Pipe burying and paying-off device for water conservancy construction
By designing a pipe-burning and line laying device for water conservancy construction including carts, material pipes and plowshares, the problems of inaccurate and low efficiency of pipe-burning and line laying in the prior art are solved, and more efficient and clear line laying is achieved Effects ensure that the lime powder adheres to the soil and avoids wind dissipation.
Patent Information
- Application Number
- CN202420709288.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-04-08
AI Technical Summary
The existing methods of pipe burying and laying lines in water conservancy construction mostly rely on manual handheld lime powder, which leads to inaccurate and low efficiency, especially in environments with high wind speeds, which can easily cause lime powder to be blown away, affecting clarity.
A water conservancy construction pipe buried line laying device is designed, including a push cart, material feed pipe, barrier plate, pull rod, fixed cylinder, telescopic rod and limit screw. The lime powder is uniformly reversed through the material storage box and material feed pipe. and accurately lay the line and adjust the plowshare height through the plowshare and limit screw to fix the lime powder on the soil.
It improves the efficiency and clarity of laying lines, ensures that lime powder adheres to the ground for a long time, avoids wind dissipation, and improves the convenience and accuracy of construction.
Smart Images

Figure CN221939725U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of water conservancy construction, and more specifically to a pipe laying device for water conservancy construction. Background Art
[0002] Water conservancy engineering mainly studies the basic knowledge and skills in engineering hydrology, water conservancy engineering surveying, water conservancy reinforced concrete, hydraulic structures, engineering drawing, etc., and conducts engineering planning and design, on-site construction, engineering budgeting, and maintenance and repair of water conservancy equipment in the field of water conservancy engineering. For example: when building different types of hydraulic structures such as dams, dikes, spillways, sluices, channels, ferryways, rafts, and fishways, when burying pipes in water conservancy, it is necessary to lay out the buried pipe positions. Laying out the lines is to facilitate the workers' work and to ensure that the construction can be carried out strictly in accordance with the design drawings.
[0003] Based on the above, the inventors found that most of the existing buried pipe laying out is carried out by marking the line with lime powder. Since the line is laid out manually with lime powder in hand, it may lead to inaccurate line laying and reduce the line laying efficiency. In addition, since the ground is flat and the wind speed is high in the laying environment, the lime powder for laying out may be blown away, making it unclear. Therefore, in view of this, the existing structure is studied and improved, and a buried pipe laying device for water conservancy construction is provided, in order to achieve a more practical purpose. Utility Model Content
[0004] 1. Technical issues to be solved
[0005] In view of the problems existing in the prior art, the purpose of the utility model is to provide a pipe laying device for water conservancy construction, which can facilitate workers to lay out the pipes and effectively improve the clarity after laying out the pipes.
[0006] 2. Technical solution
[0007] To solve the above problems, the utility model adopts the following technical solutions.
[0008] A pipe laying device for water conservancy construction comprises a cart, a push rod is fixedly installed on one side of the cart, a through opening is opened on the top of the cart, a fixed bracket is fixedly installed on the top of the cart, a storage box is fixedly installed on the inner side of the fixed bracket, a material passing pipe is fixedly installed on the bottom end of the storage box, one end of the material passing pipe extends to the bottom end of the cart through the through opening, a pair of rails are fixedly installed on the outer wall of the material passing pipe through support rods, and the positions of the pair of rails are symmetrical to each other, a blocking plate is clamped and installed inside the pair of rails, the top of the blocking plate is blocked to the open end of one end of the material passing pipe, one side of the blocking plate is connected to a connecting rod through a rotating shaft, one end of the connecting rod is connected to a pull rod through a rotating shaft, and a handle is fixedly installed on one end of the pull rod.
[0009] Furthermore, the through opening is located at the center of the top of the cart, and the center position of the fixed bracket is symmetrical to the center position of the through opening.
[0010] Furthermore, the connecting rod is connected to the bottom end of the cart via a rotating shaft, and the outer wall of the pull rod is connected to one side of the outer wall of the push rod via a rotating shaft.
[0011] Furthermore, a fixing cylinder is fixedly installed at the bottom end of the cart, a telescopic rod is inserted into the interior of the fixing cylinder, a plowshare is fixedly installed at one end of the telescopic rod, threaded holes are evenly opened on one side of the outer wall of the fixing cylinder, and limiting holes are evenly opened on one side of the outer wall of the telescopic rod.
[0012] Furthermore, the fixing cylinder is located at the edge of the bottom end of the cart, and the position of the fixing cylinder is symmetrical to the position of the feeding pipe.
[0013] Furthermore, the interior of the threaded hole is connected with a limiting screw via a threaded connection, one end of the limiting screw extends to the interior of the limiting hole, and the other end of the limiting screw is fixedly mounted with a knob.
[0014] Furthermore, an anti-skid pad is fixedly installed on the outer side of the knob, and rubber particles are fixedly arranged on the outer side of the anti-skid pad.
[0015] 3. Beneficial effects
[0016] Compared with the prior art, the advantages of the present invention are:
[0017] (1) This solution, by setting up a storage box, a material passing pipe, a connecting rod and a pull rod, after the device is put into use, lime powder is poured into the storage box, and then the handle is pushed, so that the handle drives one end of the pull rod to tilt backward, and then one end of the pull rod pulls the connecting rod, and at the same time, one end of the connecting rod pulls the blocking plate to move, and the blocking plate exposes the opening of the material passing pipe. Then the staff pushes the cart to lay out the wire. Similarly, the staff pulls the handle to drive the blocking plate to block the opening of the material passing pipe. Through this device, the efficiency and convenience of laying out the wire can be effectively improved.
[0018] (2) This solution, by setting a fixed cylinder, a telescopic rod, a plowshare and a limit screw, before the cart moves to lay out the line, the staff will adjust the height of the plowshare and its fit with the ground according to the looseness of the soil. By turning the knob, the limit screw is disengaged from the limit hole on the outer wall of the telescopic rod, and then the height of the plowshare is adjusted. After the adjustment is completed, the knob is turned to extend one end of the limit screw to the inside of the limit hole, so that the height of the plowshare will be fixed. The plowshare can loosen and groove the soil in front of the feeding pipe, and then the feeding pipe is laid out in the groove of the soil, so that the lime powder laid out can adhere to the ground for a long time, ensuring the clarity of the lime powder laid out. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a three-dimensional schematic diagram of the structure of the utility model;
[0020] Figure 2 It is a three-dimensional schematic diagram of the fixed bracket structure of the utility model;
[0021] Figure 3 It is a three-dimensional schematic diagram of the material storage box structure of the utility model;
[0022] Figure 4 For the utility model Figure 3 A is an enlarged schematic diagram of the local structure at center A;
[0023] Figure 5 It is a three-dimensional disassembled schematic diagram of the fixed cylinder structure of the utility model.
[0024] Description of the numbers in the figure:
[0025] 1. Trolley; 2. Push rod; 3. Through port; 4. Fixed bracket; 5. Storage box; 6. Through pipe; 7. Rail; 8. Blocking plate; 9. Connecting rod; 10. Pull rod; 11. Handle; 12. Fixed tube; 13. Telescopic rod; 14. Plowshare; 15. Threaded hole; 16. Limit hole; 17. Limit screw; 18. Knob. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model; it is obvious that the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the utility model without making creative work are within the scope of protection of the utility model.
[0027] Example:
[0028] See also Figure 1-5The top of the trolley 1 is provided with a connecting rod 9, and one end of the connecting rod 9 is connected with a pull rod 10 through the connecting rod 11. The bottom of the pull rod 10 is provided with a handle 11.
[0029] See also Figure 1 , 2 3. The through opening 3 is located at the center of the top of the trolley 1, and the center position of the fixed bracket 4 is symmetrical to the through opening 3. By setting the center position of the through opening 3, the trolley 1 and the fixed bracket 4, the material discharge of the material pipe 6 can be effectively made more accurate; the connecting rod 9 is connected to the bottom end of the trolley 1 through a rotating shaft, and the outer wall of the pull rod 10 is connected to one side of the outer wall of the push rod 2 through the rotating shaft. The various components are connected through the rotating shaft, so that when the staff pulls the handle 11, the baffle plate 8 can be driven to open and close, which can achieve the purpose of discharging and closing the material through the material pipe 6.
[0030] See also Figure 1 , 5 A fixed cylinder 12 is fixedly installed at the bottom end of the cart 1, a telescopic rod 13 is inserted into the fixed cylinder 12, a plowshare 14 is fixedly installed at one end of the telescopic rod 13, threaded holes 15 are evenly opened on one side of the outer wall of the fixed cylinder 12, and limiting holes 16 are evenly opened on one side of the outer wall of the telescopic rod 13; the fixed cylinder 12 is located at the edge of the bottom end of the cart 1, and the position of the fixed cylinder 12 is symmetrical to that of the feeding pipe 6. The soil can be loosened by the plowshare 14, and a concave groove is opened on the soil, so that the lime powder falling through the feeding pipe 6 is directly spread into the groove of the soil to avoid being blown away by the wind.
[0031] See also Figure 5The interior of the threaded hole 15 is connected with a limit screw 17 through a thread, one end of the limit screw 17 extends to the interior of the limit hole 16, and the other end of the limit screw 17 is fixedly installed with a knob 18; an anti-skid pad is fixedly installed on the outside of the knob 18, and rubber particles are fixedly arranged on the outside of the anti-skid pad. The position inside the fixed tube 12 can be adjusted by the telescopic rod 13, so that the height of the plowshare 14 can be adjusted according to the state of the soil, and the limit screw 17 can be used to firmly fix the position of the telescopic rod 13 inside the fixed tube 12, and the anti-skid pad on the knob 18 can effectively facilitate the staff to apply force to twist the limit screw 17.
[0032] When in use: first, the staff pours the lime powder into the storage box 5, and then pushes the handle 11, so that the handle 11 drives one end of the pull rod 10 to tilt backward, and then one end of the pull rod 10 pulls the connecting rod 9, and at the same time, one end of the connecting rod 9 pulls the blocking plate 8 to move, and the blocking plate 8 exposes the opening of the feed pipe 6. At the same time, the staff adjusts the height of the plowshare 14 and the fit with the ground according to the looseness of the soil, and by turning the knob 18, the limiting screw 17 is disengaged from the limiting hole 1 on the outer wall of the telescopic rod 13. 6, and then adjust the height of the plowshare 14. After the adjustment is completed, turn the knob 18 so that one end of the limit screw 17 extends to the inside of the limit hole 16, and the height of the plowshare 14 will be fixed. When the staff pushes the cart 1 to lay out the line, the plowshare 14 can loosen and groove the soil in front of the feeding pipe 6, and then the feeding pipe 6 is laid out in the groove of the soil to improve the adhesion of the lime powder. After the laying is completed, similarly, the staff pulls the handle 11 to drive the blocking plate 8 to seal the open end of the feeding pipe 6 to end the laying.
[0033] Finally, it should be noted that in the description of the present invention, it should be noted that the terms "vertical", "up", "down", "horizontal", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present invention.
[0034] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0035] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions described in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A pipe laying device for water conservancy construction, comprising a cart (1), characterized in that: A push rod (2) is fixedly installed on one side of the cart (1), a through opening (3) is opened at the top of the cart (1), a fixed bracket (4) is fixedly installed at the top of the cart (1), a material storage box (5) is fixedly installed on the inner side of the fixed bracket (4), a material passing pipe (6) is fixedly installed at the bottom end of the material storage box (5), one end of the material passing pipe (6) extends to the bottom end of the cart (1) through the through opening (3), and the outer wall of the material passing pipe (6) is connected by a support rod. A pair of rails (7) are fixedly installed, and the positions of the pair of rails (7) are symmetrical to each other. A blocking plate (8) is installed inside the pair of rails (7), and the top end of the blocking plate (8) is sealed to the open end of the material passage pipe (6). One side of the blocking plate (8) is connected to a connecting rod (9) via a rotating shaft, and one end of the connecting rod (9) is connected to a pull rod (10) via a rotating shaft, and a handle (11) is fixedly installed on one end of the pull rod (10).
2. A pipe laying device for water conservancy construction according to claim 1, characterized in that: The through opening (3) is located at the center of the top of the cart (1), and the center position of the fixed bracket (4) is symmetrical to the center position of the through opening (3).
3. A pipe laying device for water conservancy construction according to claim 1, characterized in that: The connecting rod (9) is connected to the bottom end of the cart (1) via a rotating shaft, and the outer wall of the pull rod (10) is connected to one side of the outer wall of the push rod (2) via a rotating shaft.
4. A pipe laying device for water conservancy construction according to claim 1, characterized in that: A fixing cylinder (12) is fixedly installed at the bottom end of the cart (1), a telescopic rod (13) is inserted into the interior of the fixing cylinder (12), a plowshare (14) is fixedly installed at one end of the telescopic rod (13), threaded holes (15) are evenly arranged on one side of the outer wall of the fixing cylinder (12), and limiting holes (16) are evenly arranged on one side of the outer wall of the telescopic rod (13).
5. A pipe laying device for water conservancy construction according to claim 4, characterized in that: The fixed cylinder (12) is located at the edge of the bottom end of the cart (1), and the position of the fixed cylinder (12) is symmetrical to the position of the feeding pipe (6).
6. A pipe laying device for water conservancy construction according to claim 4, characterized in that: The interior of the threaded hole (15) is connected to a limiting screw rod (17) via a threaded connection, one end of the limiting screw rod (17) extends into the interior of the limiting hole (16), and the other end of the limiting screw rod (17) is fixedly mounted with a knob (18).
7. A pipe laying device for water conservancy construction according to claim 6, characterized in that: An anti-skid pad is fixedly mounted on the outer side of the knob (18), and rubber particles are fixedly arranged on the outer side of the anti-skid pad.