Construction shaft for construction engineering
Through the combined structure of the arc baffle and the positioning pressure plate, the problem of dislocation and deformation of the construction shaft under soil pressure is solved, and the stability and integrity of the well pipe are achieved.
Patent Information
- Application Number
- CN202420684124.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-05
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-04-05
AI Technical Summary
The construction shafts of existing construction projects are prone to dislocation and deformation when subjected to external soil pressure. The lack of auxiliary fixing structures leads to instability of the shaft body.
Multiple arc-shaped baffles are connected to form a ring. The arc-shaped baffles and arc-shaped baffles are used to exert thrust and support on the No. 1 well pipe, combined with the positioning pressure plate and the cross positioning plate to prevent the well pipe from dislocating and sinking, ensuring Stability of well tube structure.
It effectively prevents the well pipe from dislocating and sinking under soil pressure, ensures the stability and integrity of the well pipe structure, and avoids well body deformation and connection fractures.
Smart Images

Figure CN221896588U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of construction engineering, in particular to a construction shaft for construction engineering. Background Art
[0002] The existing patent (Announcement No.: CN215718750U) proposes a construction shaft for construction engineering, No. 1 protective sleeve and No. 2 protective sleeve, and No. 2 protective sleeve slides vertically on the inner wall of No. 1 protective sleeve with the cooperation of the internal lifting assembly; the lifting assembly is composed of No. 1 limiting ring, threaded sleeve, threaded rod, No. 2 limiting ring, gear, and the threaded sleeve is fixed in the No. 1 limiting ring, and the threaded rod is fixed with the gear, and the threaded rod is threadedly connected with the threaded sleeve; the No. 1 protective sleeve has a fixed ring on the outside, and the fixed ring is connected with a limited frame. By designing No. 1 protective sleeve, No. 2 protective sleeve, threaded rod, and threaded sleeve, the device is placed in the excavated shaft, and then the position is adjusted and the threaded rod is rotated, so that the threaded rod and its threaded sleeve produce threaded rotation, so that the No. 2 protective sleeve slides vertically downward in the No. 1 protective sleeve, thereby avoiding safety hazards such as landslides during the underground construction of the well by the operators. In this device, the No. 2 protective sleeve 2 performs vertical limited sliding on the inner wall of the No. 1 protective sleeve 1 with the cooperation of the internal lifting assembly; however, there is no auxiliary fixing structure on the outside of the No. 1 protective sleeve and the No. 2 protective sleeve when in use, which can easily cause deformation of the entire well body when the soil is hollow or moves during use. Summary of the invention
[0003] In view of the above-mentioned deficiencies in the prior art, the utility model provides a construction shaft for preventing the two from misaligning when the pressures from the outer soil are different during construction of a construction project. A plurality of arc-shaped baffles are connected to form a circular ring, and the circular ring applies a thrust to the No. 1 well pipe through the arc-shaped blocking plate side plates. At the same time, the arc-shaped baffles support the structure of the No. 1 well pipe, so that the No. 1 well pipe can be easily squeezed and deformed inwardly when the No. 1 well pipe is squeezed by the soil.
[0004] The purpose of this utility model is achieved through the following technical solutions:
[0005] A construction shaft for a construction project comprises a No. 1 well pipe, a No. 2 well pipe, an arc-shaped plugging plate, an arc-shaped baffle plate, a positioning pressure plate, a down-well ladder and a well ladder outer cover. The No. 1 well pipe has an upper groove for the No. 1 well pipe on the upper part, a lower ring for the No. 1 well pipe on the lower part, the lower ring for the No. 1 well pipe is adapted to the upper groove for the No. 1 well pipe, the lower ring for the No. 1 well pipe is inserted into the upper groove for the No. 1 well pipe, a plurality of No. 1 well pipes are connected up and down, the No. 2 well pipe has a lower ring for the No. 2 well pipe on the lower part, the lower ring for the No. 2 well pipe is adapted to the upper groove for the No. 1 well pipe, the lower ring for the No. 2 well pipe is inserted into the upper groove for the No. 1 well pipe, the No. 2 well pipe has the same outer diameter as the No. 1 well pipe, the No. 2 well pipe has an upper plate for the No. 2 well pipe on the upper part, the lower surface of the upper plate for the No. 2 well pipe is in contact with the ground, the adjacent No. 1 well pipes are in contact, the No. 1 well pipe has side holes for the No. 1 well pipe, and a plurality of side holes for the No. 1 well pipe are evenly distributed on the axial side of the No. 1 well pipe.
[0006] The arc-shaped plugging plate is adapted to the side hole of the No. 1 well pipe, the arc-shaped plugging plate is inserted into the side hole of the No. 1 well pipe, the transverse connecting rod connects the arc-shaped plugging plate, the cross positioning plate connects the transverse connecting rod, the inner side of the arc-shaped plugging plate is provided with an arc-shaped plugging plate side plate, the arc-shaped plugging plate side plate has an arc-shaped slot, the arc-shaped slot is symmetrically arranged on the side of the arc-shaped plugging plate side plate, the arc-shaped baffle plate is adapted to the arc-shaped slot, and the arc-shaped baffle plate is inserted into the arc-shaped slot.
[0007] The arc-shaped plugging plate has a strip-shaped limiting groove, and the arc-shaped baffle plate has a limiting insert, which is adapted to the strip-shaped limiting groove and inserted into the strip-shaped limiting groove. The limiting insert slides in the strip-shaped limiting groove. A group of arc-shaped baffle plates are distributed on the inner side of the arc-shaped plugging plate, and the outer diameter of the arc-shaped plugging plate is the same as the outer diameter of the No. 1 well pipe.
[0008] Beneficial effects:
[0009] 1. The utility model inserts the lower ring of the No. 1 well pipe into the upper groove of the No. 1 well pipe, so that the No. 1 well pipes stacked up and down keep the sides aligned, and prevent the two from being misaligned when subjected to different pressures from the outer soil during construction. The No. 2 well pipe is stacked on the No. 1 well pipe to press the wellhead of the well, and prevent the soil from loosening during construction. The cross positioning plate is inserted into the soil through the side hole of the No. 1 well pipe, and the arc plugging plate is inserted into the side hole of the No. 1 well pipe. The side hole of the No. 1 well pipe positions the cross positioning plate, so that the cross positioning plate is fixed at the position outside the No. 1 well pipe. Through the cooperation of multiple cross positioning plates, the No. 1 well pipe can be prevented from sinking during use and from being disconnected and broken due to soil movement, so that a gap appears at the joint of the two sections of the No. 1 well pipe.
[0010] 2. The arc baffle of the utility model is plugged into the arc slot, and the limit strip is inserted into the strip limit slot. The limit strip prevents the arc baffle from moving in the arc slot during construction, ensures that the sides of the three groups of arc baffles adjacent to each other are aligned, and the adjacent arc baffles are positioned by the positioning pressure plate, and the positioning pressure plate is fixed inside the No. 1 well pipe. The arc baffle is limited by the positioning pressure plate, and then the arc plugging plate is fixed in the side hole of the No. 1 well pipe, to prevent the arc plugging plate from slipping out of the side hole of the No. 1 well pipe during construction, and the arc plugging plate is fixed. A plurality of arc baffles are connected to form a circular ring, which applies a thrust to the No. 1 well pipe through the side plates of the arc plugging plate. At the same time, the arc baffle supports the structure of the No. 1 well pipe, so that the No. 1 well pipe is convenient to be squeezed and deformed inward when it is squeezed by the soil. The down-well ladder is installed in the well in cooperation with the well ladder outer cover, so that it is convenient for workers to go up and down the well from the ground. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 The utility model is a top-down axonometric drawing of a construction shaft of a construction project.
[0012] Figure 2 The utility model is a bottom-up axonometric drawing of a construction shaft of a construction project.
[0013] Figure 3 The utility model is a cross-sectional view of a construction shaft for a construction project.
[0014] Figure 4 The utility model is a top view of a construction shaft of a construction project.
[0015] Figure 5 This is an axonometric view of the No. 1 well pipe described in the utility model.
[0016] Figure 6 This is an axonometric view of the arc-shaped blocking plate described in the present utility model.
[0017] Figure 7 This is an axonometric view of the arc-shaped baffle described in the utility model.
[0018] Figure 8 This is an axonometric view of the positioning pressure plate described in the utility model.
[0019] Fig. 9 This is an axonometric view of the down-well ladder and the outer cover of the well ladder described in the utility model. DETAILED DESCRIPTION
[0020] The utility model is further described in detail below according to the accompanying drawings and embodiments:
[0021] Embodiment 1:
[0022] A construction shaft for a construction project comprises a No. 1 shaft pipe 01, a No. 2 shaft pipe 05, an arc-shaped plugging plate 07, an arc-shaped baffle plate 13, a positioning pressure plate 15, a lower shaft ladder 18, and a shaft ladder outer cover 19. The No. 1 shaft pipe 01 has a No. 1 shaft pipe upper groove 03 on the upper part, and a No. 1 shaft pipe lower ring 02 on the lower part of the No. 1 shaft pipe 01. The No. 1 shaft pipe lower ring 02 is adapted to the No. 1 shaft pipe upper groove 03, and the No. 1 shaft pipe lower ring 02 is inserted into the No. 1 shaft pipe upper groove 03. A plurality of No. 1 shaft pipes 01 are connected up and down, and the No. 1 shaft pipes 01 stacked up and down keep the sides aligned, so as to prevent the two from being misaligned when the pressures of the outer soil are different during the construction of the construction project. The No. 2 shaft pipe 05 The lower part is provided with a No. 2 well pipe lower ring 20, which is adapted to the No. 1 well pipe upper groove 03. The No. 2 well pipe lower ring 20 is inserted into the No. 1 well pipe upper groove 03, so that the No. 2 well pipe 05 is stacked on the No. 1 well pipe 01 to compact the wellhead to prevent soil loosening during construction. The No. 2 well pipe 05 has the same outer diameter as the No. 1 well pipe 01. The upper part of the No. 2 well pipe 05 is provided with a No. 2 well pipe upper plate 06, the lower surface of the No. 2 well pipe upper plate 06 is in contact with the ground, and the adjacent No. 1 well pipe 01 is in contact with each other. The No. 1 well pipe 01 has a No. 1 well pipe side hole 04, and a plurality of No. 1 well pipe side holes 04 are evenly distributed on the axial side of the No. 1 well pipe 01.
[0023] Embodiment 2:
[0024] The arc plugging plate 07 of the utility model is adapted to the side hole 04 of the No. 1 well pipe, the arc plugging plate 07 is inserted into the side hole 04 of the No. 1 well pipe, the cross connecting rod 10 is connected to the arc plugging plate 07, the cross positioning plate 11 is connected to the cross connecting rod 10, the cross positioning plate 11 is inserted into the soil through the side hole 04 of the No. 1 well pipe, the side hole 04 of the No. 1 well pipe positions the cross positioning plate 11, so that the cross positioning plate 11 is fixed at the position outside the No. 1 well pipe 01, and a plurality of cross positioning plates are used to fix the cross positioning plate 11. The cooperation of the positioning plate 11 prevents the No. 1 well pipe 01 from sinking during the construction project when in use and from being disconnected and broken due to soil movement, resulting in a gap between the two sections of the No. 1 well pipe 01. The inner side of the arc-shaped plugging plate 07 has an arc-shaped plugging plate side plate 08, and the arc-shaped plugging plate side plate 08 has an arc-shaped groove 09. The arc-shaped groove 09 is symmetrically arranged on the side of the arc-shaped plugging plate side plate 08, and the arc-shaped baffle plate 13 is adapted to the arc-shaped groove 09, and the arc-shaped baffle plate 13 is inserted into the arc-shaped groove 09.
[0025] Embodiment 3:
[0026] The arc-shaped blocking plate 07 of the utility model has a strip-shaped limiting groove 12, and the arc-shaped baffle plate 13 has a limiting insert 14. The limiting insert 14 is adapted to the strip-shaped limiting groove 12, and the limiting insert 14 is inserted into the strip-shaped limiting groove 12. The limiting insert 14 prevents the arc-shaped baffle plate 13 from moving in the arc-shaped slot 09 during the construction of the construction project, and ensures that the sides of the three groups of arc-shaped baffle plates 13 adjacent to each other are aligned. The limiting insert 14 slides in the strip-shaped limiting groove 12, and a group of arc-shaped baffle plates 13 are distributed on the inner side of the arc-shaped blocking plate 07, and the outer diameter of the arc-shaped blocking plate 07 is the same as the outer diameter of the No. 1 well pipe 01.
[0027] Embodiment 4:
[0028] The utility model has adjacent arc-shaped baffles 13 fitted together, and a plurality of positioning plate side strips 16 are provided inside the positioning plate 15. The arc-shaped baffles 13 fit together with the positioning plate side strips 16. The positioning plate side strips 16 are symmetrically arranged at the upper and lower ends of the arc-shaped baffles 13. The upper and lower ends of the positioning plate 15 have symmetrical positioning plate side plates 17. The positioning plate side plates 17 fit together with the inner side of the No. 1 well pipe 01. The positioning plate side plates 17 are connected to the No. 1 well pipe 01 by bolts. The adjacent arc-shaped baffles 13 are positioned by the positioning plate 15. The positioning plate 15 is fixed inside the No. 1 well pipe 01. The arc-shaped baffles 13 are limited by the positioning plate 15, and the arc-shaped plugging plate 07 is fixed on the No. 1 well pipe. In the side hole 04, the arc plugging plate 07 is prevented from slipping out of the side hole 04 of the No. 1 well pipe during construction, and the arc plugging plate 07 is fixed and connected through multiple arc baffles 13 to form a circular ring, which applies thrust to the No. 1 well pipe 01 through the arc plugging plate side plate 08. At the same time, the arc baffle 13 supports the structure of the No. 1 well pipe 01, which facilitates the inward extrusion and deformation of the No. 1 well pipe 01 when the No. 1 well pipe 01 is squeezed by the soil. The upper part of the lower well ladder 18 is connected to the No. 2 well pipe upper plate 06, the lower part of the lower well ladder 18 is connected to the No. 1 well pipe 01, and the outer side of the lower well ladder 18 is connected to the well ladder cover 19. The lower well ladder 18 and the well ladder cover 19 are installed in the well in cooperation, which is convenient for workers to go up and down the well from the ground.
[0029] Embodiment 5:
[0030] The utility model installation steps are as follows: first, insert the No. 1 well pipe lower ring 02 into the No. 1 well pipe upper groove 03, stack multiple No. 1 well pipes 01 in the well, insert the arc baffle 13 into the arc slot 09, insert the limit insert strip 14 into the strip limit slot 12, connect the two ends of the horizontal connecting rod 10 to the arc plugging plate 07 and the cross positioning plate 11 respectively, insert the cross positioning plate 11 through the No. 1 well pipe side hole 04 into the soil, insert the arc plugging plate 07 into the No. 1 well pipe side hole 04, make the outer side surface of the arc plugging plate side plate 08 fit with the inner side surface of the No. 1 well pipe 01, insert the arc baffle 13 between the symmetrical positioning pressure plate side strips 16, connect the positioning pressure plate side plate 17 to the No. 1 well pipe 01 by bolts, connect the upper and lower ends of the lower well ladder 18 to the No. 2 well pipe upper plate 06 and the No. 1 well pipe 01 respectively, and connect the well ladder outer cover 19 to the lower well ladder 18.
[0031] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the technical principle of the present invention, and these improvements and modifications should also be regarded as within the protection scope of the present invention.
Claims
1. A construction shaft for a construction project, characterized in that The invention comprises a No. 1 well pipe (01), a No. 2 well pipe (05), an arc-shaped plugging plate (07), an arc-shaped baffle plate (13), a positioning pressure plate (15), a down-well ladder (18), and a well ladder outer cover (19). The No. 1 well pipe (01) has a No. 1 well pipe upper groove (03) on the upper part, and a No. 1 well pipe lower ring (02) on the lower part. The No. 1 well pipe lower ring (02) is adapted to the No. 1 well pipe upper groove (03). The No. 1 well pipe lower ring (02) is inserted into the No. 1 well pipe upper groove (03). A plurality of No. 1 well pipes (01) are connected up and down. The No. 2 well pipe (05) has a No. 1 well pipe upper groove (03) on the lower part. A No. 2 well pipe lower ring (20) is adapted to the No. 1 well pipe upper groove (03), the No. 2 well pipe lower ring (20) is inserted into the No. 1 well pipe upper groove (03), the No. 2 well pipe (05) has the same outer diameter as the No. 1 well pipe (01), the No. 2 well pipe (05) has a No. 2 well pipe upper plate (06) on its upper portion, the No. 2 well pipe upper plate (06) is in contact with the ground, and the adjacent No. 1 well pipe (01) is in contact with each other, the No. 1 well pipe (01) has a No. 1 well pipe side hole (04), and a plurality of No. 1 well pipe side holes (04) are evenly distributed on the axial side of the No. 1 well pipe (01).
2. A construction shaft for construction engineering according to claim 1, characterized in that The arc plugging plate (07) is adapted to the side hole (04) of the well pipe No. 1, the arc plugging plate (07) is inserted into the side hole (04) of the well pipe No. 1, the cross connecting rod (10) is connected to the arc plugging plate (07), the cross positioning plate (11) is connected to the cross connecting rod (10), the inner side of the arc plugging plate (07) has an arc plugging plate side plate (08), the arc plugging plate side plate (08) has an arc-shaped slot (09), the arc-shaped slot (09) is symmetrically arranged on the side of the arc plugging plate side plate (08), the arc-shaped baffle plate (13) is adapted to the arc-shaped slot (09), and the arc-shaped baffle plate (13) is inserted into the arc-shaped slot (09).
3. A construction shaft for construction engineering according to claim 2, characterized in that The arc-shaped plugging plate (07) has a strip-shaped limiting groove (12), and the arc-shaped baffle plate (13) has a limiting insert (14). The limiting insert (14) is adapted to the strip-shaped limiting groove (12), and the limiting insert (14) is inserted into the strip-shaped limiting groove (12). The limiting insert (14) slides in the strip-shaped limiting groove (12). A group of arc-shaped baffle plates (13) are distributed on the inner side of the arc-shaped plugging plate (07), and the outer diameter of the arc-shaped plugging plate (07) is the same as the outer diameter of the No. 1 well pipe (01).
4. A construction shaft for construction engineering according to claim 3, characterized in that : Adjacent arc-shaped baffles (13) are fitted together, a plurality of positioning pressure plate side strips (16) are provided inside the positioning pressure plate (15), the arc-shaped baffle (13) and the positioning pressure plate side strips (16) are fitted together, the positioning pressure plate side strips (16) are symmetrically arranged at the upper and lower ends of the arc-shaped baffle (13), the upper and lower ends of the positioning pressure plate (15) have symmetrical positioning pressure plate side plates (17), and the positioning pressure plate side plates (17) are fitted together with the inner side of the No. 1 well pipe (01).
5. A construction shaft for construction engineering according to claim 4, characterized in that The positioning pressure plate side plate (17) is connected to the No. 1 well pipe (01) by bolts, the upper part of the lower well ladder (18) is connected to the No. 2 well pipe upper plate (06), the lower part of the lower well ladder (18) is connected to the No. 1 well pipe (01), and the outer side of the lower well ladder (18) is connected to the well ladder outer cover (19).