Configuration structure of horizontal desulfurization system for aluminum electrolysis flue gas
By using a horizontal desulfurization reaction device and a low liquid-to-gas ratio spray layer in the aluminum electrolytic flue gas desulfurization system, the problems of high energy consumption and large floor space of the traditional vertical desulfurization system are solved, and high-efficiency desulfurization and low energy consumption are achieved. effect, and ensures stable operation of the system through the backup slurry pool.
Patent Information
- Application Number
- CN202422322623.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-09-24
AI Technical Summary
The traditional vertical aluminum electrolytic flue gas desulfurization system has the problems of low desulfurization efficiency, high energy consumption, large floor space and high maintenance costs, especially the high energy consumption and energy consumption caused by the high resistance in the vertical desulfurization tower and the energy consumption of the circulation pump. High maintenance costs.
A horizontal desulfurization system is adopted. By setting up a collision ejection device and a low liquid-to-gas ratio spray layer in the horizontal desulfurization reaction device, equipment resistance and circulation pump energy consumption are reduced. The circulating slurry pool is placed under the chimney to reduce the system footprint. floor area and equipped with a backup slurry pool to ensure stable operation of the system.
It improves the desulfurization efficiency, reduces energy consumption, reduces the system footprint and maintenance costs, and ensures the stable operation and accident handling capabilities of the system.
Smart Images

Figure CN221889588U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of a desulfurization system configuration structure, in particular to a configuration structure of a horizontal desulfurization system for aluminum electrolysis flue gas. Background Art
[0002] Electrolytic aluminum is a high-pollution and high-energy-consuming industry, so it is necessary to meet environmental protection requirements while controlling low energy consumption.
[0003] Under the dual pressure of carbon emissions and environmental protection, it is urgent to develop an efficient and energy-saving desulfurization system. At present, aluminum electrolysis flue gas desulfurization usually adopts semi-dry desulfurization and limestone gypsum wet desulfurization. Among them, semi-dry desulfurization has the disadvantages of low desulfurization efficiency, high energy consumption, large amount of desulfurizer, and more impurities in solid waste after desulfurization, which is difficult to sell.
[0004] Limestone gypsum wet desulfurization usually uses a vertical desulfurization tower. Its energy consumption mainly comes from the energy consumption of the main induced draft fan caused by the resistance of the desulfurization tower and the energy consumption of the circulating pump caused by the circulating spray. Since the flue gas velocity in the vertical desulfurization tower is high and there are many spray layers, the resistance in the tower is large and the energy consumption of the main induced draft fan is high. Due to the high liquid-gas ratio and the high spray layer, the circulating pump has a large flow rate and a high head, so the energy consumption of the circulating pump is high. Therefore, the traditional vertical desulfurization tower configuration has high energy consumption. In addition, the interior of the vertical desulfurization tower needs to be overhauled regularly and the anti-corrosion materials need to be replaced. Since the overhaul time is generally long, a desulfurization tower with one use and one standby is required, so the cost is too high and the floor space is too large. Summary of the invention
[0005] In order to solve the above technical problems, the utility model provides a configuration structure of a horizontal desulfurization system for aluminum electrolysis flue gas, which aims to improve the desulfurization efficiency while reducing the energy consumption of aluminum electrolysis flue gas desulfurization, and reasonably configure to reduce the floor space.
[0006] To achieve the above purpose, the utility model is achieved as follows:
[0007] A configuration structure of a horizontal desulfurization system for aluminum electrolysis flue gas, wherein a flue gas inlet is provided at the lower part of the horizontal desulfurization reaction device, the flue gas inlet is connected to a first pipe, and a flue gas outlet at the top or upper part of the horizontal desulfurization reaction device is connected to a chimney through a second pipe, wherein the horizontal desulfurization reaction device is arranged in two rows, the chimney is arranged between or outside the two rows of horizontal desulfurization reaction devices, a partition is provided in the lower cavity of the chimney, a circulating slurry pool is provided below the partition, and an equipment room, a power distribution room and an automatic control room are provided below the horizontal desulfurization reaction device.
[0008] There are 1 to 3 horizontal desulfurization reaction devices in each row, and the flue gas inlet of each horizontal desulfurization reaction device is arranged at the lower part of the end or the lower part of the side.
[0009] The bottom surface of the horizontal desulfurization reaction device is rectangular, the height of the horizontal desulfurization reaction device is 3-10m, and a collision ejection device is provided above the flue gas inlet in the chamber of the horizontal desulfurization reaction device; above the collision ejection device, a spray layer is provided in the middle of the chamber of the horizontal desulfurization reaction device; in the upper part of the chamber of the horizontal desulfurization reaction device, a dust collector and demister are provided above the spray layer.
[0010] The top surface of the flue gas outlet side of the horizontal desulfurization reaction device is higher than the top surface of the flue gas inlet side, and the height of the collision ejection device on the flue gas inlet side is higher than that on the flue gas outlet side.
[0011] The collision ejection device is a grid plate, and the pore size of the grid plate gradually increases from the smoke inlet side to the other side.
[0012] When the chimney is arranged outside one side of the smoke outlet of the two rows of horizontal desulfurization reaction devices, the chimney and the two smoke outlets form an acute triangle.
[0013] The circulating slurry pump, standby slurry tank, oxidation air system and process water system are arranged in the equipment room. The circulating slurry tank and the standby slurry tank are connected to the horizontal desulfurization reaction device through the circulating slurry pump respectively, and the oxidation air system is connected to the circulating slurry tank and the standby slurry tank through pipelines.
[0014] The low voltage power supply and distribution system is arranged in the power distribution room, and the automatic control system is arranged in the automatic control room.
[0015] When there are more than one horizontal desulfurization reaction device in each row, they are arranged in parallel on the vertical plane.
[0016] The first pipeline is provided with a fan.
[0017] Advantages and effects of the utility model:
[0018] 1. The utility model adopts a horizontal desulfurization reaction device, which strengthens the desulfurization reaction through collision and ejection, so the liquid-gas ratio is low and the desulfurization efficiency is high.
[0019] 2. Due to the low liquid-gas ratio, the utility model has fewer spray layers compared with the traditional vertical desulfurization tower. Since the flow rate in the horizontal desulfurization reaction device is low and there are fewer spray layers, the equipment resistance is low. Due to the low liquid-gas ratio, the circulation pump flow is small. Since the height of the horizontal desulfurization reaction device is low, the circulation pump is directly placed below the horizontal desulfurization reaction device, and the flow distance is small, so the circulation pump head is low, so the circulation pump energy consumption is low. Therefore, the energy consumption of the utility model is much lower than that of the traditional limestone gypsum desulfurization method.
[0020] 3. The circulating slurry pool of the utility model is arranged below the chimney and is separated from the chimney, which not only effectively reduces the area occupied by the system, but also does not affect the chimney smoke exhaust when the circulating slurry pool needs maintenance and overhaul.
[0021] 4. The utility model is provided with a spare slurry pool. When the circulating slurry pool needs maintenance and overhaul, it can be directly switched to the spare slurry pool to ensure the stable operation of the system.
[0022] 5. The spare slurry pool of the utility model can also be used as an accident slurry pool in the event of a system accident, thereby reducing the system engineering workload.
[0023] 6. The equipment room, power distribution room and automatic control room of the utility model are all placed below the horizontal desulfurization reaction device, which effectively saves the system floor space.
[0024] 7. The utility model is usually equipped with two horizontal desulfurization reaction devices. When the system is operating normally, both horizontal desulfurization reaction devices are put into use. During maintenance and overhaul, one can be temporarily used to treat the flue gas of the entire system. This avoids the high investment cost of the vertical desulfurization tower, and also avoids the equipment corrosion and maintenance cost caused by the standby device not being put into use for a long time. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a top view of embodiment 1 of the utility model.
[0026] Figure 2 It is a partial front view of Example 1 of the utility model.
[0027] Figure 3 It is a top view of embodiment 2 of the present utility model.
[0028] Figure 4 It is a partial front view of Example 2 of the utility model.
[0029] Figure 5 It is the front view of the horizontal desulfurization reaction device of the utility model.
[0030] Figure 6 This is the front view of the horizontal desulfurization reaction device in Example 4.
[0031] Figure 7 This is a front view of the stacked arrangement of three horizontal desulfurization reaction devices in Example 6.
[0032] In the figure: 1. Electrolytic flue gas defluorination system; 2. Fan; 3. Horizontal desulfurization reaction device; 4. Equipment room, power distribution room and automatic control room; 5. Chimney; 6. Circulating slurry pool; 7. First pipeline; 8. Flue gas inlet; 9. Second pipeline; 10. Flue gas outlet; 11. Collision ejection device; 12. Spray layer; 13. Dust and mist collector; 14. Circulating slurry pump; 15. Drain port; 16. Partition. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Example 1
[0034] As shown in the figure, the utility model is a configuration structure of a horizontal desulfurization system for aluminum electrolysis flue gas, the outlet of the electrolytic flue gas defluorination system 1 is connected to the flue gas inlet 8 at the lower part of one side of the horizontal desulfurization reaction device 3 through the first pipeline 7, and the flue gas outlet 10 at the top of the other side of the horizontal desulfurization reaction device 3 is connected to the chimney 5 through the second pipeline 9, wherein the horizontal desulfurization reaction device 3 is arranged in two rows, and the chimney 5 is arranged between the two rows of horizontal desulfurization reaction devices 3, so that the floor space in the length direction can be reduced, and a partition 16 is provided in the lower inner cavity of the chimney 5, and a circulating slurry pool 6 is provided below the partition 16, and the circulating slurry pool 6 is arranged at the lower part of the chimney 5, which effectively utilizes the lower space of the chimney 5, and an equipment room, a power distribution room and an automatic control room 4 are provided below the horizontal desulfurization reaction device 3.
[0035] Each row of horizontal desulfurization reaction devices 3 is 1-3 units, and this embodiment is 1 unit. The flue gas inlet 8 of each horizontal desulfurization reaction device 3 is arranged at the lower part of one side end. The bottom surface of the horizontal desulfurization reaction device 3 is rectangular, and the height of the horizontal desulfurization reaction device 3 is 3-10m. The length and width of the bottom surface of the horizontal desulfurization reaction device 3 in this embodiment are 20m×4m, and the height of the flue gas outlet 10 to the bottom surface is 6m. Using this embodiment, its floor area is 28m×26m=728㎡, and using the traditional limestone gypsum method, its floor area is 21m×72m=1512㎡. A collision ejection device 11 is provided above the flue gas inlet 8 in the chamber of the horizontal desulfurization reaction device 3. A spray layer 12 is provided in the middle of the chamber of the horizontal desulfurization reaction device 3 above the collision ejection device 11. A dust remover and demister 13 is provided above the upper spray layer 12 in the chamber of the horizontal desulfurization reaction device 3. The top surface of the flue gas outlet 10 side of the horizontal desulfurization reaction device 3 is higher than the top surface of the flue gas inlet 8 side. The height of the collision ejection device 11 on the flue gas inlet 8 side is higher than the height on the flue gas outlet 10 side. The collision ejection device 11 of this embodiment is a grid plate. The gap size of the grid plate gradually increases from the flue gas inlet 8 side to the flue gas outlet 10 side. The gradual change is large. Since the grid plate is tilted in this embodiment and the pores on the side of the flue gas inlet are small, the flue gas entering the horizontal desulfurization reaction device 3 moves upward through the grid plate while continuing to move forward along the grid plate. The grid plate separates the bottom of the horizontal desulfurization reaction device 3 into an inverted right-angled trapezoid. When the flue gas moves forward, due to the smaller space of the right-angled trapezoid, the larger gap of the grid plate and the pressure of the fan, after the flue gas enters the horizontal desulfurization reaction device 3, the cross-sectional area of the flow is larger, the flue gas velocity is low, and the airflow distribution is more uniform. There are a large number of holes on the grid plate, and the flue gas can pass directly. Therefore, the flue gas resistance is small. The grid plate plays a role in airflow uniformity on the one hand, and plays a role in collision ejection on the other hand. The spray forms a liquid film on the pores when it collides with the grid. On the one hand, the liquid film can play the role of humidification and pre-reaction of the flue gas; on the other hand, the droplets of the spray layer are sprayed on the liquid film, and the liquid film refines the droplets under the joint action of the spray slurry and the lower airflow, thereby improving the reaction efficiency. The top surface of the horizontal desulfurization reaction device 3 is an inclined surface to reduce the resistance of the flue gas. After the flue gas moves to the bottom of the top surface, it moves toward the flue gas outlet along the bottom of the top surface. The spray layer 12 is a single layer, and the nozzles of the spray layer spray upward and downward in an umbrella shape. A downwardly protruding liquid discharge port 15 is provided at the bottom of the flue gas outlet side of the horizontal desulfurization reaction device 3.
[0036] The chimney 5 of this embodiment is arranged between two horizontal desulfurization reaction devices 3, and the circulating slurry pool 6 in the lower part of the chimney 5 is connected to the spray pipe of each horizontal desulfurization reaction device 3 through a circulating slurry pump 14. The circulating slurry pump 14, the standby slurry pool, the oxidation wind system and the process water system are arranged in the equipment room, and the standby slurry pool is also connected to the horizontal desulfurization reaction device 3 through the circulating slurry pump 14. The oxidation wind system is connected to the circulating slurry pool 6 and the standby slurry pool through pipelines, and the process water system provides water to the system. The low-voltage power supply and distribution system is arranged in the power distribution room, and the low-voltage power supply and distribution system provides power to the system. The automatic control system is arranged in the automatic control room, and the automatic control system is connected to the control equipment. The connection between the circulating slurry pump 14, the standby slurry pool, the oxidation wind system, the process water system, the low-voltage power supply and distribution system and the automatic control system and this system adopts the existing connection structure, such as the connection structure in the existing limestone gypsum wet desulfurization system.
[0037] The outlet of the electrolytic flue gas defluorination system 1 is connected through two first pipes 7 , each of which is connected to a flue gas inlet 8 at the lower part of one side of a horizontal desulfurization reaction device 3 , and two fans are arranged on each first pipe 7 . Example 2
[0038] The chimney 5 in Example 1 is arranged outside one side of the flue gas outlet of two rows of horizontal desulfurization reaction devices 3, and the chimney 5 and the two flue gas outlets 10 form an acute triangle; the flue gas inlet 8 of each horizontal desulfurization reaction device 3 is arranged at the lower part of one side. The height from the flue gas outlet of the horizontal desulfurization reaction device 3 of this embodiment to the bottom surface is 10m. Others are the same as in Example 1. Example 3
[0039] The height from the top to the bottom of the horizontal desulfurization reaction device 3 in Example 1 is 3m, the top of the horizontal desulfurization reaction device 3 is horizontally arranged, the flue gas outlet 10 is arranged on the upper side of the horizontal desulfurization reaction device 3, and a spare spray layer is arranged above the spray layer. Others are the same as in Example 1. Example 4
[0040] like Figure 6 As shown, the top surface of the horizontal desulfurization reaction device 3 forms a triangle with the flue gas outlet as the vertex, and the length of the top surface from the flue gas outlet to the flue gas inlet side is greater than the length from the flue gas outlet to the top surface of the end of the flue gas outlet side. Example 5
[0041] In Example 1, the flue gas outlet is located in the middle of the top surface, the liquid discharge port 15 is located in the middle of the horizontal desulfurization reaction device 3, the grid plate is inclined, and the height of the grid plate above the flue gas inlet is higher than the height of the grid plates at other positions. Example 6
[0042] In Example 1, each row of horizontal desulfurization reaction devices 3 is 3 units, such as Figure 7 The three horizontal desulfurization reaction devices are arranged in parallel and stacked on the vertical plane, the flue gas outlet is arranged at the upper part of the horizontal desulfurization reaction device, and the flue gas inlet is arranged at the lower part of the side of the horizontal desulfurization reaction device.
[0043] The utility model stacks three horizontal desulfurization reaction devices 3 in parallel on the vertical plane, and the maximum height thereof is 30m, which is much smaller than the height of the existing desulfurization tower.
[0044] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A configuration structure of a horizontal flue gas desulfurization system for aluminum electrolysis, characterized in that A flue gas inlet (8) is provided at the bottom of the horizontal desulfurization reaction device (3), the flue gas inlet (8) is connected to a first pipe (7), and a flue gas outlet (10) at the top or upper part of the horizontal desulfurization reaction device (3) is connected to a chimney (5) through a second pipe (9), wherein the horizontal desulfurization reaction device (3) is arranged in two rows, the chimney (5) is arranged between or outside the two rows of horizontal desulfurization reaction devices (3), a partition (16) is provided in the lower cavity of the chimney (5), and a circulating slurry pool (6) is provided below the partition (16), and an equipment room, a power distribution room and an automatic control room (4) are provided below the horizontal desulfurization reaction device (3).
2. The configuration structure of the horizontal desulfurization system for aluminum electrolysis flue gas according to claim 1 is characterized in that Each row includes 1 to 3 horizontal desulfurization reaction devices (3), and the flue gas inlet (8) of each horizontal desulfurization reaction device (3) is arranged at the lower part of the end or the lower part of the side.
3. The configuration structure of a horizontal desulfurization system for aluminum electrolysis flue gas according to claim 1 or 2, characterized in that The bottom surface of the horizontal desulfurization reaction device (3) is rectangular, the height of the horizontal desulfurization reaction device (3) is 3-10m, and a collision ejection device (11) is provided above the flue gas inlet in the chamber of the horizontal desulfurization reaction device (3); a spray layer (12) is provided in the middle of the chamber of the horizontal desulfurization reaction device (3) above the collision ejection device (11); and a dust removal and mist removal device (13) is provided above the spray layer (12) in the upper part of the chamber of the horizontal desulfurization reaction device (3).
4. The configuration structure of the horizontal desulfurization system for aluminum electrolysis flue gas according to claim 3 is characterized in that The top surface of the flue gas outlet (10) side of the horizontal desulfurization reaction device (3) is higher than the top surface of the flue gas inlet (8) side, and the height of the collision ejection device (11) on the flue gas inlet (8) side is higher than the height on the flue gas outlet (10) side.
5. The configuration structure of the horizontal desulfurization system for aluminum electrolysis flue gas according to claim 4 is characterized in that The collision ejection device (11) is a grid plate, and the pore size of the grid plate gradually increases from the smoke inlet (8) side to the other side.
6. The configuration structure of the horizontal desulfurization system for aluminum electrolysis flue gas according to claim 1 is characterized in that When the chimney (5) is arranged outside one side of the flue gas outlets (10) of the two rows of horizontal desulfurization reaction devices (3), the chimney (5) and the two flue gas outlets (10) form an acute triangle.
7. The configuration structure of the horizontal desulfurization system for aluminum electrolysis flue gas according to claim 1 is characterized in that The circulating slurry pump, standby slurry tank, oxidation air system and process water system are installed in the equipment room. The circulating slurry tank and the standby slurry tank are connected to the horizontal desulfurization reaction device through the circulating slurry pump respectively, and the oxidation air system is connected to the circulating slurry tank and the standby slurry tank through pipelines.
8. The configuration structure of the horizontal desulfurization system for aluminum electrolysis flue gas according to claim 4 is characterized in that When there is more than one horizontal desulfurization reaction device (3) in each row, they are arranged in parallel on the vertical plane.
9. The configuration structure of the horizontal desulfurization system for aluminum electrolysis flue gas according to claim 1 is characterized in that The first pipeline is provided with a fan.
Citation Information
Cited By
Horizontal wet flue gas desulfurization system
CN120346654A
A horizontal wet flue gas desulfurization system
CN120346654B
Horizontal wet flue gas desulfurization system
RU2872168C1
