Large-flow-state concrete pavement

By applying hardened reinforcement layers on the surface of large flow concrete pavement and designing buffer conduit structures, the problem of damage to the surface strength and drainage components of the pavement is solved, and the service life and drainage capacity are significantly improved, ensuring efficient drainage performance of the pavement.

CN221940997UActive Publication Date: 2024-11-01HUBEI HUATIANYI CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420137723.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-19
Publication Date
2024-11-01
Estimated Expiration
2034-01-19

AI Technical Summary

Technical Problem

The surface strength of the existing large flow concrete pavement is poor after hardening and is easily crushed by the vehicle. The drainage components are easily crushed and damaged after being damaged, resulting in a short service life and a reduced drainage capacity.

Method used

The hardened reinforcement layer is applied to the surface of the first concrete layer of the large flow concrete pavement, and a bent drainage pipe, buffer conduit and filter net cover are installed in the installation hole, combining the permeable layer design of porous concrete and permeable asphalt material to add surface layer Hardness and drainage capacity.

Benefits of technology

It significantly improves the hardness of the surface layer of large flow concrete pavement, extends the service life, and avoids damage to the drainage components through buffer conduits and spring designs, enhancing the drainage capacity of the pavement, especially in rainy weather, maintaining good drainage effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221940997U_ABST
    Figure CN221940997U_ABST
Patent Text Reader

Abstract

The utility model discloses a large-flow-state concrete pavement which comprises a first concrete layer, a hardened reinforcing layer is laid on the upper side of the first concrete layer, and two rows of mounting holes are symmetrically formed in the first concrete layer. The large-flow-state concrete pavement has the beneficial effects that the hardened reinforcing layer is coated on the surface of the first concrete layer, so that the hardness of the surface layer of the large-flow-state concrete pavement is obviously improved, the surface layer is prevented from being easily damaged when the large-flow-state concrete pavement is used, the service life of the large-flow-state concrete pavement is prolonged, and the service life of the large-flow-state concrete pavement is prolonged. Meanwhile, the design of a buffer guide pipe and a spring is matched, so that the drainage assembly can be effectively prevented from being damaged after the surface layer of the large-flow-state concrete pavement is damaged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of high-flow concrete pavement, in particular to a high-flow concrete pavement. Background Art

[0002] High-flow concrete refers to concrete with high flowability. High-flow concrete has good fluidity. The concrete mixture can fill the mold and wrap the steel bars by its own weight without vibration. It has good construction performance and filling performance, which can save time for laying concrete pavement. The aggregate of high-flow concrete does not segregate. After hardening, it has good mechanical properties and durability, which can enhance the support of the pavement.

[0003] A Chinese patent with patent number CN202222225215.6 discloses a high-flow concrete pavement, including a first concrete layer and a first permeable layer arranged in sequence from top to bottom along the pavement, the first concrete layer is composed of high-flow concrete, the first concrete layer is provided with a first drainage component, the first drainage component is arranged through the first concrete layer, and the first drainage component can drain the accumulated water on the upper surface of the high-flow concrete away from the pavement.

[0004] Although the high-flow concrete pavement described in the above patent can improve the drainage capacity of the concrete pavement by laying a seepage layer and a drainage pipe to avoid water accumulation on the high-flow concrete pavement during use, the high-flow concrete pavement with the above structure is directly put into use after laying and hardening. Since the surface strength of the high-flow concrete pavement is still poor without hardening and strengthening treatment, the surface of the high-flow concrete pavement with the above structure is easily crushed by moving vehicles during use, thereby reducing the service life of the high-flow concrete pavement. At the same time, it is also easy for the drainage components to be damaged due to the direct rolling of the vehicles on the surface of the concrete pavement after the surface of the concrete pavement is damaged. Utility Model Content

[0005] The technical problem to be solved by the utility model is to provide a high-flow concrete pavement that can increase the hardness of the surface layer of the high-flow concrete pavement and avoid damage to the drainage components when the concrete pavement surface is damaged, in view of the current status of the prior art.

[0006] The utility model is achieved through the following technical scheme: the utility model proposes a large-flow concrete pavement, including a first concrete layer, a hardened reinforcement layer is laid on the upper side of the first concrete layer, two rows of mounting holes are symmetrically opened on the first concrete layer, a bent drain pipe is fixed in each mounting hole, a ring platform is formed outside the drain pipe at the bottom end of the mounting hole, the upper side of the ring platform is connected to a buffer conduit sleeved on the top of the drain pipe through a spring, a filter mesh cover is fixed on the top of the buffer conduit, a first seepage layer is laid on the lower side of the first concrete layer, a second concrete layer is laid on the lower side of the first seepage layer, a second seepage layer is laid on the lower side of the second concrete layer, seepage pipes are evenly spaced in the first seepage layer and the second seepage layer, and seepage mesh holes are opened on the outer wall of the seepage pipe.

[0007] By adopting the above technical solution, a hardening reinforcement layer is applied on the surface of the first concrete layer, so that the hardness of the surface layer of the high-flow concrete pavement is significantly improved, which avoids the easy damage of the surface layer of the high-flow concrete pavement during use, and improves the service life of the high-flow concrete pavement. At the same time, with the design of the buffer duct and the spring, it can effectively avoid damage to the drainage components of the high-flow concrete pavement after the surface layer is damaged. In addition, by adding seepage pipes in the first seepage layer and the second seepage layer, the drainage capacity of the high-flow concrete pavement during use is enhanced, ensuring the drainage capacity of the high-flow concrete pavement in continuous rainfall weather.

[0008] Furthermore, four sliding blocks are arranged in a ring shape on the outer top of the drainage pipe, and a sliding groove is provided in the buffer conduit at a position cooperating with the sliding blocks.

[0009] By adopting the above technical solution, the slider cooperates with the slide groove to realize stable sliding of the buffer tube relative to the top end of the drain pipe, so as to buffer the top end of the drain pipe when the filter cover is crushed by an external vehicle to avoid damage.

[0010] Furthermore, the hardened reinforcement layer is made of a concrete layer coated with a concrete surface enhancer, and the hardened reinforcement layer is connected to the first concrete layer by pouring.

[0011] By adopting the above technical solution, the hardened reinforcement layer can effectively increase the hardness of the surface layer of the high-flow concrete pavement during use.

[0012] Furthermore, two ends of the spring are respectively plugged into the ring platform and the buffer tube, and a gap is reserved between the outer wall of the buffer tube and the mounting hole.

[0013] By adopting the above technical solution, convenient sliding and resetting of the buffer conduit relative to the mounting hole can be ensured.

[0014] Furthermore, the middle portion of the top end of the filter screen cover is a concave hollow structure, and the filter screen cover is screwed to the buffer conduit.

[0015] By adopting the above technical solution, the filter screen cover can filter the water on the surface of the high-flow concrete pavement and guide the water into the buffer conduit to ensure that the water can be discharged through the drain pipe.

[0016] Furthermore, the water seepage pipe penetrates the first water seepage layer and the second water seepage layer, and the water seepage mesh is formed on the water seepage pipe.

[0017] By adopting the above technical solution, the seepage mesh and the seepage pipe can cooperate to increase the drainage space inside the first seepage layer and the second seepage layer, thereby facilitating the rapid discharge of water inside the first seepage layer and the second seepage layer, and improving the drainage efficiency of the large-flow concrete pavement.

[0018] Furthermore, the first water seepage layer is made of porous concrete material, and the second water seepage layer is made of permeable asphalt material.

[0019] By adopting the above technical solution, the water permeability of the first water permeability layer and the second water permeability layer can be effectively ensured.

[0020] Furthermore, a waterproof cloth is laid on the lower side of the second water-seepage layer to provide waterproof protection for the roadbed.

[0021] By adopting the above technical solution, the roadbed can be effectively waterproofed under the action of the waterproof cloth.

[0022] Compared with the prior art, the utility model has the following beneficial effects:

[0023] The utility model significantly improves the hardness of the surface layer of the high-flow concrete pavement by coating a hardened reinforcement layer on the surface of the first concrete layer, thereby avoiding easy damage to the surface layer of the high-flow concrete pavement during use, thereby increasing the service life of the high-flow concrete pavement. At the same time, the design of the buffer duct and the spring can effectively avoid damage to the drainage component after the surface layer of the high-flow concrete pavement is damaged. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a structural schematic diagram of a high-flow concrete pavement described in the utility model;

[0025] Figure 2It is a right sectional view of a high-flow concrete pavement described in the utility model;

[0026] Figure 3 It is a kind of large flow concrete pavement described in the utility model. Figure 2 The enlarged view of point A in the middle;

[0027] Figure 4 It is a top sectional view of a buffer conduit and a drainage pipe in a large-flow concrete pavement described in the utility model;

[0028] Figure 5 It is a structural schematic diagram of a water seepage pipe in a large-flow concrete pavement described in the utility model.

[0029] The following are the descriptions of the reference numerals:

[0030] 1. Filter cover; 2. Hardened reinforcement layer; 3. First concrete layer; 4. First seepage layer; 5. Second concrete layer; 6. Second seepage layer; 7. Drain pipe; 8. Seepage pipe; 9. Slider; 10. Spring; 11. Seepage mesh; 12. Buffer duct; 13. Slide; 14. Mounting hole; 15. Ring platform; 16. Waterproof cloth. DETAILED DESCRIPTION

[0031] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0032] like Figure 1-Figure 3As shown, a large-flow concrete pavement in this embodiment includes a first concrete layer 3, a hardened reinforcement layer 2 is laid on the upper side of the first concrete layer 3, two rows of mounting holes 14 are symmetrically opened on the first concrete layer 3, a bent drain pipe 7 is fixed in each mounting hole 14, and a ring platform 15 is formed at the bottom end of the mounting hole 14 outside the drain pipe 7, and the upper side of the ring platform 15 is connected to the buffer conduit 12 sleeved on the top of the drain pipe 7 through a spring 10, and the two ends of the spring 10 are respectively plugged with the ring platform 15 and the buffer conduit 12, and a gap is reserved between the outer wall of the buffer conduit 12 and the mounting hole 14, which can ensure the convenient sliding and resetting of the buffer conduit 12 relative to the mounting hole 14, and a filter screen cover 1 is fixed on the top of the buffer conduit 12, a first seepage layer 4 is laid on the lower side of the first concrete layer 3, and a second concrete layer 5 is laid on the lower side of the first seepage layer 4. A second water seepage layer 6 is laid on the lower side of the second concrete layer 5, and water seepage pipes 8 are arranged at equal intervals in the first water seepage layer 4 and the second water seepage layer 6. Water seepage mesh holes 11 are opened on the outer walls of the water seepage pipes 8. By applying a layer of hardening reinforcement layer 2 on the surface of the first concrete layer 3, the hardness of the surface layer of the high-flow concrete pavement is significantly improved, which avoids the easy damage of the surface layer of the high-flow concrete pavement during use, and improves the service life of the high-flow concrete pavement. At the same time, with the design of the buffer duct 12 and the spring 10, the damage to the drainage components of the high-flow concrete pavement after the surface layer is damaged can be effectively avoided. In addition, by adding water seepage pipes 8 in the first water seepage layer 4 and the second water seepage layer 6, the drainage capacity of the high-flow concrete pavement during use is enhanced, ensuring the drainage capacity of the high-flow concrete pavement under continuous rainfall weather.

[0033] like Figure 2 , Figure 4 and Figure 5 As shown, in this embodiment, four sliders 9 are arranged in a ring shape on the outer top of the drain pipe 7, and a slide groove 13 is provided in the buffer conduit 12 at the position cooperating with the slider 9. The slider 9 cooperates with the slide groove 13 to realize the stable sliding of the buffer conduit 12 relative to the top of the drain pipe 7, so as to buffer the top of the drain pipe 7 when the filter cover 1 is crushed by an external vehicle to avoid damage. The hardened reinforcement layer 2 is made of a concrete layer coated with a concrete surface enhancer. The hardened reinforcement layer 2 is cast and connected to the first concrete layer 3. The hardened reinforcement layer 2 can effectively increase the hardness of the surface layer of the large-flow concrete pavement during use. The middle part of the top of the filter cover 1 is an inwardly concave hollow structure. The filter cover 1 is screwed to the buffer conduit 12. The filter cover 1 can filter the water on the surface of the large-flow concrete pavement and introduce the water into the buffer conduit 12 to ensure that the water can be discharged through the drain pipe 7.

[0034] like Figure 1-Figure 5As shown, in this embodiment, the seepage pipe 8 passes through the first seepage layer 4 and the second seepage layer 6, and the seepage mesh 11 is formed on the seepage pipe 8. The seepage mesh 11 cooperates with the seepage pipe 8 to increase the drainage space inside the first seepage layer 4 and the second seepage layer 6, thereby facilitating the rapid discharge of water inside the first seepage layer 4 and the second seepage layer 6, and improving the drainage efficiency of the large-flow concrete pavement. The first seepage layer 4 is made of porous concrete material, and the second seepage layer 6 is made of permeable asphalt material, which can effectively ensure the water seepage performance of the first seepage layer 4 and the second seepage layer 6. A waterproof cloth 16 for waterproofing the roadbed is also laid on the lower side of the second seepage layer 6, and the roadbed can be effectively waterproofed under the action of the waterproof cloth 16.

[0035] The specific implementation process of this embodiment is as follows: When in use, just follow the steps below to Figure 1 After being paved in the manner shown, the high-flow concrete pavement can be put into use. During use, a hardening reinforcement layer 2 is applied on the surface of the first concrete layer 3, so that the hardness of the surface layer of the high-flow concrete pavement is significantly improved, thereby avoiding easy damage to the surface layer of the high-flow concrete pavement during use, thereby improving the service life of the high-flow concrete pavement. At the same time, the design of the buffer duct 12 and the spring 10 can effectively avoid damage to the drainage components of the high-flow concrete pavement after the surface layer is damaged. In addition, by adding seepage pipes 8 in the first seepage layer 4 and the second seepage layer 6, the drainage capacity of the high-flow concrete pavement during use is enhanced, thereby ensuring the drainage capacity of the high-flow concrete pavement under continuous rainfall weather.

[0036] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A large flow concrete pavement, Features: The invention comprises a first concrete layer (3), a hardened reinforcement layer (2) is laid on the upper side of the first concrete layer (3), two rows of mounting holes (14) are symmetrically opened on the first concrete layer (3), a bent drainage pipe (7) is fixed in each mounting hole (14), a ring platform (15) is formed outside the drainage pipe (7) at the bottom end of the mounting hole (14), the upper side of the ring platform (15) is connected to a buffer conduit (12) sleeved on the top end of the drainage pipe (7) through a spring (10), a filter screen cover (1) is fixed on the top end of the buffer conduit (12), a first seepage layer (4) is laid on the lower side of the first concrete layer (3), a second concrete layer (5) is laid on the lower side of the first seepage layer (4), a second seepage layer (6) is laid on the lower side of the second concrete layer (5), seepage pipes (8) are evenly spaced in the first seepage layer (4) and the second seepage layer (6), and seepage mesh holes (11) are opened on the outer wall of the seepage pipe (8).

2. A high-flow concrete pavement according to claim 1, Features: Four sliding blocks (9) are arranged in a ring shape on the outer top end of the drainage pipe (7), and a sliding groove (13) is provided in the buffer conduit (12) at a position cooperating with the sliding blocks (9).

3. A high-flow concrete pavement according to claim 1, Features: The hardened reinforcement layer (2) is made of a concrete layer coated with a concrete surface enhancer, and the hardened reinforcement layer (2) is connected to the first concrete layer (3) by pouring.

4. A high-flow concrete pavement according to claim 1, Features: Both ends of the spring (10) are plugged into the annular platform (15) and the buffer conduit (12) respectively, and a gap is reserved between the outer wall of the buffer conduit (12) and the mounting hole (14).

5. The high-flow concrete pavement according to claim 1, Features: The middle portion of the top end of the filter screen cover (1) is an inwardly concave hollow structure, and the filter screen cover (1) is screwed to the buffer conduit (12).

6. A high-flow concrete pavement according to claim 1, Features: The water seepage pipe (8) penetrates the first water seepage layer (4) and the second water seepage layer (6), and the water seepage mesh (11) is formed on the water seepage pipe (8).

7. The high-flow concrete pavement according to claim 1, Features: The first water seepage layer (4) is made of porous concrete material, and the second water seepage layer (6) is made of permeable asphalt material.

8. The high-flow concrete pavement according to claim 1, Features: A waterproof cloth (16) is also laid on the lower side of the second water-permeable layer (6) to provide waterproof protection for the roadbed.