Water hammer simulation device
By designing the circulation pipeline and control valve structure of the water hammer simulation device, the water hammer effect of the water meter in the real flow state is simulated, which solves the problem that the existing technology cannot test the water hammer effect in the real flow state, and realizes the water hammer effect of the water meter. Efficient assessment of the impact of the hammer effect.
Patent Information
- Application Number
- CN202420053632.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-09
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-01-09
AI Technical Summary
Existing water hammer simulation devices cannot simulate the water hammer effect under real flow conditions, and cannot effectively test the water hammer effect of water meters under actual use conditions.
A water hammer simulation device is designed, including a device platform, a first nozzle, a second nozzle, a circulation pump, a calibration pipeline and a control valve. By forming a circulation pipeline, the water meter to be measured is connected to it, and the circulation pump is turned on to allow the water to flow. Circulation is carried out, and the water hammer effect is simulated through the control valve to check the impact of water hammer effect on the water meter.
It has realized the simulation test of the water hammer effect of the water meter under the real flow state, and can effectively evaluate the impact of the water hammer effect on the water meter. The structure is simple and reliable.
Smart Images

Figure CN221882737U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water meter detection equipment, in particular to a water hammer simulation device. Background Art
[0002] As an important measuring instrument for water consumption, the water meter's measurement accuracy, measurement range, reliability, life and function, and manufacturing cost are all related to the measurement of water consumption and the settlement of water charges, as well as its use value in terms of water control, water conservation, and water management. It is particularly important to simulate the water hammer effect (i.e., the influence of pressure fluctuations in the pipeline under normal flow conditions) when the water meter maintains normal operation under normal flow conditions, so as to detect the change in the flow error of the water meter under the sudden change of water pressure in the pipeline network and the influence of the electromechanical synchronization consistency of the smart 1.0 water meter. The Chinese patent with announcement number CN219104128U discloses a water hammer simulation device, which simulates the impact force on each component of the water meter by a sphere from a high place to simulate the water hammer effect of the water meter. It cannot approach the actual use conditions, and it can only test the impact resistance of each component of the water meter but cannot test the water hammer effect of the water meter under the real flow state. Utility Model Content
[0003] The utility model provides a water hammer simulation device, which can complete the simulation test of the water hammer effect of the water hammer under the real flow state.
[0004] In order to solve the above technical problems, the utility model provides a water hammer simulation device, comprising:
[0005] A device station, wherein a first connecting pipe and a second connecting pipe are arranged on the device station, and a circulating pump is arranged on the first connecting pipe;
[0006] A calibration pipeline, used to connect the water meter to be tested, the first connecting pipe, the second connecting pipe and the calibration pipeline are connected to form a circulation pipeline, the calibration pipeline is located between the first connecting pipe and the second connecting pipe, the two ends of the calibration pipeline are respectively connected to the first connecting pipe and the second connecting pipe, and the first connecting pipe is connected to the second connecting pipe;
[0007] A control valve is arranged on the circulation pipeline, and the control valve is used to control the on-off of the water flow in the circulation pipeline.
[0008] As a preferred embodiment of the above technical solution, the water hammer simulation device also includes a branch pipe, both ends of the branch pipe are connected to the first connecting pipe, the connection between the first end of the branch pipe and the first connecting pipe is close to the inlet of the circulation pump, and the connection between the second end of the branch pipe and the first connecting pipe is close to the outlet of the circulation pump, and a branch control valve is arranged on the branch pipe.
[0009] As a preferred embodiment of the above technical solution, the control valve includes a first control valve and a second control valve, the first control valve is arranged on the first connecting pipe, and the second control valve is arranged on the second connecting pipe.
[0010] As a preferred embodiment of the above technical solution, the calibration pipeline includes a plurality of calibration short tubes, and two adjacent calibration short tubes are connected to a water meter to be tested so as to connect the water meter to be tested to the circulation pipeline.
[0011] As a preferred embodiment of the above technical solution, the calibration short tube is installed on a support seat, and the support seat is arranged on the device platform.
[0012] As a preferred embodiment of the above technical solution, a slide groove is provided on the device platform along its length direction, and the support seat is movably matched with the slide groove.
[0013] As a preferred embodiment of the above technical solution, the support seat includes a ring, and the ring is sleeved on the calibration short tube.
[0014] As a preferred embodiment of the above technical solution, long cover plates are respectively provided on both sides of the slide groove, and a clamping space is formed between the long cover plates on both sides. The support seat includes a base support block, the upper end of the base support block is connected to the ring, and clamping grooves are provided on both sides of the base support block, and the clamping grooves are engaged with the inner sides of the long cover plates.
[0015] As a preferred embodiment of the above technical solution, a reinforcing bracket is provided on the upper part of the device platform, and the reinforcing bracket includes a first vertical bracket, a second vertical bracket, a lateral connecting plate and a transverse rod. The first vertical bracket is fixed on the device platform and is close to the first connecting pipe. The second vertical bracket is fixed on the device platform and is close to the second connecting pipe. The two ends of the transverse rod are respectively fixedly connected to the first vertical bracket and the second vertical bracket. The lateral connecting plate is obliquely connected to the first vertical bracket and the device platform, and the lower end of the lateral connecting plate is connected to the side of the device platform.
[0016] As a preferred embodiment of the above technical solution, the circulating pump is a high-pressure variable frequency water pump, the control valve is a pneumatic ball valve, and the branch control valve is a manual control valve.
[0017] The utility model provides a water hammer simulation device, which comprises a device platform, a calibration pipeline and a control valve. A first connecting pipe and a second connecting pipe are arranged on the device platform. The first connecting pipe and the second connecting pipe are connected with the calibration pipeline to form a circulation pipeline. A water meter to be tested is connected to the calibration pipeline so as to connect the water meter to be tested to the circulation pipeline. When simulating water hammer, a circulation pump on the first connecting pipe is turned on to make water flow circulate in the circulation pipeline. During the process of water flow circulation, water flows through the water meter to be tested. Then, the control valve on the circulation pipeline is switched on and off to simulate the water hammer effect on the water meter to be tested in a real flow state. The utility model not only has a simple structure, but also can simulate the water hammer effect of the water meter in a real flow state to see whether the water hammer effect will affect the water meter.
[0018] The above description is only an overview of the technical solution of the utility model. In order to more clearly understand the technical means of the utility model, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the utility model more obvious and easy to understand, the specific implementation methods of the utility model are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 A schematic diagram of the three-dimensional structure of a water hammer simulation device according to the present embodiment is shown;
[0020] Figure 2 The three-dimensional structure diagram of the device station in this embodiment is shown;
[0021] Figure 3 Shows Figure 2 A is an enlarged schematic diagram;
[0022] Figure 4 A schematic diagram of the connection structure of the calibration pipeline in this embodiment is shown;
[0023] Figure 5 The schematic diagram of the installation structure of the verification short tube in this embodiment is shown;
[0024] In the figure: 10, device position; 20, first connecting pipe; 30, second connecting pipe; 40, first control valve; 50, branch pipe; 60, reinforcement bracket; 70, circulation pump; 80, calibration pipe; 90, support seat; 100, long cover plate; 110, water meter to be tested; 120, second control valve; 130, branch control valve; 101, slide; 102, clamping space; 103, guide slope; 601, first vertical bracket; 602, horizontal rod; 603, second vertical bracket; 604, lateral connecting plate; 801, calibration short pipe; 901, collar; 902, base support block; 903, clamping groove. DETAILED DESCRIPTION
[0025] In order to make the purpose, features and advantages of the utility model more obvious and easy to understand, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.
[0026] See also Figures 1 to 5 The present invention provides a water hammer simulation device, comprising:
[0027] The device station 10 is provided with a first connecting pipe 20 and a second connecting pipe 30, and the first connecting pipe 20 is provided with a circulating pump 70;
[0028] The verification pipe 80 is used to connect the water meter 110 to be tested. The first connecting pipe 20 and the second connecting pipe 30 are connected to the verification pipe 80 to form a circulation pipeline. The verification pipe 80 is located between the first connecting pipe 20 and the second connecting pipe 30. Both ends of the verification pipe 80 are respectively connected to the first connecting pipe 20 and the second connecting pipe 30. The first connecting pipe 20 and the second connecting pipe 30 are connected.
[0029] The control valve is arranged on the circulation pipeline and is used to control the on-off of the water flow in the circulation pipeline.
[0030] The present embodiment provides a water hammer simulation device, which includes a device station 10, a calibration pipe 80 and a control valve. A first connecting pipe 20 and a second connecting pipe 30 are arranged on the device station 10. The first connecting pipe 20 and the second connecting pipe 30 are connected to the calibration pipe 80 to form a circulation pipeline. A water meter 110 to be tested is connected to the calibration pipe 80 so as to connect the water meter 110 to be tested to the circulation pipeline. When performing water hammer simulation, the circulation pump 70 on the first connecting pipe 20 is turned on to allow water to circulate in the circulation pipeline. During the circulation of the water, the water flows through the water meter 110 to be tested. Then, the control valve on the circulation pipeline is switched on and off to simulate the water hammer effect on the water meter 110 to be tested under the actual flow state. The device not only has a simple structure, but also can simulate the water hammer effect of the water meter under the actual flow state to see whether the water hammer effect will affect the water meter.
[0031] In a further implementable embodiment of the present embodiment, the water hammer simulation device further includes a branch pipe 50, both ends of the branch pipe 50 are connected to the first connecting pipe 20, the connection between the first end of the branch pipe 50 and the first connecting pipe 20 is close to the inlet of the circulation pump 70, the connection between the second end of the branch pipe 50 and the first connecting pipe 20 is close to the outlet of the circulation pump 70, and a branch control valve 130 is arranged on the branch pipe 50.
[0032] The branch pipe 50 in this embodiment is connected to the first connecting pipe 20 and is connected in parallel with the circulation pump 70, which can protect the circulation pump 70 and prevent the circulation pump 70 from being damaged when the control valve on the circulation pipeline is closed. In addition, the branch control valve 130 in this embodiment can adjust the water pressure in the circulation pipeline by controlling the water flow passing through the branch pipe 50.
[0033] In a further implementable manner of this embodiment, the control valve includes a first control valve 40 and a second control valve 120 , the first control valve 40 is disposed on the first connecting pipe 20 , and the second control valve 120 is disposed on the second connecting pipe 30 .
[0034] In this embodiment, the first control valve 40 and the second control valve 120 are respectively arranged at the water inlet end and the water outlet end of the calibration pipe 80. The first control valve 40 and the second control valve 120 can be opened and closed alternately to simulate the water hammer effect of the water meter in the open valve state and the water hammer effect in the closed valve state, that is, the water hammer effect generated in the process from zero flow to normal flow and the water hammer effect generated in the process from normal flow to zero flow can be simulated.
[0035] In a further feasible embodiment of the present invention, the test pipe 80 includes a plurality of test short pipes 801 , and two adjacent test short pipes 801 are connected to a water meter 110 to be tested so as to connect the water meter 110 to be tested to the circulation pipeline.
[0036] The short calibration tube 801 in this embodiment can conveniently connect the water meter 110 to be tested to the circulation pipeline. After the water meter 110 to be tested is installed, the short calibration tube 801 is hydraulically tightened to clamp the water meter 110 to be tested.
[0037] In a further feasible embodiment of the present invention, the short test tube 801 is installed on a support seat 90 , and the support seat 90 is disposed on the device platform 10 .
[0038] In a further possible implementation of this embodiment, a slide groove 101 is provided on the device platform 10 along its length direction, and the support seat 90 is movably matched with the slide groove 101 .
[0039] The support seat 90 in this embodiment can move along the slide groove 101 in the length direction, which can facilitate the adjustment of the position of the support seat 90 and thus facilitate the installation of the water meter 110 to be tested.
[0040] In a further possible implementation of this embodiment, the support seat 90 includes a collar 901 , and the collar 901 is sleeved on the verification short tube 801 .
[0041] The collar 901 in the embodiment can facilitate the installation of the calibration short tube 801 .
[0042] In a further feasible embodiment of the present embodiment, long cover plates 100 are respectively provided on both sides of the slide groove 101, and a clamping space 102 is formed between the long cover plates 100 on both sides. The support seat 90 includes a base support block 902, and the upper end of the base support block 902 is connected to the ring 901. The base support block 902 is provided with clamping grooves 903 on both sides, and the clamping grooves 903 are clamped and matched with the inner side of the long cover plate 100.
[0043] In this embodiment, the card slot 903 is connected to the side of the long cover plate 100 , which not only makes the structure of the base support block 902 more stable, but also enables the movement of the base support block 902 .
[0044] In a further feasible embodiment of the present embodiment, a reinforcing bracket 60 is provided on the upper portion of the device platform 10, and the reinforcing bracket 60 includes a first vertical bracket 601, a second vertical bracket 603, a lateral connecting plate 604 and a transverse rod 602. The first vertical bracket 601 is fixed on the device platform 10 and is close to the first connecting pipe 20. The second vertical bracket 603 is fixed on the device platform 10 and is close to the second connecting pipe 30. Both ends of the transverse rod 602 are respectively fixedly connected to the first vertical bracket 601 and the second vertical bracket 603. The lateral connecting plate 604 is obliquely connected to the first vertical bracket 601 and the device platform 10. The lower end of the lateral connecting plate 604 is connected to the side of the device platform 10.
[0045] The reinforcing bracket 60 in this embodiment can strengthen the strength of the device stand 10 to prevent it from being deformed during the test process.
[0046] In a further embodiment of the present invention, a guiding inclined surface 103 is formed at the end of the slide groove 101 .
[0047] The guiding inclined surface 103 in this embodiment can facilitate the lower end of the base support block 902 to extend into the slide groove 101 .
[0048] In a further implementable embodiment of the present invention, the first connecting pipe 20 is disposed at one end of the device station 10 , and the second connecting pipe 30 is disposed at the other end of the device station 10 .
[0049] In a further feasible embodiment of the present embodiment, the circulation pump 70 is a high-pressure variable frequency water pump, the control valve is a pneumatic ball valve, and the branch control valve 130 is a manual control valve.
[0050] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification and the features of different embodiments or examples, unless they are contradictory.
[0051] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0052] The above is only a specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model should be based on the protection scope of the claims.
Claims
1. A water hammer simulation device, It is characterized in that include: A device station, wherein a first connecting pipe and a second connecting pipe are arranged on the device station, and a circulating pump is arranged on the first connecting pipe; A calibration pipeline, used to connect the water meter to be tested, the first connecting pipe, the second connecting pipe and the calibration pipeline are connected to form a circulation pipeline, the calibration pipeline is located between the first connecting pipe and the second connecting pipe, the two ends of the calibration pipeline are respectively connected to the first connecting pipe and the second connecting pipe, and the first connecting pipe is connected to the second connecting pipe; A control valve is arranged on the circulation pipeline, and the control valve is used to control the on-off of the water flow in the circulation pipeline.
2. The water hammer simulation device according to claim 1, It is characterized in that The water hammer simulation device also includes a branch pipe, both ends of the branch pipe are connected to the first connecting pipe, the connection between the first end of the branch pipe and the first connecting pipe is close to the inlet of the circulation pump, and the connection between the second end of the branch pipe and the first connecting pipe is close to the outlet of the circulation pump, and a branch control valve is arranged on the branch pipe.
3. The water hammer simulation device according to claim 1, It is characterized in that The control valve includes a first control valve and a second control valve, wherein the first control valve is arranged on the first connecting pipe, and the second control valve is arranged on the second connecting pipe.
4. The water hammer simulation device according to claim 1, It is characterized in that The calibration pipeline includes a plurality of calibration short tubes, and two adjacent calibration short tubes are connected to a water meter to be tested so as to connect the water meter to be tested to the circulation pipeline.
5. The water hammer simulation device according to claim 4, It is characterized in that The verification short tube is installed on a support seat, and the support seat is arranged on the device platform.
6. The water hammer simulation device according to claim 5, It is characterized in that The device platform is provided with a slide groove along its length direction, and the support seat is movably matched with the slide groove.
7. The water hammer simulation device according to claim 6, It is characterized in that The support seat comprises a collar, and the collar is sleeved on the verification short tube.
8. The water hammer simulation device according to claim 7, It is characterized in that Long cover plates are respectively provided on both sides of the slide groove, and a clamping space is formed between the long cover plates on both sides. The support seat includes a base support block, the upper end of the base support block is connected to the ring, and clamping grooves are provided on both sides of the base support block, and the clamping grooves are matched with the inner sides of the long cover plates.
9. The water hammer simulation device according to claim 1, It is characterized in that A reinforcing bracket is arranged on the upper part of the device platform, and the reinforcing bracket includes a first vertical bracket, a second vertical bracket, a lateral connecting plate and a transverse rod. The first vertical bracket is fixed on the device platform and is close to the first connecting pipe. The second vertical bracket is fixed on the device platform and is close to the second connecting pipe. The two ends of the transverse rod are respectively fixedly connected to the first vertical bracket and the second vertical bracket. The lateral connecting plate is obliquely connected to the first vertical bracket and the device platform, and the lower end of the lateral connecting plate is connected to the side of the device platform.
10. The water hammer simulation device according to claim 2, It is characterized in that The circulation pump is a high-pressure variable frequency water pump, the control valve is a pneumatic ball valve, and the branch control valve is a manual control valve.