Bent cap formwork underwater supporting system
Through the combined structure of support beams, support connectors and support platforms, the problem of scratching the pile pier foundation when the cover beam formwork is fixed in the water is solved, a stable and non-damaging fixing effect is achieved, and the use effect of the pile pier foundation is guaranteed. Appearance quality.
Patent Information
- Application Number
- CN202420454581.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-03-08
AI Technical Summary
In the prior art, the pile pier foundation is easily scratched when the cover beam formwork is set in the water by directly fixing the hoop to the pile pier foundation, affecting its use effect and appearance quality.
It adopts a combined structure of support beams, support connectors and support platforms, and is fixed by pre-embedded support columns and bolts to reduce static friction and scratches on the pile pier foundation, and achieve applicability and stability through sliding and locking components.
It effectively avoids scratches on the pile pier foundation, ensures its use effect and appearance quality, and at the same time improves the stability and applicability of the support platform.
Smart Images

Figure CN221895585U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of cap beam formwork, and in particular to an underwater support system for a cap beam formwork. Background Art
[0002] During the construction of bridge projects, in order to ensure the safety of the substructure and superstructure and the stability of the pile pier foundation, it is usually necessary to set up a cap beam to bear part of the load generated during the construction of the superstructure, so as to evenly transfer the load to the pile pier foundation through the cap beam.
[0003] The setting of the cap beam should comply with relevant national and local laws and regulations and technical specifications to ensure its safety, reliability and durability. Commonly used cap beams are prefabricated cap beams and cast-in-place cap beams. Prefabricated cap beams are prefabricated in the factory according to the requirements of the design drawings, and then transported to the construction site for assembly and connection. Cast-in-place cap beams are cast on site at the construction site by setting up formwork according to the design and construction requirements.
[0004] When the pile pier foundation in the prior art is set in water and the cast-in-place cap beam needs to be cast on site, it is usually necessary to first build a support platform between two adjacent pile pier foundations to facilitate the subsequent construction of the cast-in-place cap beam formwork. The support platform is usually directly fixed to the pile pier foundation by a hoop.
[0005] With regard to the above-mentioned prior art, the method of directly fixing the pier foundation to the pile foundation by means of a clamp is likely to scratch the surface of the pile foundation, thereby easily affecting the use effect and appearance quality of the pile foundation. Utility Model Content
[0006] In order to facilitate the fixation between the support platform and the pile pier foundation and not easily cause scratches to the pile pier foundation, thereby ensuring the use effect and appearance quality of the pile pier foundation, the present application provides an underwater support system for the cap beam formwork.
[0007] The cap beam formwork underwater support system provided in this application adopts the following technical solution:
[0008] A cap beam formwork underwater support system includes two pile foundations and a support mechanism arranged between the two pile foundations, the two pile foundations are pre-embedded with support columns, the support mechanism includes a support beam, a support connector and a support platform, two support beams are provided and both are located on the tops of the support columns of the two pile foundations, two groups of support connectors are provided corresponding to the pile foundations, the support connectors include a first connecting half ring and a second connecting half ring, the first connecting half ring and the second connecting half ring are respectively arranged on the two supporting beams and used to clamp the pile foundations, the first connecting half ring and the second connecting half ring are fixed by bolts, and the support platform is fixed to the supporting beam.
[0009] By adopting the above technical scheme, the supporting crossbeam is first placed on the top of the supporting column of the pile pier foundation. When the pile pier foundation is located between the first connecting semi-ring and the second connecting semi-ring, the first connecting semi-ring and the second connecting semi-ring are firmly fixed by bolts, thereby realizing the fixation between the supporting crossbeam, the supporting platform and the pile pier foundation, which is convenient for the subsequent erection of the cast-in-place cap beam formwork. After the position of the supporting platform is fixed, the supporting effect of the supporting column on the supporting crossbeam reduces the static friction between the first connecting semi-ring and the second connecting semi-ring when the pile pier foundation is directly clamped and fixed, and it is convenient to directly realize the connection between the first connecting semi-ring and the second connecting semi-ring in the horizontal direction, so that the first connecting semi-ring and the second connecting semi-ring are not easy to cause scratches on the surface of the pile pier foundation during the fixing process of the supporting crossbeam and the supporting platform, which is beneficial to ensure the use effect and appearance quality of the pile pier foundation.
[0010] Optionally, the first connecting half ring and the second connecting half ring are respectively slidably fitted to the two supporting beams along the length direction of the two supporting beams, and the first connecting half ring and the second connecting half ring are respectively fixed to the two supporting beams by two locking components.
[0011] By adopting the above technical solution, the positions of the first connecting half ring and the second connecting half ring can slide along the length direction of the supporting beam, so as to facilitate the clamping and fixation of two pile pier foundations at different distances at different length positions of the supporting beam, and has strong applicability.
[0012] Optionally, the two supporting beams are each provided with a sliding groove extending along their own length direction, and the locking assembly includes a sliding part and a sliding screw, the sliding parts of the two locking assemblies are respectively fixedly connected to the first connecting half ring and the second connecting half ring, and the sliding parts of the two locking assemblies are respectively slidably fitted in the two sliding grooves, the sliding screw is passed through the sliding part and cooperates with the sliding part thread, and the sliding part is tightly fixed in the sliding groove by the sliding screw.
[0013] By adopting the above technical solution, when the sliding screw is loosened, force is applied to move the sliding part to achieve the position adjustment of the first connecting half ring or the second connecting half ring along the length direction of the supporting beam. After the first connecting half ring or the second connecting half ring is moved to the desired position, the position of the first connecting half ring or the second connecting half ring can be fixed by tightening the sliding screw. The setting of the locking component makes the adjustment operation of the first connecting half ring or the second connecting half ring along the length direction of the supporting beam fast and stable.
[0014] Optionally, the support platform is fixed to the support beam by bolts, and the support platform is provided with a reinforcement component for connecting to the pile pier foundation.
[0015] By adopting the above technical solution, the fixation of the support platform and the support crossbeam is convenient and stable, and at the same time, the arrangement of the strengthened components is conducive to further ensuring the stability of the position of the support platform after it is finally fixed.
[0016] Optionally, two groups of reinforcement assemblies are provided corresponding to the pile pier foundation, and the reinforcement assemblies include reinforcement rods, a first reinforcement half ring and a second reinforcement half ring. Each group of reinforcement rods is provided with two rods and are rotatably installed on a support platform. The two reinforcement rods in each group are respectively located on both sides of the pile pier foundation, and the first reinforcement half ring and the second reinforcement half ring are respectively installed at one end of the two reinforcement rods away from the support platform. The first reinforcement half ring and the second reinforcement half ring are fixed by bolts and are used to clamp the pile pier foundation.
[0017] By adopting the above technical solution, after the support platform is installed, the reinforcing rod is rotated so that the pile pier foundation is located between the first reinforcing half ring and the second reinforcing half ring, and the first reinforcing half ring and the second reinforcing half ring are fixed by bolts, so as to further strengthen the position of the support platform, which is convenient and stable.
[0018] Optionally, the two reinforcing rods each include a first rod body, a second rod body and a rotating connection portion, the first rod body is rotatably installed on a supporting platform, the second rod body is passed through an end of the first rod body away from the supporting platform and is threadedly engaged with the first rod body, the rotating connection portion is coaxially rotatably connected to an end of the second rod body away from the first rod body, and the first reinforcing half ring and the second reinforcing half ring are respectively rotatably connected to the rotating connection portions of the two reinforcing rods.
[0019] By adopting the above technical solution, the length of the reinforcing rod can be adjusted by applying force to rotate the second rod body, thereby facilitating the reinforcing rod to strengthen and fix the position of the support platform at different angles according to actual needs, which is conducive to further enhancing applicability.
[0020] Optionally, a buffer pad is fixedly provided on one side of the first connecting half ring and the second connecting half ring that clamp the pile pier foundation.
[0021] By adopting the above technical solution, the setting of the buffer pad enables the first connecting half ring and the second connecting half ring to have a further supporting and buffering effect when clamping and fixing the pile pier foundation, which is conducive to better protecting the surface of the pile pier foundation and further ensuring the use effect and appearance quality of the pile pier foundation.
[0022] Optionally, a positioning portion and a movable portion are provided at the bottom of the supporting beam, the positioning portion is fixedly mounted on the supporting beam, and the movable portion is slidably fitted to the supporting beam along the length direction of the supporting beam and is fixed to the supporting beam by bolts.
[0023] By adopting the above technical solution, when erecting the supporting beam, the positioning part is firstly abutted against the supporting column of one of the pile pier foundations to achieve preliminary positioning of the position of the supporting beam, and then the movable part is moved to make the movable part abut against the supporting column of another pile pier foundation and fixed by bolts to achieve stable positioning of the position of the supporting beam, so that the supporting beam is not prone to horizontal sliding in a direction perpendicular to the supporting column, has strong stability, and is convenient to ensure the consistency of the positions of the two supporting beams during installation.
[0024] In summary, the present application includes at least one of the following beneficial technical effects:
[0025] 1. After the position of the support platform is fixed, the supporting effect of the support column on the support beam reduces the static friction between the first connecting semi-ring and the second connecting semi-ring and the pile pier foundation when the pile pier foundation is directly clamped and fixed, and it is convenient to directly realize the connection between the first connecting semi-ring and the second connecting semi-ring in the horizontal direction, so that the first connecting semi-ring and the second connecting semi-ring are not easy to cause scratches on the surface of the pile pier foundation during the fixing process of the support beam and the support platform, which is conducive to ensuring the use effect and appearance quality of the pile pier foundation.
[0026] 2. After the support platform is installed, the position of the support platform can be further strengthened by rotating the reinforcement rod so that the pile pier foundation is located between the first reinforcement half ring and the second reinforcement half ring and fixing the first reinforcement half ring and the second reinforcement half ring with bolts, which is convenient and stable.
[0027] 3. The positions of the first connecting half ring and the second connecting half ring can slide along the length direction of the supporting crossbeam, so as to facilitate the clamping and fixing of two pile pier foundations at different distances at different length positions of the supporting crossbeam, and the applicability is strong. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application.
[0029] Figure 2 It is a side view schematic diagram of the overall structure in the embodiment of the present application.
[0030] Figure 3 yes Figure 2 A partial enlarged schematic diagram of part A.
[0031] Figure 4 It is a schematic diagram of the overall structure from another perspective of the embodiment of the present application.
[0032] Figure 5 yes Figure 4 A partial enlarged schematic diagram of part B.
[0033] Description of reference numerals:
[0034] 1. Pile foundation; 2. Support beam; 3. Support column; 4. Positioning part; 5. Movable part; 6. Movable groove; 7. Tightening bolt; 8. Tightening groove; 9. First connecting half ring; 10. Second connecting half ring; 11. Sliding groove; 12. Sliding part; 13. Sliding screw; 14. Buffer pad; 15. First support plate; 151. First connecting part; 152. First supporting part; 16. Second support plate; 161. Second connecting part; 162. Second supporting part; 17. Reinforcing rod; 171. First rod body; 172. Second rod body; 173. Rotating connecting part; 18. First reinforcing half ring; 19. Second reinforcing half ring; 20. Elastic pad. DETAILED DESCRIPTION
[0035] The following is combined with Figure 1-5 This application is described in further detail.
[0036] The present application embodiment discloses a cap beam template underwater support system. Figure 1 The cap beam formwork underwater support system includes two pile pier foundations 1 and a support mechanism arranged between the two pile pier foundations 1, wherein the support mechanism includes a support beam 2, a support connector and a support platform.
[0037] Reference Figure 1 and Figure 2 The two pile foundations 1 are both pre-buried and fixed with two support columns 3, which are located on the same horizontal line and on both sides of the pile foundation 1 in the radial direction. Two support beams 2 are provided, and the bottom of the support beams 2 is provided with a positioning part 4 and a movable part 5. Figure 3 The positioning part 4 is fixedly installed on the supporting beam 2. The bottom of the supporting beam 2 is provided with a movable groove 6 extending along its length direction. The movable part 5 slides and fits in the movable groove 6. One side of the movable part 5 in the horizontal direction is threaded with a bolt, and the bolt is set as a tightening bolt 7. One side of the supporting beam 2 is provided with a tightening groove 8 extending along its length direction and connected to the movable groove 6. The tightening bolt 7 slides and fits in the tightening groove 8. When the tightening bolt 7 is rotated so that the bolt head of the tightening bolt 7 presses against the supporting beam 2, the movable part 5 is fixed to the supporting beam 2.
[0038] Reference Figure 1When the supporting crossbeam 2 is erected on the supporting column 3, the positioning portion 4 is firstly pressed against the side of the supporting column 3 of one of the pile pier foundations 1 close to the other pile pier foundation 1 to achieve preliminary positioning of the position of the supporting crossbeam 2, and then the movable portion 5 is moved so that the movable portion 5 is pressed against the side of the supporting column 3 of the other pile pier foundation 1 close to the positioning portion 4 and fixed by bolts to achieve stable positioning of the position of the supporting crossbeam 2, which is beneficial to ensure the stability of the position of the supporting crossbeam 2. At the same time, when the two supporting crossbeams 2 are respectively installed on the two supporting columns 3 of the two pile pier foundations 1, it is beneficial to ensure the consistency of the positions of the two supporting crossbeams 2 during installation, so that the two supporting crossbeams 2 can stably support the same component.
[0039] Reference Figure 4 and Figure 5 Two groups of supporting connectors are provided corresponding to the pile pier foundation 1, and the supporting connectors include a first connecting half ring 9 and a second connecting half ring 10, wherein the first connecting half ring 9 and the second connecting half ring 10 are respectively provided on the two supporting beams 2, and the first connecting half ring 9 and the second connecting half ring 10 are used to clamp the pile pier foundation 1, and the first connecting half ring 9 and the second connecting half ring 10 are respectively fixed to the top of the two supporting beams 2 through two locking components, specifically, the locking components include a sliding portion 12 and a sliding screw 13.
[0040] Reference Figure 3 and Figure 5 The tops of the two supporting beams 2 are each provided with a sliding groove 11 extending along the length direction thereof, the sliding parts 12 of the two locking assemblies are respectively fixedly connected to the first connecting semi-ring 9 and the second connecting semi-ring 10, the longitudinal section of the sliding part 12 is L-shaped, the bottoms of the sliding parts 12 of the two locking assemblies are respectively slidably matched in the sliding grooves 11 of the two supporting beams 2, the sliding screws 13 are vertically penetrated in the sliding parts 12 and threadedly matched with the sliding parts 12, and the sliding screws 13 are rotated so that the sliding screws 13 are tightly fixed in the sliding grooves 11 to achieve the fixation of the position of the sliding part 12, which is convenient to operate, and when the positions of the first connecting semi-ring 9 and the second connecting semi-ring 10 slide along the length direction of the supporting beam 2, it is convenient for the first connecting semi-ring 9 and the second connecting semi-ring 10 to clamp and fix the two pile pier foundations 1 at different length positions of the supporting beam 2, and the applicability is strong.
[0041] Reference Figure 5When the pile foundation 1 is located between the first connecting semi-ring 9 and the second connecting semi-ring 10 and the first connecting semi-ring 9 and the second connecting semi-ring 10 are fixed by bolts, the support beam 2 and the pile foundation 1 are firmly fixed. In order to better protect the surface of the pile foundation 1 when the first clamping semi-ring and the second clamping semi-ring clamp the surface of the pile foundation 1, a buffer pad 14 is provided on one side of the first clamping semi-ring and the second clamping semi-ring clamping the pile foundation 1 by bonding, and the material of the buffer pad 14 is selected to be rubber.
[0042] Reference Figure 3 and Figure 5 The support platform includes a first support plate 15 and a second support plate 16. The first support plate 15 includes a first connection portion 151 and a first support portion 152 integrally fixedly connected to the first connection portion 151. The first connection portion 151 is fixedly connected to the two support beams 2 by two groups of countersunk bolts corresponding to the two support beams 2. The second support portion 162 includes a second connection portion 161 and a second support portion 162 integrally fixedly connected to the second connection portion 161. The second connection portion 161 is located at the top of the first connection portion 151. The second connection portion 161 is fixedly connected to the two support beams 2 by two groups of bolts corresponding to the two support beams 2 and penetrating the first connection portion 151 and threadedly matched with the support beams 2. The first support portion 152 and the second support portion 162 are respectively located on the side away from the first connection portion 151 and the second connection portion 161, so as to facilitate the assembly between the support platform and the two support beams 2.
[0043] Reference Figure 4 and Figure 5 A reinforcement assembly is provided on the top of the support platform, and two groups of reinforcement assemblies are provided corresponding to the pile pier foundation 1. Specifically, the reinforcement assembly includes a reinforcement rod 17, a first reinforcement semi-ring 18 and a second reinforcement semi-ring 19, wherein two reinforcement rods 17 are provided and are rotatably installed on the top of the first support portion 152 and the second support portion 162 respectively, that is, each group of two reinforcement rods 17 are respectively located on both sides of the radial direction of the pile pier foundation 1, specifically, each reinforcement rod 17 includes a first rod body 171, a second rod body 172 and a rotation connection portion 173, the first rod body 171 of each group of two reinforcement rods 17 are respectively rotatably installed on the top of the first support portion 152 and the second support portion 162, the second rod body 172 of each group of two reinforcement rods 17 are respectively penetrated at one end of each group of two first rod bodies 171 away from the support platform and threadedly matched with the first rod body 171, and each group of two rotation connection portions 173 are respectively coaxially rotatably connected to one end of each group of two second rod bodies 172 away from the first rod body 171.
[0044] Continue to refer to Figure 4 and Figure 5The first reinforcing half ring 18 and the second reinforcing half ring 19 are respectively rotatably connected to the rotating connection part 173 of each group of two reinforcing rods 17, and the first reinforcing half ring 18 and the second reinforcing half ring 19 are used to clamp the pile pier foundation 1. When the pile pier foundation 1 is located between the first reinforcing half ring 18 and the second reinforcing half ring 19 and the first reinforcing half ring 18 and the second reinforcing half ring 19 are fixed by bolts, a stable fixation between the supporting beam 2 and the pile pier foundation 1 is achieved. The first reinforcing half ring 18 and the second reinforcing half ring 19 are both provided with an elastic pad 20 by bonding and fixing on one side of the pile pier foundation 1. The material of the elastic pad 20 is selected as rubber, so that the first reinforcing half ring 18 and the second reinforcing half ring 19 can better protect the surface of the pile pier foundation 1 when clamping the surface of the pile pier foundation 1. In addition, when the second rod 172 is rotated, the second rod 172 moves along the axial direction of the first rod 171 due to the threaded cooperation with the first rod 171, thereby realizing the adjustment of the length of the reinforcing rod 17, which is convenient for the reinforcing rod 17 to realize the reinforced fixation of the position of the support platform at different angles according to actual needs, and has strong applicability.
[0045] The implementation principle of an underwater support system for a cap beam formwork in an embodiment of the present application is as follows: when it is necessary to cast the cast-in-place cap beam on site, first place the supporting crossbeam 2 on top of the supporting column 3 of the pile pier foundation 1, and when the pile pier foundation 1 is located between the first connecting semi-ring 9 and the second connecting semi-ring 10, the first connecting semi-ring 9 and the second connecting semi-ring 10 are firmly fixed by bolts, and then the first supporting plate 15 and the second supporting plate 16 of the supporting platform are fixedly installed on the supporting crossbeam 2 in sequence, and the reinforcing rod 17 is rotated so that the pile pier foundation 1 is located between the first reinforcing semi-ring 18 and the second reinforcing semi-ring 19, and the first reinforcing semi-ring 18 and the second reinforcing semi-ring 19 are firmly fixed by bolts, thereby achieving fixation between the supporting crossbeam 2, the supporting platform and the pile pier foundation 1, which is convenient for the subsequent erection of the cast-in-place cap beam formwork.
[0046] After the position of the support platform is fixed, the supporting effect of the support column 3 on the support beam 2 reduces the static friction between the first connecting semi-ring 9 and the second connecting semi-ring 10 and the pile pier foundation 1 when they directly clamp and fix the pile pier foundation 1, and facilitates the direct connection between the first connecting semi-ring 9 and the second connecting semi-ring 10 in the horizontal direction, so that the first connecting semi-ring 9 and the second connecting semi-ring 10 are not likely to cause scratches on the surface of the pile pier foundation 1 during the fixing process of the support beam 2 and the support platform, which is beneficial to ensuring the use effect and appearance quality of the pile pier foundation 1.
[0047] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A cap beam template underwater support system, comprising two pile foundations (1) and a support mechanism arranged between the two pile foundations (1), characterized in that: The two pile pier foundations (1) are both pre-buried with support columns (3), the support mechanism comprises a support crossbeam (2), a support connector and a support platform, the support crossbeam (2) is provided with two and both are located at the top of the support columns (3) of the two pile pier foundations (1), the support connector is provided in two groups corresponding to the pile pier foundations (1), the support connector comprises a first connecting half ring (9) and a second connecting half ring (10), the first connecting half ring (9) and the second connecting half ring (10) are respectively provided on the two support crossbeams (2) and used to clamp the pile pier foundations (1), the first connecting half ring (9) and the second connecting half ring (10) are fixed by bolts, and the support platform is fixedly provided on the support crossbeam (2).
2. The underwater support system for cap beam formwork according to claim 1, characterized in that: The first connecting half ring (9) and the second connecting half ring (10) are respectively slidably matched with the two supporting beams (2) along the length direction of the two supporting beams (2), and the first connecting half ring (9) and the second connecting half ring (10) are respectively fixed to the two supporting beams (2) by two locking components.
3. The underwater support system for cap beam formwork according to claim 2, characterized in that: The two supporting cross beams (2) are each provided with a sliding groove (11) extending along the length direction thereof. The locking assembly comprises a sliding portion (12) and a sliding screw (13). The sliding portions (12) of the two locking assemblies are respectively fixedly connected to the first connecting half ring (9) and the second connecting half ring (10), and the sliding portions (12) of the two locking assemblies are respectively slidably fitted in the two sliding grooves (11). The sliding screw (13) is penetrated through the sliding portion (12) and threadably fitted with the sliding portion (12). The sliding portion (12) is tightly fixed in the sliding groove (11) by the sliding screw (13).
4. The underwater support system for cap beam formwork according to claim 1, characterized in that: The support platform is fixed to the support beam (2) by means of bolts, and the support platform is provided with a reinforcement component for connecting to the pile pier foundation (1).
5. The underwater support system for cap beam formwork according to claim 4, characterized in that: The reinforcement components are arranged in two groups corresponding to the pile pier foundation (1), and the reinforcement components include a reinforcement rod (17), a first reinforcement half ring (18) and a second reinforcement half ring (19). Each group of the reinforcement rods (17) is provided with two rods, which are both rotatably mounted on a support platform. The two reinforcement rods (17) in each group are respectively located on both sides of the pile pier foundation (1). The first reinforcement half ring (18) and the second reinforcement half ring (19) are respectively mounted on one end of the two reinforcement rods (17) away from the support platform. The first reinforcement half ring (18) and the second reinforcement half ring (19) are fixed by bolts and are used to clamp the pile pier foundation (1).
6. The underwater support system for cap beam formwork according to claim 5, characterized in that: The two reinforcing rods (17) each comprise a first rod body (171), a second rod body (172) and a rotatable connection portion (173); the first rod body (171) is rotatably mounted on a support platform; the second rod body (172) is inserted through an end of the first rod body (171) away from the support platform and is threadedly engaged with the first rod body (171); the rotatable connection portion (173) is coaxially rotatably connected to an end of the second rod body (172) away from the first rod body (171); the first reinforcing half ring (18) and the second reinforcing half ring (19) are rotatably connected to the rotatable connection portions (173) of the two reinforcing rods (17), respectively.
7. A cap beam formwork underwater support system according to any one of claims 1 to 6, characterized in that: A buffer pad (14) is fixedly provided on one side of the first connecting half ring (9) and the second connecting half ring (10) that clamps the pile pier foundation (1).
8. A cap beam formwork underwater support system according to any one of claims 1 to 6, characterized in that: A positioning portion (4) and a movable portion (5) are provided at the bottom of the support beam (2); the positioning portion (4) is fixedly mounted on the support beam (2); and the movable portion (5) is slidably engaged with the support beam (2) along the length direction of the support beam (2) and is fixed to the support beam (2) by bolts.