Boiler with flue gas purification function

By designing a purification filter element structure that can be quickly replaced, the problem that existing flue gas purification boilers cannot quickly replace the filter element is solved, achieving rapid purification of flue gas and reducing maintenance time.

CN221923539UActive Publication Date: 2024-10-29JILIN JIARUN THERMAL POWER GRP CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202322835573.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-10-20
Publication Date
2024-10-29
Estimated Expiration
2033-10-20

AI Technical Summary

Technical Problem

The existing flue gas purification boiler has an integrated structure and cannot quickly replace the filter element, which greatly increases the maintenance time.

Method used

A boiler with flue gas purification function is designed, including a furnace body, a box, an exhaust pipe, an exhaust fan, a purification filter element and a movable filter element holder, which allows the purification filter element to be quickly replaced without stopping the boiler operation. By pouring Purify the liquid and turn on the exhaust fan to react the harmful gases with the filter element for purification.

Benefits of technology

It achieves rapid purification of flue gas and rapid replacement of filter elements, reducing maintenance time and improving boiler efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221923539U_ABST
    Figure CN221923539U_ABST
Patent Text Reader

Abstract

The utility model discloses a boiler with a flue gas purification function, relates to the field of industrial boilers, and aims to solve the technical problem that the maintenance time is greatly increased due to the fact that a flue gas purification boiler in the prior art is generally of an integrated structure and a filter element cannot be quickly replaced during use. The flue gas purification boiler comprises a boiler body and a box body fixedly arranged at the right end of the boiler body, an exhaust pipe is fixedly installed on the outer wall of the boiler body, an exhaust fan is fixedly installed at the air outlet end of the exhaust pipe, a connecting pipe is fixedly installed at the air outlet end of the exhaust fan, the air outlet end of the connecting pipe is connected with the air inlet end of the box body, and a shell is fixedly installed at the upper end of the box body. The inner walls of the front end and the rear end of the shell are fixedly provided with evenly-distributed placing frames, the upper ends of the placing frames are movably provided with symmetrically-distributed filter element supports, the outer walls of the filter element supports are movably provided with purification filter elements, the flue gas purification boiler can purify flue gas, and the filter element bodies can be rapidly replaced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of industrial boilers, and in particular relates to a boiler with a flue gas purification function. Background Art

[0002] At present, most of my country's industrial boilers and domestic boilers use coal or oil as fuel. Harmful substances such as smoke generated during the combustion of fuel are discharged into the atmosphere in large quantities, causing environmental pollution. However, current flue gas purification boilers are generally integrated structures, and the filter element cannot be quickly replaced during use, which greatly increases maintenance time.

[0003] At present, the utility model patent with patent number CN202122955968.8 discloses an energy-saving, emission-reducing and environmentally friendly boiler with flue gas purification function, including a boiler base, an energy-saving boiler body is fixedly provided on the top of the boiler base, a flue gas purification box is fixedly provided on the left side of the energy-saving boiler body, a high-temperature flue gas output pipe, which is fixedly connected to the front end of the flue gas purification box, and a flue gas discharge pipe is fixedly connected to the rear end of the flue gas purification box. The flue gas purification box is interconnected with the energy-saving boiler body through the high-temperature flue gas output pipe, a shunt pipe, which is fixedly connected to the output end of the high-temperature flue gas output pipe, and a plurality of air outlets are opened on the outer wall of the shunt pipe. A cooling box is arranged inside the flue gas purification box. The boiler can make the flue gas in the cooling box enter the right side of the partition plate through multiple gas delivery ports, so that when there is no gas impact on the closing plate, the closing plate can be rotated downward by a rotating column to prevent gas reflux. However, the current flue gas purification boiler is generally an integrated structure, and the filter core cannot be quickly replaced during use, which greatly increases the maintenance time. Utility Model Content

[0004] (1) Technical issues to be solved

[0005] In view of the deficiencies in the prior art, the purpose of the utility model is to provide a boiler with a flue gas purification function. The flue gas purification boiler is intended to solve the technical problem that the existing flue gas purification boilers are generally an integrated structure and the filter element cannot be quickly replaced during use, resulting in a greatly increased maintenance time.

[0006] (2) Technical solution

[0007] In order to solve the above technical problems, the utility model provides a boiler with a flue gas purification function, which comprises a furnace body and a box body fixedly arranged at the right end of the furnace body, an exhaust pipe is fixedly installed on the outer wall of the furnace body, an exhaust fan is fixedly installed on the air outlet end of the exhaust pipe, a connecting pipe is fixedly installed on the air outlet end of the exhaust fan, the air outlet end of the connecting pipe is connected to the air inlet end of the box body, an outer shell is fixedly installed on the upper end of the box body, and evenly distributed placement racks are fixedly installed on the inner walls of the front and rear ends of the outer shell, and symmetrically distributed filter element holders are movably arranged on the upper end of the placement rack, and a purification filter element is movably arranged on the outer wall of the filter element holder, a symmetrically arranged frame body is fixedly installed on the front end of the outer shell, a door body is hingedly installed on the inner walls of the upper and lower ends of the frame, and an air outlet pipe is fixedly installed on the upper end of the outer shell.

[0008] When using the flue gas purification boiler of the present technical solution, pour the purification liquid into the box, turn on the furnace body, turn on the exhaust fan, so that the gas generated when the furnace body burns is sucked into the box from the exhaust pipe by the exhaust fan, so that the harmful gas in the gas reacts with the purification liquid. After the reaction is completed, the gas moves to the outer shell, so that the purification filter installed in the outer shell further purifies the gas, thereby quickly purifying the flue gas. When the boiler is not in use, open the door body and replace the purification filter, thereby quickly replacing the purification filter.

[0009] Furthermore, a fixing plate is fixedly installed on the inner walls of the front and rear ends of the shell, the inner wall of the fixing plate is in contact with the outer wall of the purification filter element, the lower end of the filter element bracket passes through the upper end of the placement frame to open a positioning hole, and a fixing rod is movably installed on the inner wall of the positioning hole. By using the fixing rod movably installed on the inner wall of the positioning hole, the fixation of the filter element bracket can be strengthened.

[0010] Furthermore, a placement groove is formed through the upper end of the box body, the inner wall of the placement groove is connected to the outer wall of the lower end of the shell, and a support frame is fixedly installed on the upper end of the box body, and the upper end of the support frame is connected to the lower end of the shell. By connecting the upper end of the support frame to the lower end of the shell, the fixation of the shell can be strengthened.

[0011] Furthermore, the front end of the shell is fixedly mounted with symmetrically arranged threaded rods, and the outer wall of the threaded rod is threadedly mounted with a limiting block. The door body can be positioned by using the symmetrically arranged threaded rods fixedly mounted on the front end of the shell.

[0012] Furthermore, a symmetrically arranged fixing block is fixedly installed at the front end of the door body, and grooves are fixedly opened at the left and right ends of the fixing block. The inner wall of the groove fits with the outer wall of the threaded rod. By utilizing the fit between the inner wall of the groove and the outer wall of the threaded rod, the door body can be locked using a limit block.

[0013] Furthermore, a rubber pad is fixedly installed at the front end of the frame, and the front end outer wall of the rubber pad fits with the rear end outer wall of the door body. An observation window is fixedly installed at the right end of the shell. The rubber pad is fixedly installed at the front end of the frame to prevent smoke from being discharged from the door body.

[0014] Furthermore, a through hole is formed through the left end of the box body, the inner wall of the through hole is connected to the outer wall of the connecting pipe, and a boiler door is fixedly installed on the upper end of the furnace body. The boiler door can be opened to add fuel into the furnace body.

[0015] (3) Beneficial effects

[0016] Compared with the prior art, the beneficial effects of the utility model are as follows: the flue gas purification boiler of the utility model pours purification liquid into the box body, turns on the furnace body, turns on the exhaust fan, so that the gas generated when the furnace body burns is sucked into the box body from the exhaust pipe by the exhaust fan, so that the harmful gas in the gas reacts with the purification liquid, and after the reaction is completed, the gas moves to the outer shell, so that the purification filter element installed in the outer shell further purifies the gas, thereby quickly purifying the flue gas, and when the boiler is not in use, the limit block is turned out, so that the grooves on the left and right ends of the fixed block slide along the outer wall of the threaded rod, the door body is opened, and the fixed rod installed at the lower end of the filter element bracket is pulled out, so that the filter element bracket can slide along the placement rack, and the purification filter element movably arranged on the outer wall of the filter element bracket is taken out, thereby quickly replacing the purification filter element. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a three-dimensional structural schematic diagram of a specific implementation method of the flue gas purification boiler of the utility model;

[0018] Figure 2 This is a three-dimensional structural exploded view of the shell of a specific implementation mode of the flue gas purification boiler of the utility model;

[0019] Figure 3 This is a schematic diagram of the three-dimensional structure of A of a specific implementation of the flue gas purification boiler of the utility model;

[0020] Figure 4 This is a schematic diagram of the three-dimensional structure of a specific implementation of the flue gas purification boiler of the utility model at B;

[0021] Figure 5 It is a schematic diagram of the three-dimensional structure of a box body of a specific implementation mode of the flue gas purification boiler of the utility model.

[0022] The markings in the attached drawings are: 1. furnace body; 2. boiler door; 3. exhaust pipe; 4. connecting pipe; 5. box body; 6. exhaust pipe; 7. outer shell; 8. door body; 9. observation window; 10. support frame; 11. fixing plate; 12. frame; 13. purification filter element; 14. threaded rod; 15. limit block; 16. rubber pad; 17. fixing block; 18. groove; 19. through hole; 20. placement slot; 21. fixing rod; 22. placement rack; 23. filter element bracket; 24. positioning hole; 25. exhaust fan. DETAILED DESCRIPTION

[0023] This specific embodiment is a boiler with a flue gas purification function, and its three-dimensional structural diagram is as follows Figure 1 As shown, the three-dimensional structure of the housing 7 is shown in FIG. Figure 2 As shown, the flue gas purification boiler includes a furnace body 1 and a box body 5 fixedly arranged at the right end of the furnace body 1, an exhaust pipe 3 is fixedly installed on the outer wall of the furnace body 1, an exhaust fan 25 is fixedly installed on the air outlet end of the exhaust pipe 3, a connecting pipe 4 is fixedly installed on the air outlet end of the exhaust fan 25, the air outlet end of the connecting pipe 4 is connected to the air inlet end of the box body 5, an outer shell 7 is fixedly installed on the upper end of the box body 5, and evenly distributed placement racks 22 are fixedly installed on the inner walls of the front and rear ends of the outer shell 7, and symmetrically distributed filter element holders 23 are movably arranged on the upper end of the placement rack 22, and a purification filter element 13 is movably arranged on the outer wall of the filter element holder 23, and a symmetrically arranged frame body 12 is fixedly installed on the front end of the outer shell 7, and a door body 8 is hingedly installed on the inner walls of the upper and lower ends of the frame body 12, and an air outlet pipe 6 is fixedly installed on the upper end of the outer shell 7.

[0024] In order to strengthen the fixation of the outer shell 7, a fixing plate 11 is fixedly installed on the inner walls of the front and rear ends of the outer shell 7, and the inner wall of the fixing plate 11 fits with the outer wall of the purification filter element 13. The lower end of the filter element bracket 23 passes through the upper end of the placement frame 22 and is penetrated by a positioning hole 24. The inner wall of the positioning hole 24 is movably installed with a fixing rod 21. The upper end of the box body 5 passes through a placement groove 20, and the inner wall of the placement groove 20 is connected to the outer wall of the lower end of the outer shell 7. The upper end of the box body 5 is fixedly installed with a support frame 10, and the inner wall of the support frame 10 fits with the outer wall of the outer shell 7. The upper end of the support frame 10 is connected to the lower end of the outer shell 7 to strengthen the fixation of the outer shell 7.

[0025] In order to open the door body 8, a symmetrically arranged threaded rod 14 is fixedly installed at the front end of the shell 7, and a limit block 15 is threadedly installed on the outer wall of the threaded rod 14. A symmetrically arranged fixed block 17 is fixedly installed at the front end of the door body 8. Grooves 18 are fixedly provided at the left and right ends of the fixed block 17, and the inner wall of the groove 18 fits with the outer wall of the threaded rod 14. A rubber pad 16 is fixedly installed at the front end of the frame 12, and the front end outer wall of the rubber pad 16 fits with the rear end outer wall of the door body 8. An observation window 9 is fixedly installed at the right end of the shell 7, and a through hole 19 is penetrated at the left end of the box body 5, and the inner wall of the through hole 19 is connected to the outer wall of the connecting pipe 4. A boiler door 2 is fixedly installed at the upper end of the furnace body 1. By utilizing the inner wall of the groove 18 to fit with the outer wall of the threaded rod 14, the limit block 15 can be turned out, so that the symmetrically arranged fixed blocks 17 fixedly provided at the front end of the door body 8 slide along the threaded rod 14, thereby allowing the door body 8 to be opened.

[0026] The schematic diagram of the three-dimensional structure of the flue gas purification boiler at A is as follows Figure 3 As shown, the three-dimensional structure diagram at B is as follows Figure 4 As shown, the three-dimensional structural diagram of the box body 5 is as shown Figure 5 shown.

[0027] When using the flue gas purification boiler of the present technical solution, pour the purification liquid into the box body 5, turn on the furnace body 1, turn on the exhaust fan 25, so that the gas generated when the furnace body 1 is burned is sucked into the box body 5 from the exhaust pipe 3 by the exhaust fan 25, so that the harmful gas in the gas reacts with the purification liquid. After the reaction is completed, the gas moves to the outer shell 7, so that the purification filter element 13 installed in the outer shell 7 further purifies the gas, thereby quickly purifying the flue gas. When the boiler is not in use, turn out the limit block 15, so that the front end of the door body 8 is fixedly installed with a symmetrically arranged fixing block 17 that slides along the threaded rod 14, open the door body 8, pull out the fixing rod 21 installed at the lower end of the filter element bracket 23, so that the filter element bracket 23 can slide along the placement rack 22, and the purification filter element 13 movably arranged on the outer wall of the filter element bracket 23 is taken out, so that the purification filter element 13 can be quickly replaced.

Claims

1. A boiler with a flue gas purification function, the flue gas purification boiler comprising a furnace body and a box body fixedly arranged at the right end of the furnace body; It is characterized in that An exhaust pipe is fixedly installed on the outer wall of the furnace body, an exhaust fan is fixedly installed on the air outlet end of the exhaust pipe, a connecting pipe is fixedly installed on the air outlet end of the exhaust fan, the air outlet end of the connecting pipe is connected to the air inlet end of the box body, an outer shell is fixedly installed on the upper end of the box body, and evenly distributed placement racks are fixedly installed on the inner walls of the front and rear ends of the outer shell, and symmetrically distributed filter element holders are movably provided on the upper end of the placement rack, and a purification filter element is movably provided on the outer wall of the filter element holder, a symmetrically arranged frame is fixedly installed on the front end of the outer shell, and a door body is hingedly installed on the inner walls of the upper and lower ends of the frame, and an air outlet pipe is fixedly installed on the upper end of the outer shell.

2. A boiler with flue gas purification function according to claim 1, It is characterized in that A fixing plate is fixedly installed on the inner walls of the front and rear ends of the shell, and the inner wall of the fixing plate fits the outer wall of the purification filter element. The lower end of the filter element bracket passes through the upper end of the placement frame to open a positioning hole, and a fixing rod is movably installed on the inner wall of the positioning hole.

3. A boiler with flue gas purification function according to claim 1, It is characterized in that A placement groove is formed through the upper end of the box body, the inner wall of the placement groove is connected to the outer wall of the lower end of the shell, and a support frame is fixedly installed on the upper end of the box body, and the upper end of the support frame is connected to the lower end of the shell.

4. A boiler with flue gas purification function according to claim 1, It is characterized in that A symmetrically arranged threaded rod is fixedly mounted on the front end of the shell, and a limit block is threadedly mounted on the outer wall of the threaded rod.

5. A boiler with flue gas purification function according to claim 1, It is characterized in that A symmetrically arranged fixing block is fixedly installed at the front end of the door body, and grooves are fixedly opened at the left and right ends of the fixing block, and the inner wall of the groove fits with the outer wall of the threaded rod.

6. A boiler with flue gas purification function according to claim 1, It is characterized in that A rubber pad is fixedly installed at the front end of the frame, the front end outer wall of the rubber pad is in contact with the rear end outer wall of the door body, and an observation window is fixedly installed at the right end of the shell.

7. A boiler with flue gas purification function according to claim 1, It is characterized in that A through hole is formed through the left end of the box body, the inner wall of the through hole is connected to the outer wall of the connecting pipe, and a boiler door is fixedly mounted on the upper end of the furnace body.

Citation Information

Cited By

  • Low-emission flue gas purification equipment for thermal power plant

    CN119909473A

  • A low-emission flue gas purification device for thermal power plants

    CN119909473B

  • Heat-preservation, energy-saving and emission-reduction environment-friendly boiler

    CN223319099U