Dam three-dimensional dislocation deformation monitoring device

By installing a three-dimensional displacement deformation monitoring device with cameras and target components on the dam, the problem of abnormal measurement lag verification in traditional monitoring methods is solved, automatic monitoring and remote real-time viewing of the dam are realized, and the identification of engineering problems is improved. Timely discovery capabilities.

CN221924992UActive Publication Date: 2024-10-29POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420403865.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-01
Publication Date
2024-10-29
Estimated Expiration
2034-03-01

AI Technical Summary

Technical Problem

Traditional dam displacement and deformation monitoring has the problem of high automatic monitoring accuracy but lagging verification of abnormal measurement values, which requires manual inspection and confirmation.

Method used

Design a three-dimensional displacement deformation monitoring device for a dam, including a first camera, a second camera, a first target component and a second target component installed on the top of the dam. The cameras can capture and compare the measurements of the target components in real time. According to the head center position, the misalignment deformation parameters are automatically calculated and communicated with the remote control platform in real time to realize automatic monitoring and remote real-time viewing.

Benefits of technology

It realizes the automatic monitoring of the three-dimensional displacement deformation of the dam, provides basic data on the engineering operation performance, and promptly detects engineering problems when abnormal measurement values ​​occur, reducing the lag of manual verification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221924992U_ABST
    Figure CN221924992U_ABST
Patent Text Reader

Abstract

The utility model discloses a dam three-dimensional dislocation deformation monitoring device, which relates to the field of dam deformation monitoring, and comprises a first camera, a second camera, a first beacon assembly and a second beacon assembly, a first arrangement area and a second arrangement area are respectively arranged on two sides of a to-be-measured part of a dam body, installing a first beacon assembly, a first camera and a second camera in the first arrangement area, and installing a second beacon assembly in the second arrangement area; the first beacon assembly and the second beacon assembly have the same structure, and each of the first beacon assembly and the second beacon assembly comprises a measuring head, a base arranged below the measuring head and a connecting part connected between the measuring head and the base. According to the utility model, automatic monitoring of three-dimensional dislocation deformation of the dam can be realized, the actual operation condition of the dam structure can be remotely checked in real time through video images when abnormal measurement values occur, and engineering problems can be found in time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of dam deformation monitoring, in particular to a dam three-dimensional displacement deformation monitoring device. Background Art

[0002] Due to differences in geological conditions and structural types, there is often a certain amount of displacement and deformation between different dam sections (pile numbers) along the dam axis, which has an adverse effect on the dam's operating performance. Traditional dam displacement and deformation are monitored using a three-way joint meter, which has high monitoring accuracy and is easy to achieve automatic monitoring. However, when abnormal measurements occur, in order to verify whether the measurements are true, manual inspections are still required to check whether the structure has real abnormal deformation, which means that there is a certain lag in the verification of abnormal data. Utility Model Content

[0003] The purpose of the utility model is to overcome the shortcomings of the prior art and to provide a three-dimensional displacement deformation monitoring device for a dam, which can not only realize automatic monitoring of the three-dimensional displacement deformation of the dam, but also can remotely view the actual operation status of the dam structure in real time through video images when abnormal measured values ​​appear, so as to discover engineering problems in time.

[0004] The purpose of the utility model is achieved through the following technical scheme: this three-dimensional dislocation deformation monitoring device for a dam is installed on the top plane of a dam body, and includes a first camera, a second camera, a first target assembly and a second target assembly. A first layout area and a second layout area are respectively arranged on both sides of a part to be measured of the dam body, the first target assembly, the first camera and the second camera are installed in the first layout area, and the second target assembly is installed in the second layout area; the first target assembly and the second target assembly have the same structure and both include a measuring head, a base arranged below the measuring head, and a connecting part connected between the measuring head and the base.

[0005] As a further technical solution, the first camera and the second camera are installed at different heights, and their angles relative to the first target assembly and the second target assembly are also different.

[0006] As a further technical solution, when the dam body is displaced and deformed, the first target assembly, the first camera and the second camera are displaced synchronously with the first layout area, and the second target assembly is displaced synchronously with the second layout area.

[0007] As a further technical solution, the first camera and the second camera are used to shoot and compare the center positions of the measuring heads of the first target assembly and the second target assembly in real time to obtain the displacement deformation parameters of the first arrangement area relative to the second arrangement area.

[0008] As a further technical solution, the portion to be measured is a joint position of the dam body.

[0009] As a further technical solution, the first camera, the second camera and the remote control platform communicate in real time.

[0010] As a further technical solution, the measuring head is a sphere, the base is a disc, and the connecting part is a frustum.

[0011] As a further technical solution, the sphere is a hollow stainless steel sphere with a painted surface.

[0012] As a further technical solution, the truncated table and the disc are made of stainless steel, and the truncated table, the sphere and the disc are fixed by welding.

[0013] As a further technical solution, the disc is connected to the top plane of the dam body by bolts, and the bolts are pre-buried anchor bolts or drilled expansion bolts.

[0014] The beneficial effects of the utility model are:

[0015] 1. The camera takes real-time photos and compares the center positions of the spheres of the two target beacon assemblies, automatically calculating the relative displacement deformation of the project site where the target is located in two directions in the plane and in the elevation, realizing automatic monitoring of the three-dimensional displacement deformation of the dam and providing basic data for monitoring the operation status of the project;

[0016] 2. When there are doubts about the monitoring calculation results, the camera can be controlled through the network for remote real-time monitoring to check the actual operation of the structure and discover engineering problems in time. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the arrangement position of the utility model relative to the dam body.

[0018] Figure 2 It is an enlarged schematic diagram of the top plane of the dam body in the utility model.

[0019] Explanation of the reference numerals: sphere 1, truncated cone 2, disc 3, bolt 4, first camera 5, dam body 6, top plane 7, first arrangement area 8, second arrangement area 9, joint 10, first target assembly 11, second target assembly 12, second camera 13. DETAILED DESCRIPTION

[0020] The utility model will be described in detail below with reference to the accompanying drawings:

[0021] Example: As shown in the attached Figure 1 , 2As shown, the three-dimensional displacement deformation monitoring device of the dam includes a sphere 1, a truncated cone 2, a disc 3, a bolt 4, a first camera 5, a dam body 6, a top plane 7, a first arrangement area 8, a second arrangement area 9, a joint 10, a first target assembly 11, a second target assembly 12 and a second camera 13.

[0022] Reference Figure 1 In this embodiment, the arrangement is performed at the part of the dam body 6 where displacement and deformation may occur (i.e., the part to be measured, such as the location of the joint 10). A first arrangement area 8 is arranged on the top plane 7 of the dam body 6 along the left side of the joint 10, and a second arrangement area 9 is arranged along the right side of the joint 10. Figure 2 As shown, the first target assembly 11, the first camera 5 and the second camera 13 are installed in the first layout area 8, and the second target assembly 12 is installed in the second layout area 9. When the dam body 6 is displaced and deformed, the first target assembly 11, the first camera 5 and the second camera 13 are displaced synchronously with the first layout area 8, and the second target assembly 12 is displaced synchronously with the second layout area 9.

[0023] Furthermore, the first target assembly 11 and the second target assembly 12 have the same structure and both include a measuring head, a base disposed below the measuring head, and a connecting portion connected between the measuring head and the base. Preferably, the measuring head is a sphere 1, the base is a disc 3, and the connecting portion is a frustum 2. The sphere 1 is a hollow stainless steel sphere, and the surface is painted. The frustum 2 and the disc 3 are both made of stainless steel, and the frustum 2 is fixed to the sphere 1 and the disc 3 by welding. The disc 3 is connected to the top plane 7 of the dam body 6 by bolts 4, and the bolts 4 are pre-buried anchor bolts or drilled expansion bolts.

[0024] Preferably, if Figure 2 As shown, the first camera 5 and the second camera 13 are installed at different heights, and their angles relative to the first target assembly 11 and the second target assembly 12 are also different. The first camera 5 and the second camera 13 can shoot and compare the center positions of the measuring heads of the first target assembly 11 and the second target assembly 12 in real time to obtain the displacement deformation parameters of the first layout area 8 relative to the second layout area 9. Furthermore, the first camera 5 and the second camera 13 can communicate with the remote control platform in real time.

[0025] The working process of this utility model:

[0026] When the dam body 6 is displaced and deformed, the first target assembly 11, the first camera 5 and the second camera 13 are displaced synchronously with the first layout area 8, and the second target assembly 12 is displaced synchronously with the second layout area 9. The two cameras (the first camera 5 and the second camera 13) take photos from different heights and angles, and grayscale the color image with the help of image processing technology. After that, the image recognition algorithm is used to detect the circular boundary of the image of the measuring head (sphere 1) to obtain the center position of the sphere 1. Then, by comparing and analyzing the center positions of the two targets (the first target assembly 11 and the second target assembly 12), the relative displacement deformation parameters of the project part where the target is located in three directions, namely, the plane two directions and the elevation, are obtained. When the dam is in operation, the first camera 5 and the second camera 13 communicate with the remote control platform in real time to transmit the displacement deformation parameters.

[0027] When there are doubts about the monitoring calculation results, the camera can be controlled through the network for remote real-time monitoring to promptly confirm whether there are obvious abnormalities in the structural operation state. This device can not only realize the automatic monitoring of the three-dimensional displacement deformation of the dam, providing basic data for the monitoring of the engineering operation state, but also can remotely view the actual operation of the structure in real time through video images when abnormal measurements occur, and promptly discover engineering problems.

[0028] It is understandable that, for those skilled in the art, any equivalent replacement or change to the technical solution and the concept of the utility model should fall within the protection scope of the claims attached to the utility model.

Claims

1. A 3D displacement deformation monitoring device for a dam, installed on the top plane (7) of a dam body (6), characterized in that: The invention comprises a first camera (5), a second camera (13), a first target assembly (11) and a second target assembly (12); a first arrangement area (8) and a second arrangement area (9) are respectively arranged on both sides of a part to be measured of the dam body (6); the first target assembly (11), the first camera (5) and the second camera (13) are installed in the first arrangement area (8); and the second target assembly (12) is installed in the second arrangement area (9); the first target assembly (11) and the second target assembly (12) have the same structure and both comprise a measuring head, a base arranged below the measuring head and a connecting portion connected between the measuring head and the base.

2. The three-dimensional displacement deformation monitoring device for a dam according to claim 1 is characterized in that: The first camera (5) and the second camera (13) are installed at different heights, and their angles relative to the first target assembly (11) and the second target assembly (12) are also different.

3. The three-dimensional displacement deformation monitoring device for a dam according to claim 2 is characterized in that: When the dam body (6) is displaced and deformed, the first target assembly (11), the first camera (5) and the second camera (13) are displaced synchronously with the first arrangement area (8), and the second target assembly (12) is displaced synchronously with the second arrangement area (9).

4. The three-dimensional displacement deformation monitoring device for a dam according to claim 3 is characterized in that: The first camera (5) and the second camera (13) are used to shoot and compare the center positions of the measuring heads of the first target assembly (11) and the second target assembly (12) in real time, so as to obtain the displacement deformation parameters of the first arrangement area (8) relative to the second arrangement area (9).

5. The three-dimensional displacement deformation monitoring device for a dam according to claim 1 is characterized in that: The part to be tested is the position of the joint (10) of the dam body (6).

6. The three-dimensional displacement deformation monitoring device for a dam according to claim 1 is characterized in that: The first camera (5) and the second camera (13) communicate with the remote control platform in real time.

7. The dam three-dimensional displacement deformation monitoring device according to any one of claims 1 to 6, characterized in that: The measuring head is a sphere (1), the base is a disc (3), and the connecting part is a frustum (2).

8. The three-dimensional displacement deformation monitoring device for a dam according to claim 7 is characterized in that: The ball (1) is a hollow stainless steel ball with a baking varnish on the surface.

9. The dam three-dimensional displacement deformation monitoring device according to claim 7 is characterized in that: The truncated table (2) and the circular disc (3) are made of stainless steel, and the truncated table (2) and the sphere (1) and the circular disc (3) are fixed by welding.

10. The dam three-dimensional displacement deformation monitoring device according to claim 7 is characterized in that: The disc (3) is connected to the top plane (7) of the dam body (6) by bolts (4), and the bolts (4) are pre-buried anchor bolts or drilled expansion bolts.