and environmental protection, and are also adopted by more and more designers. However, for construction, the construction difficulty and risk of super-high cable towers with complex structures are also greater. In order to facilitate in-plant manufacturing, transportation and hoisting, the construction process of vertical segmentation or vertical segmentation + horizontal block hoisting will be adopted according to the hoisting capacity of the tower crane. Due to the geographical location of the steel tower in the water far from the shore, there are few locations for the measurement base points under the tower, and the number of measurement base points under the tower is limited. At the same time, in order to improve the measurement accuracy of steel tower hoisting and reduce the influence of temperature on the deformation of steel towers, the general steel tower hoisting positioning measurement is selected when the temperature is relatively constant at night, and the instrument is set on the top of the steel tower for measurement and control. However, for the hoisting of steel tower segments that are both vertically segmented and horizontally segmented, the space on the top of the tower is limited, and the construction personnel and construction machinery cross-operate and come and go frequently. Therefore, it is particularly important to set the measuring instrument in a stable position and ensure the safety of personnel and equipment, and quickly complete the data collection of steel tower positioning within a limited time period to guide the positioning of steel tower segments.
[0003] At present, for the hoisting measurement of steel tower segments, in order to improve convenience, the commonly used wooden tripod of the total station is generally selected, and the total station is set up at a location with good visibility. During measurement, the top surface of the steel tower is relatively smooth, and the construction workers are very likely to touch the tripod when walking back and forth, causing the tripod to slip during the observation process, and the problem of the instrument bubble not being centered. It is necessary to repeatedly detect the bubble and repeatedly look back, and even the measurement accident of the instrument falling may occur, affecting the construction efficiency and quality of the steel tower positioning. Another method is to weld the steel frame at the top surface of the steel tower with good visibility after the initial positioning of the steel tower is completed, which ensures the stability of the instrument. However, the height of the welded steel frame cannot be adjusted. When measuring the line of sight obstruction, it is impossible to avoid the influence of obstacles by adjusting the installation height of the steel frame. It is not conducive to on-site measurement. At the same time, welding steel components after the steel tower is hoisted affects the construction efficiency, and when the steel frame is cut, it is very easy to cause damage to the steel structure parent material, which brings quality risks to the steel tower. Utility Model Content
[0004] The utility model aims to provide a telescopic assembled far-shore steel tower hoisting measurement platform to solve the problem that the top surface space is narrow when hoisting the steel tower segment far away from the embankment, making it difficult to ensure the stability and safety of the measuring instrument.
[0005] The purpose of the utility model is achieved through the following technical solutions:
[0006] A telescopic assembled far-shore steel tower hoisting measurement platform comprises an anchor plate and a stiffening rib plate, a horizontal telescopic base frame is arranged between the stiffening rib plates, a vertical lifting support frame is arranged on the horizontal telescopic base frame, a total station is arranged on the vertical lifting support frame, and a walkway protection platform located outside the horizontal telescopic base frame is arranged on the anchor plate and the stiffening rib plate.
[0007] Furthermore, at least two stiffening ribs are connected to the outer side of the anchor plate, and the anchor plate is arranged perpendicularly to the stiffening ribs.
[0008] Furthermore, the horizontal telescopic base frame includes a cross bar, both ends of which are connected with inverted U-shaped buckles, the inverted U-shaped buckles are arranged on the stiffening rib plate, a diagonal brace is connected between the cross bar and the inverted U-shaped buckles, and a cross bar telescopic assembly is arranged on the cross bar.
[0009] Furthermore, the crossbar comprises a cross base bar and a longitudinal connecting bar, the cross base bars are connected with the longitudinal connecting bar, and one end of the diagonal brace is connected to the longitudinal connecting bar.
[0010] Furthermore, the inverted U-shaped buckle includes a buckle top plate and a buckle side plate, the two sides of the buckle top plate are respectively connected to the top of a buckle side plate, and the buckle top plate or the inner buckle side plate is connected to the cross bar.
[0011] Furthermore, a diagonal brace telescopic assembly is provided on the diagonal brace.
[0012] Furthermore, the vertical lifting support frame includes a lower support rod, the bottom of the lower support rod is connected to the horizontal telescopic base frame, the top of the lower support rod is connected to the support rod lifting assembly, the support rod lifting assembly is connected to the bottom of the upper support rod, the top of the upper support rod is connected to the observation plate, and the total station is arranged on the observation plate.
[0013] Furthermore, an upper fastening frame is connected between the upper parts of the lower support rods, and an upper fastening frame is connected between the lower parts of the upper support rods.
[0014] Furthermore, the observation plate of the vertical lifting support frame has a total station above and a clamping adapter below, and the instrument tension screws are connected to the total station after passing through the clamping adapter and the circular holes of the observation plate, and the observation plate and the clamping adapter are clamped together.
[0015] Furthermore, the walkway protection platform is in a U-shaped structure and is arranged on the outside of the anchor plate, and the horizontal telescopic base frame is located in the U-shaped groove.
[0016] Furthermore, the walkway protection platform includes a walkway bottom plate, and a protective railing is arranged on the edge of the walkway bottom plate. The walkway bottom plate is fixed to the anchor plate or the stiffening rib plate by protective fastening screws.
[0017] The beneficial effects of the utility model are as follows: the measuring platform has a simple structure, is stable and reliable, can be assembled quickly, and is a device that can adjust the installation height arbitrarily and can be reused. The device can be processed and manufactured in parts in advance in the factory, and can be quickly assembled and dismantled on the tower, realizing the adjustable installation height, ensuring the stability of the instrument when positioning the steel tower, improving the efficiency of steel tower positioning measurement, and ensuring the accuracy and quality of steel tower positioning measurement.
[0018] The aforementioned main scheme of the utility model and its further options can be freely combined to form multiple schemes, all of which are schemes that can be adopted and protected by the utility model; and in the utility model, (non-conflicting options) options and other options can also be freely combined. After understanding this scheme, those skilled in the art can understand that there are many combinations based on the existing technology and common knowledge, all of which are technical schemes to be protected by the utility model, and they are not exhaustively listed here. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the structure of the utility model.
[0020] Figure 2 yes Figure 1 1-1 cross-sectional view.
[0021] Figure 3 yes Figure 1 2-2 cross-section diagram.
[0022] Figure 4 yes Figure 1 3-3 cross-section diagram.
[0023] In the figure: 1-anchor plate, 2-stiffening rib plate, 3-horizontal telescopic base frame, 4-vertical lifting support frame, 5-total station, 6-walkway protection platform; 31-cross bar, 32-inverted U-shaped buckle, 33-diagonal brace, 35-cross bar telescopic assembly, 36-diagonal brace telescopic assembly; 41-lower support rod, 42-lower fastening frame, 43-support rod lifting assembly, 44-upper support rod, 45-upper fastening frame, 46-observation plate; 51-clamping adapter, 52-instrument tension screws, 61-walkway bottom plate, 62-guardrail, 63-protection fastening screws. DETAILED DESCRIPTION
[0024] The present invention will be further described below in conjunction with specific embodiments and drawings.
[0025] refer to Figure 1 to Figure 4As shown, a telescopic assembled far-shore steel tower hoisting measurement platform includes an anchor plate 1, a stiffening rib plate 2, a horizontal telescopic base frame 3, a vertical lifting support frame 4, a total station 5 and a walkway protection platform 6.
[0026] At least two stiffening ribs 2 are welded to the outer side of the anchor plate 1. The anchor plate 1 is arranged vertically relative to the stiffening ribs 2. The stiffening ribs 2 strengthen the structure of the anchor plate 1. The anchor plate 1 combined with the stiffening ribs 2 provides a basis for setting up a measuring platform.
[0027] A horizontal telescopic base frame 3 is provided between two adjacent stiffening ribs 2. The horizontal telescopic base frame 3 is a structure arranged on the stiffening ribs 2, which can be horizontally telescopic to meet the spacing between different ribs. As the bottommost basic structure, it provides support for the vertical lifting frame 4. A vertical lifting frame 4 is provided on the horizontal telescopic base frame 3, and a total station 5 is provided on the vertical lifting frame 4. The vertical lifting frame 4 is used to support the total station 5, which can be raised and lowered to adjust the height to avoid problems of obstruction or poor position of observation. A walkway protection platform 6 located outside the horizontal telescopic base frame 3 is provided on the anchor plate 1 and the stiffening ribs 2. The walkway protection platform 6 is used to form a platform for people to walk outside the horizontal telescopic base frame 3, thereby extending the operating range outside the original anchor plate 1. Arranging the total station within this operating range will not cause adverse effects on the original operating range.
[0028] The horizontal telescopic base frame 3 includes a cross bar 31 , a U-shaped buckle 32 , a diagonal brace 33 , a cross bar telescopic assembly 35 and a diagonal brace telescopic assembly 36 .
[0029] The cross bar 31 is a main part of the base frame welded from pipes, including a cross basic rod and a longitudinal connecting rod, and the cross basic rods are welded with the longitudinal connecting rods to form a grid-like frame rod structure. The two ends of the cross bar 31 (cross basic rod) are welded with an inverted U-shaped buckle 32, which is buckled on the stiffening rib plate 2 to achieve the buckling and fixing of the cross bar 31 on the stiffening rib plate 2.
[0030] The inverted U-shaped buckle 32 is welded from steel plates, including a buckle top plate and a buckle side plate. The two sides of the buckle top plate are respectively welded to the top of a buckle side plate, thereby forming an inverted U-shaped buckle. The buckle top plate or the inner buckle side plate is welded to the end of the crossbar 31. Two inverted U-shaped buckles 32 are welded at both ends of the crossbar 31. The inverted U-shaped buckle is installed on the top surface of the steel tower stiffening rib plate, and upper and lower fastening screws are set on the side of the inverted U-shaped buckle to fix it, so as to increase the stability of the inverted U-shaped buckle.
[0031] The crossbar 31 is provided with a crossbar telescopic assembly 35, and specifically, the crossbar telescopic assembly 35 is provided at one end of the crossbar 31 to adapt to the spacing change of stiffening ribs of different widths. The crossbar telescopic assembly 35 can be formed of two mutually sleeved pipes, and the telescopic length can be continuously adjusted, and then locked and fixed with screws. The crossbar telescopic assembly 35 can also be formed of a transition sleeve with threads at both ends, and both ends of the sleeve are threadedly connected to the crossbar, and the crossbar can be extended or shortened by rotating the transition sleeve.
[0032] A diagonal brace 33 is connected between the crossbar 31 and the inverted U-shaped buckle 32 at one end. Specifically, one end of the diagonal brace 33 is connected to the longitudinal connecting rod of the crossbar 31. Two diagonal braces are arranged inside the inverted U-shaped buckle 32 and converge at the center of the crossbar to form a triangular support to improve stability. A diagonal brace telescopic assembly 36 is arranged on the diagonal brace 33 to adjust the slight vertical deviation of the upper support lifting system. The structure or principle of the diagonal brace telescopic assembly 36 is the same as that of the crossbar telescopic assembly 35.
[0033] The vertical lifting support frame 4 includes a lower support rod 41 , a lower fastening frame 42 , a support rod lifting assembly 43 , an upper support rod 44 and an upper fastening frame 45 .
[0034] The bottom of the lower support rod 41 is connected to the horizontal telescopic base frame 3. Specifically, the lower support rod is composed of four hollow steel columns, and the lower end of the lower support rod is connected to the cross bar (cross base bar) by connecting screws. The upper part of the lower support rod 41 is connected with a lower fastening frame 42, which is a square frame structure formed by connecting the lower support rod 41 with four connecting rods to increase the overall stability of the lower support rod.
[0035] The top of the lower support rod 41 is connected to the support rod lifting assembly 43, and the support rod lifting assembly 43 is connected to the bottom of the upper support rod 44. The upper support rod 44 and the lower support rod 41 are extended and connected through the support rod lifting assembly 43, so as to facilitate the adjustment of the upper and lower heights when measuring the line of sight obstruction. The structure or principle of the support rod lifting assembly 43 is the same as that of the crossbar telescopic assembly 35.
[0036] The top of the upper support rod 44 is connected to the observation plate 46. Specifically, the upper support rod is composed of four hollow steel columns, and the top of the upper support rod 44 is connected to the observation plate by screws. An upper fastening frame 45 is connected between the lower parts of the upper support rods 44. The upper fastening frame 45 is a square frame structure formed by connecting the upper support rods 44 with four connecting rods to increase the overall stability of the upper support.
[0037] The total station 5 is arranged on the observation plate 46, that is, the total station 5 is placed on the observation plate 46, and then the load is transmitted to the horizontal telescopic base frame 3 through the upper and lower support rods, and the relative height of the upper and lower support rods can be adjusted.
[0038] The total station 5 is located above the observation plate 46, and the clamping adapter 51 is located below. A 60mm diameter circular hole is reserved in the center of the observation plate so that the instrument can move in a small range when the line of sight is blocked. The instrument tension screw 52 passes through the clamping adapter 51 and the circular hole of the observation plate 46 and is connected to the total station 5. The observation plate 46 and the clamping adapter 51 are clamped together. The position of the total station can be adjusted by loosening the screw, and the total station and the clamping adapter clamp the observation plate to achieve fixed locking by tightening the screw.
[0039] The walkway protection platform 6 is in a U-shaped structure and is arranged on the outside of the anchor plate 1. The horizontal telescopic base frame 3 is located in the U-shaped groove, that is, the horizontal telescopic base frame 3 and the walkway protection platform 6 expand the working range on the top surface of the steel tower. The operator can adjust the total station 5 on the walkway protection platform 6.
[0040] The walkway protection platform 6 includes a walkway base plate 61, a protective railing 62 and protective fastening screws 63. The walkway base plate is laid in three directions of the stiffening rib plate and the anchor plate. The walkway base plate 61 is fixed to the anchor plate 1 or the stiffening rib plate 2 by protective fastening screws 63. Fastening bolts are arranged at the intersection of the walkway base plate, the anchor plate and the stiffening rib plate to increase the stability of the walkway. A protective railing 62 is arranged on the edge of the walkway base plate 61 to increase the safety of the walkway. The walkway base plate and the protective railing are on the top surface of the steel tower in the positive direction of the anchor plate, which is the passage for daily passage and entry into the measurement platform, and there is no need to lay walkways and railings.
[0041] The above structure is simple in design, easy to manufacture, and convenient to install and disassemble. It solves the problem of narrow space on the top surface during steel tower hoisting, no stable position to set up instruments, and obstruction of measurement vision. It avoids the need for construction workers to repeatedly level and look back after touching the instruments when walking back and forth, and the safety risk of the instruments falling. It greatly improves the efficiency and accuracy of measurements on steel tower hoisting towers. Prefabricated processing, manufacturing and assembly are adopted, which can be recycled, thus saving material costs. While ensuring the safety of personnel, assembly can omit the welding process, eliminate the quality risks of traditional steel frame disassembly and welding to the steel tower, improve the efficiency of steel tower measurement, and also ensure the quality of steel tower construction, which has good prospects for promotion and application.
[0042] Before the steel tower is hoisted and positioned, the relevant components of the measurement platform are processed and manufactured in advance in the factory. When the steel tower is hoisted, in order to improve the installation efficiency and safety, the walkway protection platform can be installed under the tower in advance, and other measurement platform assembly parts are placed inside the steel tower, and then installed after being hoisted to the tower together with the steel tower. First, install the horizontal telescopic base frame, and adjust the length of the crossbar by telescoping the crossbar to adapt to the spacing of the stiffening plates. A small amount of downward deflection may occur during the installation of the crossbar, and the horizontal level of the crossbar can be fine-tuned through the diagonal brace telescopic device.
[0043] Then install the vertical lifting frame, connect the vertical lifting frame to the top of the horizontal bar through the bolts at the lower end of the lower support rod, and install the observation plate through the bolts at the top of the upper support rod. During observation, adjust the installation height of the instrument by telescoping the vertical lifting frame according to the visibility, and adjust the installation position of the instrument through the reserved hole in the center of the observation plate to achieve the best visibility conditions.
[0044] The above basic examples and further optional examples of the utility model can be freely combined to form multiple embodiments, which are all embodiments that can be adopted and claimed for protection by the utility model. In the scheme of the utility model, each optional example can be arbitrarily combined with any other basic examples and optional examples.
[0045] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A telescopic assembled offshore steel tower hoisting measurement platform, comprising an anchor plate (1) and a stiffening rib plate (2), characterized in that: A horizontal telescopic base frame (3) is provided between the stiffening rib plates (2), a vertical lifting support frame (4) is provided on the horizontal telescopic base frame (3), a total station (5) is provided on the vertical lifting support frame (4), and a walkway protection platform (6) located outside the horizontal telescopic base frame (3) is provided on the anchor plate (1) and the stiffening rib plates (2).
2. The telescopic assembled remote shore steel tower hoisting measurement platform according to claim 1 is characterized by: At least two stiffening ribs (2) are connected to the outer side of the anchor plate (1), and the anchor plate (1) is arranged vertically relative to the stiffening ribs (2).
3. The telescopic assembled remote shore steel tower hoisting measurement platform according to claim 1 is characterized by: The horizontal telescopic base frame (3) comprises a cross bar (31), both ends of the cross bar (31) are connected with inverted U-shaped buckles (32), the inverted U-shaped buckles (32) are buckled on the stiffening rib plate (2), a diagonal brace (33) is connected between the cross bar (31) and the inverted U-shaped buckle (32), and a cross bar telescopic assembly (35) is provided on the cross bar (31).
4. The telescopic assembled remote shore steel tower hoisting measurement platform according to claim 3 is characterized by: The crossbar (31) comprises a cross-base rod and a longitudinal connecting rod, the cross-base rods are connected with the longitudinal connecting rod, and one end of the diagonal brace (33) is connected to the longitudinal connecting rod; The inverted U-shaped buckle (32) comprises a buckle top plate and a buckle side plate, the two sides of the buckle top plate are respectively connected to the top of a buckle side plate, and the buckle top plate or the inner buckle side plate is connected to the crossbar (31).
5. The telescopic assembled remote shore steel tower hoisting measurement platform according to claim 3 or 4, characterized in that: The diagonal brace (33) is provided with a diagonal brace telescopic assembly (36).
6. The telescopic assembled remote shore steel tower hoisting measurement platform according to claim 1 is characterized by: The vertical lifting support frame (4) comprises a lower support rod (41), the bottom of the lower support rod (41) is connected to the horizontal telescopic base frame (3), the top of the lower support rod (41) is connected to the support rod lifting assembly (43), the support rod lifting assembly (43) is connected to the bottom of the upper support rod (44), the top of the upper support rod (44) is connected to the observation plate (46), and the total station (5) is arranged on the observation plate (46).
7. The telescopic assembled remote shore steel tower hoisting measurement platform according to claim 6 is characterized by: The upper parts of the lower support rods (41) are connected with a lower fastening frame (42), and the lower parts of the upper support rods (44) are connected with an upper fastening frame (45).
8. The telescopic assembled remote shore steel tower hoisting measurement platform according to claim 1 is characterized by: The observation plate (46) of the vertical lifting support frame (4) has a total station (5) above and a clamping adapter (51) below. The instrument tension screws (52) pass through the clamping adapter (51) and the circular holes of the observation plate (46) to connect with the total station (5). The observation plate (46) and the clamping adapter (51) are clamped and matched.
9. The telescopic assembled remote shore steel tower hoisting measurement platform according to claim 1 is characterized by: The walkway protection platform (6) is in a U-shaped structure and is arranged outside the anchor plate (1), and the horizontal telescopic base frame (3) is located in the U-shaped notch.
10. The telescopic assembled remote shore steel tower hoisting measurement platform according to claim 1 or 9, characterized in that: The walkway protection platform (6) comprises a walkway base plate (61), the edge of which is provided with a protection railing (62), and the walkway base plate (61) is fixed to the anchor plate (1) or the stiffening rib plate (2) by means of protection fastening screws (63).