Protective shed suitable for open cut underground pipeline operation
By designing the bracket components and connectors of the protective shed, combined with diagonal braces, lifting lugs, traction hooks and pulleys, the problem of safety risks for workers in the trench during the construction of open-cut underground pipelines is solved, and the protection against soil collapse and object impact is achieved. Effective protection ensures operational safety.
Patent Information
- Application Number
- CN202420112095.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-01-17
AI Technical Summary
During the construction of open-cut underground pipelines, workers in the trenches face high safety risks. Existing protective facilities cannot fully meet the needs of the operation, leading to hidden dangers of accidents such as collapse and object strikes.
A protective shed is designed, which includes multiple bracket components and connectors. The bracket components are equipped with beams and columns, and have protective panels on the outside. The bracket components are connected through connectors to form parallel fixation, providing internal space for pipeline laying, and through inclined Supports, lifting lugs, traction hooks and pulleys realize the stability and movement of the protective shed and prevent soil collapse and object impact.
It effectively reduces the safety risks for workers in the trench. By enhancing the strength and stability of the protective shed, it prevents soil collapse and object strikes, ensuring smooth operation.
Smart Images

Figure CN221895953U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of open-cut underground pipeline construction in civil engineering, in particular to a protective shed suitable for open-cut underground pipeline operations. Background Art
[0002] The open excavation of underground pipelines has a complex working environment and high safety risks. It requires a device that can provide comprehensive protection to ensure the safety of workers and the smooth progress of the work. However, existing protection facilities can only provide a relatively single protection function and cannot meet the various needs of trench operations.
[0003] Traditional open-cut underground pipelines are generally excavated in sections. After excavation, trench support is applied. After completion, pipeline construction is carried out in the trench. After the pipeline is installed, the trench is backfilled. Then the adjacent sections are excavated according to the same process. The pipeline installation of the later excavated section needs to be manually connected with the pipe head of the completed section. The operators face risks such as trench collapse and object impact, which poses a great safety hazard.
[0004] Therefore, how to reduce the safety risks of personnel working in the trench is a technical problem that technical personnel in this field currently need to solve. Utility Model Content
[0005] The utility model aims to provide a protective shed suitable for open excavation of underground pipeline operations, which can reduce the safety risks of personnel working in the trench.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A protective shed suitable for open excavation of underground pipelines to enable workers to lay pipelines, the protective shed comprising:
[0008] A plurality of bracket assemblies, each of which is provided with a crossbeam and two mutually parallel columns, the two columns are respectively connected to two ends of the crossbeam and are arranged on the same side relative to the crossbeam, and the outside of the crossbeam and the columns are provided with protective plates;
[0009] The connecting piece connects several adjacent bracket assemblies so that all the bracket assemblies are arranged in parallel and fixed to each other.
[0010] Preferably, the bracket assembly includes a middle bracket assembly and two end bracket assemblies, the middle bracket assembly is located between the two end bracket assemblies, and the end bracket assemblies are provided with two guide members for preventing the bracket assembly from colliding with the outside.
[0011] Preferably, the two guide members are respectively located on both sides of the end bracket assembly and are arranged adjacent to the protective plate, and the distance between the outer sides of the two guide members gradually decreases in a direction away from the protective plate.
[0012] Preferably, the projection of the guide member in the horizontal direction is a right triangle, and the angle of the right triangle away from the protective plate is 30°.
[0013] Preferably, the protective shed further comprises a soil retaining device, which is located on one side of the protective shed and is used for soil backfilling.
[0014] Preferably, the soil retaining device comprises a first baffle and a second baffle, the first baffle is provided with a notch, and the notch is used to fit the outer circumference of the pipeline.
[0015] Preferably, the bracket assembly is further provided with an oblique brace, which is arranged at an angle with the crossbeam, and two ends of the oblique brace are respectively connected to the crossbeam and the column.
[0016] Preferably, the end bracket assembly is also provided with a lifting lug and a traction hook, the lifting lug is welded to the top of the crossbeam, and the traction hook is welded to the bottom of the column.
[0017] Preferably, a pulley is provided at one end of the column away from the cross beam, and the pulley is used to drive the bracket assembly to move.
[0018] Preferably, the protective plate and the guide member are steel plates.
[0019] Compared with the above-mentioned background technology, the utility model provides a protective shed suitable for open excavation of underground pipeline operations, so that workers can lay pipelines. The protective shed includes a connector and a plurality of bracket assemblies. The plurality of bracket assemblies are each provided with a crossbeam and two mutually parallel columns. The two columns are respectively connected to the two ends of the crossbeam and are arranged on the same side relative to the crossbeam. The outside of the crossbeam and the column are provided with a protective plate. The connector connects a number of adjacent bracket assemblies so that all the bracket assemblies are arranged in parallel and fixed to each other.
[0020] Specifically, multiple support assemblies are connected in sequence through connectors to form a protective shed. The support assemblies include beams and columns. The two ends of the beams are connected to two parallel columns, so that the protective shed has a certain internal space for workers to lay pipelines. Protective plates are provided on the outside of the beams and columns to strengthen the strength of the entire protective shed, prevent soil collapse and objects from hitting workers, thereby reducing the safety risks of people working in the trench. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0022] Figure 1A schematic diagram of the structure of the protective shed provided in the embodiment of the utility model when in use;
[0023] Figure 2 A schematic structural diagram of another perspective of the protective shed provided by the embodiment of the utility model when it is in use;
[0024] Figure 3 for Figure 2 A partial enlarged view of
[0025] Figure 4 for Figure 2 A top view of the structure;
[0026] Figure 5 A structural cross-sectional view of a soil retaining device provided by an embodiment of the utility model;
[0027] in:
[0028] 1-Pipeline;
[0029] 110-crossbeam, 120-column, 130-protection plate, 140-guide, 150-diagonal brace, 160-lifting ear, 170-traction hook, 180-pulley;
[0030] 200-connecting pieces;
[0031] 300-retaining device, 310-gap. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0033] In order to enable those skilled in the art to better understand the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0034] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "inside" and "outside" indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the position or element referred to must have a specific direction, be constructed and operate in a specific direction, and therefore should not be understood as a limitation of the present invention.
[0035] The utility model aims to provide a protective shed suitable for open excavation of underground pipeline operations, which can reduce the safety risks of personnel working in the trench.
[0036] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0037] See also Figure 1 and Figure 2 This embodiment provides a protective shed suitable for open excavation of underground pipeline operations to enable workers to lay pipelines 1. The protective shed includes a connector 200 and multiple bracket assemblies.
[0038] Multiple bracket assemblies are each provided with a crossbeam 110 and two parallel columns 120 . The two columns 120 are respectively connected to the two ends of the crossbeam 110 and are arranged on the same side relative to the crossbeam 110 . Protective plates 130 are provided on the outside of the crossbeam 110 and the columns 120 .
[0039] It should be noted that the specific number of bracket components can be adjusted according to actual conditions and is not specifically limited here, as long as the above-mentioned purpose can be achieved.
[0040] In this embodiment, the columns 120 and the beam 110 are preferably arranged vertically, and the beam 110 is supported by two parallel columns 120. In addition, the height of the columns 120 and the angle between the columns 120 and the beam 110 can also be adjusted according to actual conditions to meet the space required for construction.
[0041] The connecting member 200 connects a number of adjacently arranged bracket assemblies so that all the bracket assemblies are arranged in parallel and fixed to each other.
[0042] It is understandable that the number of connectors 200 can be increased according to actual needs to enhance the stability of the connection of all bracket components. In addition, the connector 200 can also be detachable relative to the bracket assembly to facilitate the assembly and turnover of the connector 200, which helps to reduce costs.
[0043] Specifically, multiple support assemblies are connected in sequence through connectors 200 to form a protective shed. The support assemblies include a crossbeam 110 and a column 120. The two ends of the crossbeam 110 are connected to two parallel columns 120, so that the protective shed has a certain internal space for workers to lay pipelines 1. Protective plates 130 are provided on the outside of the crossbeam 110 and the columns 120 to strengthen the strength of the entire protective shed, prevent soil collapse and objects from hitting and injuring workers, thereby reducing the safety risks of workers working in the trench.
[0044] Preferably, the support assembly includes a middle support assembly and two end support assemblies, the middle support assembly is located between the two end support assemblies, and the end support assemblies are provided with two guide members 140 for preventing the support assembly from colliding with the outside.
[0045] It can be understood that the support assembly includes a middle support assembly and two end support assemblies. The end support assemblies are each provided with two guide members 140. The guide members 140 can be used to guide the support assembly when it moves, so as to avoid the collision between the protective shed and the external soil as much as possible. The middle support assembly is located between the two end support assemblies. The number of middle support assemblies can be adjusted according to actual conditions. No specific limitation is made here, as long as the above purpose can be achieved.
[0046] See also Figure 4 Preferably, the two guide members 140 are respectively located on both sides of the end bracket assembly and are arranged adjacent to the protective plate 130 , and the distance between the outer sides of the two guide members 140 gradually decreases in a direction away from the protective plate 130 .
[0047] In this embodiment, the two guide members 140 are respectively located on both sides of the end bracket assembly and are arranged adjacent to the protective plate 130. The two guide members 140 are respectively located on two columns 120, and the distance between the outer sides of the guide members 140 gradually decreases in the direction away from the protective plate 130, which helps to move the entire protective shed. The guide members 140 are in a closed shape to reduce the risk of collision with the outside.
[0048] Preferably, the projection of the guide member 140 in the horizontal direction is a right triangle, and the angle of the right triangle away from the protective plate 130 is 30°.
[0049] Among them, the projection of the guide member 140 in the horizontal direction is a right triangle, and the angle of the right triangle away from the protective plate 130 is 30°, that is, the outer side of the guide member 140 and the vertical protective plate 130 located on the outer side of the column 120 form an angle of 30°, and the size of the angle can also be adjusted according to actual conditions.
[0050] Preferably, the protection shed further comprises a soil retaining device 300, which is located at one side of the protection shed and is used for soil backfilling.
[0051] The protection shed also includes a soil retaining device 300, which is located on one side of the protection shed. The protection shed supports the soil retaining device 300. After the pipeline 1 is installed, the soil is backfilled in layers through the soil retaining device 300 until the backfilling is completed.
[0052] See also Figure 5 Preferably, the soil retaining device 300 includes a first baffle and a second baffle, and the first baffle is provided with a notch 310 , and the notch 310 is used to fit the outer circumference of the pipeline 1 .
[0053] Among them, the soil retaining device 300 includes a first baffle and a second baffle, and the first baffle and the second baffle are used for backfilling soil at different heights. The first baffle is provided with a notch 310, and the notch 310 is used to fit the outer periphery of the pipeline 1. When backfilling the soil outside the pipeline 1, the second baffle can be used. When backfilling the soil on both sides of the pipeline 1, the first baffle with the notch 310 is used. Through the coordination and cumulative use of the first baffle and the second baffle, the backfilling work of each part of the step is completed.
[0054] It should be noted that the number and shape of the first baffle and the second baffle can be adjusted according to actual conditions as long as the above purpose can be achieved. The above embodiment is only described by backfilling soil as an example, and the soil can also be other materials, which is not specifically limited here.
[0055] Preferably, the bracket assembly is further provided with an oblique brace 150 , which is arranged at an angle with the cross beam 110 , and two ends of the oblique brace 150 are respectively connected to the cross beam 110 and the column 120 .
[0056] It can be understood that the bracket assembly is also provided with a diagonal brace 150, which is set at an angle to the crossbeam 110. The two ends of the diagonal brace 150 are respectively connected to the crossbeam 110 and the column 120 to enhance the stability of the protective shed. The number and position of the diagonal brace 150 can be adjusted according to actual conditions as long as the above purpose can be achieved.
[0057] See also Figure 3 Preferably, the end bracket assembly is also provided with a lifting ear 160 and a traction hook 170 , the lifting ear 160 is welded to the top of the beam 110 , and the traction hook 170 is welded to the bottom of the column 120 .
[0058] In this embodiment, the end bracket assembly is also provided with a lifting ear 160 and a towing hook 170. By means of the lifting ear 160 arranged on the top of the cross beam 110, after the trench excavation is completed, the protective shed can be lifted into place at the downstream end of the trench using a lifting equipment. By means of the towing hook 170 at the bottom of the column 120, the protective shed can be driven by the towing equipment to move back and forth in the trench, thereby protecting the safety of workers in the trench in all directions.
[0059] Among them, the fixing method of the lifting ear 160 and the towing hook 170 is preferably welding, and the fixing method and fixing position can be adjusted according to actual conditions as long as the above purpose can be achieved. The number of lifting ears 160 and towing hooks 170 can also be increased according to actual needs.
[0060] Preferably, a pulley 180 is provided at one end of the column 120 away from the beam 110, and the pulley 180 is used to drive the bracket assembly to move.
[0061] It should be noted that a pulley 180 is provided at one end of the column 120 away from the beam 110. The pulley 180 is located at the bottom of the column 120 to facilitate the above-mentioned traction device to drive the protective shed to move back and forth in the groove. The specifications and quantity of the pulley 180 can be adjusted according to actual conditions as long as the above-mentioned purpose can be achieved.
[0062] Preferably, the protection plate 130 and the guide member 140 are specifically steel plates.
[0063] In this embodiment, the protective plate 130 and the guide member 140 are preferably steel plates, which can meet the strength requirements of the entire protective shed during use. In addition, the materials of the protective plate 130 and the guide member 140 can also be adjusted according to actual conditions to achieve the above purpose.
[0064] It should be noted that, in this specification, relational terms such as first and second are merely used to distinguish one entity from other entities, but do not necessarily require or imply any actual relationship or order between these entities.
[0065] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0066] The above is a detailed introduction to the embodiments provided by the utility model. This article uses specific examples to illustrate the principles and implementation methods of the utility model. The description of the above embodiments is only used to help understand the method and core ideas of the utility model. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the utility model, the utility model can also be improved and modified, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.
Claims
1. A protective shed suitable for open excavation of underground pipelines to enable workers to lay pipelines (1), characterized in that: The protective shed comprises: A plurality of bracket assemblies, each of which is provided with a crossbeam (110) and two mutually parallel columns (120), wherein the two columns (120) are respectively connected to two ends of the crossbeam (110) and are arranged on the same side relative to the crossbeam (110), and the outsides of the crossbeam (110) and the columns (120) are both provided with protective plates (130); A connecting piece (200) connects a plurality of adjacently arranged bracket assemblies so that all of the bracket assemblies are arranged in parallel and fixed to each other; The support assembly comprises a middle support assembly and two end support assemblies, wherein the middle support assembly is located between the two end support assemblies, and the end support assemblies are each provided with two guide members (140) for preventing the support assembly from colliding with the outside.
2. The protective shed suitable for open excavation of underground pipelines according to claim 1 is characterized in that: The two guide members (140) are respectively located on both sides of the end bracket assembly and are arranged adjacent to the protective plate (130), and the distance between the outer sides of the two guide members (140) gradually decreases in a direction away from the protective plate (130).
3. The protective shed suitable for open excavation of underground pipelines according to claim 2 is characterized in that: The projection of the guide member (140) in the horizontal direction is a right triangle, and the angle of the right triangle away from the protection plate (130) is 30 degrees.
4. The protective shed suitable for open excavation of underground pipelines according to claim 1 is characterized in that: The protection shed further comprises a soil retaining device (300), wherein the soil retaining device (300) is located on one side of the protection shed and is used for soil backfilling.
5. The protective shed suitable for open excavation of underground pipelines according to claim 4 is characterized in that: The soil retaining device (300) comprises a first baffle and a second baffle, the first baffle being provided with a notch (310), the notch (310) being used to fit the outer circumference of the pipeline (1).
6. The protective shed suitable for open excavation of underground pipelines according to claim 1 is characterized in that: The support assembly is also provided with an oblique brace (150), the oblique brace (150) being arranged at an angle with the crossbeam (110), and the two ends of the oblique brace (150) are respectively connected to the crossbeam (110) and the column (120).
7. The protective shed suitable for open excavation of underground pipelines according to claim 1 is characterized in that: The end bracket assembly is also provided with a lifting ear (160) and a traction hook (170), wherein the lifting ear (160) is welded to the top of the crossbeam (110), and the traction hook (170) is welded to the bottom of the column (120).
8. The protective shed suitable for open excavation of underground pipelines according to claim 1 is characterized in that: A pulley (180) is provided at one end of the upright column (120) away from the crossbeam (110), and the pulley (180) is used to drive the bracket assembly to move.
9. The protective shed suitable for open excavation of underground pipelines according to claim 1 is characterized in that: The protective plate (130) and the guide member (140) are specifically steel plates.