Pipeline mounting and lifting device for water conservancy construction

By designing adjustable mounting brackets and clamp assemblies, the problem of existing devices being unable to adjust pipe length has been solved, improving the efficiency and stability of pipe installation.

CN221939992UActive Publication Date: 2024-11-01FUJIAN YAJIUSHAN CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323604249.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-11-01
Estimated Expiration
2033-12-27

AI Technical Summary

Technical Problem

Existing pipe installation lifting devices cannot be adjusted to the required pipe length, resulting in low installation efficiency.

Method used

A device comprising a protective shell, an operating table, a mounting bracket, a clamping assembly, a slide rail, a rack, a gear, a rotary handle, a power assembly, and a lifting assembly is designed. By adjusting the rotary handle and gear engagement, the mounting bracket can be extended or shortened. Combined with the adjustment of the clamping assembly, the pipe can be secured and lifted.

Benefits of technology

It enables flexible adjustment based on pipe length, reduces pipe swaying during lifting, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221939992U_ABST
    Figure CN221939992U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pipeline installation, in particular to a pipeline installation lifting device for water conservancy construction. The utility model provides a pipeline installation lifting device for water conservancy construction. The pipeline installation lifting device can adjust the distance between clamps. The pipeline installation lifting device comprises a protective shell, an operation table, an installation frame, a clamp assembly, a sliding rail, a rack, a gear and the like. Mounting frames are arranged on the two sides of the upper portion of the operating table; clamp assemblies are arranged on the mounting frames on the two sides; a gear is arranged on the rear portion of the operating table; a rotating handle is arranged on the rear portion of the gear; according to the pipeline lifting device, the rotating handle is adjusted, the rotating handle drives the gear to rotate, the mounting frames extend outwards along with the gear, when the distance between the mounting frames on the two sides is long enough, a pipeline is placed in the clamp assembly, the first threaded rod and the clamping clamp are adjusted, the motor is started, the pipeline is lifted, and the effect of reducing shaking when the long pipeline is lifted is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline installation, in particular to a pipeline installation and lifting device for water conservancy construction. Background Art

[0002] With the progress of science and technology and the rapid development of my country's economy, the technical requirements for water conservancy construction projects have gradually increased. The most widely used process in water conservancy construction projects is pipeline installation. When the pipeline needs to be installed at a higher position, a pipeline installation lifting device must be used.

[0003] The existing pipeline installation and lifting device can usually only lift the pipeline. The distance between the left and right clamps is fixed and cannot be adjusted according to the length of the pipeline to be lifted, which affects the pipeline installation efficiency. Therefore, we provide a pipeline installation and lifting device for water conservancy construction. Utility Model Content

[0004] In order to overcome the shortcomings of existing pipeline installation and lifting devices that usually can only lift the pipeline, the distance between the left and right clamps is fixed, and it cannot be adjusted according to the length of the pipeline to be lifted, the utility model provides a pipeline installation and lifting device for water conservancy construction.

[0005] The technical solution of the utility model is: a pipeline installation and lifting device for water conservancy construction, including a protective shell, an operating table, a mounting frame, a clamp assembly, a slide rail, a rack, a gear, a rotating handle, a power assembly and a lifting assembly, an operating table is provided on the top of the protective shell, mounting frames are provided on both sides of the upper part of the operating table, the mounting frames are U-shaped, and clamp assemblies are provided on the mounting frames on both sides, a gear is provided at the rear of the operating table, a rotating handle is provided at the rear of the gear, a slide rail is provided on the upper part of the operating table, a rack is slidably provided at the bottom of the slide rail, the gear is meshed with the rack, a power assembly is provided inside the protective shell, and the lifting assembly is rotatably connected to the top of the power assembly.

[0006] Preferably, the clamp assembly includes a lower clamping plate, an upper clamping plate, a guide rod and a first threaded rod. The lower part of the mounting frames on both sides is provided with a lower clamping plate, the upper part of the mounting frames on both sides are rotatably provided with a first threaded rod, the bottom of the first threaded rod is provided with an upper clamping plate, the upper part of the mounting frames on both sides are slidably provided with a guide rod, and the bottom end of the guide rod is in contact with the upper clamping plate.

[0007] Preferably, the power assembly includes a motor and a bevel gear set. The motor is provided at the bottom of the protective shell, and the bevel gear set is rotatably provided on the output shaft of the motor.

[0008] Preferably, the lifting assembly includes a telescopic rod, a bidirectional threaded rod, a moving block, a connecting rod and a slider. A plurality of telescopic rods are provided at the bottom of the operating table. The bottom ends of the plurality of telescopic rods are connected to the protective shell. A bidirectional threaded rod is rotatably provided on the upper part of the bevel gear group. A plurality of moving blocks are slidably provided on the bidirectional threaded rod. A connecting rod is provided on the top of the moving block. A slider is provided on the top of the connecting rod. The top of the slider is in contact with the operating table.

[0009] Preferably, rubber sheets are also included. Rubber sheets are arranged on the tops of the lower clamping plates on both sides, and rubber sheets are arranged on the bottoms of the upper clamping plates on both sides.

[0010] Preferably, a fixing block and a second threaded rod are further included, a plurality of second threaded rods are arranged at the bottom of the protective shell, and a fixing block is arranged at the bottom of each of the plurality of second threaded rods.

[0011] The utility model adjusts the rotating handle, which is fixedly connected to the gear. The rotating handle drives the gear to rotate, and the gear meshes with the upper and lower racks. The racks move outward under the action of the slide rail, and the mounting frame extends outward with the gear. When the distance between the mounting frames on both sides is long enough, the rotating handle is stopped, the pipe is placed between the lower clamping plate and the upper clamping plate, the first threaded rod is adjusted, the clamp is clamped, and the motor is started to lift the pipe to the required position. The utility model achieves the effect of lifting longer pipes, reducing shaking, and facilitating construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a three-dimensional structural schematic diagram of the utility model.

[0013] Figure 2 It is a three-dimensional cross-sectional structural schematic diagram of the upper clamping plate, rubber sheet and guide rod of the utility model.

[0014] Figure 3 It is a three-dimensional cross-sectional structural schematic diagram of the rack, gear and rotating handle of the utility model.

[0015] Figure 4 It is a three-dimensional cross-sectional structural schematic diagram of the motor, bevel gear set and bidirectional threaded rod of the utility model.

[0016] Figure 5 It is a three-dimensional cross-sectional structural schematic diagram of the fixed block, the second threaded rod, etc. of the utility model.

[0017] Explanation of the reference numerals: 1-protective shell, 2-operating table, 3-mounting frame, 4-lower clamping plate, 401-upper clamping plate, 5-rubber sheet, 6-guide rod, 7-first threaded rod, 8-slide rail, 9-rack, 10-gear, 11-rotating handle, 12-telescopic rod, 13-motor, 14-bevel gear set, 15-bidirectional threaded rod, 16-moving block, 17-connecting rod, 18-slider, 19-fixed block, 20-second threaded rod. DETAILED DESCRIPTION

[0018] The utility model is further described below in conjunction with the accompanying drawings and specific implementation methods.

[0019] Example 1

[0020] A pipe installation and lifting device for water conservancy construction, such as Figure 1 , Figure 2 and Figure 3 As shown, it includes a protective shell 1, an operating table 2, a mounting frame 3, a fixture assembly, a slide rail 8, a rack 9, a gear 10, a rotating handle 11, a power assembly and a lifting assembly. The protective shell 1 is provided with an operating table 2 on the top, and mounting frames 3 are provided on both sides of the upper part of the operating table 2. The mounting frames 3 act on the installation of the fixture assembly. The mounting frame 3 is U-shaped, and the mounting frames 3 on both sides are provided with fixture assemblies. A gear 10 is provided at the rear of the operating table 2, and the gear 10 acts to slide the rack 9. A rotating handle 11 is provided at the rear of the gear 10, and the rotating handle 11 is used to rotate the gear 10. A slide rail 8 is provided on the top of the operating table 2, and a rack 9 is slidably provided at the bottom of the slide rail 8. The rack 9 is used to move the mounting frame, and the gear 10 is meshed with the rack 9. A power assembly is provided inside the protective shell 1, and the top of the power assembly is rotatably connected to the lifting assembly The power component includes a motor 13 and a bevel gear set 14. The motor 13 is provided at the bottom of the protective shell 1. The bevel gear set 14 is rotatably provided on the output shaft of the motor 13. The lifting component includes a telescopic rod 12, a bidirectional threaded rod 15, a moving block 16, a connecting rod 17 and a slider 18. Two telescopic rods 12 are provided at the bottom of the operating table 2. The telescopic rods 12 are used to provide guidance for the movement of the operating table 2. The bottom ends of the two telescopic rods 12 are connected to the protective shell 1. A bidirectional threaded rod 15 is rotatably provided on the upper part of the bevel gear set 14. The bidirectional threaded rod 15 is used to rotate to move the moving block 16. Two moving blocks 16 are slidably provided on the bidirectional threaded rod 15. Two connecting rods 17 are provided on the top of the two moving blocks 16. Two sliders 18 are provided on the top of the two connecting rods 17. The top of the slider 18 is in contact with the operating table 2.

[0021] The existing pipeline installation and lifting device can usually only lift the pipeline, and the distance between the left and right clamps is fixed, and it cannot be adjusted according to the length of the pipeline that needs to be lifted, which affects the pipeline installation efficiency. Therefore, we provide a pipeline installation and lifting device for water conservancy construction. First, people move the pipeline installation and lifting device to the working position, place the pipeline between the lower clamping plate 4 and the upper clamping plate 401, adjust the first threaded rod 7, and the upper clamping plate 401 rotates and moves downward with the first threaded rod 7 under the action of the guide rod 6 to clamp the pipeline, so that the pipeline can be fixed. When people need to lift the pipeline height, they can start the motor 13, and the output shaft of the motor 13 rotates to drive the bevel gear set 14 to rotate, and the rotation of the bevel gear set 14 drives the bidirectional threaded rod 15 to rotate. Several moving blocks 16 slide inward with the rotation of the bidirectional threaded rod 15, and the bottom of the connecting rod 17 is connected to the moving block 16, and the top of the connecting rod 17 is connected to the slider 18. 17 gather inward, lift the operating table 2, fix the mounting frame 3 on the operating table 2, lift the mounting frame 3, fix the pipeline between the upper clamping plate 401 and the lower clamping plate 4, and lift the pipeline with the mounting frame 3. When the pipeline reaches the required height, stop the motor and install the pipeline. When people need to lift a longer pipeline, the two ends of the pipeline shake greatly. You can adjust the rotating handle 11. The rotating handle 11 is fixedly connected to the gear 10. The rotating handle 11 drives the gear 10 to rotate. The gear 10 is meshed with the upper and lower racks 9. The racks 9 move outward under the action of the slide rail 8, and the mounting frame 3 extends outward with the gear 10. When the distance between the mounting frames 3 on both sides is long enough, stop adjusting the rotating handle 11, place the pipeline between the lower clamping plate 4 and the upper clamping plate 401, adjust the first threaded rod 7, clamp the fixture, and then start the motor 13 to lift the pipeline to the required position. You can lift a longer pipeline, reduce shaking, and facilitate construction.

[0022] Example 2

[0023] On the basis of Example 1, Figure 4 and Figure 5 As shown, the clamp assembly includes a lower clamping plate 4, an upper clamping plate 401, a rubber sheet 5, a guide rod 6, a first threaded rod 7, a fixing block 19 and a second threaded rod 20. The lower part of the mounting frames 3 on both sides is provided with a lower clamping plate 4, and the upper part of the mounting frames 3 on both sides is rotatably provided with a first threaded rod 7, the first threaded rod 7 is used to adjust the upper clamping plate 401, and the bottom of the first threaded rod 7 is provided with an upper clamping plate 401. The lower clamping plate 401 and the upper clamping plate 4 act to clamp the pipe. The upper part of the mounting frames 3 on both sides is slidably provided with a guide rod 6, the guide rod 6 is used to provide guidance for the upper clamping plate 401, and the bottom end of the guide rod 6 is in contact with the upper clamping plate 401. Four second threaded rods 20 are provided at the bottom of the protective shell 1, and the bottom of the four second threaded rods 20 is provided with a fixing block 19. Rubber sheets 5 are provided on the top of the lower clamping plates 4 on both sides, and rubber sheets 5 are provided on the bottom of the upper clamping plates 401 on both sides.

[0024] When people need to prevent the lower clamping plate 4 and the upper clamping plate 401 from damaging the pipeline, the rubber sheet 5 can be used to fix the pipeline. Rubber sheets 5 are provided on the top of the lower clamping plates 4 on both sides to protect the pipeline from being damaged. Rubber sheets 5 are provided on the bottom of the upper clamping plates 401 on both sides to protect the pipeline from being damaged by the clamping plates. When people need to stabilize the pipeline installation and lifting device, the four second threaded rods 20 at the bottom of the protective shell 1 can be adjusted, and the fixing block 19 rotates and moves downward with the second threaded rods 20 until it touches the ground, thereby stabilizing the pipeline installation and lifting device.

[0025] The technical principles of the embodiments of the present utility model are described above in combination with specific embodiments. These descriptions are only for explaining the principles of the embodiments of the present utility model, and cannot be interpreted in any way as limiting the protection scope of the embodiments of the present utility model. Based on the explanations here, technicians in this field can think of other specific implementation methods of the embodiments of the present utility model without creative work, and these methods will fall within the protection scope of the embodiments of the present utility model.

Claims

1. A pipe installation and lifting device for water conservancy construction, characterized in that: The invention comprises a protective shell (1), an operating table (2), a mounting frame (3), a clamp assembly, a slide rail (8), a rack (9), a gear (10), a rotating handle (11), a power assembly and a lifting assembly. The top of the protective shell (1) is provided with an operating table (2), both sides of the upper part of the operating table (2) are provided with mounting frames (3), the mounting frames (3) are U-shaped, and both sides of the mounting frames (3) are provided with clamp assemblies. The rear part of the operating table (2) is provided with a gear (10), and the rear part of the gear (10) is provided with a rotating handle (11). The upper part of the operating table (2) is provided with a slide rail (8), and the bottom of the slide rail (8) is slidably provided with a rack (9), and the gear (10) is meshed with the rack (9). The inside of the protective shell (1) is provided with a power assembly, and the top of the power assembly is rotatably connected with the lifting assembly.

2. A pipe installation and lifting device for water conservancy construction according to claim 1, characterized in that: The clamp assembly comprises a lower clamping plate (4), an upper clamping plate (401), a guide rod (6) and a first threaded rod (7); the lower part of the mounting frames (3) on both sides is provided with the lower clamping plate (4); the upper part of the mounting frames (3) on both sides is provided with the first threaded rod (7) in a rotatable manner; the bottom of the first threaded rod (7) is provided with an upper clamping plate (401); the upper part of the mounting frames (3) on both sides is provided with a guide rod (6) in a slidable manner; the bottom end of the guide rod (6) is in contact with the upper clamping plate (401).

3. A pipe installation and lifting device for water conservancy construction according to claim 2, characterized in that: The power assembly comprises a motor (13) and a bevel gear set (14). The motor (13) is arranged at the bottom of the protective shell (1), and the bevel gear set (14) is rotatably arranged on the output shaft of the motor (13).

4. A pipe installation and lifting device for water conservancy construction according to claim 3, characterized in that: The lifting assembly comprises a telescopic rod (12), a bidirectional threaded rod (15), a moving block (16), a connecting rod (17) and a sliding block (18); a plurality of telescopic rods (12) are arranged at the bottom of an operating table (2); the bottom ends of the plurality of telescopic rods (12) are connected to a protective shell (1); a bidirectional threaded rod (15) is rotatably arranged on the upper part of a bevel gear set (14); a plurality of moving blocks (16) are slidably arranged on the bidirectional threaded rod (15); a connecting rod (17) is arranged at the top of the moving block (16); a sliding block (18) is arranged at the top of the connecting rod (17); and the top of the sliding block (18) contacts the operating table (2).

5. A pipe installation and lifting device for water conservancy construction according to claim 4, characterized in that: It also includes a rubber sheet (5), wherein the tops of the lower clamping plates (4) on both sides are provided with the rubber sheet (5), and the bottoms of the upper clamping plates (401) on both sides are provided with the rubber sheet (5).

6. A pipe installation and lifting device for water conservancy construction according to claim 5, characterized in that: It also includes a fixing block (19) and a second threaded rod (20). A plurality of second threaded rods (20) are provided at the bottom of the protective shell (1), and a fixing block (19) is provided at the bottom of each of the plurality of second threaded rods (20).