Precast beam hoisting device
By using a balanced drum and embedded sling components in the prefabricated beam hoisting device, the problem of unstable sling fixation and uneven stress on the sling when the beam body is tilted is solved, achieving uniformity and safety of the sling force. It is suitable for hoisting different types of prefabricated beams.
Patent Information
- Application Number
- CN202420707321.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-04-08
AI Technical Summary
In bridge construction, during the hoisting process of prefabricated box girders, traditional wire rope slings are easily damaged and the hoisting is unstable, affecting safety and quality. The existing technology cannot effectively solve the problem of unstable sling fixation and slings when the beam body is tilted. The problem of uneven stress.
A prefabricated beam hoisting device is designed, including a spreader component and a sling component. The spreader component includes a balanced drum and a pre-embedded sling. The combination of the pre-embedded sling and the balanced sling ensures uniform stress on the sling. It adapts to different beam widths and heights through multiple sets of spreader components and multiple balancing drums to improve hoisting stability.
It improves the uniformity of force and the firmness of fixation of the sling, ensuring the safety of hoisting and the convenient disassembly and assembly process. It is suitable for eccentric, conventional and T-shaped prefabricated beams, avoiding damage to the beam body and wear of the wire rope.
Smart Images

Figure CN221894517U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of beam hoisting, in particular to a prefabricated beam hoisting device. Background Art
[0002] Prefabricated box girders have been widely used in bridge construction. Prefabricated box girders of reinforced concrete structures need to be lifted to designated locations by wire rope slings during installation. Traditional prefabricated box girder lifting operations use wire ropes to directly lift the bottom of the beam for installation. During the lifting process, the wire ropes are prone to damage the concrete at the bottom plate and edge of the flange plate of the prefabricated box girder, affecting the quality of the box girder. Since the corner edges of the prefabricated box girder are too sharp, the wire ropes are easily worn during lifting, which can cause safety hazards due to the repeated use of the lifting wire ropes, and the lifting structure is also unstable.
[0003] A Chinese patent (authorization announcement number CN 218261572 U, 2023.01.10) discloses a prefabricated box girder hoisting protection device, which specifically discloses: by combining a first rubber pad with a first steel plate, and a second rubber pad with a second steel plate, the first rubber pad is fitted with the flange of the prefabricated box girder, and the second rubber pad is fitted with the corner of the bottom plate of the prefabricated box girder. During the hoisting process of the prefabricated box girder, compared with the method of installing a single steel plate, the possibility of the first steel plate and the second steel plate scratching the surface of the prefabricated box girder is reduced. At the same time, the steel wire rope contacts the surface of the first steel plate and the second steel plate. Compared with the method of installing a single rubber pad, the steel wire rope is prevented from wearing or breaking the first rubber pad and the second rubber pad, thereby avoiding the steel wire rope from scratching the surface of the prefabricated box girder and improving the surface quality of the prefabricated box girder. It can be seen that the technical solution is still to use a wire rope sling to directly lift the bottom of the beam for lifting. However, when the box beam tilts during lifting, the wire rope sling is easy to detach from the first steel plate and the second steel plate, which cannot ensure the safety and reliability of the lifting, nor can it ensure the uniformity of the force on the wire rope. When installing and disassembling the device, it is necessary to manually arrange the components around the box beam, which is very inconvenient to use.
[0004] In view of the above problems, how to provide a prefabricated beam lifting device that can improve the uniformity of the force on the slings, firmly fix the slings, and have the characteristics of good safety and convenient disassembly and assembly is an issue that technical personnel in this field urgently need to solve. Utility Model Content
[0005] In view of this, the utility model proposes a prefabricated beam lifting device, aiming to solve the technical problems of unstable fixing of the lifting cables of the above-mentioned prefabricated beam lifting device and uneven force on the lifting cables when the beam body is tilted.
[0006] The utility model provides a prefabricated beam hoisting device, comprising:
[0007] A sling assembly, the sling assembly comprising a sling, a balancing drum and a sling assembly;
[0008] The balancing drum is arranged horizontally and rotatably connected to the bottom of the sling;
[0009] The sling assembly includes a balancing sling and two embedded slings; the two embedded slings are arranged at intervals perpendicular to the axial direction of the balancing drum, and their lower parts can be embedded in the prefabricated beam; the balancing sling is hung around the sling or the balancing drum, and its two ends are detachably connected to the tops of the two embedded slings in a one-to-one manner.
[0010] The utility model provides a prefabricated beam lifting device, in which a lifting device is installed on a lifting device; during the prefabricated beam manufacturing process, two pre-buried slings are pre-buried in the prefabricated beam along the height direction thereof, and the tops of the pre-buried slings are reserved at the top of the prefabricated beam as sling connection ends; for lighter prefabricated beams or lifting points with smaller lifting loads, the sling load is smaller, and the balancing sling can be hung on the lifting device or the balancing drum; for heavier prefabricated beams, the balancing sling needs to be hung on the balancing drum, so that the two sections of the balancing sling corresponding to the two sides of the balancing drum can be evenly stressed; especially when the two ends of the prefabricated beam body are in a high and low tilt state, the rotatable balancing drum can always maintain the uniformity of stress on the two ends of the balancing sling.
[0011] As a further improvement of the above technical solution, there are more than two groups of the hanger assemblies, and the more than two groups of the hanger assemblies can be arranged at intervals along the length direction of the prefabricated beam.
[0012] The beneficial effects of the above technical solution are: for longer precast beams, more than two sets of lifting equipment assemblies can be arranged for use when the beam body is heavier or the load on the lifting point is larger; the two or more sets of lifting equipment assemblies are powered by corresponding lifting equipment; when the heights of the precast beams lifted by more than two sets of lifting equipment assemblies are different, the precast beam body will tilt, and the balancing drum rotates to always maintain the uniformity of force on both ends of the balancing sling.
[0013] As a further improvement of the above technical solution, the sling assemblies are divided into two groups, and the two groups of sling assemblies are arranged at intervals along an axial direction parallel to the balancing drum.
[0014] The beneficial effect of the above technical solution is that two groups of sling assemblies are arranged at intervals along the axial direction of the parallel balance drum, which can make the lifting of the prefabricated beam in the width direction more stable and avoid shaking.
[0015] As a further improvement of the above technical solution, the sling assembly also includes multiple shackles; the two embedded slings are bent into a U shape, and their straight sections are embedded in the prefabricated beam, and their arc-shaped curved sections constitute U-shaped connecting ends; both ends of the balancing sling are bent to form annular connecting parts; the U-shaped connecting end and the corresponding annular connecting part are detachably connected through the shackle to form a linking structure.
[0016] The beneficial effects of the above technical solution are: both ends of the embedded sling are embedded downward inside the prefabricated beam along the height direction of the prefabricated beam, thereby improving the connection strength of the embedded part; the top of the embedded sling is a U-shaped connecting end, which is structurally convenient for connection and firm and reliable; the two ends of the balancing sling are annular connecting parts, and the U-shaped connecting ends are detachably connected by shackles, forming a link structure that is easy to disassemble and assemble, and can maintain the uniformity of force on each sling segment when the prefabricated beam body is tilted.
[0017] As a further improvement of the above technical solution, an anchor plate is fixed to the bottom of the embedded sling.
[0018] The beneficial effect of the above technical solution is that the anchor plate plays a role in strengthening the pre-embedded connection strength of the pre-embedded sling.
[0019] As a further improvement of the above technical solution, there are multiple balancing drums, and the multiple balancing drums are coaxially arranged at intervals.
[0020] The beneficial effects of the above technical solution are: multiple balancing drums are arranged at intervals in the width direction of the prefabricated beam, which can adapt to different beam widths; multiple balancing drums rotate independently to adjust the tension of the corresponding slings, further improving the lateral stability of the beam during lifting and the uniformity of the force on the slings.
[0021] As a further improvement of the above technical solution, an ear plate assembly is fixed to the bottom end of the sling, and the ear plate assembly includes two relatively parallel ear plates and a rotating drum shaft; the rotating drum shaft is arranged along the relative directions of the two ear plates and is located between the two ear plates, and both ends of the rotating drum shaft are fixedly connected to the corresponding ear plates; the balancing drum is rotatably sleeved on the rotating drum shaft.
[0022] The beneficial effects of the above technical solution are: the drum shaft is fixed by the ear plate, the balancing drum is rotatably connected to the drum shaft, the structure is stable, and the support is reliable.
[0023] As a further improvement of the above technical solution, the balancing sling is a wire rope sling; the embedded sling is a steel strand sling.
[0024] It can be seen from the above technical solutions that, compared with the prior art, the utility model discloses a prefabricated beam hoisting device, which has the following advantages and beneficial effects:
[0025] 1. The utility model can improve the uniformity of the force on the sling, the sling is firmly fixed, and has the advantages of good safety and convenient disassembly and assembly.
[0026] 2. The utility model device is suitable for the hoisting of eccentric prefabricated beams, conventional box beams, and conventional T-beams. The conventional bottom-covering wire rope sleeve is eliminated to avoid damage to the beam body. For eccentric beams or heavier beams, double or multiple sets of pre-buried slings are used, each connected to a balancing sling through a balancing drum to bear the force together. The number of pre-buried steel strand slings can be configured as needed according to the force conditions. When the beam body is prefabricated, there is no need to reserve a bottom-covering notch for the wire rope on the bottom pedestal, which is convenient for hoisting out of the pit, especially for the hoisting of T-beams, with higher safety and stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0028] Figure 1 A schematic diagram of the structure of a prefabricated beam hoisting device of the utility model;
[0029] Figure 2 A schematic diagram of a prefabricated beam hoisting device for horizontally hoisting a prefabricated beam in the utility model;
[0030] Figure 3 A schematic diagram of the state of a prefabricated beam hoisting device of the utility model with two ends of the beam body tilted high and low to lift the prefabricated beam;
[0031] Figure 4 A schematic diagram of the structure of a prefabricated beam hoisting device for hoisting a prefabricated eccentric box beam in the utility model;
[0032] Figure 5 A schematic diagram of the structure of a prefabricated beam hoisting device for hoisting a conventional prefabricated box beam in the utility model;
[0033] Figure 6 A schematic diagram of the structure of a prefabricated beam hoisting device for hoisting a T-shaped prefabricated box beam in the utility model;
[0034] In the figure: 1. sling assembly; 11. sling; 111. ear plate assembly; 1111. ear plate; 1112. drum shaft; 12. balancing drum; 13. sling assembly; 131. balancing sling; 1311. annular connection part; 132. embedded sling; 1321. U-shaped connection end; 1322. anchor plate; 133. shackle; 2. precast beam. DETAILED DESCRIPTION
[0035] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0036] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0037] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0038] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0039] like Figures 1 to 6 As shown, a prefabricated beam hoisting device comprises:
[0040] A sling assembly 1, the sling assembly 1 comprising a sling 11, a balancing drum 12 and a sling assembly 13;
[0041] The balancing drum 12 is horizontally arranged and perpendicular to the length direction of the precast beam 2, and is rotatably connected to the bottom of the sling 11;
[0042] The sling assembly 13 includes a balancing sling 131 and two embedded slings 132; the two embedded slings 132 are arranged at intervals perpendicular to the axial direction of the balancing drum 12, that is, during installation, the two embedded slings 132 are arranged at intervals along the length direction of the prefabricated beam 2, and their lower parts can be embedded inside the prefabricated beam 2 along the height direction of the prefabricated beam 2; the balancing sling 131 is hung around the sling 11 or the balancing drum 12, and its two ends are detachably connected to the tops of the two embedded slings 132 in a one-to-one manner.
[0043] The present embodiment provides a precast beam lifting device, in which a lifting device 11 is installed on a lifting device; during the manufacturing process of the precast beam 2, two embedded slings 132 are pre-buried in the precast beam 2 along the height direction, and the top of the embedded sling 132 is reserved at the top of the precast beam 2 as the sling connection end; for lighter precast beams, the load of the sling 131 is smaller, and the balancing sling 131 can be hung on the lifting device 11 or the balancing drum 12; for heavier precast beams, the balancing sling 131 needs to be hung on the balancing drum 12, so that the two sections of the balancing sling 131 corresponding to the two sides of the balancing drum 12 can be evenly stressed; especially when the two ends of the precast beam body are in a high and low tilt state, the rotatable balancing drum will always maintain the uniformity of the force at both ends of the balancing sling 131, thereby ensuring that the two embedded slings 132 are evenly stressed.
[0044] In some embodiments, there are more than two groups of hanger assemblies 1 , and the two or more groups of hanger assemblies 1 can be arranged at intervals along the length direction of the precast beam 2 .
[0045] For longer precast beams, more than two sets of sling assemblies 1 can be arranged; the two sets of sling assemblies 1 are powered by corresponding lifting equipment; when the two sets of sling assemblies 1 lift the precast beam 2 to different heights, the precast beam 2 will tilt, and the balancing drum rotates to always maintain the uniformity of force at both ends of the balancing sling 131.
[0046] In some embodiments, the sling assembly 13 is divided into two groups, and the two groups of sling assemblies 13 are arranged at intervals along the axial direction of the parallel balance drum 12, that is, the two groups of sling assemblies 13 are arranged at intervals along the width direction of the precast beam 2;
[0047] Two balancing slings 131 are hung around the sling 11 and / or the balancing drum 12 , and two ends of each balancing sling 131 are detachably connected to the tops of the corresponding two pre-buried slings 132 in a one-to-one correspondence.
[0048] Two groups of sling assemblies 13 are arranged at intervals in the width direction of the prefabricated beam 2, so that the lifting of the prefabricated beam 2 in the width direction can be more stable and avoid shaking.
[0049] Specifically, Figure 1 and Figure 3As shown, when the prefabricated eccentric box girder is hoisted, multiple sets of embedded slings can be embedded on the eccentric side of the beam along the length direction of the beam, and hung on the balancing drum 12 through the balancing sling 131; the other side of the beam is lighter, and the corresponding balancing sling 131 can be directly hung on the sling 11.
[0050] In some embodiments, the sling assembly 13 also includes a plurality of shackles 133; the two embedded slings 132 are bent into a U shape, and their straight sections are embedded downward inside the prefabricated beam 2 along the height direction of the prefabricated beam 2, and their arc-shaped curved sections are located at the top of the prefabricated beam 2 to form a U-shaped connecting end 1321; both ends of the balancing sling 131 are bent to form an annular connecting portion 1311; the U-shaped connecting end 1321 and the corresponding annular connecting portion 1311 are detachably connected together through the shackle 133 to form a linking structure.
[0051] Specifically, the shackle 133 may be a D-shaped shackle, a bow-shaped shackle, or a horseshoe-shaped shackle. The buckle of the shackle 133 is connected to the annular connecting portion 1311 of the balancing sling 131 , and the transverse pin shaft of the shackle 133 is connected to the U-shaped connecting end 1321 of the embedded sling 132 .
[0052] Both ends of the embedded sling 132 are embedded downward inside the precast beam 2 along the height direction of the precast beam 2, thereby improving the connection strength of the embedded part; the top of the embedded sling 132 is a U-shaped connecting end 1321, which is structurally convenient for connection and firm and reliable; the two ends of the balancing sling 131 are annular connecting parts 1311, and the U-shaped connecting ends 1321 are detachably connected through shackles 133, forming a link structure that is easy to disassemble and assemble, and can maintain the uniformity of force on each sling segment when the precast beam 2 is tilted.
[0053] In some embodiments, an anchor plate 1322 is fixed to the bottom of the embedded sling 132 .
[0054] The anchor plate 1322 serves to strengthen the pre-embedded connection strength of the pre-embedded sling 132 .
[0055] In some embodiments, there are multiple balancing drums 12 , and the multiple balancing drums 12 are coaxially arranged at intervals.
[0056] Multiple balancing drums 12 are arranged at intervals in the width direction of the precast beam 2 to adapt to different beam widths; multiple balancing drums 12 rotate independently to adjust the tension of the corresponding slings, further improving the stability of the lifting and the uniformity of the force on the slings.
[0057] In some embodiments, an ear plate assembly 111 is fixed to the bottom end of the hanger 11, and the ear plate assembly 111 includes two relatively parallel ear plates 1111 and a drum shaft 1112; the drum shaft 1112 is arranged in relative directions of the two ear plates 1111 and is located between the two ear plates 1111, and both ends of the drum shaft 1112 are fixedly connected to the corresponding ear plates 1111; the balancing drum 12 is rotatably sleeved on the drum shaft 1112.
[0058] The drum shaft 1112 is fixed by the ear plate 1111, and the balancing drum 12 is rotatably connected to the drum shaft 1112, so the structure is stable and the support is reliable.
[0059] In some embodiments, the balancing sling 131 is a steel wire rope sling, and the embedded sling 132 is a steel strand sling. The annular connecting parts 1311 at both ends of the balancing sling 131 are formed by bending both ends into annular shapes and fixing them by welding or by buckling.
[0060] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification.
[0061] Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A prefabricated beam hoisting device, characterized in that: include: A sling assembly (1), the sling assembly (1) comprising a sling (11), a balancing drum (12) and a sling assembly (13); The balancing drum (12) is arranged horizontally and rotatably connected to the bottom of the sling (11); The sling assembly (13) comprises a balancing sling (131) and two pre-buried slings (132); the two pre-buried slings (132) are arranged at intervals perpendicular to the axial direction of the balancing drum (12), and their lower parts can be pre-buried inside the prefabricated beam (2); the balancing sling (131) is hung around the sling (11) or the balancing drum (12), and its two ends are detachably connected to the tops of the two pre-buried slings (132) in a one-to-one manner.
2. The prefabricated beam hoisting device according to claim 1, characterized in that: The hanger assemblies (1) are in two or more groups, and the two or more hanger assemblies (1) can be arranged at intervals along the length direction of the prefabricated beam (2).
3. The prefabricated beam hoisting device according to claim 1, characterized in that: The sling assemblies (13) are divided into two groups, and the two groups of sling assemblies (13) are arranged at intervals along an axial direction parallel to the balancing drum (12).
4. The prefabricated beam hoisting device according to claim 3, characterized in that: The sling assembly (13) further comprises a plurality of shackles (133); the two embedded slings (132) are both bent into a U-shape, and their straight sections are both embedded in the prefabricated beam (2), and their arc-shaped curved sections constitute U-shaped connecting ends (1321); both ends of the balancing sling (131) are bent to form an annular connecting portion (1311); the U-shaped connecting end (1321) and the corresponding annular connecting portion (1311) are detachably connected via the shackles (133) to form a linking structure.
5. The prefabricated beam hoisting device according to claim 4, characterized in that: An anchor plate (1322) is fixed at the bottom of the embedded sling (132).
6. The prefabricated beam hoisting device according to claim 1, characterized in that: There are a plurality of balancing drums (12), and the plurality of balancing drums (12) are coaxially arranged at intervals.
7. The prefabricated beam hoisting device according to claim 1, characterized in that: An ear plate assembly (111) is fixed at the bottom end of the sling (11), and the ear plate assembly (111) comprises two ear plates (1111) and a rotating drum shaft (1112) which are arranged in parallel with each other. The rotating drum shaft (1112) is arranged in opposite directions of the two ear plates (1111) and is located between the two ear plates (1111), and both ends of the rotating drum shaft (1112) are fixedly connected to the corresponding ear plates (1111). The balancing rotating drum (12) is rotatably sleeved on the rotating drum shaft (1112).
8. The prefabricated beam hoisting device according to claim 1, characterized in that: The balancing sling (131) is a steel wire rope sling; the pre-buried sling (132) is a steel strand sling.