Tunnel concrete curing equipment
Through the expansion and folding of the curved plate and the height adjustment of the lifting components, the problem of inconvenience in transportation of existing equipment is solved, a smaller volume and height is achieved, and the applicability and transportation convenience of the equipment are improved.
Patent Information
- Application Number
- CN202420453353.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-11
AI Technical Summary
Existing tunnel concrete curing equipment cannot be stored and adjusted after use, resulting in inconvenient transportation and large volume affects the scope of application.
A device consisting of two curved plates, sprinkler assembly and adjustment assembly is designed to expand and fold the curved plate by adjusting the height of the lift seat and curved plate by adjusting the lifting assembly to reduce the volume and height of the device. Improve the scope of application.
While ensuring the working area remains unchanged, the volume and height of the device are reduced, convenient for transportation, and improved the practicality and scope of application of the equipment.
Smart Images

Figure CN221942455U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of health-preserving equipment, in particular to tunnel concrete health-preserving equipment. Background Art
[0002] In tunnel construction, a lot of concrete needs to be poured in the secondary lining of the tunnel to ensure the structural stability of the tunnel. During the hardening process, concrete is very sensitive to changes in temperature and humidity. If the maintenance work is improper and untimely, the water on the concrete surface will be lost too quickly, and cracks will appear in the concrete before demolding or even before final setting. This directly affects the strength and durability of the concrete, and even endangers the safety of the engineering structure.
[0003] For example, the patent (CN209430212U) discloses a new type of tunnel secondary lining concrete curing trolley, which records "including a water spraying system and a walking system, the water spraying system is connected to the walking system, the walking system drives the water spraying system to walk in the tunnel, and the water spraying system sprays water to the inner wall of the tunnel; the water spraying system includes an arc-shaped arch frame and a plurality of nozzles, the nozzles are arranged on the arc-shaped arch frame at intervals, and the spraying direction of the nozzles is toward the inner wall of the tunnel, the water spraying system also includes a support frame, and the support frame connects the arc-shaped arch frame with the walking system; the walking system includes a plurality of motors and track wheels, and the motor drives the track wheels to rotate; it also includes a plurality of storage boxes, the storage boxes are connected to the support frames, the storage boxes are arranged on the top of the track wheels, and the motors are arranged in the storage boxes."
[0004] When using the above technology, it was found that the following technical problems exist in the prior art: the above device occupies a large area when in use. Although it can perform maintenance operations on the inner wall of the tunnel well, it is large in size after use and cannot be stored or adjusted to reduce its own volume, which makes it inconvenient to transport the device. For this reason, we designed a tunnel concrete curing equipment to provide another technical solution to the above technical problems. Utility Model Content
[0005] Based on this, it is necessary to provide a tunnel concrete curing equipment to address the above-mentioned technical problems. Through the coordinated structural design of two arc-shaped plates, a sprinkler assembly and an adjustment assembly, the two arc-shaped plates can be unfolded and folded through the adjustment assembly, thereby being able to conveniently reduce the volume of the device without affecting the working area. At the same time, through the structural design of the lifting assembly, the height of the lifting seat and the arc-shaped plate can be adjusted, thereby further reducing the height of the device during transportation, thereby facilitating transportation, and at the same time being able to increase the scope of application of the device and enhance the practicability of the device.
[0006] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0007] A tunnel concrete curing equipment comprises a mobile base, a fixed base is fixed on the top of the mobile base, a lifting base is arranged above the fixed base, fixing rods are arranged on the inner sides of both ends of the lifting base, an arc-shaped plate is fixed on the top of the fixing rod, a supporting rod is fixed on the outer side of one end of the fixing rod close to the arc-shaped plate, and one end of the supporting rod away from the fixing rod is fixedly connected to the arc-shaped plate, an adjusting component is arranged on the inner side of the lifting base, and the adjusting component is used to adjust the angles of the two arc-shaped plates, a lifting component is arranged on the inner side of the fixed base, and the lifting component is used to adjust the height of the lifting base, and a sprinkler component is also arranged on the top of the mobile base.
[0008] As a preferred embodiment of the tunnel concrete curing equipment provided by the utility model, the adjusting component includes a first motor, the first motor is arranged at an inner position of a lifting seat, a driving bevel gear is fixed to the output end of the first motor, and a first driven bevel gear and a second driven bevel gear are symmetrically arranged at positions inside the lifting seat and corresponding to the driving bevel gear, the first driven bevel gear and the second driven bevel gear are both meshed and connected with the driving bevel gear, and a rotating shaft is fixed to one end of the first driven bevel gear and the second driven bevel gear away from the driving bevel gear, and the rotating shaft is rotatably connected to the lifting seat, and a connecting ring is fixed to one end of the rotating shaft away from the driving bevel gear, and the connecting ring is rotatably connected to the lifting seat, and the connecting ring is fixedly connected to the fixing rod.
[0009] As a preferred embodiment of the tunnel concrete curing equipment provided by the utility model, the sprinkler assembly includes a water tank, which is arranged at a position on one side of the top of the mobile base, and the water tank is fixedly connected to the mobile base, and a water pump is fixed at the top of the mobile base and at a position corresponding to the water tank, the water pumping end of the water pump is fixedly connected to the water tank, and a diversion hose is fixed to the water outlet end of the water pump, and the diversion hose passes through the inner side of the lifting seat, the fixed rod and the arc plate, and a guide pipe is fixed to one end of the diversion hose located on the inner side of the arc plate, and a plurality of water spray heads are evenly fixed to the upper end of the guide pipe, and the water spray heads extend to the outer side of the top of the arc plate.
[0010] As a preferred embodiment of the tunnel concrete curing equipment provided by the utility model, the lifting assembly includes two lifting screws, which are respectively vertically arranged at the two end positions of a fixed seat, and the lower end of the lifting screw extends to the inner side of the fixed seat, and the lifting screw is rotatably connected to the fixed seat, and both ends of the lifting seat are fixed with fixed blocks, and the fixed blocks are threadedly connected to the lifting screw, and the top of the lifting screw is fixed with an anti-slip block, and a driving assembly is arranged on the inner side of the fixed seat and between the two lifting screws.
[0011] As a preferred embodiment of the tunnel concrete curing equipment provided by the utility model, the driving assembly includes a transmission rod, which is longitudinally arranged at an inner position of a fixed seat, the transmission rod is rotatably connected to the fixed seat, a second motor is fixed to the inner side of the fixed seat, a transmission gear is fixed to the output end of the second motor, a driven gear is fixed to the outer side of the transmission rod and at a position corresponding to the transmission gear, and the driven gear is meshingly connected to the transmission gear.
[0012] As a preferred embodiment of the tunnel concrete curing equipment provided by the utility model, a transmission worm is fixed at both ends of the transmission rod and at positions corresponding to the lifting screw, and a driven turbine is fixed at one end of the lifting screw located on the inner side of the fixed seat, and the driven turbine is meshingly connected with the transmission worm.
[0013] As a preferred embodiment of the tunnel concrete curing equipment provided by the utility model, a connecting rod is arranged between the two arc-shaped plates, sliders are fixed at both ends of the connecting rod, sliding grooves are provided at positions of the arc-shaped plates corresponding to the sliders, and the sliders are slidably connected to the arc-shaped plates through the sliding grooves.
[0014] It can be seen without a doubt that the above-mentioned technical solution of the present application can certainly solve the technical problem to be solved by the present application.
[0015] At the same time, through the above technical solutions, the utility model has at least the following beneficial effects:
[0016] The utility model provides a tunnel concrete curing equipment, which, through the coordinated structural design of two arc-shaped plates, a sprinkler assembly and an adjusting assembly, enables the two arc-shaped plates to be unfolded and folded through the adjusting assembly, thereby conveniently reducing the volume of the device under the premise of not affecting the working area, and at the same time, through the structural design of the lifting assembly, enables the height of the lifting seat and the arc-shaped plate to be adjusted, thereby further reducing the height of the device during transportation, thereby facilitating transportation, and at the same time can improve the scope of application of the device and enhance the practicability of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0019] Figure 2 It is a structural schematic diagram of the adjustment component of the utility model;
[0020] Figure 3 This is a schematic diagram of the connection structure between the diverter hose and the fixing rod of the utility model;
[0021] Figure 4 This is a schematic diagram of the structure of the flow guide pipe of the utility model;
[0022] Figure 5 This is a schematic diagram of the structure of the lifting assembly of the utility model;
[0023] Figure 6 For this utility model Figure 5 The enlarged view of point A in the middle;
[0024] Figure 7 For this utility model Figure 5 Enlarged view of point B in the middle.
[0025] The markings in the figure are as follows:
[0026] 1. Mobile base; 2. Fixed base; 3. Lifting base; 4. Arc plate; 5. Fixed rod; 6. Water tank; 7. Diversion hose; 8. Sprinkler head; 9. Support rod; 10. Connecting rod; 11. Sliding block; 12. Fixed block; 13. Lifting screw; 14. Anti-slip block; 15. First motor; 16. Driving bevel gear; 17. First driven bevel gear; 18. Second driven bevel gear; 19. Rotating shaft; 20. Connecting ring; 21. Water pump; 22. Transmission rod; 23. Second motor; 24. Transmission gear; 25. Driven gear; 26. Transmission worm; 27. Driven turbine; 28. Guide pipe. DETAILED DESCRIPTION
[0027] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0028] In order to enable those skilled in the art to better understand the solution of the utility model, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the accompanying drawings.
[0029] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features and technical solutions in the embodiments may be combined with each other.
[0030] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0031] Embodiment 1
[0032] Reference Figure 1-Figure 4 , a tunnel concrete curing equipment, comprising a mobile base 1, a fixed base 2 is fixed on the top of the mobile base 1, a lifting base 3 is arranged above the fixed base 2, a fixing rod 5 is arranged on the inner sides of both ends of the lifting base 3, an arc plate 4 is fixed on the top of the fixing rod 5, a support rod 9 is fixed on the outer side of one end of the fixing rod 5 close to the arc plate 4, and the end of the support rod 9 away from the fixing rod 5 is fixedly connected to the arc plate 4, an adjusting component is arranged on the inner side of the lifting base 3, and the adjusting component is used to adjust the angle of the two arc plates 4, a lifting component is arranged on the inner side of the fixing base 2, and the lifting component is used to adjust the height of the lifting base 3, and a watering component is also arranged on the top of the mobile base 1;
[0033] The adjusting component includes a first motor 15, which is arranged at the inner side of the lifting seat 3. A driving bevel gear 16 is fixed to the output end of the first motor 15. A first driven bevel gear 17 and a second driven bevel gear 18 are symmetrically arranged at the inner side of the lifting seat 3 and at positions corresponding to the driving bevel gear 16. The first driven bevel gear 17 and the second driven bevel gear 18 are both meshed and connected with the driving bevel gear 16. A rotating shaft 19 is fixed to the ends of the first driven bevel gear 17 and the second driven bevel gear 18 away from the driving bevel gear 16. The rotating shaft 19 is connected to the lifting seat 3 is rotatably connected, and a connecting ring 20 is fixed to one end of the rotating shaft 19 away from the driving bevel gear 16. The connecting ring 20 is rotatably connected to the lifting seat 3, and the connecting ring 20 is fixedly connected to the fixing rod 5; when the first motor 15 is started to rotate, the two connecting rings 20 can be driven to rotate in the opposite direction through the driving bevel gear 16, the first driven bevel gear 17 and the second driven bevel gear 18, so that the two arc plates 4 can be driven to rotate through the fixing rod 5 fixed to the connecting ring 20, so that the two arc plates 4 can be unfolded or folded, which effectively reduces the volume of the device and facilitates subsequent transportation;
[0034] Specifically, the watering assembly includes a water storage tank 6, which is arranged at a position on one side of the top of the mobile base 1, and the water storage tank 6 is fixedly connected to the mobile base 1. A water pump 21 is fixed at the top of the mobile base 1 and at a position corresponding to the water storage tank 6. The water pumping end of the water pump 21 is fixedly connected to the water storage tank 6, and a diversion hose 7 is fixed to the water outlet end of the water pump 21. The diversion hose 7 passes through the inner side of the lifting seat 3, the fixed rod 5 and the curved plate 4. A guide pipe 28 is fixed to one end of the diversion hose 7 located on the inner side of the curved plate 4, and a plurality of sprinkler heads 8 are evenly fixed to the upper end of the guide pipe 28. The sprinkler heads 8 extend to the outer side of the top of the curved plate 4; thereby facilitating the maintenance of the concrete on the inner wall of the tunnel through the watering assembly;
[0035] Furthermore, a connecting rod 10 is provided between the two arc-shaped plates 4, and sliders 11 are fixed at both ends of the connecting rod 10. A sliding groove is provided at the position of the arc-shaped plate 4 corresponding to the slider 11, and the slider 11 is slidably connected to the arc-shaped plate 4 through the sliding groove; thereby, the two arc-shaped plates 4 can be limited to avoid the angle of the two arc-shaped plates 4 being too large, resulting in uneven spraying;
[0036] The device provided in this embodiment enables the two arc-shaped plates 4 to be unfolded and folded by adjusting the components, so that the volume of the device can be conveniently reduced without affecting the working area, thereby facilitating transportation, and at the same time, the scope of application of the device can be expanded, thereby enhancing the practicality of the device.
[0037] Embodiment 2
[0038] Reference Figure 5-Figure 7 , a tunnel concrete curing equipment, the lifting component includes two lifting screws 13, the two lifting screws 13 are respectively vertically arranged at the two end positions of the fixed seat 2, the lower end of the lifting screw 13 extends to the inner side of the fixed seat 2, the lifting screw 13 is rotatably connected with the fixed seat 2, both ends of the lifting seat 3 are fixed with fixed blocks 12, the fixed block 12 is threadedly connected with the lifting screw 13, the top of the lifting screw 13 is fixed with an anti-slip block 14, and a driving component is arranged at the inner side of the fixed seat 2 and between the two lifting screws 13; thereby, the fixed block 12 and the lifting seat 3 are driven to move by the rotation of the lifting screw 13, so that the arc plate 4 can be driven to adjust the height by the vertical movement of the lifting seat 3;
[0039] The driving assembly includes a transmission rod 22, which is longitudinally arranged at the inner side of the fixed seat 2, and the transmission rod 22 is rotatably connected to the fixed seat 2. A second motor 23 is fixed to the inner side of the fixed seat 2, and a transmission gear 24 is fixed to the output end of the second motor 23. A driven gear 25 is fixed to the outer side of the transmission rod 22 and at a position corresponding to the transmission gear 24, and the driven gear 25 is meshed and connected with the transmission gear 24; thus, when the second motor 23 is started, the transmission rod 22 can be driven to rotate through the transmission gear 24 and the driven gear 25;
[0040] Specifically, a transmission worm 26 is fixed at both ends of the transmission rod 22 and at positions corresponding to the lifting screw 13, and a driven turbine 27 is fixed at one end of the lifting screw 13 located inside the fixed seat 2, and the driven turbine 27 is meshed and connected with the transmission worm 26; thus, when the transmission rod 22 rotates, the lifting screw 13 can be driven to rotate through the transmission worm 26 and the driven turbine 27;
[0041] The device provided in this embodiment, through the structural design of the lifting assembly, can adjust the height of the lifting seat 3 and the arc plate 4, thereby further reducing the height of the device during transportation, thereby facilitating transportation, and at the same time can expand the scope of application of the device and enhance the practicability of the device.
[0042] The use process of a tunnel concrete curing device provided by the utility model is as follows: when in use, first start the second motor 23 so that the second motor 23 drives the transmission gear 24 to rotate. When the transmission gear 24 rotates, the transmission rod 22 is driven to rotate through the driven gear 25 meshing with it. When the transmission rod 22 rotates, it drives the transmission worm 26 fixed thereto to rotate at the same time, so that the lifting screw 13 is driven to rotate through the driven turbine 27 meshing with the transmission worm 26. When the lifting screw 13 rotates, it drives the fixed block 12 threadedly connected thereto to move along the axial direction of the lifting screw 13, thereby driving the lifting seat 3 fixed to the fixed block 12 to move, and then when the lifting seat 3 moves, the curved plate 4 is driven to be lifted and moved through the fixed rod 5. When the curved plate 4 is adjusted to be close to the inner wall of the tunnel, the second motor 23 can be stopped, thereby completing the height adjustment of the curved plate 4. After the curing operation is completed, the second motor 23 can be started to rotate in the opposite direction, so that the height of the lifting seat 3 and the curved plate 4 is reduced, thereby facilitating transportation;
[0043] When performing curing operations, firstly, the first motor 15 is started so that the first motor 15 drives the driving bevel gear 16 to rotate. When the driving bevel gear 16 rotates, the first driven bevel gear 17 and the second driven bevel gear 18 are driven to rotate in opposite directions respectively. Therefore, when the first driven bevel gear 17 and the second driven bevel gear 18 rotate, the two connecting rings 20 are driven to rotate respectively through the two rotating shafts 19 fixed thereto. Therefore, when the connecting ring 20 rotates, the arc plate 4 is driven to rotate around the rotating shaft 19 as the center through the fixed rod 5 fixed thereto, so that the two arc plates 4 are fan-shaped and have the same curvature as the inner wall of the tunnel. Subsequently, the water pump 21 is started so that the water inside the water storage tank 6 is pumped out through the water pump 21, and then diverted through the diversion hose 7, and finally sprayed to the inner wall of the tunnel through the sprinkler head 8 fixed to the diversion hose 7, thereby completing the curing of the tunnel concrete. After the work is completed, the first motor 15 is controlled to rotate in the opposite direction so that the two arc plates 4 overlap, which is convenient for subsequent transportation.
[0044] The preferred embodiments of the utility model disclosed above are only used to help explain the utility model. The preferred embodiments do not describe all the details in detail, nor do they limit the utility model to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the utility model, so that technicians in the relevant technical field can well understand and use the utility model. The utility model is limited only by the claims and their full scope and equivalents.
Claims
1. A tunnel concrete curing equipment, characterized in that: The invention comprises a movable base (1), a fixed base (2) being fixed at the top of the movable base (1), a lifting base (3) being arranged above the fixed base (2), a fixing rod (5) being arranged on the inner sides of both ends of the lifting base (3), an arc-shaped plate (4) being fixed at the top of the fixing rod (5), a supporting rod (9) being fixed on the outer side of the end of the fixing rod (5) close to the arc-shaped plate (4), and an end of the supporting rod (9) being fixedly connected to the arc-shaped plate (4) away from the fixing rod (5), an adjusting component being arranged on the inner side of the lifting base (3), the adjusting component being used for adjusting the angle of the two arc-shaped plates (4), a lifting component being arranged on the inner side of the fixing base (2), the lifting component being used for adjusting the height of the lifting base (3), and a watering component being arranged on the top of the movable base (1).
2. The tunnel concrete curing equipment according to claim 1, characterized in that: The adjustment assembly comprises a first motor (15), the first motor (15) being arranged at an inner position of the lifting seat (3), a driving bevel gear (16) being fixed to an output end of the first motor (15), a first driven bevel gear (17) and a second driven bevel gear (18) being symmetrically arranged at positions inside the lifting seat (3) and corresponding to the driving bevel gear (16), the first driven bevel gear (17) and the second driven bevel gear (18) being meshingly connected to the driving bevel gear (16), a rotating shaft (19) being fixed to one end of the first driven bevel gear (17) and the second driven bevel gear (18) away from the driving bevel gear (16), the rotating shaft (19) being rotatably connected to the lifting seat (3), a connecting ring (20) being fixed to one end of the rotating shaft (19) away from the driving bevel gear (16), the connecting ring (20) being rotatably connected to the lifting seat (3), and the connecting ring (20) being fixedly connected to the fixing rod (5).
3. The tunnel concrete curing equipment according to claim 2, characterized in that: The watering assembly comprises a water storage tank (6), the water storage tank (6) being arranged at a position on one side of the top end of the mobile base (1), the water storage tank (6) being fixedly connected to the mobile base (1), a water pump (21) being fixedly connected at a position on the top end of the mobile base (1) and corresponding to the water storage tank (6), the water pumping end of the water pump (21) being fixedly connected to the water storage tank (6), a diversion hose (7) being fixedly connected to the water outlet end of the water pump (21), the diversion hose (7) penetrating the inner side of the lifting seat (3), the fixing rod (5) and the curved plate (4), a guide pipe (28) being fixedly connected to one end of the diversion hose (7) located on the inner side of the curved plate (4), a plurality of water spray heads (8) being evenly fixedly connected to the upper end of the water spray head (28), the water spray heads (8) extending to the outer side of the top end of the curved plate (4).
4. The tunnel concrete curing equipment according to claim 2, characterized in that: The lifting assembly comprises two lifting screws (13), the two lifting screws (13) are respectively arranged vertically at the two end positions of the fixed seat (2), the lower ends of the lifting screws (13) extend to the inner side of the fixed seat (2), the lifting screws (13) are rotatably connected to the fixed seat (2), both ends of the lifting seat (3) are fixed with fixed blocks (12), the fixed blocks (12) are threadedly connected to the lifting screws (13), the top end of the lifting screws (13) is fixed with an anti-slip block (14), and a driving assembly is arranged inside the fixed seat (2) and between the two lifting screws (13).
5. The tunnel concrete curing equipment according to claim 4, characterized in that: The driving assembly comprises a transmission rod (22), the transmission rod (22) being longitudinally arranged at an inner position of a fixing seat (2), the transmission rod (22) being rotationally connected to the fixing seat (2), a second motor (23) being fixed inside the fixing seat (2), a transmission gear (24) being fixed at an output end of the second motor (23), a driven gear (25) being fixed outside the transmission rod (22) and at a position corresponding to the transmission gear (24), the driven gear (25) being meshingly connected to the transmission gear (24).
6. The tunnel concrete curing equipment according to claim 5, characterized in that: A transmission worm (26) is fixed at both ends of the transmission rod (22) and at positions corresponding to the lifting screw (13); a driven turbine (27) is fixed at one end of the lifting screw (13) located inside the fixed seat (2); and the driven turbine (27) is meshingly connected to the transmission worm (26).
7. The tunnel concrete curing equipment according to claim 2, characterized in that: A connecting rod (10) is provided between the two arc-shaped plates (4), and sliding blocks (11) are fixed to both ends of the connecting rod (10). Sliding grooves are provided at positions of the arc-shaped plates (4) corresponding to the sliding blocks (11), and the sliding blocks (11) are slidably connected to the arc-shaped plates (4) via the sliding grooves.
