Auxiliary hoisting maintenance frame for pre-tensioning method pre-stressed plate
By designing a pre-tensioning prestressed plate auxiliary hoisting maintenance frame, the problems of mold deformation and low construction efficiency are solved, safe and reliable transport and efficient construction are achieved, and cost and safety risks are reduced.
Patent Information
- Application Number
- CN202420229393.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-31
AI Technical Summary
The mold is easily deformed during the transport process before the concrete is finalized, resulting in damage to the concrete structure. The traditional maintenance methods are inefficient and costly, which affects the construction progress and safety.
A pre-tensioning prestressed plate auxiliary hoisting maintenance frame was designed, including maintenance brackets, hoisting lugs, limiting snap assembly and moving device. It can firmly lift pre-tensioning pre-tensioning pre-stressed plate molds, support vertical and horizontal lifting, ensuring that The mold does not deform and protects the integrity of the bracket with a protective frame.
The safe and convenient transportation of prestressed slabs before the concrete is finalized is achieved, the construction quality is ensured, construction efficiency is improved, safety risks and cost investment are reduced, and mold deformation risks are reduced.
Smart Images

Figure CN221937108U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a curing frame, in particular to an auxiliary hoisting curing frame for prestressed plates of a pre-tensioning method, which is used to solve the transportation problem of prestressed plates of a pre-tensioning method before the final setting of concrete and belongs to the technical field of building construction. Background Art
[0002] Generally speaking, prestressed slabs are a type of concrete structural material that generates pre-compressive stress in concrete by tensioning prestressed steel in the formwork before pouring concrete and releasing the tension of the prestressed steel after the concrete reaches a certain strength, thereby improving the bearing capacity and performance of the concrete structure.
[0003] At present, in the construction of flat warehouses in grain depots, the number of prestressed roof panels using the pre-tensioning method is large and the workload is heavy. During prefabrication, traditional natural curing takes a long time and progresses slowly, and a large number of molds are required, resulting in high cost input and a great impact on the construction period. It is difficult to complete the corresponding workload at the corresponding progress node. When the concrete is transported to the steam curing room before final setting, mold deformation is likely to occur during the transportation process before final setting of the concrete, leading to damage to the concrete structure.
[0004] Therefore, the key to solving the above technical problems is to develop an auxiliary lifting and maintenance frame for prestressed slabs that is convenient to transport, stable and reliable. Summary of the invention
[0005] In view of the many defects and shortcomings existing in the above-mentioned background technology, the present utility model has made improvements and innovations thereon, with the aim of providing an easy-to-use, safe and reliable auxiliary lifting and curing frame for prestressed slabs, which can solve the problem that the mold of the prestressed slabs will not be deformed and the concrete structure will not be damaged during the transportation process before the final setting of the concrete.
[0006] Another invention purpose of the utility model is to ensure construction quality while improving construction efficiency, accelerating construction progress, reducing safety risks, being reusable, reducing cost investment, and being easy to transport, and can be lifted vertically or transported horizontally.
[0007] In order to solve the above problems and achieve the above invention objectives, the utility model is a prestressed plate auxiliary hoisting and curing frame by adopting the following design structure and the following technical solutions:
[0008] As an improvement of the auxiliary hoisting and curing frame of the prestressed plate of the utility model, it comprises:
[0009] A maintenance support (1), the maintenance support (1) is used for placing and maintaining the prestressed plate (6);
[0010] Lifting ears (2), the lifting ears (2) are symmetrically connected to both sides of the maintenance support (1) in the length direction, and are used for lifting the prestressed plate (6) by the prestressing method;
[0011] A plurality of position-limiting buckle assemblies (3) are respectively arranged on the circumferential outer side of the maintenance bracket (1).
[0012] As an improvement of the above-mentioned utility model, it also includes a plurality of moving devices (4), and the plurality of moving devices (4) can be detachably installed in the length direction of the maintenance bracket (1).
[0013] As a further improvement of the above-mentioned utility model, the moving device (4) includes a moving wheel and a fixing assembly for detachably mounting the moving wheel, wherein the moving wheel is a fixed wheel or a universal wheel, and a braking device is provided on the fixed wheel or the universal wheel to complete the work in coordination therewith.
[0014] As a further improvement of the above-mentioned utility model, the movable devices (4) are arranged in pairs on both sides of the maintenance support (1), and the movable devices (4) are arranged symmetrically and equidistantly in sequence.
[0015] As a further improvement of the above-mentioned utility model, it also includes a protection frame (5) that is adaptively connected to the maintenance bracket (1), and the protection frame (5) is movably connected above the maintenance bracket (1), wherein the lower end surface of the protection frame (5) is also provided with a protection pad.
[0016] As a further improvement of the above-mentioned utility model, the maintenance support (1) comprises:
[0017] The cross beams (11) are symmetrically arranged relative to each other;
[0018] Longitudinal beams (12), wherein a plurality of longitudinal beams (12) are respectively connected between and at ends of the two transverse beams (11);
[0019] The longitudinal beams (12) connected between the two transverse beams (11) are arranged at equal or unequal intervals.
[0020] As a further improvement of the above-mentioned utility model, the cross beam (11) and the longitudinal beam (12) are both channel steels, wherein the channel steel opening of the square curing frame of the curing bracket (1) is arranged to face outwards.
[0021] As a further improvement of the above-mentioned utility model, the lifting ear (2) is overall in a U-shaped, square or triangular plate structure, one end of the lifting ear (2) is connected to the crossbeam (11), and the other end of the lifting ear (2) is provided with a lifting hole.
[0022] As a further improvement of the above-mentioned utility model, the position limiting buckle assembly (3) comprises:
[0023] A mounting seat (31), wherein a rotation hole is formed at a non-connecting end of the mounting seat (31);
[0024] A clamping plate (32), the clamping plate (32) is used for clamping a limited pre-tensioning method prestressed plate mold (7);
[0025] The pin (33) is rotated, and the clamping plate (32) is rotatably connected in the mounting seat (31) through the rotating pin (33).
[0026] As a further improvement of the above-mentioned utility model, the mounting seat (31) is composed of connecting plates arranged opposite to each other, and the two connecting plates are coaxially penetrated and have rotation holes;
[0027] A connection hole is provided at one end of the clamping plate (32), and a buckle is provided at the middle of the clamping plate (32);
[0028] The middle part of the rotating pin (33) is cylindrical, one end of the cylinder is connected to a circular stopper, and the other end of the cylinder is provided with a locking hole, and a locking piece is connected in the locking hole.
[0029] The working principle is as follows: when the auxiliary hoisting and curing frame of the prestressed plate of the utility model is used, the operator first places the protective frame (5) on the top of the curing support (1); then, the operator places the prestressed plate mold (7) on the top of the protective frame (5); then, the operator rotates the clamping plates (32) of each limiting buckle assembly (3) respectively, and clamps the clamping mouth of the clamping plate (32) on the prestressed plate mold (7) so that it is firmly limited above the curing support (1); then, the operator pours concrete in the prestressed plate mold (7); after the concrete pouring is completed, the operator hangs the hook of the traction tool (8) on the lifting ear (2), and vertically hoists the curing support (1), the prestressed plate mold (7) and the prestressed plate (6) to the steam curing room for curing, thereby completing the auxiliary hoisting and curing work of a prestressed plate.
[0030] Compared with the prior art, the utility model has the following beneficial effects:
[0031] 1. The utility model is easy to use, safe and reliable, and can solve the problem that the mold of the prestressed plate before the final setting of the concrete does not deform and the concrete structure is not damaged during the transportation process. It is convenient to transport and can be lifted vertically or transported horizontally.
[0032] 2. The utility model can ensure the construction quality while improving the construction efficiency, speeding up the construction progress, reducing the safety risk, being reusable and reducing the cost investment;
[0033] 3. The protective frame adopted by the utility model can better protect the integrity of the maintenance bracket. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] The specific implementation of the utility model is further described in detail below with reference to the accompanying drawings, wherein:
[0035] Figure 1 This is one of the use state diagrams of the utility model;
[0036] Figure 2 This is the second usage state diagram of the utility model;
[0037] Figure 3 This is the third use state diagram of the utility model;
[0038] Figure 4 It is a schematic diagram of the overall structure of the utility model;
[0039] Figure 5 It is a schematic diagram of the overall structure of another design structure of the utility model;
[0040] Figure 6 It is one of the overall structural schematic diagrams of another design structure of the utility model;
[0041] Figure 7 This is the second overall structural diagram of another design structure of the utility model;
[0042] Figure 8 This utility model Figure 7 Side view of
[0043] Fig. 9 This utility model Figure 7 A top view of
[0044] Fig.10 It is a partial structural schematic diagram of the utility model;
[0045] Fig.11 It is a partial structural decomposition schematic diagram of the utility model;
[0046] Among them, the numbers in the figure are: 1-maintenance support, 11-crossbeam, 12-longitudinal beam;
[0047] 2—hanging lugs;
[0048] 3—limiting buckle assembly, 31—mounting seat, 32—cage, 33—rotating pin;
[0049] 4—mobile device;
[0050] 5—protective frame;
[0051] 6—Prestressed slab;
[0052] 7—Prestressed slab mold;
[0053] 8—Traction tool. DETAILED DESCRIPTION
[0054] In order to make the technical means, creative features, objectives and effects of the present invention easy to understand, the technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
[0055] As shown in the attached drawings of the specification, a prestressed plate auxiliary hoisting and curing frame comprises:
[0056] A maintenance support 1, which is used for placing and maintaining the prestressed slab 6;
[0057] Lifting ears 2, the lifting ears 2 are symmetrically connected to both sides of the maintenance support 1 in the length direction, and are used for lifting the prestressed plate 6 by prestressing method;
[0058] A plurality of position-limiting buckle assemblies 3 are respectively arranged on the circumferential outer side of the maintenance bracket 1 .
[0059] Further, such as Figure 4 and Fig. 9 as well as Fig.11 As shown, the maintenance support 1 includes:
[0060] The cross beams 11 are symmetrically arranged relative to each other;
[0061] A longitudinal beam 12, wherein a plurality of longitudinal beams 12 are respectively connected between and at ends of the two cross beams 11;
[0062] The longitudinal beams 12 connected between the two transverse beams 11 are arranged at equal or unequal intervals.
[0063] Specifically, Figure 4 and Fig. 9 as well as Fig.11 As shown, the cross beam 11 and the longitudinal beam 12 are both channel steels, wherein the channel steel openings of the square curing frame of the curing bracket 1 are arranged to face outwards.
[0064] In the present invention, 16# channel steel is used as the skeleton of the maintenance bracket 1. The main materials used are cross beam 11: 2 pieces of 16# channel steel L=6m, and longitudinal beam 12: 5 pieces of 16# channel steel L=1.5m. The entire frame is formed as a whole by welding.
[0065] Further, such as Figures 5 to 7As shown, the lifting ear 2 is in a U-shaped, square or triangular plate structure as a whole, one end of the lifting ear 2 is connected to the crossbeam 11, and the other end of the lifting ear 2 is provided with a lifting hole.
[0066] In the utility model, the steel plate strength of the lifting ear 2 is Q235B, the thickness is 20mm, the length of the steel plate is 180mm, the width is 140 / 80mm, and a circular lifting hole with a diameter of 40mm is opened on the steel plate.
[0067] Further, such as Fig.11 As shown, the limit buckle assembly 3 includes:
[0068] A mounting seat 31, wherein a rotation hole is formed at a non-connecting end of the mounting seat 31;
[0069] A clamping plate 32, which is used for clamping the limited pre-tensioning prestressed plate mold 7;
[0070] The pin 33 is rotated, and the clamping plate 32 is rotatably connected in the mounting seat 31 through the rotating pin 33 .
[0071] Specifically, Fig.11 As shown, the mounting seat 31 is composed of connecting plates arranged opposite to each other, and two connecting plates are coaxially connected and have rotation holes;
[0072] A connection hole is provided at one end of the clamping plate 32, and a buckle is provided at the middle of the clamping plate 32;
[0073] The middle part of the rotating pin 33 is cylindrical, one end of the cylinder is connected to a circular stopper, and the other end of the cylinder is provided with a locking hole, and a locking piece is connected in the locking hole.
[0074] In the utility model, the connecting plate is a steel plate with strength Q235B, thickness 10mm, length 110mm, width 80 / 50mm, a circular hole with a diameter of 20mm is opened on the connecting plate, and the number is 28;
[0075] The card plate 32 is a steel plate with strength Q235B, thickness 10mm, length 200mm, width 90mm, a round hole with a diameter of 20mm is opened on the steel plate, and the quantity is 14 pieces;
[0076] The rotating pin 33 is a cylindrical member with a strength of Q235, a diameter of 20 mm, a length of 60 mm, and 14 in number.
[0077] Before using the prestressed plate auxiliary hoisting and maintenance frame of the above-mentioned design structure, it is necessary to manufacture and install it as a backup.
[0078] The specific steps for making and installing are:
[0079] 1. Maintenance bracket 1 uses 16# channel steel, cut into 5 pieces with a length of 1500mm and 2 pieces with a length of 6000mm. The whole frame is welded to form a whole;
[0080] 2. The lifting lug 2 is made of Q235B steel plate with a thickness of 20mm, cut into a length of 180mm and a width of 140 / 80mm. A round hole with a diameter of 40mm is opened at the end of the width of 80mm, 25mm away from the end. The number is 4;
[0081] 3. The connecting plate of the mounting seat 31 is made of Q235B steel plate with a thickness of 10mm, cut into a length of 110mm and a width of 80 / 50mm. A round hole with a diameter of 20mm is opened at the end of the width of 50mm and 20mm away from the end. The quantity is 28 pieces;
[0082] 4. The card plate 32 is made of Q235B steel plate with a thickness of 10mm, cut into a length of 200mm and a width of 90mm. A circular hole with a diameter of 20mm is opened at one end, 20mm away from the end. The quantity is 14 pieces;
[0083] 5. Weld 7 16# channel steels into a maintenance bracket 1 according to the overall structural diagram, then weld the prepared lifting ears 2 and mounting seat 31 to the outside of the maintenance bracket 1, install the moving device 4 on the maintenance bracket 1, and assemble the prepared clamping plate 32 and rotating pin 33 on the mounting seat 31. After the production and installation are completed, it can be used.
[0084] In summary, a more specific implementation method of the present invention is:
[0085] Example 1
[0086] like Figure 1 As shown, when in use, first, the operator places the prestressed plate mold 7 above the maintenance bracket 1, and then the operator rotates the clamping plates 32 of each limiting buckle assembly 3 respectively, and clamps the clamping mouth of the clamping plate 32 on the prestressed plate mold 7, so that it is firmly limited above the maintenance bracket 1; then, the operator pours concrete in the prestressed plate mold 7. After the concrete pouring is completed, the operator hangs the hook of the traction tool 8 on the lifting ear 2, and vertically lifts the maintenance bracket 1, the prestressed plate mold 7 and the prestressed plate 6 to the steam maintenance room for maintenance, thereby completing the auxiliary lifting and maintenance work of a prestressed plate. As time goes by, after the maintenance is completed, the next process can be entered.
[0087] Example 2
[0088] like Figure 5As shown, Example 2 is basically the same as Example 1, with the only difference being that, on the basis of Example 1, it further includes a protection frame 5 adaptably connected to the maintenance bracket 1, and the protection frame 5 is movably connected above the maintenance bracket 1, wherein the lower end face of the protection frame 5 is also provided with a protection pad.
[0089] When the auxiliary lifting and curing frame for prestressed slabs of the above-mentioned design structure is used, the operator first places the protective frame 5 on the top of the curing support 1; then, the operator places the prestressed slab mold 7 on the protective frame 5, and then, the operator rotates the clamping plates 32 of each limiting buckle assembly 3 respectively, and clamps the clamping mouth of the clamping plate 32 on the prestressed slab mold 7, so that it is firmly limited above the curing support 1; then, the operator pours concrete in the prestressed slab mold 7, and after the concrete pouring is completed, the operator hangs the hook of the traction tool 8 on the lifting ear 2, and vertically lifts the curing support 1, the prestressed slab mold 7 and the prestressed slab 6 to the steam curing room for curing, thereby completing the auxiliary lifting and curing work of a prestressed slab. As time goes by, after the curing is completed, the next process can be entered.
[0090] During the entire implementation process described above, since the protective frame 5 is provided, the integrity of the maintenance bracket 1 can be better protected.
[0091] Example 3
[0092] like Figure 2 and Figure 3 As shown, Example 3 is basically the same as Example 1 and Example 2, the only difference being that, based on Example 1 and Example 2, it further includes a plurality of moving devices 4, and the plurality of moving devices 4 can be detachably installed in the length direction of the maintenance bracket 1.
[0093] Furthermore, the moving device 4 includes a moving wheel and a fixing assembly for detachably mounting the moving wheel, wherein the moving wheel is a fixed wheel or a universal wheel, and a brake device is provided on the fixed wheel or the universal wheel to complete the work in coordination therewith.
[0094] Specifically, the moving devices 4 are arranged in pairs on both sides of the maintenance support 1, and the moving devices 4 are arranged symmetrically and equidistantly in sequence.
[0095] In the present invention, the moving device 4 is a rubber wheel with a diameter of 500 mm and a width of 150 mm, and there are six of them.
[0096] When used as described above, the operator can move the utility model to the construction site through the mobile device 4, which saves time and effort and is convenient for transportation. The specific use is the same as that of Example 1 and Example 2, and will not be repeated here.
[0097] Finally, it should be noted that the above is only a preferred embodiment of the utility model, and does not limit the utility model in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the utility model without departing from the content of the technical solution of the utility model still belongs to the protection scope of the technical solution of the utility model.
Claims
1. A prestressed plate auxiliary hoisting and curing frame, characterized in that: It includes: A maintenance support (1), the maintenance support (1) is used for placing and maintaining the prestressed plate (6); Lifting ears (2), the lifting ears (2) are symmetrically connected to both sides of the maintenance support (1) in the length direction, and are used for lifting the prestressed plate (6) by the prestressing method; A plurality of position-limiting buckle assemblies (3) are respectively arranged on the circumferential outer side of the maintenance bracket (1).
2. The auxiliary hoisting and curing frame for prestressed slab according to claim 1 is characterized in that: It also comprises a plurality of moving devices (4), and the plurality of moving devices (4) are detachably mounted in the length direction of the maintenance support (1).
3. The auxiliary hoisting and curing frame for prestressed slab according to claim 2 is characterized in that: The moving device (4) comprises a moving wheel and a fixing assembly for detachably mounting the moving wheel, wherein the moving wheel is a fixed wheel or a universal wheel, and a brake device is provided on the fixed wheel or the universal wheel to complete the work in coordination therewith.
4. The auxiliary hoisting and curing frame for prestressed slab according to claim 2 or 3, characterized in that: The moving devices (4) are arranged in pairs on both sides of the maintenance support (1), and the moving devices (4) are arranged in sequence and symmetrically at equal distances.
5. The auxiliary hoisting and curing frame for prestressed slab according to claim 1 is characterized in that: It also comprises a protection frame (5) adapted to be connected to the maintenance support (1), the protection frame (5) being movably connected above the maintenance support (1), wherein a protection pad is also provided on the lower end surface of the protection frame (5).
6. The auxiliary hoisting and curing frame for prestressed slab according to claim 1 is characterized in that: The maintenance support (1) comprises: The cross beams (11) are symmetrically arranged relative to each other; Longitudinal beams (12), wherein a plurality of longitudinal beams (12) are respectively connected between and at ends of the two transverse beams (11); The longitudinal beams (12) connected between the two transverse beams (11) are arranged at equal or unequal intervals.
7. The auxiliary hoisting and curing frame for prestressed slab according to claim 6 is characterized in that: The cross beam (11) and the longitudinal beam (12) are both channel steels, wherein the channel steel openings of the square curing frame of the curing support (1) are arranged to face outwards.
8. The auxiliary hoisting and curing frame for prestressed slab according to claim 1 is characterized in that: The lifting ear (2) is in a U-shaped, square or triangular plate-like structure as a whole; one end of the lifting ear (2) is connected to the crossbeam (11); and the other end of the lifting ear (2) is provided with a lifting hole.
9. The auxiliary hoisting and curing frame for prestressed slab according to claim 1 is characterized in that: The position limiting buckle assembly (3) comprises: A mounting seat (31), wherein a rotation hole is formed at a non-connecting end of the mounting seat (31); A clamping plate (32), the clamping plate (32) is used for clamping a limited pre-tensioning method prestressed plate mold (7); The pin (33) is rotated, and the clamping plate (32) is rotatably connected in the mounting seat (31) through the rotating pin (33).
10. The auxiliary hoisting and curing frame for prestressed slab according to claim 9, characterized in that: The mounting seat (31) is composed of connecting plates arranged opposite to each other, and the two connecting plates are coaxially connected and have rotation holes; A connection hole is provided at one end of the clamping plate (32), and a buckle is provided at the middle of the clamping plate (32); The middle part of the rotating pin (33) is cylindrical, one end of the cylinder is connected to a circular stopper, and the other end of the cylinder is provided with a locking hole, and a locking piece is connected in the locking hole.
