Permanent and temporary combined assembly type subway station structure

Through the Yonglin combined prefabricated structure combining prefabricated ground walls and prefabricated support, the long time of cast-in-place construction and major traffic impact problems are solved, and the efficient, low-cost and low-carbon construction of subway stations is achieved, and it is suitable for most subways. Station construction.

CN221972478UActive Publication Date: 2024-11-08CHINA RAILWAY DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323274189.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-01
Publication Date
2024-11-08
Estimated Expiration
2033-12-01

AI Technical Summary

Technical Problem

The subway stations constructed in cast-in-place are problems such as long construction time, great impact on traffic, and difficult to guarantee construction quality in the surrounding environment of the city. Although the prefabricated structure has advantages, there is a complex design and construction in the specific application of the subway station. sex.

Method used

The Yonglin combined prefabricated structure adopts a combination of prefabricated ground walls and prefabricated support. Through the combination of prefabricated ground walls, cast-in-place top waist beams, prefabricated top cross beams, cast-in-place mid-waist beams and other components, the Yonglin combined design is formed to reduce support. Demolition and waste, achieve integration of enclosure and main structure, and reduce construction costs and construction periods.

Benefits of technology

It has achieved a construction method with low cost, high construction efficiency, low construction period, green and low carbon, reduced waste and simplified the on-site construction process, and is suitable for the construction of most subway stations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972478U_ABST
    Figure CN221972478U_ABST
Patent Text Reader

Abstract

The utility model discloses a permanent and temporary combined assembly type subway station structure which comprises a set of vertical prefabricated diaphragm walls oppositely arranged in the longitudinal direction of a station, the prefabricated diaphragm walls are used for supporting the two sides, and the prefabricated diaphragm walls are sequentially connected with a cast-in-place top waist beam, a cast-in-place middle waist beam and a cast-in-place bottom plate from top to bottom through embedded steel bar connecting sleeves. The cast-in-place top waist beam is connected with the multiple prefabricated top cross beams to form a permanent-temporary combined top plate supporting structure, the cast-in-place middle waist beam is connected with the multiple prefabricated middle cross beams to form a permanent-temporary combined middle plate supporting structure, and vertical supporting structures are arranged in the middle of the top plate supporting structure, the middle plate supporting structure and the cast-in-place bottom plate. The vertical support is a temporary steel latticed column in the foundation pit excavation stage, and concrete is poured in the back-building stage to form a permanent middle column. The structure system of the prefabricated diaphragm wall, the permanent and temporary combined support and the prefabricated plate is adopted, waste and waste are reduced, the manufacturing cost and the construction period are saved, site construction is simplified, and the system is suitable for most subway stations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of building construction, and specifically relates to a permanent and temporary combined assembled subway station structure. Background Art

[0002] At present, when building subway stations in areas with complex surrounding environments in cities, the use of cast-in-place construction often takes up a long time on the road and has a great impact on traffic. In addition, the construction time of cast-in-place concrete is long and the construction quality is difficult to guarantee. Cast-in-place stations are generally constructed by open excavation. After the foundation pit is excavated, concrete supports and steel supports are erected in time for support. When the main structure is rebuilt, the supports are removed and cast-in-place. There are problems such as low efficiency and large waste. Prefabricated structures use prefabricated assembly, standardized production of components, high quality, and can improve construction efficiency. In recent years, my country has actively developed prefabricated buildings, and governments at all levels have successively issued a number of policies to promote the application of prefabricated buildings.

[0003] By adopting prefabricated ground-anchored walls and prefabricated supports as a combined prefabricated construction method, the enclosure structure and the main structure are integrated, the side walls are saved, and the removal of supports is reduced. It has many advantages such as low cost, high construction efficiency, short construction period, and green and low-carbon. It provides an effective method for solving the problems existing in the design and construction of existing urban rail transit, and thus becomes an important trend for future development. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a permanent and temporary combined assembled subway station structure and a construction method thereof.

[0005] The technical solution adopted by the present invention is:

[0006] A permanent and temporary combined assembled subway station structure, the permanent and temporary combined assembled subway station structure mainly includes: prefabricated ground connection wall, cast-in-place top waist beam, prefabricated top cross beams Ι, Ⅱ, prefabricated top longitudinal beam, cast-in-place middle waist beam, prefabricated middle cross beams Ι, Ⅱ, prefabricated middle longitudinal beam, cast-in-place bottom plate, bottom longitudinal beam, cast-in-place negative first and second floor center columns, prefabricated middle plate and top plate composite plate. Specifically: the permanent and temporary combined prefabricated subway station structure includes a group of vertical prefabricated ground diaphragm walls relatively arranged along the longitudinal direction of the station, the prefabricated ground diaphragm walls are used as two side supports, the prefabricated ground diaphragm walls are connected to the cast-in-place top waist beam, cast-in-place middle waist beam and cast-in-place bottom plate from top to bottom in sequence through pre-buried steel bar connecting sleeves, the cast-in-place top waist beam connects multiple prefabricated top cross beams to form a permanent and temporary combined top plate support structure (as the first horizontal support), the cast-in-place middle waist beam connects multiple prefabricated middle cross beams to form a permanent and temporary combined middle plate support structure (as the second horizontal support), a vertical support structure is provided in the middle of the top plate support structure, the middle plate support structure and the cast-in-place bottom plate, the vertical support structure is a temporary steel lattice column in the foundation pit excavation stage, and a permanent middle column is formed by pouring concrete in the backbuilding stage.

[0007] In the permanent and temporary combined prefabricated subway station structure, the prefabricated ground-connected walls serve as both enclosing walls and main side walls, the prefabricated top and middle cross beams serve as the first and second horizontal supports, and the steel lattice columns are first used as temporary vertical supports and later converted into permanent middle columns, thus realizing a permanent and temporary combined design, reducing abandonment and waste, and saving construction costs and construction period.

[0008] In one embodiment, the prefabricated top cross beam is arranged along the transverse direction of the station, and is divided into two sections with the prefabricated top longitudinal beam as the boundary. According to different setting positions, it is divided into two types: prefabricated top cross beam I and prefabricated top cross beam II. The prefabricated top cross beam I is set at the middle column position, and the prefabricated top cross beam II is set at the middle position between two adjacent middle columns.

[0009] In one embodiment, the prefabricated top longitudinal beam is arranged along the longitudinal direction of the station, the prefabricated top longitudinal beam between two adjacent center columns is a segment, and the two adjacent segments are connected by the top plate longitudinal and transverse beam connection node II.

[0010] In one embodiment, two relatively arranged prefabricated top cross beam I-type components are connected through the top plate longitudinal and transverse beam connection node II; two relatively arranged prefabricated top cross beam II-type components are connected to the prefabricated top longitudinal beam through the top plate longitudinal and transverse beam connection node I; the prefabricated top cross beam I and prefabricated top cross beam II are connected to the prefabricated ground connection wall through the cast-in-place top waist beam.

[0011] In one embodiment, the prefabricated center cross beam is arranged along the transverse direction of the station, and is divided into two sections with the prefabricated center longitudinal beam as the boundary. According to different setting positions, it is divided into two types: prefabricated center cross beam I and prefabricated center cross beam II. The prefabricated center cross beam I is arranged at the center column position, and the prefabricated center cross beam II is arranged in the middle position between two adjacent center columns.

[0012] In one embodiment, the prefabricated center longitudinal beam is arranged along the longitudinal direction of the station, the prefabricated center longitudinal beam between two adjacent center columns is a segment, and the two adjacent segments are connected by the middle plate longitudinal and transverse beam connection node II.

[0013] In one embodiment, two relatively arranged prefabricated center cross beam I-type components are connected through the middle plate longitudinal and transverse beam connection node II; two relatively arranged prefabricated center cross beam II-type components are connected to the prefabricated center longitudinal beam through the middle plate longitudinal and transverse beam connection node I; the prefabricated center cross beam I and the prefabricated center cross beam II are connected to the prefabricated ground connection wall through the cast-in-place top and waist beams.

[0014] In one embodiment, during the foundation pit excavation stage, steel lattice columns are set at the permanent center column positions as temporary vertical supports; during the main body backbuilding stage, steel bars are tied outside the steel lattice columns, and concrete is poured in sections from bottom to top to form cast-in-place center columns on the first underground floor and cast-in-place center columns on the second underground floor.

[0015] In one embodiment, the sides of the prefabricated top cross beam I, prefabricated top cross beam Ⅱ, prefabricated middle cross beam I, prefabricated middle cross beam Ⅱ, prefabricated top longitudinal beam and prefabricated middle longitudinal beam are provided with corbel supports for installing prefabricated panels, and the prefabricated panels include a middle plate and a top plate.

[0016] In one embodiment, the middle plate is a prefabricated middle plate, which is a prefabricated assembled structure. It is installed on the corbel supports on the sides of the prefabricated middle beam I and the prefabricated middle beam Ⅱ by using block-based prefabricated middle plate components. The gaps between the prefabricated middle plates are filled with cement mortar.

[0017] In one embodiment, the top plate is a top plate composite plate, which is a composite cast-in-place structure. First, the prefabricated top plate composite plate is suspended between adjacent prefabricated top cross beams I and prefabricated top cross beams Ⅱ, and then the upper layer of the prefabricated top plate composite plate is reinforced, and finally the top plate cast-in-place layer is constructed to form an integral structure.

[0018] The second invention purpose of the utility model is to provide a construction method of a permanent and temporary combined assembled subway station, comprising the following steps:

[0019] S01. Hang and assemble prefabricated ground-connected walls, construct bored piles and steel lattice columns;

[0020] S02. Excavate the foundation pit to the top slab position, construct cast-in-place top waist beams, prefabricated top cross beams Ι and Ⅱ and prefabricated top longitudinal beams (also serving as the first permanent and temporary combined horizontal support);

[0021] S03. Continue excavating to the middle plate position, construct cast-in-place middle waist beam, prefabricated middle cross beams Ι and Ⅱ and prefabricated middle longitudinal beam (also serving as the second permanent and temporary combined horizontal support);

[0022] S04. Finally, excavate to the bottom of the pit and apply cushion layer and external waterproofing;

[0023] S05. During the backbuilding phase, cast-in-place bottom slab and bottom longitudinal beam, construct the second-floor center column, and install the prefabricated center slab;

[0024] S06. Construct the center column of the first floor below ground and install the prefabricated top slab;

[0025] S07. Tie up the upper layer of composite slab steel bars and construct the top slab cast-in-place layer;

[0026] S08. Finally, apply external waterproofing to the top slab and backfill with soil.

[0027] In one embodiment, the specific construction process of the prefabricated ground-connected wall in step S01 is as follows:

[0028] First, the prefabricated ground-connected walls are prefabricated in batches in the factory;

[0029] Then, pre-embed the steel bar connection sleeve at the connection between the prefabricated ground-connected wall and the cast-in-place top waist beam, cast-in-place middle waist beam and cast-in-place bottom plate;

[0030] Then, the prefabricated ground-connected wall is transported to the construction site;

[0031] After that, the ground-connected wall trenching construction is carried out;

[0032] Then, the prefabricated ground anchor wall is precisely placed into the slot using a crawler crane and positioning tooling;

[0033] Finally, the slurry is evenly poured into the gaps at the bottom and wall of the tank.

[0034] In one embodiment, the specific construction process of the medium-sized steel lattice column in step S01 is as follows:

[0035] First, drilling is carried out at the permanent center column of the main structure using a pile driver;

[0036] Then, a crane is used to insert the steel lattice column into the hole wall;

[0037] Then, the gap between the hole wall and the lattice column is poured with C35 concrete below the cast-in-place bottom plate to form bored piles;

[0038] Finally, the gap between the hole wall and the lattice column is filled with coarse sand above the cast-in-place base plate to make it dense.

[0039] The utility model responds to the requirements of energy conservation, emission reduction, green and low carbon, and has the following advantages:

[0040] (1) The prefabricated ground-connected wall serves as both the enclosure wall and the main body side wall. The prefabricated top and middle beams also serve as the first and second horizontal supports. The steel lattice columns are first used as temporary vertical supports and later converted into permanent middle columns, thus realizing a permanent and temporary combination design, reducing abandonment and waste, and saving construction costs and construction period.

[0041] (2) The top longitudinal beam and the middle longitudinal beam are prefabricated and assembled. They are constructed simultaneously with the first and second supporting beams during the excavation of the foundation pit and connected by cast-in-place nodes, thus avoiding the need for cast-in-place reinforcement at a later stage and saving construction time.

[0042] (3) To ensure the continuity of the longitudinal beams, the top and middle cross beams are prefabricated in two sections to reduce the size and facilitate transportation and lifting;

[0043] (4) The middle plate is assembled with prefabricated panels, which eliminates the need for formwork or brackets, thus simplifying on-site construction;

[0044] (5) The "prefabricated ground-anchored wall + permanent and temporary combined support + prefabricated slab" structural system reduces abandonment and waste, saves construction costs and construction period, simplifies on-site construction, and is applicable to most subway stations. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] The accompanying drawings, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0046] In the attached picture:

[0047] Figure 1 This is the top plate support plan layout of the utility model permanent and temporary combined assembled station foundation pit excavation stage;

[0048] Figure 2 This is the plan view of the middle plate support in the foundation pit excavation stage of the utility model combined with permanent and temporary assembled station;

[0049] Figure 3 This is the AA cross-sectional view of the foundation pit excavation stage of the permanent and temporary assembled station of the utility model;

[0050] Figure 4 This is the BB cross-sectional view of the foundation pit excavation stage of the permanent and temporary assembled station of the utility model;

[0051] Figure 5 It is the plan view of the prefabricated middle plate in the main body reconstructing stage of the permanent and temporary combined assembled station of the utility model;

[0052] Figure 6 It is a plan view of the top slab composite slab of the utility model in the main body reconstructing stage of the permanent and temporary assembled station;

[0053] Figure 7 This is the CC cross-sectional view of the main body of the permanent and temporary combined assembled station of the utility model at the reconstructing stage;

[0054] Figure 8 This is the DD cross-sectional view of the main body of the permanent and temporary assembled station of the utility model at the reconstructing stage;

[0055] Fig. 9 This is a cross-sectional view of the utility model of the permanent and temporary combined assembled station in the use stage;

[0056] Fig.10 This is the structural diagram of the prefabricated top beam of the permanent and temporary assembled station of the utility model;

[0057] Fig.11 This is the structural diagram of the prefabricated middle beam of the permanent and temporary assembled station of the utility model;

[0058] Fig.12 This is the structural diagram of the prefabricated top longitudinal beam of the permanent and temporary assembled station of the utility model;

[0059] Fig.13 This is the structural diagram of the prefabricated middle longitudinal beam of the permanent and temporary assembled station of the utility model;

[0060] Fig.14 This is a construction sequence diagram of the foundation pit excavation stage of the utility model of the permanent and temporary assembled station;

[0061] Fig.15 This is a construction sequence diagram of the main body of the permanent and temporary assembled station of the utility model;

[0062] in:

[0063] 1—Prefabricated ground-connected wall; 2—Bored cast-in-place piles;

[0064] 3—Steel lattice column; 4—Cast-in-place top and waist beam;

[0065] 5—prefabricated top cross beam Ⅰ; 6—prefabricated top cross beam Ⅱ;

[0066] 7—prefabricated top longitudinal beam; 8—top plate longitudinal and transverse beam connection node 1;

[0067] 9—Connection node II of top plate longitudinal and transverse beams; 10—Cast-in-place middle waist beam;

[0068] 11—prefabricated middle cross beam Ι; 12—prefabricated middle cross beam Ⅱ;

[0069] 13—prefabricated middle longitudinal beam; 14—middle plate longitudinal and transverse beam connection node 1;

[0070] 15—middle plate longitudinal and transverse beam connection node II; 16—cast-in-place bottom plate;

[0071] 17—cast-in-place bottom longitudinal beam; 18—cast-in-place middle column of the negative second floor;

[0072] 19—prefabricated middle slab; 20—cast-in-place middle column of the first underground floor;

[0073] 21—Prefabricated top slab composite slab; 22—Top slab cast-in-place layer. DETAILED DESCRIPTION

[0074] First of all, it should be noted that the specific structure, features and advantages of the present invention will be specifically described below by way of example, but all descriptions are only for illustration and should not be understood as limiting the present invention in any way. In addition, any single technical feature described or implied in the embodiments mentioned herein, or any single technical feature displayed or implied in the drawings, can still be combined or deleted between these technical features (or their equivalents) to obtain more other embodiments of the present invention that may not be directly mentioned in this document. In addition, in order to simplify the drawings, the same or similar technical features may be marked only in one place in the same drawing.

[0075] In the present invention, unless otherwise clearly specified and limited, the terms "install", "set", "connect", "fix", "screw" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the present invention according to the specific circumstances. Figure 1-15 The present invention will be described in detail.

[0076] A permanent and temporary combined assembled subway station structure mainly includes: a prefabricated ground-connected wall 1, a cast-in-place top waist beam 4, a prefabricated top cross beam Ι5, a prefabricated top cross beam Ⅱ6, a prefabricated top longitudinal beam 7, a cast-in-place middle waist beam 10, a prefabricated middle cross beam Ι11, a prefabricated middle cross beam Ⅱ12, a prefabricated middle longitudinal beam 13, a cast-in-place bottom plate 16, a cast-in-place bottom longitudinal beam 17, a cast-in-place first-basement center column 18, a cast-in-place second-basement center column 20, a prefabricated middle plate 19 and a top plate composite plate 21. Specifically: it includes a group of vertical prefabricated ground-connected walls 1 relatively arranged along the longitudinal direction of the station, the prefabricated ground-connected walls 1 are used as supports on both sides, and are connected in sequence from top to bottom to the cast-in-place top waist beam 4, the cast-in-place middle waist beam 10 and the cast-in-place bottom plate 16 through pre-buried steel bar connecting sleeves, the cast-in-place top waist beam 4 is connected to multiple prefabricated top cross beams 5 and 6 to form a permanent and temporary combined top plate support structure as the first horizontal support, the cast-in-place middle waist beam 10 is connected to multiple prefabricated middle cross beams 11 and 12 to form a permanent and temporary combined middle plate support structure as the second horizontal support, and a vertical support structure is provided in the middle of the top plate support structure, the middle plate support structure and the cast-in-place bottom plate 16, the vertical support structure is a temporary steel lattice column 3 in the foundation pit excavation stage, and is formed as a permanent middle column by pouring concrete in the backbuilding stage.

[0077] in:

[0078] like Figure 1 As shown: a group of relatively arranged prefabricated ground-connected walls 1 are used as retaining walls and are connected to the cast-in-place top waist beam 4 through embedded steel sleeves; the prefabricated top cross beams are divided into two types, Ι and Ⅱ, among which the prefabricated top cross beam Ι5 is arranged at the middle column position, and the prefabricated top cross beam Ⅱ6 is arranged in the middle position of the adjacent middle columns; the prefabricated top longitudinal beam 7 is arranged along the longitudinal direction of the station, and the span of two adjacent middle columns is one section; the prefabricated top longitudinal beam 7 and the prefabricated top cross beam Ι5, and the two adjacent prefabricated top longitudinal beam 7 sections are connected through the top plate longitudinal and transverse beam connection node Ⅱ9; the prefabricated top longitudinal beam 7 and the prefabricated top cross beam Ⅱ6 are connected through the top plate longitudinal and transverse beam connection node Ι8; the prefabricated top cross beams Ι, Ⅱ56 are connected to the prefabricated ground-connected wall 1 through the cast-in-place top waist beam 4.

[0079] like Figure 2As shown: the precast center cross beam is divided into two types, Ι and Ⅱ, among which the precast center cross beam Ι11 is arranged at the center column position, and the precast center cross beam Ⅱ12 is arranged in the middle position of the adjacent center columns; the precast center longitudinal beam 13 is arranged along the longitudinal direction of the station, and the span between two adjacent center columns is a segment; the precast center longitudinal beam 13 and the precast center cross beam Ι11, and between two adjacent precast center longitudinal beam 13 segments, are connected through the middle plate longitudinal and transverse beam connection node Ι15; the precast center longitudinal beam 13 and the precast center cross beam Ⅱ12 are connected through the middle plate longitudinal and transverse beam connection node Ι14; the precast center cross beams Ι, Ⅱ1112 and the precast ground connecting wall 1 are connected through the cast-in-place middle waist beam 10.

[0080] like Figure 3 As shown: the prefabricated ground-connected wall 1 is connected to the cast-in-place top waist beam 4 and the middle waist beam 10 from top to bottom in sequence through the embedded steel sleeve; the two relatively arranged prefabricated top cross beam Ι5 components are connected through the top plate longitudinal and transverse beam connection node Ⅱ9; the two relatively arranged prefabricated middle cross beam Ι11 components are connected through the middle plate longitudinal and transverse beam connection node Ⅱ15; the steel lattice column 3 is a temporary vertical support, located at the middle column position, the lower part is inserted into the bored pile 2, and the upper part is respectively connected to the top longitudinal beam and the middle longitudinal beam through the top plate longitudinal and transverse beam connection node Ⅱ9 and the middle plate longitudinal and transverse beam connection node Ⅱ15.

[0081] like Figure 4 As shown: two relatively arranged prefabricated top cross beam Ⅱ6 components are connected to the prefabricated top longitudinal beam 7 through the top plate longitudinal and transverse beam connection node Ι8; two relatively arranged prefabricated middle cross beam Ⅱ12 components are connected to the prefabricated middle longitudinal beam 13 through the middle plate longitudinal and transverse beam connection node Ι14.

[0082] like Figure 10 to Figure 13 As shown: the prefabricated top cross beams 1, Ⅱ56, the prefabricated middle cross beams 1, Ⅱ1112, the prefabricated top longitudinal beams 7 and the prefabricated middle longitudinal beams 13 have the same cross-sectional shape and different lengths, and their sides are all provided with brackets for installing prefabricated panels. Specifically: the sides of the prefabricated top cross beams 1, Ⅱ56 are provided with brackets for installing prefabricated top plate composite plates, and the sides of the prefabricated top longitudinal beams 7 are provided with brackets for installing prefabricated top plate composite plates; the sides of the prefabricated middle cross beams 1, Ⅱ1112 are provided with brackets for installing prefabricated middle plates, and the sides of the prefabricated middle longitudinal beams 13 are provided with brackets for installing prefabricated middle plates.

[0083] like Figure 5 As shown: the middle plate is a prefabricated assembly structure, and the prefabricated middle plate 19 components are installed on the corbel supports on the sides of the prefabricated middle cross beam, and the gaps between the prefabricated middle plates are filled with cement mortar.

[0084] like Figure 6 As shown: the top plate is a composite cast-in-place structure. First, the prefabricated top plate composite plate 21 is suspended between adjacent prefabricated top cross beams, and then the upper layer of the prefabricated top plate composite plate is tied, and finally the top plate cast-in-place layer 22 is constructed to form an integral structure.

[0085] like Figure 7-Figure 8 As shown: the cast-in-place bottom plate 16 is connected to the prefabricated ground wall 1 through the embedded steel bar connection sleeve, and the cast-in-place bottom plate is provided with a bottom longitudinal beam 17 along the longitudinal direction of the station; the prefabricated top plate composite plate 21 is assembled between adjacent prefabricated top cross beams, and the prefabricated middle plate 19 is assembled between adjacent prefabricated middle cross beams; the steel lattice column 3 is first used as a temporary vertical support, and later converted into a permanent middle column, and the steel bars are tied outside the steel lattice column, and concrete is poured, and the construction is carried out in sections from bottom to top to form the negative second floor middle column 18 and the negative first floor middle column 20. The steel lattice column 3 is used to bear the vertical self-weight load of the upper prefabricated top cross beam and top longitudinal beam and the vertical self-weight load of the middle prefabricated top cross beam and top longitudinal beam.

[0086] like Fig. 9 As shown: after the construction of the top slab cast-in-place layer 22 is completed, waterproofing construction is carried out and finally backfilling and covering with soil.

[0087] In this embodiment, the prefabricated ground-connected wall serves as both the supporting wall of the enclosure structure and the side wall of the main structure. The prefabricated top cross beam and the prefabricated middle cross beam serve as the first and second supports respectively. The prefabricated top and middle plate cross beams are connected to the prefabricated ground-connected wall through a cast-in-place waist beam. The steel lattice columns serve as temporary vertical supports during the foundation pit excavation stage to bear the vertical load. During the main body backbuilding stage, they are cast in sections from bottom to top to form permanent middle columns. The middle plate is installed by using divided prefabricated plates, and the top plate is a composite structure that uses prefabricated composite plates as the bottom formwork and then cast-in-place concrete to form an overall structure.

[0088] A permanent and temporary combined assembled subway station construction method comprises the following steps: Fig.14 As shown in the figure, the construction process of the foundation pit excavation stage is as follows:

[0089] S01. Hanging and assembling prefabricated ground-connected wall 1, constructing bored piles 2 and steel lattice columns 3;

[0090] Furthermore, the prefabricated ground anchor walls are first prefabricated in batches in the factory, then transported to the construction site, and then the ground anchor walls are constructed into trenches. The prefabricated ground anchor walls are then accurately lowered into the trenches by crawler cranes and positioning tooling, and finally the slurry is evenly poured into the gaps at the bottom of the trench and the trench walls.

[0091] Furthermore, firstly, drilling construction is carried out at the column position of the main structure by using a pile driver, and then the steel lattice column is inserted into the hole wall by using a crane, and then C35 concrete is poured into the gap between the hole wall and the lattice column below the cast-in-place bottom plate to form bored cast-in-place piles, and finally, coarse sand is poured into the gap between the hole wall and the lattice column above the cast-in-place bottom plate to fill it tightly.

[0092] S02. Excavate the foundation pit to the top plate position, construct cast-in-place waist beam 4, prefabricated top cross beams Ι, Ⅱ56 and prefabricated top longitudinal beams 7 as the first permanent and temporary combined horizontal support;

[0093] Furthermore, after the precast top cross beam Ι5, the precast top cross beam Ⅱ6 and the precast top longitudinal beam 7 are hoisted in place, they are connected through the cast-in-place top waist beam 4 and the top plate longitudinal and transverse beam connection nodes Ι and Ⅱ89 to form the first permanent and temporary combined horizontal support;

[0094] S03. Continue excavating to the middle plate position, construct cast-in-place middle waist beam 10, prefabricated middle cross beams Ι, Ⅱ1112 and prefabricated middle longitudinal beam 13 as the second permanent and temporary combined horizontal support;

[0095] Furthermore, after the precast middle cross beam Ι11, the precast middle cross beam Ⅱ12 and the precast middle longitudinal beam 13 are hoisted in place, the nodes Ι and Ⅱ1415 are connected by the cast-in-place middle waist beam 10 and the middle plate longitudinal and transverse beams to form the second permanent and temporary combined horizontal support;

[0096] S04. Finally, excavate to the bottom of the pit and apply cushion layer and external waterproofing;

[0097] like Fig.15 As shown in the figure, the construction process of the main structure backbuilding stage is as follows:

[0098] S05. Backbuilding stage cast-in-place bottom plate 16 and bottom longitudinal beam 17, construction of negative second floor center column 18, installation of prefabricated center plate 19;

[0099] Furthermore, the cast-in-place base plate is connected to the prefabricated ground wall through embedded steel bar connecting sleeves, the steel cage is tied outside the lattice column, and then the concrete is cast in place to form a permanent center column structure of the negative second floor. The prefabricated center plate is then hung and installed between adjacent prefabricated center beams, and the gaps between the prefabricated center plates are filled with cement mortar.

[0100] S06 construction of the first floor of the column 20, installation of prefabricated top plate composite plate 21;

[0101] Furthermore, based on the steel lattice columns on the first underground floor, a steel cage is tied outside the lattice columns, and then concrete is cast in situ to form a permanent center column structure 20 on the first underground floor, and then a prefabricated top plate composite plate 21 is suspended and installed between adjacent prefabricated top cross beams.

[0102] S07. Tie the upper layer of the composite plate and construct the top plate cast-in-place layer 22;

[0103] Furthermore, the cast-in-place layer of steel bars is tied to the prefabricated top plate composite plate 21, and then the top plate cast-in-place layer 22 is constructed to form a composite top plate structure with better integrity and stronger waterproofing.

[0104] S08. Finally, apply external waterproofing to the top slab and backfill with soil.

[0105] Furthermore, waterproof membrane is laid on the composite roof, waterproof coating is applied, waterproof construction is carried out, and then backfilling is carried out to the planned elevation.

[0106] The utility model responds to the requirements of energy conservation, emission reduction, green and low carbon, and has the following advantages:

[0107] 1. The prefabricated ground-connected wall serves as both the enclosure wall and the main body side wall. The prefabricated top and middle beams also serve as the first and second horizontal supports. The steel lattice columns are first used as temporary vertical supports and later converted into permanent middle columns, realizing a permanent and temporary combination design, reducing abandonment and waste, and saving construction costs and construction period.

[0108] 2. The top longitudinal beam and the middle longitudinal beam are prefabricated and assembled. They are constructed simultaneously with the first and second supporting beams during the foundation pit excavation. They are connected by cast-in-place nodes, avoiding the need for cast-in-place reinforcement at a later stage and saving construction time.

[0109] 3. To ensure the continuity of the longitudinal beam, the top and middle cross beams are prefabricated in two sections to reduce the size and facilitate transportation and lifting;

[0110] 4. The middle plate is assembled with prefabricated panels, which is free of formwork and brackets, simplifying on-site construction.

[0111] In summary, the utility model provides an optimized permanent and temporary combined assembled subway station structure.

[0112] The above embodiments describe the present invention in detail, but the above contents are only preferred embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of application of the present invention shall still fall within the scope of the patent coverage of the present invention.

Claims

1. A permanent and temporary combined assembled subway station structure, characterized by: It comprises a group of vertical prefabricated ground diaphragm walls (1) arranged relatively along the longitudinal direction of the station, the prefabricated ground diaphragm walls (1) are used as supports on both sides, the prefabricated ground diaphragm walls (1) are connected to a cast-in-place top waist beam (4), a cast-in-place middle waist beam (10) and a cast-in-place bottom plate (16) in sequence from top to bottom through pre-buried steel bar connection sleeves, the cast-in-place top waist beam (4) is connected to a plurality of prefabricated top cross beams to form a permanent and temporary combined top plate support structure, the cast-in-place middle waist beam (10) is connected to a plurality of prefabricated middle cross beams to form a permanent and temporary combined middle plate support structure, a vertical support structure is provided in the middle of the top plate support structure, the middle plate support structure and the cast-in-place bottom plate (16), the vertical support structure is a temporary steel lattice column in the foundation pit excavation stage, and is formed into a permanent middle column by post-casting concrete in the backfilling stage; The prefabricated top cross beam is arranged along the transverse direction of the station, and is divided into two sections with the prefabricated top longitudinal beam (7) as the boundary. According to different arrangement positions, the prefabricated top cross beam is divided into two types: prefabricated top cross beam 1 (5) and prefabricated top cross beam Ⅱ (6). The prefabricated top cross beam 1 (5) is arranged at the position of the middle column, and the prefabricated top cross beam Ⅱ (6) is arranged at the middle position of two adjacent middle columns. The prefabricated top longitudinal beam (7) is arranged along the longitudinal direction of the station. The prefabricated top longitudinal beam (7) between two adjacent middle columns is a section. The two sections are connected via a top plate longitudinal and transverse beam connection node II (9); two sections of prefabricated top transverse beam I (5) type components arranged opposite to each other are connected via a top plate longitudinal and transverse beam connection node II (9); two sections of prefabricated top transverse beam II (6) type components arranged opposite to each other are connected to the prefabricated top longitudinal beam (7) via a top plate longitudinal and transverse beam connection node I (8); the prefabricated top transverse beam I (5) and the prefabricated top transverse beam II (6) are connected to the prefabricated ground connection wall (1) via a cast-in-place top waist beam (4).

2. The permanent and temporary combined assembled subway station structure according to claim 1 is characterized by: The prefabricated center cross beam is arranged along the transverse direction of the station and is divided into two sections with the prefabricated center longitudinal beam (13) as the boundary. According to different installation positions, the prefabricated center cross beam is divided into two types: prefabricated center cross beam I (11) and prefabricated center cross beam II (12). The prefabricated center cross beam I (11) is arranged at the center column position, and the prefabricated center cross beam II (12) is arranged at the middle position between two adjacent center columns.

3. The permanent and temporary assembled subway station structure according to claim 2 is characterized by: The prefabricated middle longitudinal beam (13) is arranged along the longitudinal direction of the station. The prefabricated middle longitudinal beam (13) between two adjacent middle columns is a segment, and the two adjacent segments are connected through the middle plate longitudinal and transverse beam connection node II (15).

4. The permanent and temporary combined assembled subway station structure according to claim 3 is characterized by: Two sections of prefabricated middle cross beam I (11) type components arranged opposite to each other are connected via a middle plate longitudinal and transverse beam connection node II (15); two sections of prefabricated middle cross beam II (12) type components arranged opposite to each other are connected to the prefabricated middle longitudinal beam (13) via a middle plate longitudinal and transverse beam connection node I (14); the prefabricated middle cross beam I (11) and the prefabricated middle cross beam II (12) are connected to the prefabricated ground connection wall (1) via a cast-in-place top and waist beam (4).

5. The permanent and temporary combined assembled subway station structure according to claim 1 is characterized by: During the foundation pit excavation phase, a steel lattice column (3) is set at the position of the permanent center column as a temporary vertical support; during the main body backbuilding phase, steel bars are tied outside the steel lattice column (3), and concrete is poured in sections from bottom to top to form a cast-in-place underground first floor center column (20) and a cast-in-place underground second floor center column (18).

6. The permanent and temporary assembled subway station structure according to claim 4 is characterized by: The sides of the prefabricated top cross beam I (5), the prefabricated top cross beam II (6), the prefabricated middle cross beam I (11), the prefabricated middle cross beam II (12), the prefabricated top longitudinal beam (7) and the prefabricated middle longitudinal beam (13) are provided with bracket supports for mounting prefabricated panels, and the prefabricated panels include a middle panel and a top panel.

7. The permanent and temporary assembled subway station structure according to claim 6 is characterized by: The middle plate is a prefabricated middle plate (19) which is a prefabricated assembled structure. The prefabricated middle plate (19) is installed on the bracket supports on the sides of the prefabricated middle cross beam Ι (11) and the prefabricated middle cross beam Ⅱ (12) by using a block-by-block prefabricated middle plate (19). The gaps between the prefabricated middle plates (19) are filled with cement mortar. The top plate is a top plate composite plate (21) which is a composite cast-in-place structure. First, the prefabricated top plate composite plate (21) is suspended between adjacent prefabricated top cross beams Ι (5) and prefabricated top cross beams II (6). Then, the upper layer of steel bars of the prefabricated top plate composite plate (21) is tied. Finally, the top plate cast-in-place layer (22) is constructed to form an integral structure.