Isolation pillar recovery and surface collapse pit treatment structure
By designing the isolation ore column recycling and surface collapse pit treatment structure, the waste stone-tail sand cementing filling body is formed by using high-concentration full-tail sand cementing slurry, the isolation ore column recycling and surface collapse pit treatment in mines is solved by the collapse method to fill method. The problem of this problem has achieved efficient ore recycling and environmental governance, ensuring mining safety and resource recycling.
Patent Information
- Application Number
- CN202420685857.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-04-03
AI Technical Summary
The mines from the collapse method to the filling method lack safe and efficient isolation column recycling technology, resulting in waste of ore resources and environmental pollution of surface collapse pits, threatening the safety of underground mining.
A structure for recycling of isolated ore columns and surface collapse pits was designed, including artificial bottom columns, isolated ore columns and artificial top columns. The waste stone-tail sand cementing slurry is used to form a waste stone-tail sand cementing filling body to create safe conditions And large-scale recycling is carried out, and collapse pits are controlled through soil covering greening.
It has achieved efficient recycling of isolated ore columns and the management of surface collapse pits, improved mine safety and resource recovery rate, improved surface environment, and ensured mining safety.
Smart Images

Figure CN221942431U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of underground metal ore deposit mining and management, in particular to a structure for recovering isolated ore pillars and managing surface subsidence pits. Background Art
[0002] The caving mining method once made an important contribution to the exploitation of underground mineral resources in my country, but due to its defects such as causing surface collapse and serious ore loss and depletion, it has gradually been replaced by the backfill mining method. In order to ensure the safety of the lower backfill mining method, mines that convert the caving method to the backfill method must leave a horizontal isolation pillar of a certain thickness (about 20 to 30 meters) between the bottom of the collapse pit and the backfill mining area.
[0003] Due to the lack of safe and efficient technical approaches, existing mines that have switched from caving to backfilling either do not recycle the isolation pillars or only carry out small-scale recycling. When recycling the isolation pillars, the upper part is waste rock, which poses a major safety hazard and results in the waste of hundreds of thousands of tons of ore resources. In addition, the presence of surface collapse pits in mines that have switched from caving to backfilling will lead to two consequences: first, it will damage the surface environment and be detrimental to ecological protection; second, it will form a large area of catchment area. During the rainy season, a large amount of rainwater will flow down through the waste rock pile in the collapse pit, seriously threatening the safety of underground mining.
[0004] The existing technical solutions cannot solve the above technical problems. Utility Model Content
[0005] In order to overcome the problems existing in the above prior art, the purpose of the utility model is to provide an isolation pillar recovery and surface subsidence pit management structure, which has a simple structure and is easy to operate.
[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0007] An isolation pillar recovery and surface collapse pit treatment structure, comprising an artificial bottom pillar, an isolation pillar, and an artificial top pillar arranged in sequence from bottom to top, all of which are in the shape of a flat plate;
[0008] The height of the artificial bottom pillar is the mine stage height, the height of the isolation pillar is determined by a combination of methods (usually in the range of 20 to 30 m), and the height of the artificial top pillar is not less than the height of the isolation pillar.
[0009] The upper part of the artificial top column is a soil covering greening layer, and the bottom of the artificial top column is filled with filling slurry to form a solid body, which constitutes a part of the waste rock-tailings cemented filling body 6.
[0010] The access routes to be mined are arranged in the isolation pillars, the access routes to be mined are arranged perpendicular to the direction of the ore body, the access routes to be mined are parallel to each other, and mining is carried out layer by layer from bottom to top.
[0011] The artificial bottom column includes a cemented filling body, which includes three parts: the top and bottom are 8m high lime-sand ratio filling bodies, and the middle part (height equal to the height of the artificial bottom column 3 minus 16m) is a low lime-sand ratio filling body, so as to improve the safety of the artificial bottom column and reduce its construction cost. The artificial bottom column is composed of three parts of flat filling bodies superimposed on each other.
[0012] A waste rock-tailings cemented filling body is arranged above the isolation pillar. The waste rock-tailings cemented filling body is formed by cementing the loose waste rock and tailings slurry in the collapse pit. The shape of the waste rock-tailings cemented filling body is controlled by the shape of the collapse pit. The waste rock-tailings cemented filling body is a boss shape.
[0013] Reinforced concrete retaining walls are set on the sides of the contact ends of the artificial bottom pillar and the isolation pillar, and concrete retaining walls are set on the sides of the artificial top pillar and the isolation pillar. The concrete retaining walls and reinforced concrete retaining walls are both located at the entrance of the mining tunnel to ensure safety during construction. The shape of the retaining walls is controlled by the shape of the mining tunnel to ensure tight closure and prevent leakage.
[0014] A layer-transfer slope is arranged at the reinforced concrete retaining wall. The starting point of the layer-transfer slope is the transportation level outside the stope, and the end point is the level of each access road to be mined. The shape of the layer-transfer slope is usually a three-center arch tunnel.
[0015] Beneficial effects of the utility model:
[0016] The utility model adopts high-concentration full tailings cementing slurry to pressurize and inject the waste rock pile in the surface collapse pit to form a high-strength waste rock-tailings cementing filling body structure, which creates safety conditions for the large-scale recovery and isolation of the ore pillars at the bottom, and at the same time, covers the waste rock-tailings cementing filling body with soil and greening to achieve the treatment of the surface collapse pit. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is the front view of the overall structure of the utility model.
[0018] Figure 2 It is a left view of the overall structure of the utility model.
[0019] Explanation of the reference numerals: 1-isolation pillar; 2-cemented filling body; 3-artificial bottom pillar; 4-caving tunnel; 5-concrete retaining wall; 6-waste rock-tailings cemented filling body; 7-artificial top pillar; 8-reinforced concrete retaining wall; 9-transition slope; 10-approach to be mined; 11-safety protection layer; 12-covering greening layer. DETAILED DESCRIPTION
[0020] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0021] like Figure 1 , Figure 2As shown: an isolation pillar recovery and surface collapse pit treatment structure, including an artificial bottom pillar 3, an isolation pillar 1, and an artificial top pillar 7 arranged in sequence from bottom to top, all of which are in the shape of a flat plate;
[0022] The height of the artificial bottom pillar 3 is the mine stage height, the height of the isolation pillar 1 is determined by a variety of methods (usually in the range of 20 to 30 meters), and the height of the artificial top pillar 7 is not less than the height of the isolation pillar 1.
[0023] The upper part of the artificial top pillar 7 is a covering greening layer 12, and the rock drilling tunnel 4 left over from the original caving mining at the bottom of the artificial top pillar 7 is filled with filling slurry during the filling process to form a solid body, which constitutes a part of the waste rock-tailings cemented filling body 6.
[0024] The access roads 10 to be mined are arranged in the isolation pillar 1, and the access roads 10 to be mined are arranged perpendicular to the direction of the ore body. The access roads 10 to be mined are parallel to each other, and mining is carried out layer by layer from bottom to top.
[0025] The artificial bottom column 3 includes a cementing filling body 2, which includes three parts: the top and bottom are 8m high lime-sand ratio filling bodies, and the middle part (height equal to the height of the artificial bottom column 3 minus 16m) is a low lime-sand ratio filling body, so as to improve the safety of the artificial bottom column 3 and reduce its construction cost. The artificial bottom column 3 is composed of three parts of flat filling bodies stacked together.
[0026] A waste rock-tailings cemented filling body 6 is arranged above the isolation pillar 1. The waste rock-tailings cemented filling body 6 is formed by cementing the loose waste rock and tailings slurry in the collapse pit. The shape is controlled by the shape of the collapse pit. The waste rock-tailings cemented filling body 6 is a boss shape.
[0027] A reinforced concrete retaining wall 8 is arranged on the side of the contact end of the artificial bottom pillar 3 and the isolation pillar 1, and a concrete retaining wall 5 is arranged on the side of the artificial top pillar 7 and the isolation pillar 1. The concrete retaining wall 5 and the reinforced concrete retaining wall 8 are both located at the entrance of the mining tunnel to ensure safety during construction. The shape of the retaining wall is controlled by the shape of the mining tunnel to ensure tight closure and prevent leakage of slurry.
[0028] A layer transfer slope 9 is arranged at the reinforced concrete retaining wall 8. The starting point of the layer transfer slope 9 is the transportation level outside the stope, and the end point is the level of each access road 10 to be mined. The shape of the layer transfer slope 9 is usually a three-center arch tunnel.
[0029] The working principle of this utility model:
[0030] The artificial bottom pillar 3 separates the ore body to be mined at the bottom of the mine from the isolation pillar 1 to be mined at the top, and serves as a working platform for the mining of the isolation pillar 1; the waste rock-tailings cemented backfill 6 separates the loose waste rock pile, surface water, etc. from the isolation pillar 1 to be mined, and serves as a protective roof for the mining of the isolation pillar 1; that is, the artificial bottom pillar 3 and the waste rock-tailings cemented backfill 6 create safe conditions for the mining of the isolation pillar 1. The isolation pillar 1 is not completely recovered, but a flat plate-shaped entity of a certain thickness is left at the top as a safety protection layer 11 to separate the waste rock-tailings cemented backfill 6 at the top from the operating personnel, avoiding safety hazards caused by quality defects of the waste rock-tailings cemented backfill 6. Supported by the above-mentioned safety structure, the mining of the isolation pillar 1 can adopt existing mature processes, such as the upward approach filling mining method.
[0031] The waste rock-tailings cemented filling body 6 also serves as a safe platform for constructing the covering soil greening layer 12, avoiding the potential safety hazards caused by the settlement of the loose waste rock pile in the collapse pit. After the construction of the covering soil greening layer 12 is completed, surface water can be prevented from entering the well, and common pollution in collapse pits such as dust from the surface can be avoided.
[0032] In summary, the utility model realizes the integration of isolation pillar recovery from caving method to filling method and surface subsidence pit management.
[0033] Example:
[0034] The ore body of a gold mine is steeply inclined, thick and large. It is mined by the pillarless sublevel caving method. Due to various reasons such as technology, economy and environmental protection, it needs to be converted to the backfilling method. At present, the caving method above 1240m has been terminated, and the ore body below 1190m is mined by the backfilling method.
[0035] First, the vertical thickness of the isolation pillar 1 is determined to be 18 m. Therefore, the vertical thickness of the first middle section of the lower part of the isolation pillar is 32 m.
[0036] Secondly, according to the ore body engineering conditions, the mining method of the first middle section of the ore body at the bottom of the isolation pillar 1 is determined to be segmented emptying followed by filling, that is, first use the upward medium-deep hole to drill the rock and drop the ore, and after the ore in the stope is empty, high-concentration full tailings slurry cementing filling is carried out. The bottom 8m and the top 8m of the stope are filled with a high lime-sand ratio of 1:4, and the middle 16m of the stope is filled with a low lime-sand ratio of 1:8. According to this method, the mining of the first middle section of the ore body at the bottom of the isolation pillar and the filling of the goaf are completed, and the cementing filling body 2 is the artificial bottom pillar 3.
[0037] Secondly, a reinforced concrete retaining wall 5 with drainage holes was built at the mouth of the original caving tunnel 4, with a thickness of 0.5m. High-concentration full tailings cementing slurry was used to pressurize and fill the waste rock pile in the surface collapse pit, with a lime-sand ratio of 1:4, and the waste rock-tailings cementing filling body 6 formed an artificial top column 7. Under the current technical level, it is still impossible to accurately measure the strength of large-scale waste rock-tailings cementing filling bodies, so the vertical thickness of the artificial top column is required to be no less than the vertical thickness of the isolation pillar, that is, no less than 18m.
[0038] Then, after 28 days of maintenance of the artificial top pillar, the isolation pillar 1 is recovered by the upward access filling method to improve the safety of the isolation pillar. The length of the mining area along the ore body is 50m, and the width and height of the access are both 4m. The length direction of the access in the mining area is along the thickness direction of the ore body to minimize the exposure time of the access empty area and improve the safety of mining. After the access is mined, a reinforced concrete retaining wall 8 is built at the mouth. The access adopts interval mining and centralized filling to improve the efficiency of mining and filling. The ash-sand ratio of the access filling is 1:6. After the mining and filling of each layer of the access is completed, the upper layer is entered through the layer transfer slope 9, and the ore body in the access 10 to be mined is mined layer by layer. The 2m close to the artificial top pillar will not be mined and serve as a safety protection layer 11.
[0039] Finally, after the artificial pillar 7 has been maintained for 28 days, the artificial pillar 7 is covered with soil, the thickness of the covering soil layer is not less than 1.0m, and the surface of the covering soil is planted with easy-to-survive grasses to form a covering soil greening layer 12. To improve efficiency, the recovery of the artificial pillar and the formation of the covering soil greening layer can be carried out simultaneously.
[0040] Under the premise of ensuring safety, the recovery rate of the isolation pillar is above 88%, and the ore supply capacity of a single access route is 168t / d. At the same time, the filling of the surface subsidence area also consumes a large amount of tailings solid waste, improving the surface environment and landscape. It can be seen that the utility model has the advantages of environmental protection, safety and high resource recovery rate.
Claims
1. A structure for recovering isolated ore pillars and treating ground subsidence pits, characterized in that: It includes an artificial bottom pillar (3), an isolation pillar (1), and an artificial top pillar (7) which are arranged in sequence from bottom to top, and all of them are in the shape of a flat plate; The height of the artificial bottom pillar (3) is the height of the mine stage, the height of the isolation pillar (1) ranges from 20 to 30 m, and the height of the artificial top pillar (7) is not less than the height of the isolation pillar (1); The upper part of the artificial top column (7) is a soil covering greening layer (12), and the bottom of the artificial top column (7) is filled with filling slurry to form a solid body, which constitutes a part of the waste rock-tailings cemented filling body (6).
2. The isolation pillar recovery and surface subsidence pit treatment structure according to claim 1 is characterized in that: The access roads (10) to be mined are arranged in the isolation pillar (1), the access roads (10) to be mined are arranged perpendicular to the direction of the ore body, the access roads (10) to be mined are parallel to each other, and mining is carried out layer by layer from bottom to top.
3. The isolation pillar recovery and surface subsidence pit treatment structure according to claim 1 is characterized in that: The artificial bottom column (3) includes a cemented filling body (2), which includes three parts: the top and bottom are 8m high high-lime-sand ratio filling bodies, and the middle part is a low-lime-sand ratio filling body. The artificial bottom column (3) is composed of three parts of flat filling bodies stacked together.
4. The isolation pillar recovery and surface subsidence pit treatment structure according to claim 1 is characterized in that: A waste rock-tailings cemented filling body (6) is arranged above the isolation pillar (1), and the waste rock-tailings cemented filling body (6) is in the shape of a boss.
5. The isolation pillar recovery and surface subsidence pit treatment structure according to claim 1 is characterized in that: A reinforced concrete retaining wall (8) is arranged on the side of the contact end of the artificial bottom pillar (3) and the isolation pillar (1), and a concrete retaining wall (5) is arranged on the side of the artificial top pillar (7) and the isolation pillar (1). The concrete retaining wall (5) and the reinforced concrete retaining wall (8) are both located at the entrance of the mine tunnel.
6. The isolation pillar recovery and surface subsidence pit treatment structure according to claim 5 is characterized in that: A layer transfer slope (9) is arranged at the reinforced concrete retaining wall (8), the starting point of the layer transfer slope (9) is the transportation level outside the stope, and the end point is the level of each access road (10) to be mined, and the shape of the layer transfer slope (9) is a three-center arch tunnel.