Blast furnace slag water treatment system
By designing a blast furnace slag water treatment system that encloses the water slag tank and exhaust cylinder, the problems of water vapor dissipation and "blazing" accidents are solved, and the automatic removal of water vapor and the safety of slag water quenching are improved.
Patent Information
- Application Number
- CN202323612870.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-12-28
AI Technical Summary
During the existing slag water quenching process, water vapor is difficult to collect, resulting in corrosion of the steel structure, and "blasting" accidents are prone to occur during blast furnace high vanadium titanium smelting, which brings safety hazards.
A blast furnace slag water treatment system is designed, including a closed water slag tank and exhaust cylinder, which is water quenched through high-speed water flow, and water vapor is eliminated using negative pressure to avoid steam leakage and prevent the phenomenon of "blade".
Effectively collect water vapor, prevent corrosion of steel structures, and block "blasting" accidents through closed structures, improving the safety and treatment efficiency of slag water quenching.
Smart Images

Figure CN221971598U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a system for water treatment of blast furnace slag. Background Art
[0002] Slag quenching is a common cooling method, often used in smelting or smelting processes. Specifically, slag refers to the oxide layer of slag or molten metal formed at high temperatures. In order to quickly cool the slag and prevent it from further reacting or harming the environment, water is often used for quenching.
[0003] The process of slag quenching involves exposing the slag to water to rapidly cool it. This effectively solidifies the slag and prevents it from producing fumes or harmful gases during the cooling process. In addition, slag quenching can also change the chemical properties of the slag, making it easier to handle or recycle.
[0004] Slag quenching generates a lot of heat and steam, and the existing slag flushing trench is open, making it difficult to collect the generated water vapor, which causes corrosion to the surrounding steel structure. In addition, the iron content of slag from blast furnace high-vanadium titanium smelting is high, and when the high-temperature molten slag is granulated through the slag trench, it is easy to cause slag trench "explosion" accidents, which brings safety hazards. Utility Model Content
[0005] In view of this, the utility model provides a blast furnace slag water treatment system, which can prevent water vapor from escaping and avoid the "blasting" phenomenon.
[0006] In order to solve the above technical problems, the technical solution of the utility model is to adopt a blast furnace slag water treatment system, including a slag flushing ditch and a plurality of slag flushing ports connected to the slag flushing ditch; a high-speed water flow is arranged at the slag flushing port for water quenching the slag falling into the slag flushing port; a water slag trough is arranged on the slag flushing ditch at the slag flushing port; the water slag trough is a closed box structure, and is provided with an exhaust pipe for exhaust; the slag flushing ditch is covered with a cover.
[0007] As an improvement, the width of the water-slag trough is 4 to 5 times that of the slag flushing ditch, and the height difference between its bottom and the water-slag trough is 1.5 to 2 meters; the height from the bottom to the top of the water-slag trough is 10 to 12 meters.
[0008] As a further improvement, the slag trough is a reinforced concrete structure, and its inner wall is covered with wear-resistant castable material.
[0009] As another further improvement, the exhaust pipe is arranged on the side of the water-slag trough and is connected to the water-slag trough by a connecting pipe.
[0010] As an improvement, the height of the exhaust chimney is 50~60m and the bottom diameter is 2.5~3m.
[0011] As an improvement, the front and rear ends of the cover body are respectively provided with a cover strip and a boss, and the cover strip can be buckled on the boss so that the front and rear cover bodies are buckled together.
[0012] As an improvement, a handle is provided at the bottom of the cover body.
[0013] As an improvement, the bottom of the slag flushing ditch has a slope.
[0014] The utility model is beneficial in that:
[0015] The blast furnace slag water treatment system with the above structure collects water vapor through a box-type closed water slag tank and discharges it through an exhaust pipe. Since the density of hot air is small, it will automatically rise, thus forming a negative pressure so that water vapor can be removed without power. In addition, the water slag tank is more open than the slag flushing ditch and is closed, thus blocking the harm caused by "blasting". BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a side view of the utility model.
[0017] Figure 2 It is a top view of the present invention.
[0018] Figure 3 It is a schematic diagram of the structure of the cover body.
[0019] Markings in the figure: 1 slag flushing groove, 2 slag flushing port, 3 slag outlet, 4 water slag trough, 5 exhaust pipe, 6 connecting pipe, 7 cover body, 71 cover strip, 72 boss, 73 handle. DETAILED DESCRIPTION
[0020] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described in detail below in conjunction with specific implementation methods.
[0021] like Figure 1 , Figure 2 As shown, the utility model provides a blast furnace slag water treatment system, including a slag flushing ditch 1 and a plurality of slag flushing ports 2 connected to the slag flushing ditch 1; the bottom of the slag flushing ditch 1 has an inclination, which is high in the front and low in the back, and is transported by gravity. A high-speed water flow is arranged at the slag flushing port 2 to quench the slag falling into the slag flushing port 2; a water slag trough 3 is arranged on the slag flushing ditch 1 at the slag flushing port 2; the water slag trough 3 is a closed box structure, and is provided with an exhaust pipe 5 for exhaust; the slag flushing ditch 1 is covered with a cover 6.
[0022] The principle of the utility model is to collect water vapor through a box-type closed water-slag trough 4 and discharge it through an exhaust pipe 5. Since the density of hot air is small, it will automatically rise, thus forming a negative pressure so that water vapor can be discharged without power. In addition, the water-slag trough 4 is more open than the slag flushing ditch 1 and is closed, thereby blocking the harm caused by "blasting".
[0023] Specifically, in the present invention, the width of the slag trough 4 is 4 to 5 times that of the slag flushing ditch 1, and the height difference between its bottom and the slag trough 1 is 1.5 to 2 meters; the height from the bottom to the top of the slag trough 4 is 10 to 12 meters. The width and height of the slag trough 4 are used to provide sufficient space for collecting water vapor; its depth is used for water storage, which meets the deep water granulation conditions and can also improve the water quenching quality and slag flushing safety.
[0024] In order to improve the strength of the entire slag trough 4, in this embodiment, the slag trough is a reinforced concrete structure, and the inner wall thereof is coated with wear-resistant castable.
[0025] In addition, the height of the exhaust pipe 5 in the utility model is 50-60m, the bottom diameter is 2.5-3m, and its weight can reach tens of tons. Therefore, in this embodiment, the exhaust pipe 5 is arranged on the side of the water slag trough 4, and is connected to the water slag trough 4 by the connecting pipe 6. The exhaust pipe 5 is not arranged on the top of the water slag trough 4 to avoid it being too heavy and crushing the water slag trough. And because the installation position is more flexible, in the case of multiple water slag troughs 4, it is also better to choose a position for multiple water slag troughs 4 to share.
[0026] In some embodiments, the slag flushing opening 2 is arranged vertically at 90° to the slag flushing groove 1 , further fully utilizing the spatial width of the slag trough 4 .
[0027] In some embodiments, the front and rear ends of the cover body 7 are respectively provided with a cover strip 71 and a boss 72, and the cover strip 71 can be buckled on the boss 72 so that the front and rear covers 7 are buckled together. In this way, the airtightness can be maintained, so that steam is not easy to leak out. The bottom of the cover body 7 is provided with a handle 73 for easy carrying.
[0028] In the utility model, a water-slag trough 4 can be provided for each slag flushing port 2, so that all water vapor can be collected and each slag flushing port 2 can avoid the harm of the "blasting" phenomenon. Of course, under the premise that the water-slag trough 4 cannot be provided for each slag flushing port 2 due to limited conditions, the water-slag trough 4 can also be provided at the most downstream slag flushing port 2, so that at least the water vapor can be smoothly discharged to avoid harm to the steel structure.
[0029] The slag outlet 3 connected to the blast furnace is used to transport slag, which is a semi-solid state like magma. The slag outlet 3 is located above the slag flushing outlet 2, with a height difference of about 1 meter from the slag flushing outlet 2. There is a high-speed water flow in the slag flushing outlet 2. When the slag falls freely into the slag flushing outlet 2, it will be quenched by the high-speed water flow to form fine particles for easy recycling and reuse. The high-speed water flow in the slag flushing outlet 2 will form a vortex in the water slag trough 4, stirring up the slag at the bottom to avoid precipitation. The high-speed water flow also serves as a water flow for transporting slag, transporting the slag to the downstream of the slag flushing ditch 1 for collection.
[0030] The above are only preferred embodiments of the present invention. It should be noted that the above preferred embodiments should not be regarded as limiting the present invention. The protection scope of the present invention should be based on the scope defined by the claims. For ordinary technicians in this technical field, several improvements and modifications can be made without departing from the spirit and scope of the present invention, and these improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A blast furnace slag water treatment system, characterized in that: It comprises a slag flushing ditch and a plurality of slag flushing openings connected to the slag flushing ditch; the slag flushing openings are provided with high-speed water flows for water quenching the slag falling into the slag flushing openings; a water-slag trough is provided on the slag flushing ditch at the slag flushing openings; the water-slag trough is a closed box structure and is provided with an exhaust pipe for exhaust; the slag flushing ditch is covered with a cover.
2. A blast furnace slag water treatment system according to claim 1, characterized in that: The width of the water-slag trough is 4 to 5 times that of the slag flushing ditch, and the height difference between the bottom of the water-slag trough and the water-slag trough is 1.5 to 2 meters; the height from the bottom to the top of the water-slag trough is 10 to 12 meters.
3. A blast furnace slag water treatment system according to claim 1, characterized in that: The slag trough is a reinforced concrete structure, and the inner wall thereof is provided with wear-resistant castable material.
4. A blast furnace slag water treatment system according to claim 1, characterized in that: The exhaust pipe is arranged on the side of the water-slag trough and is connected with the water-slag trough by a connecting pipe.
5. A blast furnace slag water treatment system according to claim 1, characterized in that: The height of the exhaust chimney is 50~60m and the bottom diameter is 2.5~3m.
6. A blast furnace slag water treatment system according to claim 1, characterized in that: The front end and the rear end of the cover body are respectively provided with a cover strip and a boss, and the cover strip can be buckled on the boss so that the front and rear cover bodies are buckled together.
7. A blast furnace slag water treatment system according to claim 1, characterized in that: A handle is arranged at the bottom of the cover body.
8. A blast furnace slag water treatment system according to claim 1, characterized in that: The bottom of the slag flushing ditch has a slope.
