House building surveying pole

By introducing base, rectangular cylinder and spring mechanism into the measurement benchmark in the building construction, the problem of difficult bolts in hard soil is solved, and easier fixation and convenient use of measurement benchmarks is achieved, reducing the labor intensity of construction workers.

CN221945235UActive Publication Date: 2024-11-01THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420384305.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-11-01
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

When encountering very hard geological soil, the bolts of existing building measurement benchmarks are difficult to drill into the soil, resulting in difficulty in fixing.

Method used

A house construction measurement benchmark was designed, including a base, a measurement benchmark body, a heavy block, a rectangular cylinder, a support tooth plate, a screw, a level and a rotating handle. By rotating the base and screw, the support tooth is made by using the spring and extrusion plate mechanism. The plate slides down and is fixed to the ground, combined with the structure of the rotary rod being expanded and folded, making it easy to fix and store.

Benefits of technology

It realizes easier fixing of the measurement benchmark in hard soil, reduces the labor intensity of construction workers, and improves fixing efficiency and convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221945235U_ABST
    Figure CN221945235U_ABST
Patent Text Reader

Abstract

The utility model discloses a house building surveying pole which comprises a base and a surveying pole body fixed at the top of the base, two weight blocks are fixed at the top of the base, the surveying pole body and the two weight blocks are distributed in an equilateral triangle mode, and three rectangular cylinders are hinged to the outer side of the base at equal intervals in the radial direction of the base. A supporting toothed plate is slidably connected into the rectangular barrel, a screw is in threaded connection with the interior of the base, a top plate is fixed to the top of the screw, a gradienter is mounted at the top of the top plate, a rotating handle is further fixed to the top of the top plate, a disc is rotatably connected to the bottom of the screw, and three rotating rods are hinged to the outer side of the disc at equal intervals in the radial direction of the disc. The ends, away from the disc, of the rotating rods are hinged to the corresponding rectangular cylinders, and positioning units used for positioning the moving supporting toothed plates are arranged in the rectangular cylinders. The building surveying pole is convenient to fix and use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, in particular to a building construction measurement benchmark. Background Art

[0002] Building construction is a rigorous project that requires all components and parts to have the correct position and size. In order to ensure the precision and accuracy of the height and horizontal position of the building, it is necessary to use a surveying pole for measurement.

[0003] Publication No. CN 218097774 U discloses a benchmark for building construction measurement, including a benchmark body, a bottom support plate fixedly connected to the lower end surface of the benchmark body, a scale meter arranged on the front of the benchmark body, a top support plate fixedly connected to the upper end surface of the benchmark body, an angle meter connected to the top support plate via a plurality of screws, and a connecting column fixedly connected to the lower surface of the bottom support plate. By providing a supporting structure, the installation operation process is simple and convenient, avoiding the need for construction workers to hold the benchmark body in hand during the building construction measurement process, thereby reducing the labor intensity of the construction workers.

[0004] The above-mentioned prior art fixes the measuring benchmark by setting three groups of bolts. During use, the bolts need to be turned to embed them into the soil to fix the measuring benchmark. Turning the bolts to embed them into the soil requires a lot of effort, and when encountering very hard soil, it is more difficult to drill the bolts into the soil, which makes it more difficult to fix the measuring benchmark. Summary of the invention

[0005] In view of this, the purpose of the utility model is to provide a building construction measuring pole, and the technical problem to be solved is that when encountering very hard geological soil, it is difficult to drill bolts into the soil, which makes it difficult to fix the measuring pole.

[0006] In order to achieve the above technical objectives, the utility model provides a building construction measuring benchmark: it includes a base and a measuring benchmark body fixed to the top of the base, two weight blocks are fixed on the top of the base, and the measuring benchmark body and the two weight blocks are distributed in an equilateral triangle, three rectangular tubes are hingedly connected to the outside of the base at equal intervals along its radial direction, and a supporting tooth plate is slidably connected inside the rectangular tube, a screw is threadedly connected to the base, a top plate is fixed to the top of the screw, a level is installed on the top of the top plate, and a handle is also fixed on the top of the top plate, a disc is rotatably connected to the bottom of the screw, three rotating rods are hingedly connected to the outside of the disc at equal intervals along its radial direction, and the end of the rotating rod away from the disc is hinged to the corresponding rectangular tube, and a positioning unit for positioning the moving supporting tooth plate is provided in the rectangular tube.

[0007] Preferably, the positioning unit includes a U-shaped plate fixed on a rectangular tube, and the U-shaped plate and the rectangular tube are connected, a positioning tooth plate is arranged in the U-shaped plate, the positioning tooth plate and the supporting tooth plate are meshed, a sliding groove is opened in the U-shaped plate, and the positioning tooth plate slides in the sliding groove.

[0008] Preferably, two first springs are arranged in the slide groove, and one end of the first spring is fixed to the inner wall of the slide groove, and the other end of the first spring is fixed to the positioning tooth plate.

[0009] Preferably, a rectangular groove is provided in the positioning tooth plate, and a rectangular plate is slidably connected in the rectangular groove.

[0010] Preferably, an arc-shaped plate is fixed to the inner wall of the rectangular groove, and a wedge-shaped extrusion plate for extruding the arc-shaped plate is fixed to one side of the rectangular plate.

[0011] Preferably, a hollow plate and a limiting sleeve are fixed to one side of the rectangular tube, and the rectangular plate is slidably fitted in the hollow plate and the limiting sleeve.

[0012] Preferably, a plurality of second springs are arranged in the hollow plate, and one end of the second spring is fixed to the inner wall of the hollow plate, and the other end of the hollow plate is fixed to the rectangular plate.

[0013] It can be seen from the above technical solutions that the present application has the following beneficial effects:

[0014] 1: Turn the base and observe the level. After the base is turned to the horizontal position, press multiple rectangular plates in sequence to make the wedge-shaped extrusion plate squeeze the arc plate and drive the positioning tooth plate and the supporting tooth plate to separate. At this time, the supporting tooth plate will slide down under the action of gravity. When the bottom of the supporting tooth plate contacts the ground, release the rectangular plate, and drive the rectangular plate and the wedge-shaped extrusion plate to move up under the rebound force of the second spring. When the wedge-shaped extrusion plate no longer contacts the arc plate, the first spring rebound force drives the positioning tooth plate to move, so that the positioning tooth plate and the supporting tooth plate are meshed, that is, the supporting tooth plate and the rectangular tube are fixed, that is, the base is supported in a horizontal state, and the measuring benchmark body can be used.

[0015] 2: By rotating the screw rod, the screw rod will drive the disc to move when it moves in the base, and the disc will drive the rotating rod to rotate when it moves. When the measuring benchmark body is in use, the rotating rod will unfold the rectangular tube to open the measuring benchmark body, which is convenient for the use of the measuring benchmark body. When the measuring benchmark body is stored, the rotating rod will fold the rectangular tube to gather the rectangular tube for easy storage. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A structural schematic diagram of a building construction measurement benchmark provided by the utility model;

[0017] Figure 2 A schematic diagram of the structure of the base provided by the utility model;

[0018] Figure 3 A schematic diagram of the side cross-sectional structure of a rectangular tube provided by the utility model;

[0019] Figure 4 The utility model provides Figure 3 The structural diagram at A in the middle;

[0020] Figure 5 The utility model provides a schematic diagram of the partial structure disassembly of a building construction measurement benchmark.

[0021] Description of the drawings: 1. Base; 2. Measuring pole body; 3. Weight block; 4. Rectangular cylinder; 5. Support tooth plate; 6. Screw; 7. Top plate; 8. Level; 9. Turning handle; 10. Disc; 11. Turning rod; 12. U-shaped plate; 13. Slide; 14. Positioning tooth plate; 15. Rectangular groove; 16. Arc plate; 17. First spring; 18. Wedge-shaped extrusion plate; 19. Rectangular plate; 20. Second spring; 21. Hollow plate; 22. Limit sleeve. DETAILED DESCRIPTION

[0022] The technical solution of the present invention is described in detail below with reference to the accompanying drawings, but the protection scope of the present invention is not limited to the embodiments.

[0023] Reference Figure 1-5 Embodiment 1: A building construction measuring pole comprises a base 1 and a measuring pole body 2 fixed to the top of the base 1, two weight blocks 3 are fixed on the top of the base 1, and the measuring pole body 2 and the two weight blocks 3 are distributed in an equilateral triangle, three rectangular tubes 4 are hingedly connected to the outer side of the base 1 along its radial direction at equal intervals, and a supporting tooth plate 5 is slidably connected inside the rectangular tube 4, a screw rod 6 is threadedly connected to the inner side of the base 1, a top plate 7 is fixed to the top of the screw rod 6, a level 8 is installed on the top of the top plate 7, and a turning handle 9 is also fixed to the top of the top plate 7, a disc 10 is rotatably connected to the bottom of the screw rod 6, three rotating rods 11 are hingedly connected to the outer side of the disc 10 along its radial direction at equal intervals, and the end of the rotating rod 11 away from the disc 10 is hinged to the corresponding rectangular tube 4, and a positioning unit for positioning the moving supporting tooth plate 5 is arranged inside the rectangular tube 4.

[0024] When using the measuring benchmark body 2, first hold the handle 9 and turn it to drive the top plate 7 to rotate. When the top plate 7 rotates, it drives the screw 6 to rotate. When the screw 6 rotates, it will move downward and drive the disc 10 to move downward. When the disc 10 moves downward, it will drive the rotating rod 11 to rotate. When the rotating rod 11 is unfolded, the rectangular tube 4 is opened. Then observe the level 8 to make the base 1 in a horizontal state, and then release the supporting tooth plate 5 in turn, so that the supporting tooth plate 5 is in contact with the ground, so that the supporting tooth plate 5 and the rectangular tube 4 support the base 1, and the placement of the measuring benchmark body 2 is completed.

[0025] Embodiment 2

[0026] A building construction measurement benchmark, based on the first embodiment, the positioning unit includes a U-shaped plate 12 fixed on the rectangular tube 4, and the U-shaped plate 12 is connected to the rectangular tube 4, a positioning tooth plate 14 is arranged in the U-shaped plate 12, the positioning tooth plate 14 is meshed with the supporting tooth plate 5, a slide groove 13 is opened in the U-shaped plate 12, the positioning tooth plate 14 is slidably fitted in the slide groove 13, two first springs 17 are arranged in the slide groove 13, and one end of the first spring 17 is fixed to the inner wall of the slide groove 13, and the other end of the first spring 17 is fixed to the positioning tooth plate 14, a rectangular groove 15 is opened in the positioning tooth plate 14, and a rectangular plate 19 is slidably connected in the rectangular groove 15.

[0027] Furthermore, an arc-shaped plate 16 is fixed to the inner wall of the rectangular groove 15, a wedge-shaped extrusion plate 18 for extruding the arc-shaped plate 16 is fixed to one side of the rectangular plate 19, a hollow plate 21 and a limit sleeve 22 are fixed to one side of the rectangular tube 4, the rectangular plate 19 is slidably fitted in the hollow plate 21 and the limit sleeve 22, a plurality of second springs 20 are arranged in the hollow plate 21, and one end of the second spring 20 is fixed to the inner wall of the hollow plate 21, and the other end of the hollow plate 21 is fixed to the rectangular plate 19.

[0028] When the plurality of rectangular tubes 4 are unfolded, the base 1 is rotated and the level meter 8 is observed to rotate the base 1 to a horizontal position, and the rectangular plate 19 is pressed in sequence. When the rectangular plate 19 will drive the wedge-shaped extrusion plate 18 to move, when the wedge-shaped extrusion plate 18 is squeezed to the arc plate 16, the positioning tooth plate 14 will be driven to move into the slide groove 13, so that the positioning tooth plate 14 and the supporting tooth plate 5 are separated. At this time, the supporting tooth plate 5 will slide down under the action of gravity until the bottom of the supporting tooth plate 5 contacts the ground, and the supporting tooth plate 5 stops sliding down. At this time, the rectangular plate 19 is released, and the rectangular plate 19 and the wedge-shaped extrusion plate 18 are driven to move up under the rebound force of the second spring 20. When the wedge-shaped extrusion plate 18 no longer contacts the arc plate 16, the rebound force of the first spring 17 drives the positioning tooth plate 14 to move, so that the positioning tooth plate 14 and the supporting tooth plate 5 are meshed, that is, the supporting tooth plate 5 and the rectangular tube 4 are fixed, that is, the base 1 is supported in a horizontal state, and the measuring benchmark body 2 can be used.

[0029] The exemplary implementation scheme of the present disclosure is described in detail above with reference to the preferred embodiments. However, it can be understood by those skilled in the art that, without departing from the concept of the present disclosure, various modifications and variations can be made to the above-mentioned specific embodiments, and various technical features and structures proposed in the present disclosure can be combined in various ways without exceeding the protection scope of the present disclosure, which is determined by the attached claims.

Claims

1. A building construction measurement pole, characterized in that: It includes a base and a measuring benchmark body fixed on the top of the base, two weight blocks are fixed on the top of the base, and the measuring benchmark body and the two weight blocks are distributed in an equilateral triangle, three rectangular tubes are hinged at equal intervals along the radial direction of the outer side of the base, and a supporting tooth plate is slidably connected inside the rectangular tube, a screw is threadedly connected to the base, a top plate is fixed on the top of the screw, a level is installed on the top of the top plate, and a turning handle is also fixed on the top of the top plate, a disc is rotatably connected to the bottom of the screw, three rotating rods are hinged at equal intervals along the radial direction of the outer side of the disc, and the end of the rotating rod away from the disc is hinged to the corresponding rectangular tube, and a positioning unit for positioning the moving supporting tooth plate is arranged in the rectangular tube.

2. A building construction measurement pole according to claim 1, characterized in that: The positioning unit includes a U-shaped plate fixed on a rectangular tube, and the U-shaped plate is connected to the rectangular tube, a positioning tooth plate is arranged in the U-shaped plate, the positioning tooth plate is meshed with a supporting tooth plate, a sliding groove is opened in the U-shaped plate, and the positioning tooth plate is slidably fitted in the sliding groove.

3. A building construction measurement pole according to claim 2, characterized in that: Two first springs are arranged in the slide slot, and one end of the first spring is fixed to the inner wall of the slide slot, and the other end of the first spring is fixed to the positioning tooth plate.

4. A building construction measurement pole according to claim 3, characterized in that: A rectangular groove is provided in the positioning tooth plate, and a rectangular plate is slidably connected in the rectangular groove.

5. A building construction measurement pole according to claim 4, characterized in that: An arc-shaped plate is fixed to the inner wall of the rectangular groove, and a wedge-shaped extrusion plate for extruding the arc-shaped plate is fixed to one side of the rectangular plate.

6. A building construction measurement pole according to claim 5, characterized in that: A hollow plate and a limiting sleeve are fixed on one side of the rectangular tube, and the rectangular plate is slidably matched in the hollow plate and the limiting sleeve.

7. The building construction measurement pole according to claim 6, characterized in that: A plurality of second springs are arranged in the hollow plate, and one end of the second spring is fixed to the inner wall of the hollow plate, and the other end of the hollow plate is fixed to the rectangular plate.