Bridge capping beam and accessory integrated construction formwork
By designing the integrated construction formwork of bridge cover beams and accessories, the integrated pouring of cover beams, support cushion stones and stops is achieved, and the structural strength and construction cycle problems caused by step-by-step construction in the existing technology are solved, and the concrete transportation cost is reduced , improve construction efficiency.
Patent Information
- Application Number
- CN202420006946.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-03
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-01-03
AI Technical Summary
In bridge construction, cover beams, support cushion stones and stops are integrated structures. The prior art is usually constructed separately, resulting in an impact on the overall structural strength, an extended construction cycle and an increase in concrete transportation costs.
Design an integrated construction formwork for bridge cover beams and accessories, including bottom molds, side molds, end molds and top molds. By connecting components, a stable casting cavity is formed to realize integrated casting of cover beams, support cushion stones and stops. Eliminates phased chiseling and formwork installation, reducing concrete transport.
It effectively guarantees structural strength, shortens the construction cycle, reduces concrete transportation costs, and improves construction efficiency.
Smart Images

Figure CN221972102U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of municipal bridge construction, in particular to an integrated construction template for a bridge cap beam and accessories. Background Art
[0002] During the bridge construction process, the cap beam, support pedestal stone and block are important structures. The three structures are integrated structures. However, due to their irregular shapes, in order to facilitate construction, they are usually constructed separately. The specific steps are to embed the support pedestal stone and block steel bars when tying the cap beam reinforcement, and then cast the cap beam. After the cap beam is cast, the support pedestal stone and block parts on the cap beam are roughened, and after leveling, the support pedestal stone formwork and block formwork are installed, and finally cast. This construction method has many disadvantages. First, the integrated structure is cast in two steps, which will have a certain impact on the strength of the overall structure; second, the construction process adds processes such as roughening and support pedestal stone formwork installation, which prolongs the construction period; third, it is cast in stages, but the support pedestal stone and block require less concrete, and they need to be transported separately for their construction, which increases transportation costs. Utility Model Content
[0003] The main purpose of the utility model is to provide an integrated construction template for a bridge cap beam and accessories, which is used to solve the problem that the overall strength and construction period are affected by the step-by-step construction of the existing cap beam, support pad stone and block during the construction process.
[0004] To achieve the above-mentioned purpose, the utility model provides an integrated construction template for a bridge cap beam and accessories, comprising:
[0005] The formwork assembly includes a bottom mold, side molds and end molds arranged on the bottom mold, and a top mold arranged above the side molds and the end molds; the bottom mold is provided with a through-hole cavity, and the bottom mold is evenly divided into a first mold body and a second mold body of the same shape and size from a bisector; the side molds and the end molds are respectively arranged on two opposite side surfaces of the bottom mold, so that a casting cavity is formed between the bottom mold, the side molds and the end molds; a secondary cavity is provided inside the top mold, a support cavity connected to the secondary cavity is provided in the middle of the top mold, and block cavities connected to the secondary cavity are provided at both ends of the top mold, and a first pouring port connected to the secondary cavity is provided on the top mold; a second pouring port connected to the secondary cavity is provided on the support cavity, and a third pouring port connected to the secondary cavity is provided on the block cavity; the first pouring port and the second pouring port are respectively provided with a first blocking block and a second blocking block;
[0006] The connecting assembly includes a connecting base plate, a connecting top plate located on one side of the connecting base plate, a support plate located on one side of the connecting top plate, and a connecting rod that slides through the support plate and the connecting top plate; the connecting rod is connected to the connecting base plate by threads, and a retaining ring is provided on the outer wall of the connecting rod located between the support plate and the connecting top plate; the connecting base plate, the connecting top plate, and the support plate are respectively arranged between the first mold body and the second mold body, the bottom mold and the side mold, the bottom mold and the end mold, the side mold and the end mold, and the side mold and the top mold to ensure a stable connection between the bottom mold, the side mold, the end mold, and the top mold.
[0007] As a further improvement of the present invention, the bottom mold includes a horizontal bottom plate, an inclined plate symmetrically arranged on the horizontal bottom plate, and a support plate arranged on the end of the inclined plate and parallel to the horizontal bottom plate; the through-hole cavity is arranged on the horizontal bottom plate; the bottom mold is divided into a first mold body and a second mold body along a bisector connecting the support plate, the inclined plate, and the horizontal bottom plate, so that the through-hole cavity is equally divided into two parts.
[0008] As a further improvement of the present invention, the cross section of the support cavity is rectangular; the vertical section of the block cavity is a right-angled trapezoid; the support cavity is higher than the auxiliary cavity; and the block cavity is higher than the support cavity.
[0009] As a further improvement of the present invention, a limit frame is provided on the first pouring port and the second pouring port respectively; a limit plate is provided on the end of the first blocking block and the second blocking block respectively, and the height of the first blocking block and the second blocking block is consistent with the height of the limit frame.
[0010] The beneficial effects of the present invention are as follows:
[0011] By setting up bottom formwork, side formwork, end face and top formwork and connecting them through connecting components to form a casting cavity, the cap beam, support pad stone and block can be cast in one piece, effectively ensuring the structural strength; at the same time, the one-time casting saves the time cost of roughening and formwork installation and the transportation cost of concrete transportation. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a schematic diagram of the overall structure of a bridge cap beam and accessories integrated construction template of the utility model;
[0013] Figure 2 This is a schematic diagram of the pouring cavity structure of a bridge cap beam and accessories integrated construction template of the utility model;
[0014] Figure 3 This is an enlarged structural diagram of the bottom formwork of an integrated construction formwork for a bridge cap beam and accessories according to the present invention;
[0015] Description of reference numerals:
[0016] 1. Bottom mold; 101. First mold body; 102. Second mold body; 2. Side mold; 3. End mold; 4. Top mold; 5. Through-hole cavity; 6. Casting cavity; 7. Auxiliary cavity; 8. Support cavity; 9. Block cavity; 10. First pouring port; 11. Second pouring port; 12. Third pouring port; 14. Second blocking block; 15. Connecting bottom plate; 16. Connecting top plate; 17. Support plate; 18. Connecting rod; 19. Retaining ring; 20. Threaded hole; 21. Sliding hole; 22. Horizontal bottom plate; 23. Inclined plate; 24. Support plate; 25. Limit frame. DETAILED DESCRIPTION
[0017] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the embodiments described are only part of the embodiments of the present invention, rather than all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0018] In one embodiment, see Figure 1 、 2 The utility model discloses an integrated construction template for a bridge cap beam and accessories, including a template component and a connection component.
[0019] Among them, the template assembly includes a bottom mold 1, a side mold 2 and an end mold 3 arranged on the bottom mold 1, and a top mold 4 arranged above the side mold 2 and the end mold 3; a through-hole cavity 5 is provided on the bottom mold 1, and the bottom mold 1 is evenly divided into a first mold body 101 and a second mold body 102 of the same shape and size from the bisector; the side mold 2 and the end mold 3 are respectively arranged on two opposite sides of the bottom mold 1, so that a casting cavity 6 is formed between the bottom mold 1, the side mold 2 and the end mold 3; a secondary cavity 7 is provided inside the top mold 4, a support cavity 8 connected to the secondary cavity 7 is provided in the middle of the top mold 4, and block cavities 9 connected to the secondary cavity 7 are provided at both ends of the top mold 4, a first pouring port 10 connected to the secondary cavity 7 is provided on the top mold 4, a second pouring port 11 connected to the secondary cavity 7 is provided on the support cavity 8, and a third pouring port 12 connected to the secondary cavity 7 is provided on the stopper cavity 9 ; A first blocking block and a second blocking block 14 are respectively provided on the first pouring port 10 and the second pouring port 11; the connecting assembly includes a connecting bottom plate 15, a connecting top plate 16 located on one side of the connecting bottom plate 15, a support plate 17 located on one side of the connecting top plate 16, and a connecting rod 18 that slides through the support plate 17 and the connecting top plate 16, the connecting rod 18 is connected to the connecting bottom plate 15 by a thread, and a retaining ring 19 is provided on the outer wall of the connecting rod 18 located between the support plate 17 and the connecting top plate 16; the connecting bottom plate 15, the connecting top plate 16, and the support plate 17 are respectively arranged between the first mold body 101 and the second mold body 102, the bottom mold 1 and the side mold 2, the bottom mold 1 and the end mold 3, the side mold 2 and the end mold 3, and the side mold 2 and the top mold 4, so as to ensure a stable connection between the bottom mold 1, the side mold 2, the end mold 3, and the top mold 4.
[0020] Preferably, a threaded hole 20 is provided on the connecting base plate 15 , an end cap is provided on the end of the connecting rod 18 away from the connecting base plate 15 , and an external thread is provided on the outer wall of the connecting rod 18 adjacent to the connecting base plate 15 .
[0021] Preferably, a sliding hole 21 with an outer diameter greater than that of the connecting rod 18 is provided on the connecting top plate 16 and the supporting plate 17 respectively, and the outer diameter of the retaining ring 19 is greater than the inner diameter of the sliding hole 21 .
[0022] For further information, see Figure 3 The bottom mold 1 includes a horizontal bottom plate 22, an inclined plate 23 symmetrically arranged on the horizontal bottom plate 22, and a support plate 24 arranged on the end of the inclined plate 23 and parallel to the horizontal bottom plate 22; the through-hole cavity 5 is arranged on the horizontal bottom plate 22; the bottom mold 1 is divided into a first mold body 101 and a second mold body 102 along the bisecting line connecting the support plate 24, the inclined plate 23, and the horizontal bottom plate 22, so that the through-hole cavity 5 is equally divided into two parts.
[0023] Preferably, the support plate 24 is located above the horizontal bottom plate 22, and the two ends of the inclined plate 23 are respectively connected to the support plate 24 and the horizontal bottom plate 22. The inclined plate 23 is flipped in the direction away from the horizontal bottom plate 22 so that the angle between the inclined plate 23 and the horizontal bottom plate 22 is an obtuse angle.
[0024] Preferably, two groups of through-hole cavities 5 are arranged at intervals and can be connected to two groups of bridge piers. The number of through-hole cavities 5 can be adjusted according to the number of bridge piers.
[0025] Preferably, two groups of connecting bottom plates 15 are provided at intervals on the first mold body 101 , and two groups of connecting top plates 16 , supporting plates 17 and connecting rods 18 corresponding to the connecting bottom plates 15 are provided at intervals on the second mold body 102 .
[0026] Preferably, the connecting bottom plate 15, the connecting top plate 16, the supporting plate 17 and the connecting rod 18 are respectively arranged on the inclined plates 23 on the first template and the second template.
[0027] Preferably, the connecting top plate 16, the supporting plate 17 and the connecting rod 18 are respectively arranged on the outer wall of the side mold 2 adjacent to the bottom mold 1, the outer wall of the side mold 2 adjacent to the end face, the outer wall of the end mold 3 adjacent to the bottom mold 1, and the outer wall of the top mold 4 adjacent to the side mold 2; the connecting bottom plate 15 is respectively arranged on the horizontal bottom plate 22 of the bottom mold 1 adjacent to the side mold 2, the support plate 24 of the bottom mold 1 adjacent to the end face, the outer wall of the end face adjacent to the side mold 2, and the outer wall of the side mold 2 adjacent to the top mold 4.
[0028] In the above setting, the connecting rod 18 is screwed into the threaded hole 20 on the connecting bottom plate 15, thereby connecting the connecting bottom plate 15 to the connecting top plate 16, and then the first mold body 101 and the second mold body 102 can be assembled to form the bottom mold 1, the bottom mold 1 can be assembled with the side mold 2 and the end mold 3 to form the casting cavity 6, and the top mold 4 can be connected with the side mold 2 and the end mold 3 respectively; the setting of the retaining ring 19 can prevent the connecting rod 18 from detaching from the support plate 17. At the same time, after the connecting rod 18 is connected to the threaded hole 20, the retaining ring 19 abuts against the connecting top plate 16, and the connecting bottom plate 15 and the connecting top plate 16 are fitted together under the action of the thread, so that the bottom mold 1, side mold 2, end mold 3, and top mold 4 are stably connected; the setting of the connecting bottom plate 15 and the connecting top plate 16 can provide connection points for hoisting the bottom mold 1, side mold 2, end mold 3, and top mold 4.
[0029] For further information, see Figure 1 The cross section of the support cavity 8 is rectangular, the vertical section of the block cavity 9 is a right-angled trapezoid, the support cavity 8 is higher than the auxiliary cavity 7; the block cavity 9 is higher than the support cavity 8.
[0030] Preferably, the support cavity 8 is a rectangular body with a hollow interior; the block cavity 9 is a trapezoidal body with a hollow interior.
[0031] For further information, see Figure 1 The first pouring port 10 and the second pouring port 11 are respectively provided with a limit frame 25; the ends of the first blocking block and the second blocking block 14 are respectively provided with a limit plate, and the height of the first blocking block and the second blocking block 14 is consistent with the height of the limit frame 25.
[0032] Preferably, the first pouring port 10 , the second pouring port 11 , and the third pouring port 12 are all rectangular.
[0033] Preferably, a handle is provided on the limiting plate.
[0034] In this embodiment, the bottom formwork 1 is installed on the cap beam formwork support system and supported by I-beams. After the first formwork 101 and the second formwork 102 are connected, the through-hole cavity 5 is located on the periphery of the bridge pillar; after the installation of the bottom formwork 1 is completed, the workers will integrate the cap beam, support pad stone and block steel bars. After the steel bars are tied, the side formwork 2 and the end formwork 3 are installed first, and the top formwork 4 is installed last. After the installation of the top formwork 4 is completed, concrete is poured, and the pouring pipe is extended from the first pouring port 10 into the pouring cavity 6 for pouring. During the pouring process, the concrete vibrator can be extended from the first pouring port 10 or the second pouring port 11. The inside of the pouring cavity 6 is vibrated. After the concrete is poured to the top of the cap beam, the first pouring port 10 is closed with a first blocking block. After the closing is completed, the pouring of the support pedestal stone is continued. The pouring pipe is extended from the second pouring port 11 into the support cavity 8 to cast the support pedestal stone, and vibrated. After the concrete is poured to the top of the pillar cavity, the second pouring port 11 is closed with a second blocking block 14. After the closing is completed, the pouring of the block is continued. The pouring pipe is extended from the third pouring port 12 into the block cavity 9 to cast the block, and vibrated. After the concrete solidifies, the formwork is removed and maintained uniformly.
[0035] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A bridge cap beam and accessories integrated construction template, characterized in that: include: The template assembly comprises a bottom template (1), a side template (2) and an end template (3) arranged on the bottom template (1), and a top template (4) arranged above the side template (2) and the end template (3); the bottom template (1) is provided with a through hole cavity (5), and the bottom template (1) is evenly divided into a first template body (101) and a second template body (102) of the same shape and size along a bisecting line; the side template (2) and the end template (3) are respectively arranged on two opposite side surfaces of the bottom template (1), so that a casting cavity (6) is formed between the bottom template (1), the side template (2) and the end template (3); the top template (4) has a through hole cavity (5) inside. A secondary cavity (7) is provided, a support cavity (8) communicating with the secondary cavity (7) is provided in the middle of the top mold (4), block cavities (9) communicating with the secondary cavity (7) are provided at both ends of the top mold (4), a first pouring port (10) communicating with the secondary cavity (7) is provided on the top mold (4); a second pouring port (11) communicating with the secondary cavity (7) is provided on the support cavity (8), and a third pouring port (12) communicating with the secondary cavity (7) is provided on the block cavity (9); a first blocking block (14) and a second blocking block (14) are provided on the first pouring port (10) and the second pouring port (11), respectively; The connecting assembly comprises a connecting bottom plate (15), a connecting top plate (16) located at one side of the connecting bottom plate (15), a supporting plate (17) located at one side of the connecting top plate (16), and a connecting rod (18) slidingly passing through the supporting plate (17) and the connecting top plate (16); the connecting rod (18) is connected to the connecting bottom plate (15) by threads, and a retaining ring (19) is provided on the outer wall of the connecting rod (18) located between the supporting plate (17) and the connecting top plate (16); the connecting bottom plate (15), the connecting top plate (16), and the supporting plate (17) are respectively arranged between a first mold body (101) and a second mold body (102), a bottom mold (1) and a side mold (2), a bottom mold (1) and an end mold (3), a side mold (2) and an end mold (3), and a side mold (2) and a top mold (4), so as to stably connect the bottom mold (1), the side mold (2), the end mold (3), and the top mold (4).
2. The integrated construction formwork for bridge cap beam and accessories according to claim 1 is characterized in that: The bottom mold (1) comprises a horizontal bottom plate (22), an inclined plate (23) symmetrically arranged on the horizontal bottom plate (22), and a support plate (24) arranged on the end of the inclined plate (23) and parallel to the horizontal bottom plate (22); the through hole cavity (5) is arranged on the horizontal bottom plate (22); the bottom mold (1) is divided into a first mold body (101) and a second mold body (102) along a bisecting line connecting the support plate (24), the inclined plate (23) and the horizontal bottom plate (22), so that the through hole cavity (5) is equally divided into two parts.
3. The integrated construction formwork for bridge cap beam and accessories according to claim 2 is characterized in that: The cross section of the support cavity (8) is rectangular; the vertical section of the block cavity (9) is a right-angled trapezoid; the support cavity (8) is higher than the auxiliary cavity (7); and the block cavity (9) is higher than the support cavity (8).
4. The integrated construction template for bridge cap beam and accessories according to claim 3 is characterized by: The first pouring port (10) and the second pouring port (11) are respectively provided with a limit frame (25); the ends of the first blocking block and the second blocking block (14) are respectively provided with a limit plate, and the height of the first blocking block and the second blocking block (14) is consistent with the height of the limit frame (25).
Citation Information