Protective device for foundation pit operation
By designing the foundation pit protection device of the automatic swing cover plate and traction device, the problem of workers being injured due to the slipping of stone during foundation pit operations is solved, and the automatic closure effect is achieved, ensuring the safety of workers and the device can be reused.
Patent Information
- Application Number
- CN202323347987.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-08
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2033-12-08
AI Technical Summary
During the excavation of foundation pits, stones and tools outside the pits are prone to slide off, causing injuries to workers in the pits. The existing technology lacks automatic sealing protective devices to prevent such accidents.
A protective device including a base and a cover plate is designed. The cover plate can swing freely and is equipped with a traction device. The cover plate is automatically covered when the stone slides down. On the other hand, the base pit opening is closed through the coordination of the clip and the clamp.
When the stone slides down, the cover plate can be automatically covered, effectively preventing the stone from entering the foundation pit, protecting workers' safety, and the device can be reused.
Smart Images

Figure CN221942012U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of foundation pit protection, in particular to a protection device for foundation pit operations. Background Art
[0002] The foundation pit is a soil pit excavated at the foundation design location according to the base elevation and foundation plane dimensions. During the foundation pit excavation, there is a possibility that falling objects such as stones and tools outside the pit will slide into the pit and injure the construction workers in the pit. Now a protective device that can automatically seal the foundation pit opening when stones fall is needed. Utility Model Content
[0003] The purpose of the utility model is to solve the above technical problems and to provide a protective device for foundation pit operations.
[0004] The technical solution of the utility model: a protective device for foundation pit operations, comprising a base and a cover plate, the cover plate can swing freely on the base, and also includes a traction device, which includes a first pull rope, an I-shaped clamp, a clamping seat, a second pull rope, two clamps with inclined sides and a plurality of elastic members, the first pull rope connects the cover plate and the clamp, the clamping seat is provided with a through groove and a cavity, the clamp can be slidably arranged on the clamping seat, a plurality of elastic members are provided between the clamp and the inner wall of the cavity, one end of the elastic member is connected to the clamping seat, and the second pull rope is connected to the clamping seat.
[0005] Preferably, the clamping member consists of a T-shaped rod and a chuck, and the T-shaped rod is detachably connected to the chuck.
[0006] Preferably, the T-shaped rod is threadably connected to the chuck.
[0007] Preferably, a closed arc-shaped baffle is provided on one side of the cover plate.
[0008] Preferably, reinforcing ribs are provided on the inner wall of the arc-shaped baffle.
[0009] Preferably, two avoidance grooves are provided on the base, two rotating plates are provided at the bottom of the cover plate, protrusions are provided on both sides of the rotating plates, and the protrusions are rotatably connected to the wall of the avoidance groove.
[0010] Preferably, a groove is provided in the middle of one side of the cover plate, and a plurality of air holes are provided on the edge wall.
[0011] The beneficial effect of the utility model is that in the utility model, when the stone material slides down, the cover plate can be automatically covered and can be reused. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a front view of the overall structure of the preferred embodiment of the utility model;
[0013] Figure 2 This is a schematic diagram of the connection between the base and the cover in the preferred embodiment of the utility model;
[0014] Figure 3 This is a schematic diagram of a card in a preferred embodiment of the utility model;
[0015] Figure 4 It is a top view of the traction device in the preferred embodiment of the utility model;
[0016] Figure 5 It is a partial structural sectional view of the traction device in the preferred embodiment of the utility model.
[0017] Figure numerals: base 10, cover plate 2, arc baffle 201, rotating plate 202, groove 203, air hole 204, first pull rope 3, clamping member 4, T-shaped rod 401, chuck 402, clamping seat 5, through groove 501, cavity 502, second pull rope 6, clamping plate 7, elastic member 8. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] Reference Figures 1 to 5 A protective device for foundation pit operations includes a base 10 and a cover plate 2, the cover plate 2 can swing freely on the base 10, and also includes a traction device, which includes a first pull rope 3, an I-shaped clamp 4, a clamp seat 5, a second pull rope 6, two clamps 7 with inclined surfaces on one side and a plurality of elastic members 8. The first pull rope 3 connects the cover plate 2 and the clamp 4, the clamp seat 5 is provided with a through groove 501 and a cavity 502, the clamp plate 7 is slidably arranged on the clamp seat 5, and a plurality of elastic members 8 are arranged between the clamp plate 7 and the inner wall of the cavity 502, one end of the elastic member 7 is connected to the clamp seat 5, and the second pull rope 6 is connected to the clamp seat 5. In the utility model, the base 10 is fixed on the foundation pit, the clamping member 4 is placed in the through groove 501, and the other end of the second pull rope 6 is fixed on an external object. When in use, the original position of the cover plate 2 is vertical. When the stone on the steep terrain slides down, the cover plate 2 is impacted by the stone and pulls the first pull rope 3. The first pull rope 3 pulls the clamping member 4 and applies force to the two splints 7 and squeezes the elastic member 8. The distance between the two splints 7 becomes larger, and the clamping member 4 is disengaged from the through groove 501. The cover plate 2 rotates on the base 10 to cover the foundation pit opening to prevent stones from falling into the foundation pit and injuring people. At the same time, the traction device can be used repeatedly.
[0020] As a preferred embodiment of the utility model, it may also have the following additional technical features:
[0021] In this embodiment, the clamping member 4 is composed of a T-shaped rod 401 and a chuck 402. The T-shaped rod 401 and the chuck 402 are detachably connected. The chuck 402 can be removed, the T-shaped rod 401 is inserted into the through groove 501, and then the chuck 402 is installed, so that the clamping member 4 can be conveniently placed in the through groove 501.
[0022] In this embodiment, the T-shaped rod 401 is threadedly connected to the chuck 402 , and the chuck 402 can be installed on or removed from the T-shaped rod 401 by rotating the chuck 402 .
[0023] In this embodiment, a closed arc-shaped baffle 201 is provided on one side of the cover plate 2. When the cover plate 2 covers the foundation pit opening, the stones will slide off the arc-shaped baffle 201 to avoid being accumulated on the cover plate 2.
[0024] In this embodiment, reinforcing ribs are provided on the inner wall of the arc-shaped baffle plate 201 to improve the pit impact capability of the arc-shaped baffle plate 201 .
[0025] In this embodiment, two avoidance grooves 101 are provided on the base 10, and two rotating plates 202 are provided at the bottom of the cover plate 2. Both sides of the rotating plate 202 are provided with protrusions, which are rotatably connected to the wall of the avoidance groove 101. The rotating plate 202 rotates in the avoidance groove 101, so that the cover plate 2 can rotate on the base 10.
[0026] In this embodiment, a groove 203 is provided in the middle of one side of the cover plate 2, and a plurality of air holes 204 are provided on the edge wall. When the cover plate 2 is covered, air flows from the air holes 204 through the groove 203 into the foundation pit.
[0027] It should be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A protective device for foundation pit operations, comprising a base (10) and a cover plate (2), wherein the cover plate (2) can swing freely on the base (10), characterized in that: It also includes a traction device, which includes a first pull rope (3), an I-shaped clamp (4), a clamping seat (5), a second pull rope (6), two clamps (7) with inclined surfaces on one side, and a plurality of elastic members (8), wherein the first pull rope (3) connects the cover plate (2) and the clamp (4), the clamping seat (5) is provided with a through groove (501) and a cavity (502), the clamp (7) is slidably arranged on the clamping seat (5), a plurality of elastic members (8) are arranged between the clamp (7) and the inner wall of the cavity (502), one end of the elastic member (8) is connected to the clamping seat (5), and the second pull rope (6) is connected to the clamping seat (5).
2. A protective device for foundation pit operations according to claim 1, characterized in that: The clamping member (4) is composed of a T-shaped rod (401) and a clamping disc (402), and the T-shaped rod (401) and the clamping disc (402) are detachably connected.
3. A protective device for foundation pit operations according to claim 2, characterized in that: The T-shaped rod (401) is threadedly connected to the chuck (402).
4. A protective device for foundation pit operations according to claim 1, characterized in that: A closed arc-shaped baffle (201) is provided on one side of the cover plate (2).
5. A protective device for foundation pit operations according to claim 4, characterized in that: The inner wall of the arc-shaped baffle (201) is provided with reinforcing ribs.
6. A protective device for foundation pit operations according to claim 1, characterized in that: The base (10) is provided with two avoidance grooves (101), the bottom of the cover plate (2) is provided with two rotating plates (202), both sides of the rotating plates (202) are provided with protrusions, and the protrusions are rotatably connected to the wall of the avoidance groove (101).
7. A protective device for foundation pit operations according to claim 1, characterized in that: A groove (203) is provided in the middle of one side of the cover plate (2), and a plurality of air holes (204) are provided on the edge wall.