I-shaped steel beam clamp

By designing I-beam clamps and using channel steel batch processing and connecting screw fastening technology, the problems of welding damage and high-cost finished beam clamps were solved, and the material was realized with convenient processing and wide-range applicability.

CN221897258UActive Publication Date: 2024-10-25CHINA CONSTR EIGHTH BUREAU TIANJIN CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420420372.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-05
Publication Date
2024-10-25
Estimated Expiration
2034-03-05

AI Technical Summary

Technical Problem

In steel structure engineering, existing supports and hangers are easily damaged when connecting steel structure beams through welding, and the purchase cost of finished beam clamps is high, making it difficult to meet the needs of large-scale use.

Method used

Design an I-beam clamp that is processed in batches using channel steel. Through fixed-length cutting and center opening, the steel beam and the clamping channel steel are fixed by using connecting screws and adjusting nuts. This simplifies the production process and is suitable for large-scale use. .

Benefits of technology

It achieves easy access to materials and simple production process, avoids welding damage problems, and reduces procurement costs, making it suitable for use in a wide range of projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221897258U_ABST
    Figure CN221897258U_ABST
Patent Text Reader

Abstract

The utility model relates to a steel beam clamp, belongs to the technical field of electromechanical engineering pipeline supports, and particularly relates to an I-shaped steel beam clamp which comprises an I-shaped steel body, a beam clamp body is arranged at the lower end of the outer side of the I-shaped steel body, an elastic hanging bracket hanging rod is arranged on the lower side of the beam clamp body, and the beam clamp body further comprises two butt-clamping steel channels. Connecting steel channels are arranged on the inner sides of the two butt-clamping steel channels, a connecting screw rod is arranged on the inner sides of the two butt-clamping steel channels in a penetrating mode, and two adjusting nuts are symmetrically and rotationally connected to the outer side of the connecting screw rod through threads. The manufacturing materials of the beam clamp are convenient to take and use, the beam clamp is processed by channel steel in batches, the manufacturing process is relatively simple, the steel beam, the butt clamp channel steel and the connecting channel steel are fixed only by cutting the channel steel at a fixed length, forming a hole in the center of the channel steel and fastening through the connecting screw rod, and the beam clamp is suitable for being used in a large range of projects; the problems that steel beams are prone to being damaged by existing welding, and the purchase cost of finished beam clamps is relatively high are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of electromechanical engineering pipeline supports, in particular to an I-beam clamp. Background Art

[0002] In steel structure projects, supports and hangers are often rooted in steel beams. Generally, supports and hangers are connected to steel beams through welding or finished beam clamps. Welding can easily damage steel beams, while the procurement cost of finished beam clamps is relatively high. Utility Model Content

[0003] In order to solve the above technical problems, the utility model proposes an I-beam beam clamp. The manufacturing materials are easy to obtain and are all processed in batches from channel steels. The manufacturing process is relatively simple. It only requires cutting the channel steel to a fixed length and opening a hole in the center of the channel steel. The steel beam, the clamping channel steel and the connecting channel steel are fixed by fastening with connecting screws. The utility model is suitable for use in a wide range of projects.

[0004] The technical solution to achieve the purpose of the utility model is: an I-beam beam clamp, including an I-beam main body, a beam clamp is arranged at the lower end position of the outer side of the I-beam main body, an elastic hanger rod is arranged on the lower side of the beam clamp, the beam clamp also includes two clamping channel steels, a connecting channel steel is arranged on the inner side of the two clamping channel steels, and a connecting screw is arranged through the inner side of the two clamping channel steels, and the outer side of the connecting screw is connected to two adjusting nuts by threaded symmetrical rotation.

[0005] In some embodiments, a through hole is formed on the inner side of the connecting channel steel.

[0006] In some embodiments, the length of the connecting channel steel is equal to the width of the lower edge plate of the I-beam body.

[0007] In some embodiments, mounting holes are provided on the inner sides of the two clamping channel steels.

[0008] In some embodiments, the connecting screw can be replaced according to the distance between the two clamping channel steels.

[0009] Compared with the prior art, the present invention has the following significant advantages:

[0010] The beam clamp of the utility model is easy to obtain and is made of channel steel in batches. The manufacturing process is relatively simple. It only needs to cut the channel steel to a fixed length and open a hole at the center of the channel steel. The steel beam, the clamping channel steel and the connecting channel steel are fixed by fastening with connecting screws. It is suitable for a wide range of projects.

[0011] The problem that the existing welding easily causes damage to the steel beam and the procurement cost of the finished beam clamp is relatively high is solved. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] The utility model is further explained below in conjunction with the accompanying drawings and embodiments:

[0013] Figure 1 It is a schematic diagram of the overall assembly state structure provided by the utility model in one embodiment;

[0014] Figure 2 It is a schematic diagram of the overall structure of the beam clamp provided in one embodiment of the utility model;

[0015] Figure 3 It is a schematic diagram of a separate structure of a connecting channel steel provided in one embodiment of the utility model.

[0016] Description of reference numerals:

[0017] 1. I-beam body; 2. Beam clamp; 3. Elastic hanger rod; 4. Clamp channel steel; 5. Connecting channel steel; 6. Connecting screw; 7. Adjusting nut; 8. Through hole. DETAILED DESCRIPTION

[0018] The utility model is described in detail below, and the technical solutions in the embodiments of the utility model are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0019] The utility model provides an I-beam beam clamp through improvement. The technical solution of the utility model is:

[0020] like Figure 1-Figure 3 As shown, an I-beam beam clamp comprises an I-beam body 1, a beam clamp 2 is arranged at the lower end position of the outer side of the I-beam body 1, an elastic hanger rod 3 is arranged on the lower side of the beam clamp 2, the beam clamp 2 also comprises two clamping channel steels 4, a connecting channel steel 5 is arranged on the inner side of the two clamping channel steels 4, and a connecting screw 6 is penetrated through the inner side of the two clamping channel steels 4, and the outer side of the connecting screw 6 is connected with two adjusting nuts 7 by symmetrical rotation of threads, the two clamping channel steels 4 are respectively engaged with the outer side of the I-beam body 1, and the connecting channel steel 5 is placed on the inner side of the two clamping channel steels 4, and the connecting screw 6 is installed, the inner sides of the two clamping channel steels 4 are opened with mounting holes, the connecting screw 6 is connected to the two clamping channel steels 4 through the mounting holes, and is fixed by the adjusting nuts 7 located at the two end positions of the outer side of the connecting screw 6, and the operation is simple.

[0021] like Figure 3 As shown, in one embodiment, a through hole 8 is opened on the inner side of the connecting channel steel 5, and the elastic hanger rod 3 is installed. The through hole 8 is opened to facilitate the rooting of the elastic hanger rod 3.

[0022] like Figure 1 As shown, in one embodiment, the length of the connecting channel steel 5 is equal to the width of the lower edge plate of the I-beam body 1, thereby ensuring the fixing effect.

[0023] like Figure 2 As shown, in one embodiment, mounting holes are provided on the inner sides of the two clamping channel steels 4 to ensure the feasibility of installing the connecting screws 6 .

[0024] like Figure 2 As shown, in one embodiment, the connecting screw 6 can be replaced according to the distance between the two clamping channel steels 4. When the size of the I-beam body 1 changes, resulting in a change in the distance between the two clamping channel steels, it can be replaced, thereby improving applicability.

[0025] The specific working method is: when in use, the two clamping channel steels 4 are respectively engaged with the outer side of the I-beam body 1, and the connecting channel steel 5 is placed on the inner side of the two clamping channel steels 4, and the connecting screw 6 is installed. The inner sides of the two clamping channel steels 4 are provided with mounting holes. The connecting screw 6 connects the I-beam body 1 with the two clamping channel steels 4 through the mounting holes, and is fixed by adjusting nuts 7 located at both ends of the outer side of the connecting screw 6. A through hole 8 is provided on the inner side of the connecting channel steel 5, and the elastic hanger rod 3 is installed. The through hole 8 is provided to facilitate the rooting of the elastic hanger rod 3. Through the above principle, the connection between the support hanger or the finished beam clamp 2 and the steel structure beam can be completed.

[0026] The technical means disclosed in the utility model are not limited to the technical means disclosed in the above technical means, but also include technical solutions composed of equivalent replacement of the above technical features. Matters not covered in the utility model belong to the common knowledge of those skilled in the art.

Claims

1. An I-beam beam clamp, comprising an I-beam body (1), a beam clamp (2) is arranged at the lower end of the outer side of the I-beam body (1), and an elastic hanger rod (3) is arranged at the lower side of the beam clamp (2), characterized in that: The beam clamp (2) also includes two clamping channel steels (4), the inner sides of the two clamping channel steels (4) are provided with connecting channel steels (5), and the inner sides of the two clamping channel steels (4) are penetrated by connecting screws (6), and the outer sides of the connecting screws (6) are connected to two adjusting nuts (7) by symmetrical rotation through threads.

2. The I-beam clamp according to claim 1, characterized in that: A through hole (8) is provided on the inner side of the connecting channel steel (5).

3. The I-beam clamp according to claim 1, characterized in that: The length of the connecting channel steel (5) is equal to the width of the lower edge plate of the I-beam body (1).

4. The I-beam clamp according to claim 1, characterized in that: The inner sides of the two clamping channel steels (4) are both provided with mounting holes.

5. The I-beam clamp according to claim 1, characterized in that: The connecting screw rod (6) can be replaced according to the distance between the two clamping channel steels (4).