Supporting bridge for loading and unloading ships
By designing a support bridge for loading and unloading ships, and using high-strength steel structures and hydraulic suspension axles to fill the angle between the ferry ship and the dock, the problem in the existing technology of being unable to pass heavy and large trucks has been solved, and a safe and efficient process has been achieved. Jiang method, reducing transportation costs and avoiding safety risks.
Patent Information
- Application Number
- CN202420507734.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing ferries are unable to safely and efficiently carry heavy-duty trucks, and the public-water transport method is inefficient and costly, posing safety risks.
Design a support bridge for loading and unloading ships. It uses high-strength steel structure, hydraulic suspension axles and flip ladders to fill the angle between the ferry ship and the dock, so that heavy trucks can safely get on and off the ship, and ensure it through an intelligent weighing system. Load safety.
It realizes the safe passage of heavy and large trucks, improves the efficiency of crossing the river, reduces transportation costs, and avoids safety risks caused by crossing the river-crossing bridge.
Smart Images

Figure CN221918935U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a heavy-duty cargo cross-river transportation device in the technical field of logistics transportation, in particular to a supporting bridge for loading and unloading ships. Background Art
[0002] Ferries are widely used in the Yangtze River basin and are specially used to ferry passenger cars and small trucks. The ferries are equipped with thrusters and rudder equipment at both ends, and there are slings and gangways at the front and back to facilitate vehicles getting on and off the ship. Since the ferry terminal has a long downhill slope, when the ferry docks, the gangway is lowered. Due to the short length of the gangway, a huge angle is formed with the downhill slope of the terminal, so vehicles with a shorter wheelbase can pass normally. Heavy trucks have a long wheelbase and body, and their wheels will be suspended when passing, causing scratches on the chassis, damaging the vehicle and cargo, and limiting their passability. Therefore, ferries are currently unable to pass heavy and large trucks. Due to the load limit of the cross-river bridge, heavy and large trucks use road-water transport to cross the river, which takes a long time and has extremely high transportation costs.
[0003] At present, there are a large number of overweight vehicles crossing the Yangtze River every year. Due to the load limit of the cross-river bridge, the total weight of the vehicle and cargo exceeds 120 tons and cannot pass. In addition, the width of the cross-river bridge toll station is limited, and over-wide trucks cannot pass. The road-water combined transport mode is safe and unrestricted to cross the river, but it is inefficient and the freight is extremely high. In order to improve efficiency and save freight, transportation companies often risk being punished and force their way through the cross-river bridge. This move has great safety risks and will bring immeasurable losses. Therefore, it is extremely difficult for overweight vehicles to cross the river, and it is necessary to choose an efficient, safe and economical way to cross the river.
[0004] Ferries are widely used in the Yangtze River Basin and are specially used to ferry passenger cars and small trucks. Ferries are equipped with propellers and rudders at both ends, and slings and gangways are installed at the front and rear to facilitate vehicles to get on and off the ship. Ferries have a large load capacity, and the length and width of the cargo deck can meet the needs of loading extra-long, extra-wide, and extra-heavy large trucks. However, the load capacity allowed by the ferry gangway is limited, and large trucks cannot pass through. In addition, since the ferry terminal has a long downhill slope, when the ferry docks, the gangway is lowered. Due to the short length of the gangway, it will collide with the downhill slope of the terminal. A huge angle is formed, and vehicles with shorter wheelbases can pass normally. Heavy trucks with longer wheelbases and bodies will have their wheels suspended and chassis scratched, which will damage vehicles and cargoes and limit their passability. Therefore, heavy and oversized trucks cannot pass through ferries at present. It is necessary to design an oversized gangplank, which is erected on the dock and the deck of the ferry to fill the angle between the ferry and the downhill of the dock. This oversized gangplank must have ultra-high strength to ensure the safety of heavy trucks. This gangplank is also required to facilitate transportation and improve the efficiency of trucks getting on and off the ferry. Ferry fares are low, and how to safely and efficiently pass heavy trucks will be the best choice for oversized trucks to cross the river, avoiding the risks of oversized vehicles crossing the river through the cross-river bridge. Utility Model Content
[0005] Purpose of the utility model: In view of the shortcomings in the prior art, the utility model provides a supporting bridge for loading and unloading ships, wherein the supporting bridge fills the angle between the downhill slope of the ferry and the ferry boat gangway, so that longer trucks can get on and off the ship safely; this intelligent loading and unloading ship gangway is composed of a high-strength steel structure, which can carry heavier large equipment, and the load-sharing panel and the deck surface are always in surface-to-surface contact, solving the problem of heavy and large equipment crossing the river.
[0006] Technical solution: The support bridge for loading and unloading ships of the utility model comprises a support main beam, a support sub-beam, a support support, a first telescopic oil cylinder, a second telescopic oil cylinder, a limit oil cylinder, an intelligent weighing system, a front hydraulic suspension axle, a rear hydraulic suspension axle and a hydraulic power pump station;
[0007] The head of the supporting main beam is connected to a front hydraulic turning ladder through a first telescopic oil cylinder; the tail of the supporting main beam is hingedly connected to the supporting support;
[0008] A load-sharing panel is hinged under the supporting main beam, and the angle between the load-sharing panel and the supporting main beam is adjusted by a limit cylinder;
[0009] The head of the supporting sub-beam is connected to a rear hydraulic tilting ladder through a second telescopic cylinder, and the tail of the supporting sub-beam is hingedly connected to the supporting support;
[0010] The front hydraulic suspension axle is located below the supporting main beam, and the rear hydraulic suspension axle is located below the supporting bracket;
[0011] The intelligent weighing system is located above the rear hydraulic flip ladder.
[0012] A rotating shaft is connected between the head of the supporting main beam and the front hydraulic flip ladder.
[0013] It also includes a first hinge device, through which the supporting main beam and the load-sharing panel are connected.
[0014] A second hinge device is connected between the rear portion of the supporting main beam and the supporting support, and the second hinge device includes a rotating shaft and a hinge block.
[0015] The first telescopic oil cylinder is also provided with a first flip ladder, and the first flip ladder and the hydraulic power pump station are fixed at the bottom of the supporting auxiliary beam.
[0016] The bottom of the supporting sub-beam is provided with outriggers.
[0017] The intelligent weighing system includes a weighing platform, a display screen and an audible and visual alarm. The weighing platform is located above the rear hydraulic flip ladder.
[0018] The display screen and sound and light alarm are located on the side of the supporting subbeam and are used to measure the axle weight of the transport vehicle and calculate the total weight of the vehicle and cargo.
[0019] A splicing pin is provided at the head of the supporting sub-beam, and the supporting sub-beam is connected with a lifting gooseneck through the splicing pin.
[0020] The supporting main beam and supporting secondary beam are steel structure box beams.
[0021] The use process of the supporting bridge of the utility model for loading and unloading ships is as follows:
[0022] (1) The ferry docks and the ferry gangplank is lowered to the downhill ground of the ferry;
[0023] (2) The tractor reverses the supporting bridge along the downhill of the ferry toward the ferry gangway, and reverses the supporting bridge along the ferry gangway onto the ferry deck; when the load-sharing panel supporting the main beam is above the ferry deck, the reverse is stopped, and the front hydraulic suspension axle and the rear hydraulic suspension axle and the hydraulic lifting gooseneck begin to reduce the oil and descend, and the load-sharing panel falls on the ferry deck, and the outriggers under the supporting sub-beam and the bottom of the supporting support fall on the downhill ground of the ferry;
[0024] (3) Release the splicing pin between the hydraulic lifting gooseneck and the head of the supporting sub-beam, and drive away the tractor and the hydraulic lifting gooseneck;
[0025] (4) Start the front hydraulic tilting ladder and the rear hydraulic tilting ladder, flip them over, and stop when the bottom falls on the deck of the ship and the downhill ground of the ferry. Start the intelligent weighing system, and then the transport vehicle starts to board the ship. If the transport vehicle exceeds the axle load requirement, the weighing display screen will show overload, and the sound and light alarm will sound;
[0026] (5) If the axle load requirements are met, the transport vehicle will drive toward the ship; after boarding and disembarking, the front hydraulic tilting ladder and the rear hydraulic tilting ladder will be flipped to the set position and suspended, the tractor will reverse, and the lower joint of the hydraulic lifting gooseneck will be used to connect with the tractor, the hydraulic lifting gooseneck and the hydraulic suspension axle will be lifted to lift the supporting bridge off the ground, and the tractor will drive the supporting bridge uphill toward the ferry. After the head of the supporting main beam leaves the front end of the ferry gangplank, the ferry will retract the gangplank and drive away.
[0027] Working principle: The utility model uses the supporting main beam, supporting auxiliary beam and front and rear hydraulic flip ladders as a long steel structure transportation platform, which is erected on the downhill of the ferry terminal and the deck of the ferry ship. This platform is divided into two sections, both of which are made of high-strength steel structures.
[0028] First, flip the front hydraulic flip ladder and the rear hydraulic flip ladder to the set position and hover. The head of the supporting sub-beam is provided with a splicing pin. The tractor reverses and uses the lower splicing interface of the hydraulic lifting gooseneck to dock with the tractor. The front and rear supporting main beams and the lower ends of the sub-beams of this device are provided with hydraulic suspension axles. The hydraulic suspension axles have the lifting function, and the hydraulic lifting gooseneck and the hydraulic suspension axle are lifted as a whole to lift the device off the ground. The ferry docks and lowers the gangplank, which falls on the downhill ground of the ferry. The tractor reverses the device as a whole along the downhill of the ferry to the position of the ferry gangplank, and inverts the device onto the ship deck along the ferry gangplank. When the load-sharing panel under the head of the supporting main beam is completely above the ship deck, stop reversing. At this time, the front and rear hydraulic suspension axles and hydraulic lifting goosenecks begin to reduce oil and descend, and the load-sharing panel under the supporting main beam falls on the deck surface, and the steel structure legs under the supporting sub-beam and the bottom of the supporting support fall on the downhill ground of the ferry. Except for the joint pin between the hydraulic lifting gooseneck and the head of the supporting secondary beam, the tractor and the hydraulic lifting gooseneck drive away; start the front hydraulic flip ladder and the rear hydraulic flip ladder, flip them over, and stop after the bottom falls on the deck of the ship and the downhill ground of the ferry, and start the intelligent weighing system. At this time, heavy and large transport vehicles begin to board the ship. If the transport vehicle exceeds the axle load requirement, the weighing display will show overload, and the sound and light alarm will start to alarm. To ensure safety, this transport vehicle cannot get on and off the ship through this device. If the axle load requirement is met, it will drive towards the ship; after getting on and off the ship, the front and rear hydraulic flip ladders are also flipped to the set position and hovered, the tractor reverses, and uses the lower splicing interface of the hydraulic lifting gooseneck to connect with it. The hydraulic lifting gooseneck and the hydraulic suspension axle are lifted as a whole, and the device is lifted off the ground as a whole. The tractor drives the device uphill to the ferry. After the head of the supporting main beam leaves the front end of the ferry gangplank, the ferry retracts the gangplank and drives away.
[0029] Beneficial effects: Compared with the prior art, the utility model has the following advantages:
[0030] (1) The supporting bridge for loading and unloading ships of the utility model fills the angle between the downhill slope of the ferry and the gangway of the ferry, so that longer trucks can get on and off the ship safely.
[0031] (2) The supporting bridge of the utility model for loading and unloading ships is composed of a high-strength steel structure and carries heavy large cargoes. When the heavy and large cargoes are loaded onto the ship, one end of the ship is subjected to huge pressure, causing the bow to sink. At this time, the supporting main beam and the supporting support are connected in a hinged manner. The supporting main beam automatically rotates as the ship's deck sinks, so that the load-sharing panel at the lower end of the head of the supporting main beam is always in contact with the deck surface to bear force. The load-sharing panel and the lower end of the head of the supporting main beam are also hinged, so that the load-sharing panel and the deck surface are always in surface-to-surface contact, with a large force-bearing area, which protects the deck surface and ensures the safety of loading heavy and large cargoes onto the ship, thus solving the problem of heavy and large cargoes crossing the river.
[0032] (3) The utility model has a hydraulically suspended axle, and utilizes a tractor and a hydraulic lifting gooseneck rapid transfer device to improve the efficiency of transfer operations. This method of crossing the river improves the efficiency of crossing the river for heavy and large goods, and reduces the cost of crossing the river compared to the road-water combined transport method. In addition, for goods that are too wide to pass through the toll station of the river crossing bridge, the utility model can also be used to support the bridge to cross the river by ferry. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 This is a front view of a support bridge for loading and unloading ships according to the utility model;
[0034] Figure 2 It is a top view of the supporting bridge used for loading and unloading ships of the utility model;
[0035] Figure 3 This is the general structural diagram of the support bridge used for loading and unloading ships of the utility model;
[0036] Figure 4 It is a schematic diagram of loading a supporting bridge used for loading and unloading ships according to the utility model;
[0037] Figure 5 It is a schematic diagram of the installation process of the support bridge used for loading and unloading ships of the utility model;
[0038] Figure 6 This is a schematic diagram of the unloading positioning of the supporting bridge used for loading and unloading ships of the utility model;
[0039] Figure 7 It is a schematic diagram of the installation position of the support bridge used for loading and unloading ships of the utility model;
[0040] Figure 8 This is a schematic diagram of the installation of the support bridge used for loading and unloading ships according to the utility model;
[0041] Fig. 9 It is an overall schematic diagram of the installation of the support bridge used for loading and unloading ships of the utility model;
[0042] Fig.10 This is a schematic diagram of the bottom of the front hydraulic flip ladder of the utility model;
[0043] Fig.11 It is a schematic diagram of the position of the limit oil cylinder of the utility model;
[0044] Fig.12 It is a bottom schematic diagram of the rear hydraulic flip ladder of the utility model. DETAILED DESCRIPTION
[0045] like Figures 1 to 9As shown, the supporting bridge for loading and unloading ships of the utility model comprises a supporting main beam 1, a supporting sub-beam 10, a supporting support 8, a front hydraulic flip ladder 2, a rear hydraulic flip ladder 12, an intelligent weighing system, a front hydraulic suspension axle 7, a rear hydraulic suspension axle 15 and a hydraulic power pump station 16. The supporting main beam 1 is a steel structure box beam, the head of the supporting main beam 1 is connected to the front hydraulic flip ladder 2 through a rotating shaft and a pin hole, and a first telescopic oil cylinder 3 is provided at the bottom of the front hydraulic flip ladder 2, and the first telescopic oil cylinder 3 is composed of a cylinder body, a cylinder sleeve, a piston rod and a power control unit, and is powered by the hydraulic power pump station 16.
[0046] The front hydraulic suspension axle 7 is arranged at the lower part of the supporting main beam, the rear hydraulic suspension axle 15 is arranged at the lower part of the supporting sub-beam 10, and the hydraulic power pump station 16 is arranged at the lower part of the supporting sub-beam 10 to provide power to the hydraulic system of the entire supporting bridge.
[0047] Figure 1 In the figure, the head of the first telescopic cylinder 3 is hingedly connected to the front hydraulic flip ladder 2, and the tail of the first telescopic cylinder 3 is hingedly connected to the supporting main beam 1. The supporting main beam 1 is flipped by adjusting the length of the first telescopic cylinder 3.
[0048] like Figure 1 , Figure 2 and Figure 3 As shown, in this embodiment, the supporting main beam 1 is a steel box beam, the head of the supporting main beam 1 is connected to the front hydraulic tilting ladder 2 through a rotating shaft and a pin hole, and a first telescopic oil cylinder 3 is provided at the bottom of the front hydraulic ladder 2, and power is provided by a hydraulic power pump station 16. The first tilting ladder of the first telescopic oil cylinder 3 and the hydraulic power pump station 16 are welded to the bottom of the supporting sub-beam 10.
[0049] A load-sharing panel 4 is provided at the lower part of the supporting main beam 1. The load-sharing panel 4 is connected to the lower end of the head of the supporting main beam 1 by a first hinge device 5. The load-sharing panel 4 and the supporting main beam 1 are adjusted in angle through a limiting cylinder 6 to prevent the load-sharing panel 4 from falling and scratching during driving.
[0050] The tail of the supporting main beam 1 is hingedly connected to the supporting support 8 by the rotating shaft of the second hinge device 9 and the hinge block. The supporting sub-beam 10 is a steel structure box beam, and a plurality of steel structure legs 11 are welded at the bottom to increase the strength of the steel box beam. The bottom of the supporting support and the steel structure legs are beveled, forming a triangular structure with the supporting sub-beam. The head of the supporting sub-beam 10 is connected to the rear hydraulic flip ladder 12 through a rotating shaft and a pin hole. The bottom of the rear hydraulic flip ladder 12 is provided with a second telescopic cylinder 13, and the second telescopic cylinder 13 is powered by a hydraulic power pump station 16. The flip ladder of the second telescopic cylinder 13, the tail of the supporting sub-beam 10 and the supporting support 8 are welded as a whole.
[0051] The intelligent weighing system consists of a weighing platform 17, a display screen 18 and an audible and visual alarm 19. The weighing platform 17 is arranged on the upper part of the rear hydraulic flip ladder 12. The display screen 18 and the audible and visual alarm 19 are fixed on the side of the supporting subbeam 10. They are used to measure the axle weight of large-scale transport vehicles, calculate the total weight of the vehicle and cargo, and ensure traffic safety.
[0052] like Figure 3 and Figure 4 As shown, a joint pin 14 is provided at the head of the supporting sub-beam 10. The tractor a reverses and utilizes the lower joint interface of the hydraulic lifting gooseneck b to dock with the tractor a. The front hydraulic suspension axle, the rear hydraulic suspension axle and the hydraulic lifting gooseneck b are used for lifting, so that the supporting bridge of the utility model is lifted off the ground as a whole and transported by the tractor.
[0053] The front hydraulic suspension axle 7 and the rear hydraulic suspension axle 15 are composed of a frame, an axle, and a hydraulic system. The hydraulic lifting gooseneck is connected to the tractor and provides a lifting function. The V-shaped groove of the saddle of the tractor is used to provide driving force to the gooseneck cylinder, and the telescopic cylinder performs lifting and lowering operations.
[0054] like Figure 5 , Figure 6 and Figure 7 As shown, the method of using the supporting bridge of the utility model for loading and unloading ships is as follows:
[0055] (1) The ferry c docks and lowers the ferry gangplank d, which lands on the downhill ground e of the ferry;
[0056] (2) The tractor a reverses the supporting bridge along the downhill e of the ferry to the position of the ferry gangway d, and reverses the device onto the ferry deck f along the ferry gangway d; when the load-sharing panel 4 under the head of the supporting main beam 1 is completely above the ferry deck f, the reverse is stopped, and the front hydraulic suspension axle 7 and the rear hydraulic suspension axle 15 and the hydraulic lifting gooseneck b begin to reduce the oil and descend, and the load-sharing panel 4 under the supporting main beam 1 falls on the deck surface of the ship, and the steel structure legs 11 under the supporting sub-beam 10 and the bottom of the supporting support 8 fall on the downhill ground e of the ferry;
[0057] (3) The splicing pin between the hydraulic lifting gooseneck b and the head of the supporting sub-beam 10 is released, and the tractor a and the hydraulic lifting gooseneck b drive away;
[0058] (4) Start the front hydraulic flip ladder 2 and the rear hydraulic flip ladder 12, flip them, and stop after the bottom falls on the ship deck surface f and the ferry downhill ground e, and start the intelligent weighing system. At this time, heavy and large transport vehicles begin to board the ship. If the transport vehicle exceeds the axle load requirement, the weighing display screen will show overload, and the sound and light alarm will start to alarm. To ensure safety, this transport vehicle cannot board or disembark through this device;
[0059] (5) If the axle load requirements are met, the transport vehicle will drive toward the ship; after boarding and disembarking, the front hydraulic tilting ladder 2 and the rear hydraulic tilting ladder 12 will be flipped to the set position and suspended, the tractor will reverse, and the lower joint of the hydraulic lifting gooseneck will be used to dock with the tractor, the hydraulic lifting gooseneck and the hydraulic suspension axle will be lifted as a whole, the supporting bridge will be lifted off the ground as a whole, the tractor will drive the supporting bridge uphill toward the ferry, and after the head of the supporting main beam 1 leaves the front end of the ferry gangplank, the ferry will retract the gangplank and sail away.
[0060] In this embodiment, by using the intelligent loading and unloading bridge, the angle between the ferry downhill and the ferry boat gangway d is filled, and the overlong and overweight trucks can get on and off the ship safely. This supporting bridge for loading and unloading ships is composed of a high-strength steel structure, which carries heavy and large cargo. When heavy and large cargo is loaded on board, one end of the ship is under pressure, causing the bow to sink. At this time, the connection between the supporting main beam 1 and the supporting support 8 is hinged, and the supporting main beam 1 automatically rotates as the deck surface sinks, so that the load-sharing panel 4 at the lower end of the head of the supporting main beam 1 is always in contact with the deck surface and subjected to force. The load-sharing panel 4 and the lower end of the head of the supporting main beam 1 are also hinged, so that the load-sharing panel 4 and the deck surface are always in surface-to-surface contact, with a large force area, which effectively protects the deck surface, ensures the safety of heavy and large cargo on board, and solves the problem of heavy and large cargo crossing the river. In addition, this device has a hydraulically suspended axle, and the device can be quickly transferred using a tractor and a hydraulic lifting gooseneck, thereby improving the efficiency of transfer operations. This method of crossing the river improves the efficiency of crossing the river for heavy and large goods, and reduces the cost of crossing the river compared to the road-water combined transport method. In addition, for extra-wide goods that cannot pass through the toll station of the river bridge, this device can also be used to cross the river by ferry.
Claims
1. A supporting bridge for loading and unloading ships, characterized in that: It comprises a supporting main beam (1), a supporting auxiliary beam (10), a supporting support (8), a first telescopic oil cylinder (3), a second telescopic oil cylinder (13), a limit oil cylinder (6), an intelligent weighing system, a front hydraulic suspension axle (7), a rear hydraulic suspension axle (15) and a hydraulic power pump station (16); The head of the supporting main beam (1) is connected to a front hydraulic tilting ladder (2) via a first telescopic oil cylinder (3); the tail of the supporting main beam (1) is hingedly connected to a supporting support (8); A load-sharing panel (4) is hingedly connected below the supporting main beam (1), and the angle between the load-sharing panel (4) and the supporting main beam (1) is adjusted by a limiting oil cylinder (6); The head of the supporting sub-beam (10) is connected to a rear hydraulic tilting ladder (12) via a second telescopic oil cylinder (13), and the tail of the supporting sub-beam (10) is hingedly connected to a supporting support (8); The front hydraulic suspension axle (7) is located below the supporting main beam (1), and the rear hydraulic suspension axle (15) is located below the supporting support (8); The intelligent weighing system is located above the rear hydraulic tilting ladder (12).
2. The supporting bridge for loading and unloading ships according to claim 1, characterized in that: A rotating shaft is connected between the head of the supporting main beam (1) and the front hydraulic tilting ladder (2).
3. The supporting bridge for loading and unloading ships according to claim 1, characterized in that: It also comprises a first hinge device (5), and the supporting main beam (1) and the load-sharing panel (4) are connected via the first hinge device (5).
4. The supporting bridge for loading and unloading ships according to claim 1, characterized in that: A second hinge device (9) is connected between the rear portion of the supporting main beam (1) and the supporting support (8), and the second hinge device (9) comprises a rotating shaft and a hinge block.
5. The supporting bridge for loading and unloading ships according to claim 1, characterized in that: The first telescopic oil cylinder (3) is also provided with a first tilting ladder, and the first tilting ladder and the hydraulic power pump station (16) are fixed at the bottom of the supporting sub-beam (10).
6. The supporting bridge for loading and unloading ships according to claim 1, characterized in that: A supporting leg (11) is provided at the bottom of the supporting auxiliary beam (10).
7. The supporting bridge for loading and unloading ships according to claim 1, characterized in that: The intelligent weighing system comprises a weighing platform (17), a display screen (18) and an audible and visual alarm (19); the weighing platform (17) is located above the rear hydraulic tilting ladder (12).
8. The supporting bridge for loading and unloading ships according to claim 7, characterized in that: The display screen (18) and the sound and light alarm (19) are located on the side of the supporting sub-beam (10).
9. The supporting bridge for loading and unloading ships according to claim 1, characterized in that: The head of the supporting sub-beam (10) is provided with a splicing pin (14), and the supporting sub-beam (10) is connected to a lifting gooseneck via the splicing pin (14).
10. The supporting bridge for loading and unloading ships according to claim 1, characterized in that: The supporting main beam (1) and the supporting secondary beam (10) are steel structure box beams.
Citation Information
Cited By
Loading and unloading ship supporting bridge and using method thereof
CN117966578A
Ship unloader support bridge and method of use
CN117966578B