Mine geological exploration drilling sampling device

By adopting the design of shock-absorbing structure and multiple sampling parts in the mine geological exploration drilling device, the problem of shock-absorbing in hard mine layers and the difficulty of sampling at different depths are solved, and stable and efficient drilling sampling is achieved.

CN221898814UActive Publication Date: 2024-10-25CHANGCHUN INST OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420219778.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-10-25
Estimated Expiration
2034-01-30

AI Technical Summary

Technical Problem

Existing drilling devices for mine geological survey have insignificant shock absorption effects when facing hard mine layers, which may cause the device to fall apart, and cannot stably sample geology at different depths separately, resulting in mixed exploration results.

Method used

A mining geological exploration drilling sampling device including a shock-absorbing structure and a drilling structure is designed. The shock-absorbing structure uses an integrated support plate parallel to the ground, a support leg, an elastic member and a buffer device to alleviate the vibration during the drilling process. Cylinders, motors and multiple sampling parts are used to achieve geological sampling at different depths.

Benefits of technology

It effectively alleviates the vibration during the drilling process, improves the stability of the device, and can separately sample the geology at different depths of the rock layer, reducing cross-mixing of sampling results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221898814U_ABST
    Figure CN221898814U_ABST
Patent Text Reader

Abstract

The utility model discloses a mine geological exploration drilling sampling device in the technical field of geological exploration, which comprises a damping structure and a drilling structure, the damping structure comprises a support plate, the support plate comprises a transverse plate and a vertical plate, the side wall of the vertical plate is provided with a first groove, the damping structure further comprises a plurality of support leg rods, the side wall of each support leg rod is provided with a first bulge, and the first bulge is provided with a second groove. The vertical plate and the supporting leg rod are mutually fixed through the first groove and the first bulge; the damping structure further comprises a mounting box, the mounting box is fixed to the bottom of the transverse plate, and elastic pieces are arranged between the mounting box and the supporting leg rods. The drilling structure comprises a cylinder, a motor and a sampling rod, the top of the cylinder is fixedly connected with the inner top wall of the mounting box, the top of the motor is fixedly connected with an output shaft of the cylinder, an output shaft at the bottom of the motor is fixed with the top of the sampling rod, a plurality of sampling parts are arranged on the surface of the sampling rod, each sampling part comprises a fixed part and a digging arm hinged to each other, and a servo motor is arranged at the hinged position. The geology sampling device can be used for stably and respectively sampling geology with different depths.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of geological exploration, in particular to a mining geological exploration drilling sampling device. Background Art

[0002] Mining geological exploration is a special type of geological exploration. Compared with geological exploration, mining geological exploration focuses more on the discovery and exploitation of mineral resources. Its purpose is to explore and evaluate mineral resources and determine information such as mineral distribution, reserves, and grade. Drilling uses tools to take actual profiles of the underlying layers and capture physical samples. It is a common exploration method in mining geological exploration.

[0003] Existing spiral drills need to use other tools to sample soil layers when in use, so the workload is large, and some spiral drills with sampling functions can only sample strata at the same depth, so they cannot accurately analyze and control the geological conditions.

[0004] To solve the above problems, the Chinese patent publication number CN 208502752 U discloses a drilling device for geological survey, including a bracket and a drill rod, the drill rod is installed on the bracket by threading, a plurality of support legs are arranged on the bracket, and the support legs are distributed circumferentially with the drill rod as the center; a drill tip is arranged at the bottom of the drill rod, the drill rod is hollow inside, a plurality of collection holes are arranged on the side wall of the drill rod, and the collection holes are located in the lower half of the drill rod and are arranged at intervals along the length direction of the drill rod, a collection rod is installed inside the drill rod, and the outer circle of the collection rod matches the inner hole diameter of the drill rod, the collection rod is provided with a plurality of collection cavities on the lower half, and the collection cavities are independent of each other, and each collection cavity is provided with a collection window. The beneficial effects are: sampling can be carried out while drilling, and geology at different depths can be sampled separately; the operation is simple, the use is convenient, and the workload of drilling sampling is greatly reduced.

[0005] Although the above-mentioned drilling device for geological exploration can basically meet the needs, the shock-absorbing effect of the device is not obvious when facing the hard mining layer. The vibration generated by the drill tip digging the rock layer will be transmitted to the entire device. The vibration may cause the loosening of various parts in the device. In severe cases, it may cause the device to fall apart on the spot, affecting the exploration effect; and the above-mentioned device has only one sampling port. If the ore layer structure is complex and severely stratified, the user may cause the final sampling to be cross-mixed when using the above-mentioned device to take samples, affecting the exploration results. That is, the above-mentioned drilling device for geological exploration has the problem of not being able to stably sample the geology at different depths separately. Utility Model Content

[0006] In order to solve the problem of being unable to stably sample geological layers of different depths separately, the present utility model provides a drilling sampling device for mine geological exploration.

[0007] In order to achieve the above object, the technical solution of the present utility model is as follows: A drilling sampling device for mine geological exploration includes a shock absorption structure and a drilling structure.

[0008] The shock absorption structure includes an integral support plate parallel to the ground. The cross-section of the support plate is in the shape of "冖", that is, the support plate includes a middle cross plate and vertical plates on both mirror-image sides. The vertical plates include a first vertical plate and a second vertical plate. First grooves are provided on the inner side walls of both the first vertical plate and the second vertical plate. The shock absorption structure further includes a number of support foot rods. All of the support foot rods are arranged at the bottom of the cross plate. First protrusions corresponding to the first grooves are provided on the outer side walls of the upper parts of the support foot rods. The vertical plates and the support foot rods are fixed to each other through the first grooves and the first protrusions, and a first gap is left between the first grooves and the first protrusions. Springs for buffering vibrations are provided between the tops of the support foot rods and the bottom of the cross plate; telescopic rods are provided at the bottoms of the support foot rods away from the first protrusions. One end of the telescopic rod is fixedly connected to the bottom of the support foot rod, and the other end of the telescopic rod is provided with a fixing part. The fixing part includes a fixing plate and an insertion thorn. The top of the fixing plate is fixedly connected to the end of the telescopic rod away from the support foot rod, and the bottom of the fixing plate is fixedly connected to the insertion thorn; the shock absorption structure further includes an installation box, which is fixed to the bottom of the cross plate. Elastic members are provided between the installation box and the support foot rods on both the left and right sides. A through hole communicating with the outside is also provided at the bottom of the installation box.

[0009] The drilling structure includes a cylinder, a motor, and a sampling rod. The cylinder is located inside the installation box. The top of the cylinder is fixedly connected to the inner top wall of the installation box. The output shaft of the cylinder extends to the outside of the installation box through the through hole at the bottom of the installation box. The top of the motor is fixedly connected to the output shaft of the cylinder. The output shaft at the bottom of the motor is fixedly connected to the top of the sampling rod. The sampling rod extends to the outside of the installation box through the through hole at the bottom of the installation box. A drill bit is provided at the bottom of the sampling rod located outside. A number of sampling parts are provided on the surface of the sampling rod located outside. The sampling parts are vertically arranged on the surface of the sampling rod. Each sampling part includes a fixed arm and a digging arm that are hinged to each other. A servo motor is provided at the hinge. The other sides of the fixed arm and the digging arm are in mutual contact. The fixed arm and the digging arm form a sealed space inside. The other side of the fixed arm away from the servo motor is in mutual contact with the other side of the digging arm away from the servo motor. The fixed arm and the digging arm form a sealed space inside. The drilling structure further includes a power supply, which is fixed to the top of the support plate. The output end of the power supply is electrically connected to the input end of the motor and the input end of the servo motor respectively.

[0010] The principle and beneficial effects of the basic solution are:

[0011] When the user starts the cylinder and turns on the motor, the device will enter the drilling process, the cylinder output shaft drives the motor to move downward, the motor output shaft drives the sampling rod fixed below the output shaft to rotate, and the drill bit at the bottom of the sampling rod will drill the hard mine surface under the rotation. In the process of the drill bit drilling the mine surface, the collision vibration between the drill bit and the surface will also be transmitted to the installation box through the sampling rod above the drill bit. If no treatment is done, the vibration will be transmitted to various parts of the device with the installation box as the center. In severe cases, the vibration may cause the structure of the device to be unstable and fall apart. At this time, because the installation box is connected to the supporting foot rod through an elastic member, the vibration transmitted to the installation box will be alleviated by the buffering effect of the elastic member, that is, the shock absorbing structure of the utility model can alleviate the vibration generated during the drilling process through the elastic member;

[0012] At the same time, because the supporting foot rods are fixed in the grooves on the vertical plate by the first protrusions, and a first gap is left between the first grooves and the first protrusions, the vibration transmitted to the supporting foot rods through the elastic member will not make the connection between the supporting plate and the supporting foot rod loose. On the contrary, the vibration of the elastic member acting on the supporting foot rod will be buffered by the first gap, so that the first protrusion on the supporting foot rod will fit the grooves on the vertical plate more closely. Because a spring for buffering vibrations is provided between the top of the supporting foot rod and the bottom of the horizontal plate, the vertical vibrations acting on the supporting foot rod will also be buffered by the spring. The utility model can utilize the vibrations generated during the drilling process to make the overall structure more stable.

[0013] When the drill bit drills through the surface and goes deep into the ground, the device will enter the sampling mode. The underground rock layer has been broken and loosened by the drill bit, and the sampling part located on the surface of the sampling rod can work normally. The sampling part includes a servo motor and a fixed arm and an excavation arm that are hinged to each other. When the user starts the servo motor, the output shaft of the servo motor located at the hinge will drive the excavation arm to rotate along the hinge, and an opening will appear between the originally fitted fixed arm and the excavation arm. The rock sample that has been broken and loosened by the drill bit will flow in from the opening. When the user turns off the servo motor, the output shaft of the servo motor will drive the excavation arm to return to the initial position along the hinge, and the fixed arm and the excavation arm will form a closed accommodation space again. The accommodation space will accommodate the rock sample to achieve the sampling effect, that is, the utility model can sample the rock layer through the sampling part;

[0014] Because there are several sampling parts vertically arranged on the surface of the sampling rod, the distance between each sampling part and the drill bit is different. Only after the servo motor in the sampling part at a certain position is activated, the sampling part at this position can sample the geology through the excavation arm. Therefore, the user can sample the geology at different depths of the rock layer through the sampling parts at different positions on the surface of the sampling rod.

[0015] In summary, the utility model can reduce the vibration generated during drilling with a shock-absorbing structure, and can also make the overall structure more stable by using vibration. The utility model can also sample the geology at different depths of the rock layer separately. That is, the utility model can solve the problem of not being able to stably sample the geology at different depths separately.

[0016] Furthermore, support rods are provided on both sides of the cylinder, one end of the support rod is fixedly connected to the side wall of the cylinder, and the other end of the support rod is fixedly connected to the inner wall of the installation box.

[0017] The principle and beneficial effects of the basic solution are: compared with the method of fixing the cylinder on the top wall of the mounting box, the method of fixing the cylinder by jointly fixing the top wall of the mounting box and the side walls at both ends is more stable. After the vibration generated during the drilling process is transmitted to the cylinder, it will be more easily transmitted to the elastic member through the support rods at both ends of the cylinder. That is, the support rod structure in the utility model can fix the cylinder more firmly, and the support rod structure can also increase the shock-absorbing effect of the shock-absorbing structure.

[0018] Furthermore, a second protrusion is provided on the top side wall of the installation box, and a second groove fitting the second protrusion is provided on the bottom side wall of the support plate. The installation box and the support plate are fixed to each other through the second groove and the second protrusion, and a second gap is left between the second groove and the second protrusion.

[0019] The principle and beneficial effect of the basic solution are: compared with the method of fixing the installation box to the lower part of the support plate by threaded fixing connection, when the installation box is fixed to the second groove at the bottom of the support plate by the second protrusion, it is more stable when facing the vertical vibration generated during the drilling process. Therefore, the method of fixing the installation box and the support plate by the second protrusion and the second groove in the utility model is more stable.

[0020] Furthermore, a plurality of spiral blades are provided on the side wall between the drill bit and the sampling portion.

[0021] The principle and beneficial effect of the basic scheme are: compared with a drill bit without spiral blades, during the drilling process of the drill bit, the blades will cut the rock formation and transport the rock debris out of the borehole, freeing up drilling space for the drill bit. The drill bit will be able to penetrate the rock formation more easily under the action of the blades, so the spiral blades on the drill bit of the utility model can increase the drilling efficiency.

[0022] Furthermore, a plurality of hook-shaped thorns are provided on the inner side wall of the digging arm.

[0023] The principle and beneficial effect of the basic scheme are: compared with an excavating arm without hook-shaped barbs, during the sampling process of the excavating arm, the hook-shaped barbs on the inner wall of the excavating arm can assist the excavating arm to keep the sampled sample in the space formed by the excavating arm and the fixed arm. The sampling part of the utility model can collect samples more efficiently through the hook-shaped barbs.

[0024] Furthermore, a solar panel for converting solar energy into electrical energy is provided on the top of the support plate, and an output end of the solar panel is electrically connected to an input end of a power supply.

[0025] The principle and beneficial effect of the basic scheme are: compared with the device without solar panels, the solar panels located on the support plate can convert the energy of sunlight into electrical energy and transmit it to the power supply through electrical connection, so the method of charging the power supply of the utility model is convenient and fast, and the outdoor exploration and drilling operations of the staff will be smoother.

[0026] Furthermore, the insertion thorn is provided with a rubber tube sleeve fitted therewith.

[0027] The principle and beneficial effect of the basic scheme are: compared with the insertion thorn head without the rubber tube sleeve, the operator can be protected by the rubber tube sleeve during the handling process of the utility model, and the insertion thorn will not stab the operator, so the rubber tube sleeve structure of the utility model can protect the operator more safely.

[0028] Furthermore, the sampling rod is provided with scale bars, which are distributed vertically along the sampling rod.

[0029] Because the design of the scale bar makes it easy for the operator to intuitively observe the soil depth of the sampling part on the sampling rod at this time, the operator can record the mining geological information more conveniently. Therefore, compared with the sampling rod without a scale bar, the scale bar design of the utility model can help the operator complete the information sampling operation more efficiently. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 This is the overall plan view of the mining geological exploration drilling and sampling device.

[0031] Figure 2 for Figure 1 Partial plan view of the support plate vertical plate and supporting foot rods.

[0032] Figure 3 for Figure 1 Side view of the central sampling section when not in operation.

[0033] Figure 4 for Figure 1 Side view of the central sampling unit in operation.

[0034] Figure 5 for Figure 1 A plan view of the motor and support rods installed in the box.

[0035] Figure 6 for Figure 1 Partial plan view of the middle support plate cross plate and installation box. DETAILED DESCRIPTION

[0036] The following is a further detailed description through specific embodiments:

[0037] The reference numerals in the accompanying drawings of the specification include: support plate 1, support foot rod 2, telescopic rod 3, fixing plate 4, insertion thorn 5, mounting box 6, elastic member 7, motor 8, sampling rod 9, drill bit 10, sampling part 11, power supply 12, support rod 13, fixed arm 111, excavation arm 112, servo motor 113, first groove 14, first protrusion 15, second groove 16, second protrusion 17, helical blade 18, cylinder 19, spring 20.

[0038] Embodiment 1

[0039] Basically as shown in the attached Figure 1 , attached Figure 2 , attached Figure 3 and attached Figure 4 shown: A mine geological exploration drilling and sampling device, including a shock absorption structure and a drilling structure. The shock absorption structure includes an integral support plate 1 parallel to the ground. The cross-section of the support plate 1 is in the shape of "冖", that is, the support plate 1 includes a middle cross plate and mirror-image vertical plates on both sides. The vertical plates include a first vertical plate and a second vertical plate. First grooves 14 are provided on the inner side walls of both the first vertical plate and the second vertical plate. The shock absorption structure further includes a number of support foot rods 2. A number of support foot rods 2 are all arranged at the bottom of the cross plate. First protrusions 15 corresponding to the first grooves 14 are provided on the outer side walls of the upper parts of the support foot rods 2, and a first gap is left between the first protrusions 15 and the first grooves 14. A spring 20 for buffering vibration is provided between the top of the support foot rod 2 and the bottom of the cross plate. One end of the spring 20 is fixedly connected to the top of the support foot rod 2 by threads, and the other end of the spring 20 is fixedly connected to the bottom of the cross plate by threads. The vertical plate and the support foot rod 2 are fixed to each other through the first groove 14 and the first protrusion 15; A telescopic rod 3 is provided at the bottom of the support foot rod 2. One end of the telescopic rod 3 is fixedly connected to the bottom of the support foot rod 2 by threads, and the other end of the telescopic rod 3 is provided with a fixing part. The fixing part includes a fixing plate 4 and an insertion thorn 5. The top of the fixing plate 4 is fixedly connected to the end of the telescopic rod 3 far from the support foot rod 2 by threads, and the bottom of the fixing plate 4 is fixedly connected to the insertion thorn 5 by threads; The shock absorption structure further includes a mounting box 6. The mounting box 6 is fixedly connected to the bottom of the cross plate by threads. Elastic members 7 are provided between the mounting box 6 and the support foot rods 2 on both the left and right sides. In this embodiment, the elastic member 7 is a return spring. One end of the return spring is welded to the side wall of the mounting box 6, and the other end of the return spring is welded to the side wall of the support foot rod 2 far from the first protrusion 15. A through hole communicating to the outside is also provided at the bottom of the mounting box 6.

[0040] The drilling structure includes a cylinder 19, a motor 8 and a sampling rod 9. In this embodiment, the model of the cylinder 19 is SCX50X25-S. The cylinder 19 is located inside the installation box 6. The top of the cylinder 19 is fixedly connected to the top wall of the installation box 6 by threads. The output shaft of the cylinder 19 extends to the outside of the installation box 6 through the through hole at the bottom of the installation box 6. The top of the motor 8 is fixedly connected to the output shaft of the cylinder 19 by threads. In this embodiment, the model of the motor 8 is CMZ2100-BFPS. BFX, the output shaft at the bottom of the motor 8 is fixedly connected with the top of the sampling rod 9 by threads, a drill bit 10 is provided at the bottom of the sampling rod 9 located outside, and a plurality of sampling parts 11 are provided on the surface of the sampling rod 9 located outside the mounting box 6, and the plurality of sampling parts 11 are vertically arranged on the surface of the sampling rod 9. In this embodiment, the number of the sampling parts 11 is three, and the sampling part 11 includes a fixed arm 111 and a digging arm 112 hinged to each other, and a servo motor 113 is provided at the hinge. In this embodiment, the servo motor model is GA12-N20, and the fixed arm 111 and the digging arm 112 form a closed space inside. The drilling structure also includes a power supply 12. In this embodiment, the power supply 12 is a battery, and the battery model is 6-CNNJ-200. The power supply 12 is fixed to the top of the support plate 1 by threads, and the output end of the power supply 12 is electrically connected to the input end of the motor 8 and the input end of the servo motor 113 respectively.

[0041] The specific implementation process is as follows:

[0042] After the user adjusts the overall height of the device through the telescopic rod 3 under the supporting foot rod 2, the device is fixed to the surface of the mountain through the fixing part under the telescopic rod 3. The user starts the cylinder 19 and turns on the motor 8, and the device will enter the drilling process. The output shaft of the cylinder 19 drives the motor 8 to move downward, and the sampling rod 9 fixed below the output shaft of the motor 8 starts to rotate under the action of the motor. The drill bit 10 located at the bottom of the sampling rod 9 will drill the hard surface of the mine under the rotation. In the process of the drill bit 10 drilling the surface of the mine, the collision vibration between the drill bit 10 and the surface will also be transmitted to the installation box 6 through the sampling rod 9 above the drill bit 10. If no treatment is done, the vibration will be transmitted to various parts of the device with the installation box 6 as the center. In severe cases, the vibration may cause the structure of the device to be unstable and fall apart, and the drilling process will be forced to terminate. At this time, because the installation box 6 is connected to the supporting foot rod 2 through the elastic member 7, the vibration transmitted to the installation box 6 will be alleviated by the buffering effect of the elastic member 7, that is, the shock absorbing structure of the utility model can alleviate the vibration generated during the drilling process through the elastic member 7.

[0043] At the same time, because the supporting foot rods 2 are fixed in the first grooves 14 of the vertical plate by the first protrusions 15, the vibration transmitted to the supporting foot rods 2 by the elastic members 7 will not loosen the connection between the supporting plate 1 and the supporting foot rods 2. On the contrary, the vibration acting on the supporting foot rods 2 by the elastic members 7 will be buffered by the first gap, which will make the first protrusions 15 on the supporting foot rods 2 fit more closely to the first grooves 14 on the vertical plate. Moreover, because a spring 20 for buffering vibrations is provided between the top of the supporting foot rods 2 and the bottom of the horizontal plate, the vertical vibrations acting on the supporting foot rods 2 will also be buffered by the springs 20. The utility model can utilize the vibrations generated during the drilling process to make the overall structure more stable.

[0044] When the drill bit 10 drills through the surface and penetrates deep into the ground, the device will enter the sampling mode. The underground rock layer has been broken and loosened by the drill bit 10, and the sampling part 11 located on the surface of the sampling rod 9 can work normally. The sampling part 11 includes a servo motor 113 and a fixed arm 111 and an excavation arm 112 that are hinged to each other. When the user starts the servo motor 113, the output shaft of the servo motor 113 located at the hinge will drive the excavation arm 112 to rotate along the hinge, and an opening will appear between the originally fitted fixed arm 111 and the excavation arm 112, and the rock sample that has been broken and loosened by the drill bit 10 will flow in from the opening. When the user turns off the servo motor 113, the output shaft of the servo motor 113 will drive the excavation arm 112 to return to the initial position along the hinge, and the fixed arm 111 and the excavation arm 112 will once again form a closed accommodation space, which will accommodate the rock sample to achieve the sampling effect, that is, the utility model can sample the rock layer through the sampling part 11.

[0045] Because the geological structure of the mine is complex and severely stratified, if there is only one sampling port, the user's final sampling result may be cross-mixed due to the complex buried structure, affecting the exploration result. At this time, a plurality of sampling parts 11 are provided on the surface of the sampling rod 9, and the distance between each sampling part 11 and the drill bit 10 is different. The user selectively activates the servo motor 113 of the sampling part 11 at a certain position according to the buried structure. The servo motor 113 will drive the excavation arm 112 to sample the rock formation at that position, while the sampling parts 11 at other positions are not activated and will be in a standby state. If the user needs to collect the buried conditions at another depth, he only needs to adjust the position of the device through the cylinder 19 and activate the servo motor 113 of another sampling part 11. The other sampling part 11 will sample the buried conditions at that depth. Therefore, the user can sample the geology of different depths of the rock layer through the sampling parts 11 at different positions on the surface of the sampling rod 9. Because the sampling parts 11 used for sampling geology at different depths are different, the problem of cross-mixing of sampling results can be reduced.

[0046] In summary, the utility model can reduce the vibration generated during drilling with a shock-absorbing structure, and can also make the overall structure more stable by using vibration. The utility model can also sample the geology at different depths of the rock layer separately. That is, the utility model can solve the problem of not being able to stably sample the geology at different depths separately.

[0047] Example 2

[0048] Another embodiment of the present application is basically as shown in the attached Figure 1 and attached Figure 5 As shown, the difference from the above embodiment is that support rods 13 are provided on both sides of the cylinder 19, one end of the support rod 13 is fixedly connected to the side wall of the cylinder 19 by a thread, and the other end of the support rod 13 is fixedly connected to the inner wall of the installation box 6 by a thread.

[0049] The specific implementation process is as follows:

[0050] Because when the cylinder 19 is fixed to the top wall of the installation box 6, only one side of the cylinder 19 is fixed to the installation box 6, and the stabilizing effect is insufficient. At this time, the cylinder 19 is fixed by the top wall of the installation box 6 and the side walls at both ends. The fixing method of the cylinder 19 and the installation box 6 is more stable. After the vibration generated during the drilling process is transmitted to the cylinder 19, it will be more easily transmitted to the elastic member 7 through the support rods 13 at both ends of the cylinder 19. Therefore, compared with the method of fixing the cylinder 19 to the top wall of the installation box 6, the support rod 13 structure in the utility model can fix the cylinder 19 more firmly, and the support rod 13 structure can also increase the shock absorbing effect of the shock absorbing structure.

[0051] Example 3

[0052] Another embodiment of the present application is basically as shown in the attached Figure 1 and attached Figure 6 As shown, the difference from the above embodiment is that: a second protrusion 17 is provided on the top side wall of the installation box 6, and a second groove 16 is provided on the bottom side wall of the support plate 1 to fit the second protrusion 17, the installation box 6 and the support plate 1 are fixed to each other through the second groove 16 and the second protrusion 17, and a second gap is left between the second groove 16 and the second protrusion 17.

[0053] The specific implementation process is as follows:

[0054] Because the installation box 6 is fixed in the second groove 16 at the bottom of the support plate 1 by the second protrusion 17, when the vibration generated during the drilling process is transmitted to the installation box 6, the upward vibration will be transmitted to the support plate 1 through the installation box 6, and the vibration acting on the installation box 6 will be buffered by the second gap, so that the second protrusion 17 on the installation box 6 will fit more closely to the second groove 16 at the bottom of the support plate 1 under the upward vibration, and the connection between the installation box 6 and the support plate 1 will be more stable and reliable. Therefore, compared with the method of fixing the installation box 6 to the lower part of the support plate 1 by threaded fixing, the method of fixing the installation box 6 to the second groove 16 at the bottom of the support plate 1 by the second protrusion 17 is more stable when facing the vibration generated during the drilling process.

[0055] Example 4

[0056] Another embodiment of the present application is different from the above embodiment in that: a plurality of spiral blades 18 are fixed on the side wall between the drill bit 10 and the sampling portion 11 by welding.

[0057] The specific implementation process is as follows:

[0058] During the drilling process, the rotating sampling rod 9 will rotate the spirally structured blades. Under the action of the rotating force, the blades will cut the rock formations. After the drill bit 10 under the blades breaks the rock formations, the blades will also transport the rock formation debris out of the borehole to make drilling space for the drill bit 10. Therefore, compared with the sampling rod 9 without blades, the drill bit 10 will be able to penetrate the rock formation more easily under the action of the blades.

[0059] Example 5

[0060] Another embodiment of the present application is different from the above-mentioned embodiment in that: a plurality of hook-shaped spikes are fixed on the inner wall of the digging arm 112 by welding.

[0061] The specific implementation process is as follows:

[0062] Because during the sampling process, the hook-shaped barbs on the inner wall of the digging arm 112 can assist the digging arm 112 to keep the sample in the space formed by the digging arm 112 and the fixed arm 111, so compared with the digging arm 112 without hook-shaped barbs, the sampling part of the utility model can collect samples more efficiently through the hook-shaped barbs.

[0063] Example 6

[0064] Another embodiment of the present application is different from the above embodiment in that a solar panel is fixed to the top of the support plate 1 by threads. In this embodiment, the solar panel is a single silicon crystal panel with an outer dimension of 670*836mm. The output end of the solar panel is electrically connected to the input end of the power supply 12.

[0065] The specific implementation process is as follows:

[0066] Because mining geological exploration may require operators to work outdoors for a long time, and the power supply 12 has limited power, it is not convenient to replace the battery or return to the camp to recharge. At this time, the solar panel located on the support plate 1 can convert the energy of sunlight into electrical energy and transmit it to the power supply 12 through an electrical connection. Therefore, compared with the power supply 12 without a solar panel, the method of charging the power supply 12 of the utility model is convenient and fast, and the outdoor exploration and drilling operations of the staff will be smoother.

[0067] Example 7

[0068] Another embodiment of the present application is different from the above-mentioned embodiment in that the insertion thorn 5 is provided with a rubber tube sleeve that fits therewith.

[0069] The specific implementation process is as follows:

[0070] Because the head of the insertion thorn 5 is sharp, the operator may accidentally touch the head of the insertion thorn 5 and get injured during transportation. At this time, the rubber tube sleeve that fits the insertion thorn 5 can wrap the sharp head of the insertion thorn 5 to prevent the operator from being injured by direct contact with the insertion thorn 5. Therefore, compared with the head of the insertion thorn 5 without the rubber tube sleeve, the operator is safer during the transportation of the utility model.

[0071] Example 8

[0072] Another embodiment of the present application is different from the above embodiment in that: the sampling rod 9 is provided with scale bars, and the scale bars are distributed vertically along the sampling rod.

[0073] The specific implementation process is as follows:

[0074] Because it is difficult for operators to judge the depth of rock formations with naked eyes when performing drilling operations, the design of the scale bar at this time makes it easy for operators to intuitively observe the soil depth where the sampling part 11 on the sampling rod 9 is located at this time, and it is more convenient for operators to record mine geological information. Therefore, compared with the sampling rod 9 without a scale bar, the scale bar design of the utility model can help operators complete information sampling operations more efficiently.

[0075] The above is only an embodiment of the utility model. The common sense such as the known specific structure and characteristics in the scheme is not described in detail here. The ordinary technicians in the relevant field know all the common technical knowledge in the technical field of the utility model before the application date or priority date, can obtain all the existing technologies in the field, and have the ability to apply the conventional experimental means before that date. The ordinary technicians in the relevant field can improve and implement this scheme in combination with their own abilities under the enlightenment given by this application. Some typical known structures or known methods should not become obstacles for ordinary technicians in the relevant field to implement this application. It should be pointed out that for the technicians in this field, without departing from the structure of the utility model, several deformations and improvements can be made, which should also be regarded as the protection scope of the utility model, which will not affect the effect of the implementation of the utility model and the practicality of the patent. The protection scope required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to explain the content of the claims.

Claims

1. A mining geological exploration drilling sampling device, characterized in that: It includes a shock-absorbing structure and a drilling structure. The shock-absorbing structure includes an integral support plate. The cross-section of the support plate is in the shape of "冖", that is, the support plate includes a middle cross plate and vertical plates on both mirror-image sides. The vertical plates include a first vertical plate and a second vertical plate. The inner side walls of the first vertical plate and the second vertical plate are both provided with first grooves. The shock-absorbing structure also includes a number of support foot rods. A number of support foot rods are all arranged at the bottom of the cross plate. The outer side wall of the upper part of the support foot rod is provided with a first protrusion that fits the first groove. The vertical plate and the support foot rod are fixed to each other through the first groove and the first protrusion, and there is a first gap between the first groove and the first protrusion. A spring for buffering vibration is provided between the top of the support foot rod and the bottom of the cross plate; at the bottom of the support foot rod away from the first protrusion, there is a telescopic rod. One end of the telescopic rod is fixedly connected to the bottom of the support foot rod, and the other end of the telescopic rod is provided with a fixing part. The fixing part includes a fixing plate and an insertion thorn. The top of the fixing plate is fixedly connected to the end of the telescopic rod away from the support foot rod, and the bottom of the fixing plate is fixedly connected to the insertion thorn; the shock-absorbing structure also includes an installation box. The installation box is fixed at the bottom of the cross plate. Elastic members are provided between the installation box and the support foot rods on both left and right sides. The bottom of the installation box is also provided with a through hole communicating to the outside; the drilling structure includes a cylinder, a motor, and a sampling rod. The cylinder is located inside the installation box. The top of the cylinder is fixedly connected to the inner top wall of the installation box. The output shaft of the cylinder extends to the outside of the installation box through the through hole at the bottom of the installation box. The top of the motor is fixedly connected to the output shaft of the cylinder. The output shaft at the bottom of the motor is fixedly connected to the top of the sampling rod. At the bottom of the sampling rod located outside, there is a drill bit. A number of sampling parts are provided on the surface of the sampling rod located outside. The number of sampling parts is vertically arranged on the surface of the sampling rod. The sampling part includes a fixed arm and a digging arm that are hinged to each other. A servo motor is provided at the hinge. The side of the fixed arm away from the servo motor is in mutual contact with the side of the digging arm away from the servo motor. The fixed arm and the digging arm form a sealed space inside. The drilling structure also includes a power source. The power source is fixed on the top of the support plate. The output end of the power source is electrically connected to the input end of the motor and the input end of the servo motor respectively.

2. The mining geological exploration drilling sampling device according to claim 1 is characterized in that: There are support rods on both sides of the cylinder. One end of the support rod is fixedly connected to the side wall of the cylinder, and the other end of the support rod is fixedly connected to the inner side wall of the installation box.

3. The mining geological exploration drilling sampling device according to claim 2 is characterized in that: There is a second protrusion on the side wall of the top of the installation box, and there is a second groove on the side wall of the bottom of the support plate that fits the second protrusion. The installation box and the support plate are fixed to each other through the second groove and the second protrusion, and there is a second gap between the second groove and the second protrusion.

4. The mining geological exploration drilling sampling device according to claim 3 is characterized in that: There are a number of spiral blades on the side wall between the drill bit and the sampling part.

5. The mining geological exploration drilling sampling device according to claim 4 is characterized in that: There are a number of hook-shaped thorns on the inner side wall of the digging arm.

6. The mining geological exploration drilling sampling device according to claim 5, characterized in that: There is a solar power generation panel for converting solar energy into electrical energy on the top of the support plate. The output end of the solar panel is electrically connected to the input end of the power source.

7. The mining geological exploration drilling sampling device according to claim 6, characterized in that: The insertion thorn is provided with a rubber tube sleeve that fits it.

8. The mining geological exploration drilling sampling device according to claim 7, characterized in that: There is a scale bar on the sampling rod, and the scale bar is vertically distributed along the sampling rod.