Biomass steam boiler
By designing a system of return pipes, turbines and multi-layer separation filters in the biomass steam boiler, the problem that waste water cannot be recycled after spraying is solved, the recovery of water resources and the improvement of filtration efficiency are achieved, and the waste of water resources is reduced. .
Patent Information
- Application Number
- CN202322968210.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-03
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-11-03
AI Technical Summary
The current biomass steam boiler cannot recycle the wastewater after spraying when exhausting smoke, resulting in a waste of water resources.
A biomass steam boiler system including a boiler component, a water purification component and a spray component is designed. The exhaust gas is transported to the spray hood through the return pipe, and the water source filtered by the turbine and the multi-layer separation filter is re-entered into the annular pipe. After the pressure is formed, the exhaust gas is sprayed through the nozzle to reduce dust and recycled through the output pipe.
It realizes the recycling of waste water, reduces the waste of water resources, avoids clogging of debris through the operation of the turbine, increases the filtration speed of waste water, and enhances the practicality of the system.
Smart Images

Figure CN221923543U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of steam boilers, in particular to a biomass steam boiler. Background Art
[0002] Biomass steam boiler is a type of biomass boiler. It is a steam boiler that uses biomass fuel as raw material. It is environmentally friendly and fuel-saving. It has automatic feeding and slag discharge, blower and induced draft fan frequency regulation, and the boiler runs fully automatically. It can automatically adjust the fuel amount according to load changes, and the steam output is stable. It has multiple protection and alarm measures such as pressure, water level, and exhaust temperature to ensure the safe operation of the boiler.
[0003] At present, the existing biomass steam boilers need to go through multiple processes before the exhaust gas smoke is discharged. The last step is to reduce the dust by spraying the smoke to reduce the emission of harmful gases in the smoke. However, the water after spraying cannot be recycled for secondary use, which has certain defects. Utility Model Content
[0004] In order to solve the technical problem that the above-mentioned biomass steam boiler cannot recover and utilize the waste water after spraying when exhausting smoke, the utility model provides a biomass steam boiler.
[0005] The utility model is implemented by the following technical scheme: a biomass steam boiler comprises a boiler assembly, a water purification assembly and a spray assembly, wherein the boiler assembly comprises a load-bearing bottom plate, a steam boiler box is installed on the load-bearing bottom plate, a feeder is installed at the front end of the load-bearing bottom plate, a feeder hopper is installed on the feeder, and the feeder hopper and the inside of the feeder are mutually connected;
[0006] The water purification assembly includes a water purifier installed on the top of the steam boiler box, and a return pipe is installed on the water purifier;
[0007] The spray assembly comprises a spray cover installed on the top of the return pipe, and an output pipe is installed on the spray cover.
[0008] Through the above technical solution, a smoke exhaust pipe is installed on the steam boiler box, and the bottom end of the smoke exhaust pipe is connected to the interior of the steam boiler box.
[0009] As a further improvement of the above solution, during the use of the steam boiler, the fuel generates exhaust gas, which is discharged through the smoke exhaust pipe installed on the top.
[0010] Through the above technical solution, an output interface is provided on the side of the water purifier, and one end of the output pipe is installed on the side of the output interface and is communicated with the interior of the water purifier.
[0011] As a further improvement of the above scheme, the output interface is located at the bottom of the lowest layer of the partition filter, so that after the waste water is input into the water purifier from the reflux pipe, it is filtered through multiple layers of partition filters, and finally the filtered water source is re-input into the spray hood through the output interface to the output pipe.
[0012] Through the above technical solution, a turbine is installed inside the water purifier, and the turbine is communicated with the inside of the water purifier.
[0013] As a further improvement of the above scheme, after the turbine is powered on, the blades inside it rotate, causing the wastewater inside the water purifier to surge, thereby preventing large particles in the wastewater from clogging the separation filter.
[0014] Through the above technical solution, limiting protrusions are provided at the four angular positions inside the water purifier. At the same time, a fixed frame is installed on the inner side of the water purifier, a partition frame is installed on the bottom plate of the fixed frame, and partition filters are installed at the bottom of the fixed frame and the partition frame.
[0015] As a further improvement of the above scheme, the limiting protrusion is used to limit the height of the fixed frame so that the limiting frame is in the middle position inside the water purifier, so that the partition filter installed on the top divides the inside of the water purifier into two upper and lower spaces. At this time, the wastewater containing impurities is at the top of the partition filter, and the filtered wastewater is at the bottom of the partition filter.
[0016] Through the above technical solution, an annular tube is installed on the inner side of the spray hood, a nozzle is installed on the inner side of the annular tube, and a connecting interface is provided on the top of the annular tube. The nozzle and the connecting interface are interconnected with the interior of the annular tube.
[0017] As a further improvement of the above scheme, the output pipe inputs the filtered water source from the connecting interface into the annular tube. After the water source forms pressure inside the annular tube, it is sprayed out from the nozzle to achieve the dust reduction treatment of the exhaust gas and smoke.
[0018] Through the above technical solution, a sealing cover plate is installed on the top of the water purifier, and the bottom of the sealing cover plate is consistent with the inner side of the water purifier.
[0019] As a further improvement of the above solution, the bottom of the sealing cover is attached to the inner side of the water purifier, and a rubber strip is adhered to the edge of the sealing cover to seal the gap between the sealing cover and the water purifier to prevent wastewater from leaking.
[0020] Compared with the prior art, the beneficial effects of the present invention are:
[0021] 1. In the biomass steam boiler of the utility model, the exhaust gas and smoke are transported to the inside of the return pipe through the smoke exhaust pipe, so that the smoke floats out to the interface at the top of the return pipe. At the same time, the water source inside the annular pipe is sprayed out through the nozzle to reduce dust on the smoke. The sprayed waste water is transported to the bottom of the water purifier along the return pipe, filtered through the filter net, and then transported back to the inside of the annular pipe through the output pipe, thereby achieving the effect of recycling and reducing the waste of water resources.
[0022] 2. The biomass steam boiler of the utility model is equipped with a turbine at the bottom of the water purifier. After the turbine is operated, the water source inside the water purifier is in a surging state, which prevents the filter from being blocked by debris in the wastewater, and at the same time improves the speed of wastewater filtration, greatly increasing its practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a schematic diagram of the overall external front structure of the device of the utility model;
[0024] Figure 2 This is a schematic diagram of the overall external rear view structure of the device of the utility model;
[0025] Figure 3 This is a schematic diagram of the overall external structure of the water purifier of the utility model;
[0026] Figure 4 This is a schematic diagram of the internal structure of the water purifier of the utility model;
[0027] Figure 5 This is a schematic diagram of the overall connection structure of the fixed frame and the partition frame of the utility model;
[0028] Figure 6 It is a schematic diagram of the overall structure of the annular tube of the utility model.
[0029] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0030] 1. Boiler assembly; 101. Load-bearing bottom plate; 102. Steam boiler box; 103. Feeder; 104. Feeding hopper; 105. Smoke exhaust pipe;
[0031] 2. Water purification assembly; 201. Water purifier; 202. Output interface; 203. Turbine; 204. Position limiting convex block; 205. Fixed frame; 206. Partition frame; 207. Partition filter; 208. Sealing cover plate; 209. Reflux pipe;
[0032] 3. Spray assembly; 301. Spray hood; 302. Ring pipe; 303. Spray head; 304. Connection interface; 305. Output pipe. DETAILED DESCRIPTION
[0033] The present invention is further described below in conjunction with the accompanying drawings and specific implementation methods. It should be noted that, under the premise of no conflict, the various embodiments or technical features described below can be arbitrarily combined to form a new embodiment.
[0034] Embodiment 1:
[0035] Please combine Figure 1-6 The biomass steam boiler of this embodiment includes a boiler assembly 1, a water purification assembly 2 and a spray assembly 3. The boiler assembly 1 includes a load-bearing bottom plate 101, on which a steam boiler box 102 is installed. At the same time, a feeder 103 is installed at the front end of the load-bearing bottom plate 101, and a feeder hopper 104 is installed on the feeder 103. The feeder hopper 104 and the inside of the feeder 103 are mutually connected;
[0036] The water purification assembly 2 includes a water purifier 201 installed on the top of the steam boiler box 101, and a return pipe 209 is installed on the water purifier 201;
[0037] The spray assembly 3 includes a spray cover 301 installed on the top of the return pipe 209 , and an output pipe 305 is installed on the spray cover 301 .
[0038] The implementation principle of the biomass steam boiler in the embodiment of the present application is as follows: a load-bearing bottom plate 101 is provided, a steam boiler box 102 is installed on the top of the load-bearing bottom plate 101, and a feeder 103 is installed at the front end of the load-bearing bottom plate 101, and a feeder hopper 104 is installed on the feeder 103. The fuel is put into the feeder 103 from the feeder hopper 104 and transported to the steam boiler box 102, so that the steam boiler box 102 is in operation. At this time, the exhaust gas smoke generated is output from the exhaust pipe 105 at the top and gradually flows into the return pipe 209. Due to the property of smoke floating upward, it is gradually output from the top of the return pipe 209. At this time, the purified water source inside the water purifier 201 is input into the annular pipe 302 installed in the spray hood 301 through the output pipe 305. At this time, after the water source forms pressure in the annular pipe 302, it is sprayed out from the installed nozzle 303 to perform dust reduction treatment on the output exhaust gas smoke. The sprayed water source is returned to the interior of the water purifier 201 along the return pipe 209. After multi-layer filtration treatment of the water through the multi-layer separation filter 207, it is input into the annular pipe 302 from the bottom again through the output pipe 305.
[0039] See also Figure 1 As shown, further, a smoke exhaust pipe 105 is installed on the steam boiler box 102, and the bottom end of the smoke exhaust pipe 105 is interconnected with the interior of the steam boiler box 102;
[0040] More specifically, when the steam box 102 is in use, the fuel generates exhaust gas, which is discharged through the exhaust pipe 105 installed on the top.
[0041] See also Figure 2 , 3 As shown, further, the side of the water purifier 201 is provided with an output interface 202, and one end of the output pipe 305 is installed on the side of the output interface 202 and is connected to the inside of the water purifier 201;
[0042] More specifically, the output interface 202 is located at the bottom of the bottom-layer partition filter 207, so that after the waste water is input into the water purifier from the reflux pipe 209, it is filtered through multiple layers of partition filters 207, and finally the filtered water source is re-input into the interior of the spray hood 301 through the output interface 202 to the output pipe 305.
[0043] See also Figure 4 As shown, further, a turbine 203 is installed inside the water purifier 201, and the turbine 203 is interconnected with the inside of the water purifier 201;
[0044] More specifically, after the turbine 203 is powered on, its internal blades rotate, causing the wastewater inside the water purifier 201 to surge, thereby preventing large particles of debris in the wastewater from clogging the separation filter 207.
[0045] See also Figure 4 , 5 As shown, further, limiting protrusions 204 are provided at the four angular positions inside the water purifier 201, and a fixed frame 205 is installed on the inner side of the water purifier 201, a partition frame 206 is installed on the bottom plate of the fixed frame 205, and a partition filter 207 is installed at the bottom of the fixed frame 205 and the partition frame 206.
[0046] More specifically, the limiting protrusion 204 is used to limit the height of the fixed frame 205, so that the limiting frame 205 is located in the middle position inside the water purifier 201, so that the partition filter 207 installed on the top can divide the inside of the water purifier 201 into two upper and lower spaces. At this time, the wastewater containing impurities is at the top of the partition filter 207, and the filtered wastewater is at the bottom of the partition filter 207.
[0047] See also Figure 6 As shown, further, an annular tube 302 is installed inside the spray hood 301, a nozzle 303 is installed inside the annular tube 302, and a connection interface 304 is provided on the top of the annular tube 302, and the nozzle 303 and the connection interface 304 are mutually connected with the inside of the annular tube 302;
[0048] More specifically, after the water source forms pressure inside the annular tube 302, it is sprayed out from the nozzle 303 to achieve the effect of dust reduction treatment on the exhaust gas and smoke.
[0049] See also Figure 3 As shown, further, a sealing cover plate 208 is installed on the top of the water purifier 201, and the bottom of the sealing cover plate 208 is consistent with the inner side of the water purifier 201;
[0050] More specifically, the bottom of the sealing cover 208 is attached to the inner side of the water purifier 201, and a rubber strip is adhered to the edge of the sealing cover 208, thereby sealing the gap between the sealing cover 208 and the water purifier 201 to prevent wastewater from leaking.
[0051] The above-mentioned implementation modes are only preferred implementation modes of the present invention, and cannot be used to limit the protection scope of the present invention. Any non-substantial changes and substitutions made by technicians in this field on the basis of the present invention shall fall within the scope of protection required by the present invention.
Claims
1. Biomass steam boiler, characterized in that: The invention comprises a boiler assembly (1), a water purification assembly (2) and a spray assembly (3), wherein the boiler assembly (1) comprises a load-bearing base plate (101), a steam boiler box (102) is installed on the load-bearing base plate (101), a feeder (103) is installed at the front end of the load-bearing base plate (101), a feeder hopper (104) is installed on the feeder (103), and the feeder hopper (104) and the feeder (103) are connected to each other; The water purification assembly (2) comprises a water purifier (201) installed on the top of the steam boiler box (102), and a return pipe (209) is installed on the water purifier (201); The spray assembly (3) comprises a spray hood (301) installed on the top of the return pipe (209), and an output pipe (305) is installed on the spray hood (301).
2. The biomass steam boiler according to claim 1, characterized in that: A smoke exhaust pipe (105) is installed on the steam boiler box (102), and the bottom end of the smoke exhaust pipe (105) is connected to the interior of the steam boiler box (102).
3. The biomass steam boiler according to claim 1, characterized in that: An output interface (202) is provided on the side of the water purifier (201), and one end of the output pipe (305) is installed on the side of the output interface (202) and is communicated with the interior of the water purifier (201).
4. The biomass steam boiler according to claim 3, characterized in that: A turbine (203) is installed inside the water purifier (201), and the turbine (203) is communicated with the inside of the water purifier (201).
5. The biomass steam boiler according to claim 1, characterized in that: Limiting protrusions (204) are provided at four angular positions inside the water purifier (201), and a fixing frame (205) is installed on the inner side of the water purifier (201). A partition frame (206) is installed on the bottom plate of the fixing frame (205), and a partition filter (207) is installed at the bottom of the fixing frame (205) and the partition frame (206).
6. The biomass steam boiler according to claim 1, characterized in that: An annular tube (302) is installed on the inner side of the spray hood (301), a spray head (303) is installed on the inner side of the annular tube (302), and a connection interface (304) is provided on the top of the annular tube (302), and both the spray head (303) and the connection interface (304) are mutually connected with the inside of the annular tube (302).
7. The biomass steam boiler according to claim 5, characterized in that: A sealing cover plate (208) is installed on the top of the water purifier (201), and the bottom of the sealing cover plate (208) is consistent with the inner side of the water purifier (201).