Standard component full hanging bracket pre-assembled at low altitude and quickly mounted at high altitude
By pre-assembling a high-altitude and quickly installing standard components, the problems of high safety risks, low labor efficiency and high cost of traditional full-house hangers are solved, and a safer, more efficient and more economical bridge maintenance and reinforcement project is achieved.
Patent Information
- Application Number
- CN202420169025.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-24
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-24
AI Technical Summary
Traditional full-house hanging frames have high safety risks, low labor efficiency, environmental protection and high cost in bridge maintenance and reinforcement projects, especially in high altitude installations, bamboo springboards and high labor costs.
The standard components of the hanger are equipped with a high altitude fast installation standard, including standard hanger stents, lifting devices, displacement devices and fixing devices. By pre-assembling the hanger on the ground or water surface, then hoisting and translation to the high altitude installation position, using Devices such as wire ropes, pulleys, hoists, pulley calipers and wire rope clamps realize the fixing and movement of the hanging frame, reducing the risk of high-altitude operations.
It greatly reduces safety risks, improves operating efficiency and standardized operations, reduces comprehensive costs, realizes the versatility and economicality of the hanging frame, and reduces the risks and costs of high-altitude operations.
Smart Images

Figure CN221941149U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of bridge maintenance and reinforcement engineering, and more specifically, to a standard component full-bridge hanger that is pre-assembled at low altitude and quickly installed at high altitude. Background Art
[0002] Full-bridge hangers are often used in bridge maintenance and reinforcement projects, especially in projects with full-bridge painting and tight construction schedules. Traditional full-bridge hangers are often erected at high altitudes, which have great safety risks, extremely low work efficiency, and high overall costs. In addition, bamboo springboards or wooden boards with low turnover times + scaffolding steel pipes + large steel are commonly used as the main body of the hanging basket in China. They are not environmentally friendly, flammable, heavy, and inconvenient to install. Especially in foreign projects without bamboo springboards and high labor costs, the cost of adopting this solution is higher. In the current context of engineering construction, a new full-bridge hanger solution that is more environmentally friendly, safer, more standardized, and more economical is urgently needed. Utility Model Content
[0003] The purpose of the utility model is to provide a standard component full-hall hanger that can be pre-assembled at low altitude and quickly installed at high altitude. Compared with the traditional full-hall hanger installation technology that is directly installed at high altitude, it has more advantages in reducing safety risks, improving work efficiency, standardizing operations, terrain versatility, and economy.
[0004] The technical solution adopted by the utility model to solve this technical problem is: a standard component full-hall hanger that is pre-assembled at low altitude and quickly installed at high altitude, including a plurality of hanger standard frames, a lifting device, a shifting device and a fixing device;
[0005] The shifting device is installed on the bridge, and the lifting device is movably arranged on the shifting device. The lifting device is used to lift the standard frame of the hanger, and the standard frame of the hanger is fixed to the bridge through the fixing device.
[0006] As a further solution of the utility model, at least one lifting device is provided on each side of the bridge;
[0007] The lifting device comprises a first steel wire rope, a pulley and a winch; one end of the first steel wire rope is connected to the winch, and the other end passes through the pulley to turn and connect to the standard frame of the hanger to be lifted, and the pulley is connected to the shifting device.
[0008] As a further solution of the utility model, the standard frame of the hanger includes: a crossbeam, a panel and an edge guardrail; the panel is fixed above the crossbeam, and the side of the panel is provided with an edge guardrail, and the length of the crossbeam is greater than the width of the bridge.
[0009] As a further solution of the utility model, the standard frame of the hanger also includes a floating device, which is installed on the beam or the panel.
[0010] As a further solution of the utility model, the displacement device includes a pulley caliper and a wire rope clamp; the caliper is clamped on the bridge, and the wheels inside it can move on the bridge, and the wire rope clamp is used to fix the first wire rope. If the contact surface of the caliper is uneven, it is preferred that the displacement device also includes a track, and the caliper moves through the track.
[0011] As a further solution of the utility model, the fixing device comprises an upper anchor point, a second steel wire rope and a lower anchor point; the upper anchor point is fixed on the bridge beam, the lower anchor point is fixed on the standard frame of the hanger, and the upper anchor point and the lower anchor point are connected by the second steel wire rope.
[0012] As a further solution of the utility model, part of the second steel wire rope is connected to the upper and lower anchor points in a vertical state, and part of the second steel wire rope is connected to the upper and lower anchor points in an eight-shaped state.
[0013] The utility model at least has the following beneficial effects:
[0014] 1) Through the concept of breaking the whole into parts, the full-floor hangers are decomposed into multiple standard hangers, and each hanger is hoisted into place, which greatly improves work efficiency, shortens construction period, and ultimately reduces comprehensive costs by more than 50%.
[0015] 2) By pre-assembling the hanger on the ground or water surface, and then hoisting and moving it to the high-altitude installation position, high-altitude operations can be simplified to low-altitude operations, eliminating the risks of high-altitude operations from the root and greatly reducing the difficulty of safety management.
[0016] 3) By adopting fire-resistant and environmentally friendly standard components, the danger sources of high-altitude operations are reduced; by adopting standard components, it is more conducive to the standardized operation of the full-hall hanger. The mode of horizontal movement after lifting is adopted, so that the installation of the hanger is not limited by the terrain, making it more versatile.
[0017] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is the elevation view of the full-hall hanger of the utility model;
[0019] Figure 2 It is a cross-sectional view of the full-hall hanger of the utility model;
[0020] Figures 3-4 are the elevation and cross-sectional views of Step 1 in Example 1;
[0021] Figures 5-6 It is the elevation view and cross-sectional view of Step 2 in Example 1;
[0022] Figures 7-8It is the elevation view and cross-sectional view of Step 3 in Example 1.
[0023] In the figure: 1—standard frame of the hanger, 1-1—crossbeam, 1-2—panel, 1-3—edge guardrail, 1-4—floating device, 2—hoisting device, 2-1—first steel wire rope, 2-2—pulley, 2-3—winch, 3—shifting device, 3-1—pulley F-shaped clamp, 3-2—track, 3-3—wire rope clamp, 4—fixing device, 4-1—upper anchor point, 4-2—second steel wire rope, 4-3—lower anchor point. DETAILED DESCRIPTION
[0024] The utility model is described in detail and completely below in conjunction with the accompanying drawings. A person of ordinary skill in the art will be able to implement the utility model based on these descriptions. Before describing the utility model in conjunction with the accompanying drawings, it should be particularly pointed out that the technical solutions and technical features provided in each part of the utility model, including the following description, can be combined with each other without conflict.
[0025] In addition, the embodiments of the present invention involved in the following description are generally only a part of the embodiments of the present invention, rather than all of the embodiments. Therefore, based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0026] The following is a further detailed description of the utility model in conjunction with the accompanying drawings and implementations, and its specific implementation process is as follows:
[0027] like Figure 1 As shown, the utility model provides a standard component full-hall hanger that is pre-assembled at low altitude and quickly installed at high altitude, including a plurality of hanger standard frames, a lifting device, a shifting device and a fixing device;
[0028] The displacement device is installed on the bridge. In this embodiment, it is installed on the bridge guardrail. The lifting device is movably arranged on the displacement device. The lifting device is used to lift the standard frame of the hanger. The standard frame of the hanger is fixed to the bridge through a fixing device.
[0029] In this embodiment, a standard component full-height hanger that can be pre-assembled at low altitude and quickly installed at high altitude is developed. By pre-assembling the hanger on the ground or water surface, and then hoisting and translating it to the high-altitude installation position, high-altitude work is simplified to low-altitude work, which greatly reduces the safety risks of workers and improves work efficiency. By adopting fire-resistant and environmentally friendly standard components and construction methods suitable for various terrains, a standardized construction process for full-height hangers is formed.
[0030] The technical solution may also include the following technical details to better achieve the technical effect: at least one lifting device is provided on each side of the bridge;
[0031] The lifting device comprises a first steel wire rope, a pulley and a winch; one end of the first steel wire rope is connected to the winch, and the other end passes through the pulley to turn and connect to the standard frame of the hanger to be lifted, and the pulley is connected to the shifting device.
[0032] In this embodiment, 2-3 lifting devices can be set according to the bending resistance of the truss. In this embodiment, lifting devices are set on both sides of the bridge + near the center line of the bridge. The lifting device located near the center of the bridge can be drilled through the bridge deck and the first steel wire rope can be passed down. One end of the first steel wire rope is fixed to the standard frame of the hanger and bypasses the pulley, and the other end is fixed to the winch; the pulley is fixed to the shifting device and can move with the shifting device; the winch is fixed to the ground or the bridge pier to control the up and down of the standard frame of the hanger.
[0033] This technical solution may also include the following technical details to better achieve the technical effect: the standard frame of the hanger includes: a beam, a panel and an edge guardrail; the panel is fixed above the beam, and an edge guardrail is arranged on the side of the panel, and the length of the beam is greater than the width of the bridge.
[0034] In this embodiment, the crossbeams are made of finished standard parts and are connected by bolts to form a truss with a length greater than the width of the bridge. The panels are made of standard steel springboards and are fixed to the crossbeams by mushroom nail anchors to directly bear the crowd load. The guardrails are also made of finished standard parts and are fixed to both sides of the steel springboard platform by bolts.
[0035] The technical solution may also include the following technical details to better achieve the technical effect: the standard hanger also includes a floating device, which is installed on the beam or panel. In this embodiment, the floating device is fixed inside the beam or under the panel. The floating device is configured according to whether it is installed on water. The floating cloud device can be an air bag or flame retardant foam.
[0036] The present technical solution may also include the following technical details to better achieve the technical effect: the shifting device includes a pulley F-type caliper, a track, and a wire rope clamp; the F-type caliper is clamped on the bridge guardrail, and the wheels inside it can move on the bridge guardrail, and the wire rope clamp is used to fix the first wire rope. Depending on whether the contact surface between the bridge guardrail and the F-type caliper is flat, it is decided whether to set the track, and the track is made of angle steel. When a single-frame hanger is hoisted to the installation height, the lifting winch can be released after the standard frame height of the hanger is locked by the wire rope clamp. Then the shifting device is manually controlled to move the standard frame of the hanger longitudinally to the installation position.
[0037] The present technical solution may also include the following technical details to better achieve the technical effect: the fixing device comprises an upper anchor point, a second steel wire rope and a lower anchor point; the upper anchor point is fixed on the bridge beam, the lower anchor point is fixed on the standard frame of the hanger, and the upper anchor point and the lower anchor point are connected by a second steel wire rope.
[0038] In this embodiment, the upper anchor point is a rebar or expansion bolt, which is implanted into the bottom of the beam. The lower anchor point is a bolt or a ring buckle, which is fixed on the standard frame of the hanger and connected in the middle by a second steel wire rope. The installation position of the upper anchor point is determined according to the standard frame of the hanger.
[0039] The technical solution may also include the following technical details to better achieve the technical effect: part of the second steel wire rope is connected to the upper and lower anchor points in a vertical state, and part of the second steel wire rope is connected to the upper and lower anchor points in an eight-shaped state. The steel wire rope is divided into two modes: vertical and eight-shaped. The eight-shaped steel wire rope provides vertical force while preventing the hanger from shaking horizontally.
[0040] Assemble a single standard hanger on the ground or water near the bridge pier; install a shifting device on the bridge guardrail, with a wire rope steering pulley installed below it; the winch fixed on the bridge pier cap hoists the single standard hanger to the bottom of the bridge beam by passing the wire rope around the steering pulley; then lock the wire rope, use the shifting device on the guardrail to shift the single hanger to the installation position, and finally lock the single hanger with a fixing device. Repeat the above steps in sequence, install other standard hanger frames, and connect adjacent hanger frames with bolts to form an integral full-height hanger.
[0041] Example 1
[0042] Take a demonstration project of concrete coating for a bridge group as an example. There are 58 bridges and more than 80 spans. The single span of the bridge is 25 to 32.7 meters long and 12 meters wide. There are New Jersey guardrails on both sides of the bridge deck. The clearance under the bridge is 10 to 31 meters. There are mostly houses, rivers or roads under the bridge. The bridge operation is mainly concrete exterior coating. In order to improve work efficiency, a full-height hanger is required as a construction platform.
[0043] The standard component full-floor hangers used in this project for low-altitude pre-assembly and high-altitude rapid installation are as follows:
[0044] (1) Standard hanger
[0045] It includes the use of beams, panels, guardrails and floating devices. The bridge width of this project is 12m, and the panel uses a standard steel springboard with a width of 25cm and a length of 4m, weighing a total of 432kg. The aluminum alloy truss uses finished standard parts, and the 40×40cm standard aluminum alloy truss is selected, which has a capacity of 15m span and a load of 500kg, which meets the requirements. The 4m span of the steel springboard allows a load of 200kg to meet the requirements. The standard guardrail is 1.0m high and is fixed on both sides of the fully paved steel springboard platform by bolts. When the bridge is completely under water, flame-retardant foam is set inside the aluminum alloy truss, which is first assembled on the shore, moved to the water, and then transported to the bridge for later hoisting.
[0046] (2) Lifting device
[0047] It includes the first steel wire rope, pulley and winch. The winch is fixed on the pedestal near the bridge pier. The first steel wire rope on it passes through the pulley of the shifting device and is connected to both sides of the standard hanger. The up and down of the standard hanger is controlled by the winch. In this project, the weight of a single hanger piece is 650kg, and a 2t winch + φ12mm steel wire rope + 2t pulley is selected.
[0048] (3) Shifting device
[0049] It includes a pulley F-type caliper, a track, and a wire rope clamp. The F-type caliper is clamped on the guardrail, and there are 2 rows × 3 = 6 wheels with a load-bearing capacity of 1t arranged inside, which are clamped on the New Jersey guardrail. Because the contact surface between the New Jersey guardrail and the F-type caliper is flat, no track is set in this project; for the grid-shaped guardrail, angle steel is required as a track so that the pulley F-type caliper can move longitudinally along the bridge. When the single-frame hanger is hoisted to the installation height, the first wire rope is locked with a wire rope clamp, and then the lifting winch is released. The shifting device is manually pushed to move the standard frame longitudinally to the installation position, with a pushing force of 40kg = single-side weight 400kg × rolling friction coefficient 0.1.
[0050] (4) Fixing device
[0051] It includes an upper anchor point, a second steel wire rope and a lower anchor point. The upper anchor point is a rebar or expansion bolt, which is implanted at the bottom of the beam. The lower anchor point is a bolt or a ring buckle, which is fixed on the standard frame of the hanger and connected by a steel wire rope in the middle. The installation position of the upper anchor point is determined according to the standard frame of the hanger. In this project, a combination of expansion bolts + rebar glue is used. The second steel wire rope is divided into two modes: vertical and figure eight. The figure eight steel wire rope provides vertical force while preventing the hanger from shaking horizontally.
[0052] (5) Installation method
[0053] like Figures 3-4As shown in the figure, Step 1. In this project, there are mostly houses, rivers or roads under the bridge. A single standard hanger is pre-assembled on the roof, water surface and road side near the bridge pier. A shifting device is installed on the bridge guardrail, and a wire rope steering pulley is installed below it. The hoisting winch is fixed on the bridge pier cap, and the first wire rope on it goes around the steering pulley to lift the single standard hanger to the designed height position of the bridge beam bottom; as shown in the figure, Figures 5-6 As shown, Step 2. Then use the rope clamp to lock the first wire rope, loosen the winch, use the horizontal shift device on the guardrail to shift the single-piece hanger to the installation position, and finally lock the single-piece hanger with the fixing device.
[0054] Repeat the above steps in sequence, such as Figures 7-8 As shown, Step 3. Install other standard hanger frames and connect adjacent hanger frames with bolts to finally form an integral full-hall hanger.
[0055] Although the implementation scheme of the utility model has been disclosed as above, it is not limited to the applications listed in the specification and implementation scheme. It can be fully applied to various fields suitable for the utility model. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the utility model is not limited to the specific details and the embodiments shown and described herein.
Claims
1. A standard component full-hall hanger that is pre-assembled at low altitude and quickly installed at high altitude, characterized in that: It includes several standard hanger frames, lifting devices, shifting devices and fixing devices; The shifting device is installed on the bridge, and the lifting device is movably arranged on the shifting device, and the lifting device is used to lift the standard frame of the hanger, and the standard frame of the hanger is fixed to the bridge through the fixing device; The standard frame of the hanger includes: a crossbeam, a panel and an edge guardrail; the panel is fixed on the top of the crossbeam, and the side of the panel is provided with an edge guardrail, and the length of the crossbeam is greater than the width of the bridge; The hanger standard frame also includes a floating device, which is installed on the beam or panel.
2. The low-altitude pre-assembled high-altitude rapid installation standard component full-hall hanger as claimed in claim 1 is characterized in that: At least one lifting device is provided on each side of the bridge; The lifting device comprises a first steel wire rope, a pulley and a winch; one end of the first steel wire rope is connected to the winch, and the other end passes through the pulley to turn and connect to the standard frame of the hanger to be lifted, and the pulley is connected to the shifting device.
3. The low-altitude pre-assembled high-altitude rapid installation standard component full-hall hanger as claimed in claim 2 is characterized in that: The displacement device comprises a pulley caliper and a wire rope clamp; the caliper is clamped on the bridge, and the wheels inside the caliper can move on the bridge, and the wire rope clamp is used to fix the first wire rope.
4. The standard component full-hall hanger for low-altitude pre-assembly and high-altitude rapid installation as claimed in claim 1 is characterized in that: The fixing device comprises an upper anchor point, a second steel wire rope and a lower anchor point; the upper anchor point is fixed on the bridge beam, the lower anchor point is fixed on the standard frame of the hanger, and the upper anchor point and the lower anchor point are connected by the second steel wire rope.
5. The standard component full-hall hanger for low-altitude pre-assembly and high-altitude rapid installation as claimed in claim 4 is characterized in that: Part of the second steel wire rope is connected to the upper and lower anchor points in a vertical state, and part of the second steel wire rope is connected to the upper and lower anchor points in an eight-shaped state.
6. The standard component full-hall hanger for low-altitude pre-assembly and high-altitude rapid installation as claimed in claim 3 is characterized in that: The displacement device further comprises a track, and the caliper moves via the track.
