Rope type manual impact sampling drill
By designing a lightweight rope-type human impact sampling drill, using carbon fiber composite material and aluminum alloy, combined with the mast-type bracket and traction rope, the problem of insufficient excavation capacity in the existing technology is solved, and effective drilling of complex formations is achieved The environmentally friendly and economical drilling operation can expose the rare earth ore base plate in the semi-weathered layer.
Patent Information
- Application Number
- CN202421008466.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-05-10
AI Technical Summary
The existing human impact sampling drills lack the ability to drill holes in weathered shell ion adsorption rare earth ore exploration, and it is difficult to cope with complex formation changes, and it is difficult to expose the rare earth ore base plate in the semi-weathered layer. The mechanical dynamic exploration method is not environmentally friendly and cost-effective. high.
A lightweight rope-type human impact sampling drill is designed, using lightweight materials such as carbon fiber composite materials and aluminum alloys. Through the mast type bracket and traction rope, human power releases gravity potential energy for periodic impact, realizing "internal excavation" The drilling method is to improve drilling power and excavation capabilities, avoid the phenomenon of "sol escape", and to clearly collect rock samples.
It improves the ability to respond to complex formations, reduces labor intensity, reduces construction costs, and realizes environmentally friendly, economical and safe drilling operations. It can effectively expose the ore base plate in the semi-weathered layer and collects blocky rock samples. Comply with green exploration specifications.
Smart Images

Figure CN221973405U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a weathering crust stratum sampling drilling technology, in particular to a rope-type manpower impact sampling drill applied to the exploration and development of weathering crust ion adsorption type (elution type) rare earth mines. Background Art
[0002] In the middle of the last century, ion-adsorbed rare earth minerals were discovered in the granite weathering crust. The early exploration methods were mainly shallow wells or small circular wells. Since the exploration of shallow wells and small circular wells using shovels is costly, time-consuming, and has great safety risks, the exploration method of Luoyang shovel manual impact drilling was later adopted, which reduced the exploration cost, shortened the exploration cycle, and reduced the degree of vegetation damage. There is currently a "Gannan Drill", which is a manual impact sampling drill that has been further modified on the basis of the Luoyang shovel. With its advantages of "fast, economical, safe, and environmentally friendly", it has played an important role in the exploration and development and utilization of ion-adsorbed rare earth minerals in the weathering crust, and has been widely used in seven provinces in southern China and even in Southeast Asian countries. However, because its drilling process is too simple and its drilling capacity is insufficient, it is difficult to cope with the complex changes in the strata, it is difficult to expose the rare earth ore body bottom plate in the semi-weathered layer, or to obtain rock samples with a penetration of more than 1 meter in the semi-weathered layer. It still needs to be supplemented by "shallow drilling" to improve mineral exploration and evaluation. "Shallow drilling" is mechanically powered and requires opening roads and aprons, which is not environmentally friendly, inconvenient for manual transportation, and has high drilling construction costs. The exploration area of weathering crust ion adsorption-type rare earth minerals is large and the number of drill holes is large. The land restoration, ecological environment improvement, and secondary geological disaster prevention work associated with "shallow drilling" construction still require a high price. Summary of the invention
[0003] The utility model aims to provide a lightweight, green and environmentally friendly rope-type human impact sampling drill, which is used to solve the technical problems that the existing human impact sampling drills are insufficient in drilling capacity, difficult to cope with complex stratum changes, and difficult to expose the ore body bottom plate in the semi-weathered layer in the exploration of weathering crust ion adsorption type rare earth mines.
[0004] A rope-type human impact sampling drill comprises a base 303, on which a pipe seat hole and a straightening sleeve hole with an axis line in a vertical direction are respectively arranged, a pipe seat 303-5 is fixed in the pipe seat hole, and a straightening sleeve 303-3 is fixed in the straightening sleeve hole; a support pipe 303-2 is fixed on the outer diameter of the pipe seat 303-5, a vertical pipe 302 is arranged on the outer surface of the support pipe 303-2, an annular protective sleeve 303-1 is fixed on the inner lower part of the support pipe 303-2, and a through pin 303-4 is inserted along the radial direction of the protective sleeve 303-1; a pulley 301-2 is installed on the top of the vertical pipe 302, and a traction rope 1 is arranged on the pulley 301-2; the axis line of the through pin 303-4 and the axis line of the pulley 301-2 are located on the same vertical plane and parallel to the horizontal plane of the base 303;
[0005] An orifice tube 304 is provided in the said straightening sleeve 303-3, and the orifice tube 304 comprises a sleeve 304-2 and an orifice seat 304-1 fixed to the top of the sleeve 304-2, the inner cavity of the orifice seat 304-1 is a stepped hole with a small diameter at the top and a large diameter at the bottom, and 4 "U"-shaped grooves are evenly distributed on the top tube wall, and radial through holes for assembly and disassembly are opened at the contact part between the sleeve 304-2 and the orifice seat 304-1, and the inner diameter of the sleeve 304-2 is the same as the upper small diameter of the orifice seat 304-1; the outer diameter of the sleeve 304-2 is the same as the inner diameter of the straightening sleeve 303-3;
[0006] A pick rod 2 is inserted into the orifice pipe 304. The pick rod 2 includes a steel pipe 203. A tubular pick rod female joint 201 and a tubular pick rod male joint 202 are fixed to the upper and lower ends of the steel pipe 203, respectively. Two rows of through holes are symmetrically arranged on the wall of the steel pipe 203, and a hanging rod 8 can be inserted into the through holes.
[0007] The pull rod male joint 202 at the lower end of the pull rod 2 is connected to the drill rod female joint 501 on the drill rod 5. The drill rod 5 includes a carbon tube 503. A tubular drill rod female joint 501 and a tubular drill rod male joint 502 are fixed to the upper and lower ends of the carbon tube 503, respectively. The upper and lower ends of the carbon tube 503 are provided with radial through holes for assembly and disassembly at the contact parts with the drill rod female joint 501 and the drill rod male joint 502.
[0008] The drill pipe male connector 502 at the lower end of the drill pipe 5 is connected with the internal thread of the upper part of the sampling drill tool 7. The sampling drill tool 7 includes a sample storage tube 703. The lower end of the sample storage tube 703 is fixed with a drill bit 704, and the upper end is fixed to the lower end of the pipe connector 702. The upper end of the pipe connector 702 is connected with the external thread of the lower part of the reducer 701. The reducer 701 is a hollow structure with a large diameter at the upper end and a small diameter at the lower end. An anvil ring 705 is placed on the inner step. The lower part has an external thread, and the upper part has an internal thread connected to the drill pipe male connector (502). There are two symmetrically arranged skylight holes on the wall in the middle. The bottom end of the drill bit 704 is evenly distributed with more than 6 "U"-shaped tooth grooves. The connecting part of the reducer 701 and the pipe connector 702 is provided with a radial through hole for assembly and disassembly.
[0009] One end of the traction rope 1 is connected to the lifting joint 601 of the impact hammer 6 via the center line of the digging rod 2 and the center line of the drill rod 5. The impact hammer 6 includes a solid hammer body 602, and both upper and lower ends thereof are provided with internal threads, which are respectively connected with the external threads at the lower end of the lifting joint 601 and the external threads at the upper end of the hammer head 603; the lifting joint 601 is a hollow structure, and a bolt for hanging the traction rope 1 is provided in the middle; radial through holes for assembly and disassembly are provided on the lifting joint 601, the hammer body 602, and the hammer head 603; or one end of the traction rope 1 is connected to the lifting joint 601 of the impact hammer 6 via the center line of the digging rod 2 and the center line of the drill rod 5, The impact hammer 6 includes a solid hammer body 602, and the upper and lower ends thereof are provided with internal threads, which are respectively connected with the external threads at the lower end of the lifting joint 601 and the external threads at the upper end of the impact pipe joint 901; the lifting joint 601 is a hollow structure, and a bolt for hanging the traction rope 1 is provided in the middle; the impact pipe joint 901 is a hollow structure, the lower end of the impact pipe joint 901 is fixed to the upper end of the impact pipe 903, the lower end of the impact pipe 903 is fixed to the core drill bit 902, and the bottom end of the core drill bit 902 is uniformly distributed with more than 4 "U"-shaped tooth grooves; a radial through hole for assembly and disassembly is provided at the plug-in portion of the impact pipe joint 901 and the impact pipe 903;
[0010] It also includes a hanging rod 8, which is a solid body and consists of two thick and thin sections. The thin section of the hanging rod 8 is inserted into the through hole of the steel pipe 203 on the pick rod 2 to serve as a front fulcrum for pulling out the sampling drill 7;
[0011] It also includes a rod lifter 4, which includes a pry bar 401 and a pry head 402 made of carbon fiber tube material; the pry head 402 includes two parallel stainless steel plates, which are connected by a stainless steel end plate at one end of the two parallel stainless steel plates, and a stainless steel pipe seat is fixed in the center of the stainless steel end plate, and one end of the pry bar 401 is fixed in the pipe seat; a pair of symmetrical lower card grooves 403 are opened on one side of the two parallel stainless steel plates, and a pair of symmetrical upper card grooves 404 are opened on the other side, and the distance between the upper card groove 404 and the lower card groove 403 along the axis of the pry bar 401 is equal to the center distance from the pipe seat 303-5 to the straightening sleeve 303-3; the upper card groove 404 and the lower card groove 403 are respectively clamped on the lower surface of the two ends of the hanging rod 8 inserted in the through hole of the upper steel pipe 203 of the lift bar 2 and the upper surface of the two ends of the through pin 303-4 at the lower part of the vertical pipe 302.
[0012] The base 303 includes a bottom plate 303-6 made of carbon fiber composite material and a fixing plate 303-7 made of steel. The bottom plate 303-6 is on the top and the fixing plate 303-7 is on the bottom and fixed together by bolts. The pipe seat 303-5 and the straightening sleeve 303-3 are welded to the fixing plate 303-7 respectively.
[0013] The vertical tube 302 includes an upper carbon tube 302-1 and a lower carbon tube 302-2 made of carbon fiber composite materials. The bottom end of the upper carbon tube 302-1 with a small diameter is inserted into the top end of the lower carbon tube 302-2 with a large diameter. The plug-in portion has more than two groups of radial bolt holes, and the plug-in portion is fixed with bolts.
[0014] The pulley 301-2 is installed on the top of the upper carbon tube 302-1 through the pulley frame 301-1; the pulley frame 301-1 is processed on a cylinder, a square hole 301-4 is processed in the middle, and a cylindrical concave hole 301-3 is processed at the bottom. The top of the upper carbon tube 302-1 is inserted into the concave hole 301-3 at the bottom of the pulley frame 301-1 and fixed; the pulley 301-2 is installed in the square hole 301-4 of the pulley frame 301-1 through a shaft and a rolling bearing.
[0015] It also includes a recoil joint 10, which is a hollow cylinder with large and small outer ends. The large outer end has straight knurling on its surface, and the small outer end has an external thread that is screwed with the pull rod female joint 201 or the drill rod female joint 501; an axial notch is opened on the recoil joint 10.
[0016] When the utility model is used for drilling in the topsoil and the fully weathered layer (the rock level in the prior art is Ⅰ), the impact hammer 6 placed in the inner cavity of the drill rod 5 (or the digging rod 2) is supported by the mast-type bracket 3, and is lifted to a certain height by manpower and the traction rope 1 to release the gravitational potential energy. The sampling drill 7 shears the rock mass under the periodic impact of the impact hammer 6, and the rock sample flows into the inner cavity of the sample storage tube 703 under the squeezing of the drill bit 704, thereby obtaining effective footage.
[0017] When the utility model drills in the semi-weathered layer (rock level II in the prior art) (referred to as "inner hollowing and outer expansion"): the core drilling tool 9 placed in the inner cavity of the drill rod 5 is supported by the mast-type bracket 3, and is lifted to a certain height by manpower and the traction rope 1 to release the gravitational potential energy. The central part of the bottom of the hole shears the rock mass under the periodic impact of the core drilling tool 9, and the rock sample flows into the inner cavity of the impact tube 903 under the squeezing of the core drilling bit 902 to obtain the small hole footage; when the small hole footage reaches a certain depth, the drilling method in the topsoil and the fully weathered layer is restored to carry out hole expansion sampling drilling, and the borehole is extended in this cyclic alternating drilling method until the ore body bottom plate in the semi-weathered layer is exposed.
[0018] The rope-type manual impact sampling drill of the utility model can increase the power required for impact drilling by adjusting the weight of the impact hammer and the stroke of the impact hammer, solve the problem of insufficient power in manual impact sampling drilling, and improve the coping ability of complex strata. The step core in the drill bit is firmly fixed, which avoids the phenomenon of "soil escape" that is easy to occur during the drilling process, and solves the problem that the "Gannan Drill" cannot collect rock samples below the diving surface. The drilled rock samples and waste soil are compressed by the steps in the drill bit and poured into the sample storage tube, maintaining a certain gap with the inner wall of the tube (or no extrusion contact). After being poured out from the upper end of the sample storage tube, they can be clearly identified and distinguished, and the geological phenomenon of the original rock structure can be clearly observed. The "inside digging and outside expanding" drilling method is used for drilling in the semi-weathered layer of the weathering crust ionic rare earth ore, dismantling the problem of large resistance of the "soil plug" of the drill tool and difficulty in drilling, and can collect blocky rock samples and expose the bottom plate of the rare earth ore body. The "recoil joint" has a simple structure and is easy to install. It can easily solve accidents such as "drill eating", drill sticking and drill buried in formations that the digging rod cannot handle.
[0019] The utility model uses carbon fiber composite materials, aluminum alloy and other lightweight materials, and has the advantages and characteristics of being green, efficient, economical, safe and portable, which reduces the labor intensity of manual operations and improves the drilling capacity of drilling holes. The mast-type bracket has a simple structure, is easy to carry, does not require a landing pad, and can be quickly installed without being affected by the slope of the mountain; it can not only meet the functional requirements of the human rope impact sampling drill for the bracket, but also meet the "green exploration" requirements advocated by the rare earth mineral geological exploration specifications. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 The utility model is a schematic diagram of the structure of a rope-type human impact sampling drill. Figure 2 yes Figure 1 Schematic diagram of the middle pick-up rod structure. Figure 3 yes Figure 1 Schematic diagram of the overhead travelling crane structure of the mid-mast support components; Figure 4 yes Figure 3 Left view of . Figure 5 yes Figure 1 Schematic diagram of the component riser structure of the mid-mast support. Figure 6 yes Figure 1 Schematic diagram of the component base structure of the mid-mast support. Figure 7 yes Figure 1 Schematic diagram of the component orifice tube structure of the mid-mast support. Figure 8 yes Figure 5 Schematic diagram of the three-dimensional structure of the midsole plate and the fixed plate. Fig. 9 yes Figure 1 Schematic diagram of the three-dimensional structure of the middle lever. Fig.10 yes Figure 1 Schematic diagram of the drill pipe structure. Fig.11 yes Figure 1 Schematic diagram of the impact hammer structure. Fig.12yes Figure 1 Schematic diagram of the sampling drill structure. Fig.13 The utility model is a schematic diagram of the structure of a core-drilling tool for a rope-type human-powered impact sampling drill. Fig.14 The utility model is a schematic diagram of the structure of a hanging rod in a rope-type human impact sampling drill. Fig.15 The utility model is a schematic diagram of the structure of a recoil joint in a rope-type human impact sampling drill.
[0021] In the attached figure: 1-traction rope; 2-lifting rod, 201-lifting rod female joint, 202-lifting rod male joint, 203-steel pipe; 3-mast bracket, 301-crane (pulley assembly), 301-1-crane seat (pulley frame), 301-2-crane wheel (pulley), 301-3 concave hole, 301-4 square hole; 302-riser, 302-1-upper section carbon tube, 302-2-lower section carbon tube; 303-base, 303-1-protective cover, 303-2-support tube, 303-3-righting sleeve, 303-4-through pin, 303-5-tube seat, 303-6-bottom plate, 303-7-fixing plate; 304-orifice tube, 304-1-orifice seat, 304-2-casing; 4-lifting rod device, 401-pry rod, 402-lifting head, Lower card slot 403, upper card slot 404; 5-drill pipe, 501-drill pipe female joint, 502-drill pipe male joint, 503-carbon tube; 6-impact hammer, 601-lifting joint, 602-hammer body, 603-hammer head; 7-sampling drill tool, 701-reducing joint, 702-pipe joint, 703-sample storage tube, 704-drill bit, 705-anvil ring; 8-hanging rod; 9-coring drill tool, 901-impact pipe joint, 902-coring drill bit, 903-impact tube; 10-recoil joint; Figure 1 The figure in the middle is an operator. DETAILED DESCRIPTION
[0022] refer to Figure 1 , Fig.13 , Fig.15 The utility model comprises a traction rope 1, a digging rod 2, a mast-type bracket 3, a digging rod device 4, a drill rod 5, an impact hammer 6, a sampling drill tool 7, a hanging rod 8, a core drilling tool 9, and a recoil joint 10.
[0023] refer to Figure 1 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7The mast support 3 includes a crane 301, a vertical pipe 302, a base 303, and an orifice pipe 304; the crane 301 includes a crane seat (aluminum alloy) 301-1 and a crane wheel (hard nylon material) 301-2; the crane seat 301-1 is processed on a cylindrical material (outer diameter 76 mm), a square hole 301-4 is dug out in the middle, and a cylindrical concave hole 301-3 is provided at the bottom; the crane wheel (outer edge diameter 200 mm) 301-2 is rotatably connected to the crane shaft through a built-in rolling bearing, and is installed in the square hole 301-4 of the crane seat 301-1;
[0024] refer to Figure 5 The vertical tube 302 includes an upper carbon tube (carbon fiber composite material) 302-1 and a lower carbon tube 302-2; the top of the upper carbon tube (outer diameter 61.4 mm, wall thickness 1.5 mm, length 2.0 m) 302-1 is inserted into the concave hole 301-3 at the bottom of the overhead crane seat 301-1 and fixed with epoxy resin glue; the bottom of the upper carbon tube 302-1 is inserted into the tube at the top of the lower carbon tube (inner diameter 61.6 mm, wall thickness 2.0 mm, length 2.0 m) 302-2, and the plug-in part is fixed with bolts. There are two sets of bolt holes at the plug-in part, and the upper carbon tube 302-1 can be moved up and down as needed to adjust the height of the vertical tube 302;
[0025] refer to Figure 6 , Figure 8 The base 303 includes a bottom plate (carbon fiber composite material) 303-6 and a fixing plate 303-7; the bottom plate 303-6 is rectangular (500 mm×200 mm×5 mm), and the fixing plate (carbon steel) 303-7 is elliptical. The two plates are stacked together and fixed with six bolts (the fixing plate 303-7 is at the lower position); the six small holes on the bottom plate 303-6 and the fixing plate 303-7 are bolt holes, the middle hole is a pipe seat hole, and the large hole is a straightening sleeve hole;
[0026] refer to Figure 1 , Figure 5 , Figure 6 , Figure 8, the bottom end of the annular protective sleeve 303-1 and the top end of the tube seat 303-5 are respectively inserted from the top and bottom ends of the support tube (outer diameter 60 mm, wall thickness 1.1 mm, length 0.6 m) 303-2, and fixed with epoxy resin glue; the tube seat 303-5 and the straightening sleeve (inner diameter 109 mm, length 0.20 m) 303-3 are welded to the bottom surface of the fixed plate 303-7; the lower section carbon tube 302-2 is sleeved on the outside of the support tube 303-2, and the bottom end is on the bottom plate 303-6; the through pin 303-4 is located in the middle of the protective sleeve 303-1, and its axis and the axis of the crown wheel 301-2 are located on the same vertical plane and parallel to the bottom plate 303-6 on the horizontal plane; the through pin 303-4 has two functions: one is to limit the rotation of the lower section carbon tube 302-2, and the other is to support the force of the digging rod device (rear fulcrum) 4;
[0027] refer to Figure 7 The orifice pipe 304 includes an orifice seat 304-1 and a sleeve 304-2; the inner cavity of the orifice seat 304-1 is a cylindrical structure with a small diameter at the top and a large diameter at the bottom, and 4 "U"-shaped grooves (groove width 18 mm) are evenly distributed on the top tube wall, and the inner wall of the lower end tube (large diameter part) is machined with a triangular thread line (tooth pitch 1 mm, tooth depth 0.5 mm, the purpose is to expand the adhesion area of the adhesive applied on the surface of the component and improve the bonding force, the same below); the upper end of the sleeve (outer diameter 108 mm, wall thickness 2.0 mm, length 0.8 m) 304-2 is inserted into the bottom end of the orifice seat 304-1, and the inner diameter of the sleeve 304-2 is the same as the small diameter on the orifice seat 304-1. After the plug-in part (large diameter part) is fixed with epoxy resin glue, two symmetrical holes (diameter 18 mm, convenient for pulling out the orifice pipe 304 after drilling is completed) are drilled on the tube wall of the plug-in part;
[0028] refer to Figure 1 , Figure 6 , Figure 7 The orifice pipe 304 is placed in the tubular straightening sleeve 303-3, and the bottom end is vertically rammed on the ground at the center of the borehole. Its main function is to rely on the supporting force of the hole wall rock and soil to support the mast-type bracket 3 through the straightening sleeve 303-3, and secondly to suspend the drilling tool and prevent the topsoil from falling into the borehole.
[0029] refer to Figure 1 , Fig.11 The material of the traction rope (diameter 10 mm) 1 is artificially synthesized polypropylene fiber in the prior art, which has the characteristics of high strength, wear resistance, non-water absorption, non-deformation, low density (floating on the water surface), good flexibility, etc., and the tensile strength is not less than 137 Mpa.
[0030] refer to Fig.11The impact hammer 6 includes a lifting joint 601, a hammer body 602, and a hammer head 603; the lifting joint 601, the hammer body 602, and the hammer head 603 are threadedly connected to each other, and the outer diameter of the joint is 59 mm; the top of the lifting joint 601 has an external chamfer, the bottom has an external thread, the inside is a hollow structure, and the middle has a bolt for hanging the traction rope 1; the hammer body 602 is a solid body, with internal threads at both ends; the hammer head 603 is a solid body, with external threads at the top and a flat bottom, and the heat-treated surface Rockwell hardness (HRC) is 56-62; the lifting joint 601, the hammer body 602, and the hammer head 603 are all provided with through holes of the same diameter (diameter 15 mm) near the threaded part, in order to facilitate the assembly and disassembly of the impact hammer.
[0031] refer to Figure 2 The said pick rod 2 comprises a tubular pick rod female joint (stainless steel) 201, a tubular pick rod male joint (stainless steel) 202, and a steel pipe (stainless steel) 203, and the length of the three after assembly is 2.0 m; the top of the pick rod female joint 201 is internally threaded, and the bottom of the pick rod male joint 202 is externally threaded; two rows of hanging eyes (diameter 15 mm through holes, with hanging rods 8 inserted in the hanging eyes) with a spacing of 50 mm are symmetrically arranged on the wall of the steel pipe (outer diameter 63 mm, wall thickness 1.1 mm) 203, and the two ends are respectively inserted into the inner hole step portion of the bottom end of the pick rod female joint 201 and the top end of the pick rod male joint 202. The said steel pipe 203 and the said pick rod male joint 202 and the pick rod female joint 201 are all welded and fixed on the outer surface.
[0032] refer to Fig.10 The drill rod 5 includes a tubular drill rod female joint (aluminum alloy) 501, a tubular drill rod male joint (aluminum alloy) 502, and a carbon tube 503, and the length after assembly is 2.0 m; the upper part of the drill rod female joint 501 is an internal thread (which can be screwed with the drill rod male joint 502 and the pull rod male joint 202); the lower part of the drill rod male joint 502 is an external thread (which can be screwed with the drill rod female joint 501 and the pull rod female joint 201); the two ends of the carbon tube (outer diameter 64 mm, wall thickness 1.2 mm) 503 are respectively inserted into the lower part of the drill rod female joint 501 and the upper part of the drill rod male joint 502, and pressed against the step part of the inner hole of the joint; the inner wall of the plug-in part (adhesive fixing part) of the male and female joints is also machined with a triangular thread line with a pitch of 1 mm and a tooth depth of 0.5 mm; after the drill rod 5 is fixed with epoxy resin glue, two symmetrical hanging eyes (diameter 18 The through hole is used for hanging the hanging rod 8 at the hole mouth and installing and removing the drill rod 5).
[0033] refer to Fig.12The sampling drill 7 includes a reducer (aluminum alloy) 701, a pipe joint 702, a sample storage tube (carbon tube material) 703, a drill bit 704, and an anvil ring 705; the reducer 701 is a hollow structure with an external thread at the bottom and an internal thread at the top (screwed with the male joint 202 of the pick rod or the male joint 502 of the drill rod); there are two symmetrically arranged skylight holes on the wall in the middle of the reducer ( Fig.12 The medium-large hole, with a diameter of 50 mm, is used to prevent the rock and soil that falls off the hole wall from falling into the pipe through the skylight hole to prevent the drill from getting stuck). There is an inward step at the bottom of the inner cavity, on which sits an anvil ring 705 (annular ring, inner hole diameter 55 mm), with a heat-treated surface Rockwell hardness (HRC) of 56-62; the pipe joint 702 is cylindrical, with an internal thread on the upper part (screwed with the external thread of the reducer 701), and a triangular thread with a pitch of 1 mm and a tooth depth of 0.5 mm (for glue) on the lower inner hole; the drill bit (outer diameter 95 mm) 704 has an internal triangular thread with a pitch of 1 mm and a tooth depth of 0.5 mm on the upper part (for glue), and more than 6 "U"-shaped grooves (grooves width 12-16 mm) are evenly distributed at the bottom, and the heat-treated surface Rockwell hardness (HRC) is 45-50; the sample storage tube (outer diameter 92 mm, wall thickness 2.0 mm, length 0.5 m) Insert the two ends of 703 into the step parts at the end of the inner hole triangular thread line at the lower part of the pipe joint 702 and the upper part of the drill bit 704 respectively. After the plug-in part is fixed with epoxy resin glue, two symmetrical holes are drilled at the plug-in part of the pipe joint 702 ( Fig.12 The small and medium holes, with a diameter of 15 mm, facilitate the insertion and removal of the hanging rod 8).
[0034] refer to Fig.11 , Fig.13 The core drilling tool 9 includes an impact pipe joint 901, a core drilling bit 902, an impact pipe (stainless steel) 903, a lifting joint 601, and a hammer body 602; the impact pipe joint 901 is a hollow structure, with an external thread on the upper part, and the external thread is screwed with the internal thread on the lower part of the hammer body 602; the upper part of the core drilling bit (outer diameter 41 mm, inner diameter 27 mm) 902 is machined with an internal triangular thread line (for adhesive) with a pitch of 1 mm and a tooth depth of 0.5 mm, and more than 4 "U"-shaped grooves (grooves width 7-10 mm) are evenly distributed at the bottom, and the heat-treated surface Rockwell hardness (HRC) is 45-50; the impact pipe (outer diameter 38 mm, wall thickness 0.9 mm, length 1.1 m,) The two ends of 903 are respectively inserted into the step parts at the end of the inner hole triangular thread line of the lower part of the impact pipe joint 901 and the upper part of the core drill bit 902. After the plug-in part is fixed with epoxy resin glue, two symmetrical holes (diameter 15mm, easy to insert and disassemble the hanging rod 8) are drilled at the plug-in part of the impact pipe joint 901.
[0035] refer to Fig.14The hanging rod 8 is a solid body, consisting of two sections (small section diameter 14 mm, large section diameter 17 mm), and the heat-treated surface Rockwell hardness (HRC) is 45-50; the thin section of the hanging rod 8 is mainly used to insert into the hanging eye on the digging rod 2, and to pull out the sampling drill tool 7 that is tight in the formation after impact drilling, and the thick section is mainly used to insert into the hanging eye on the drill rod 5, and to lift and lower the drill rod 5 and the sampling drill tool 7.
[0036] refer to Figure 6 , Fig. 9 The lever device 4 includes a lever (carbon fiber tube material) 401 and a lever head 402; the lever head 402 is welded by two parallel plates (stainless steel), an end plate (stainless steel), and a small tube seat (stainless steel tube); the parallel plates (plate thickness 6 mm) and the end plates (plate thickness 12 mm) form a "concave" groove, one end of the small tube seat is placed in the middle of the outer side of the end plate, the distance between the two parallel plates is 68 mm, and one end of the lever (outer diameter 40 mm, wall thickness 3 mm, length 0.90 m) 401 is inserted into the small tube seat and fixed with epoxy resin glue; a pair of symmetrical lower grooves 403 are opened on one side of the two parallel plates, and a pair of symmetrical upper grooves 404 are opened on the other side, and the distance between the upper groove 404 and the lower groove 403 projected on the axis of the lever 401 is equal to the center distance (113 mm) from the tube seat 303-5 to the straightening sleeve 303-3.
[0037] refer to Figure 1 , Figure 2 , Fig. 9 The rod puller 4 is designed according to the lever principle, and is used to pull out the sampling drill 7 that is tightened by the formation after impact drilling; when it is needed, a pair of lower grooves 403 on the puller head 402 are clamped in the upper surfaces (rear fulcrums) at both ends of the through pin 303-4 in the mast-type bracket 3, and the other pair of upper grooves 404 are clamped in the lower surfaces (front fulcrums) at both ends of the hanging rod 8 inserted into the hanging hole of the puller rod 2; then one person holds the pry rod 401 and is responsible for pressing down, forcing the puller rod 2 to be pulled up under force, and the other person is responsible for inserting and pulling out the hanging rod 8 in the hanging hole of the puller rod 2 until the puller rod 2 has a tendency to fall back downward; after removing the rod puller 4, the sampling drill 7 can be quickly pulled out by holding the drill rod 5.
[0038] refer to Fig.15 The recoil joint (aluminum alloy) 10 is a hollow cylinder with large and small ends. The large end surface has straight knurling and the small end has external threads (screwed together with the pull rod female joint 201 and the drill rod female joint 501). An axial notch is opened on the recoil joint 10, and its width is 12 mm to facilitate the passage of the traction rope (diameter 10 mm) 1.
[0039] refer to Figure 1 , Fig.15The recoil joint 10 is a special tool for handling accidents of "drill biting", stuck drill and buried drill bit in the formation that the digging rod device 4 is unable to handle. When activated, the recoil joint 10 is installed at the upper end of the digging rod 2, and the impact hammer 6 is suspended in the digging rod 2 (or drill rod 5) tube under the support of the mast-type bracket 3, and the traction rope 1 passes through the inner hole of the recoil joint 10. Under the action of manpower, the top end of the impact hammer 6 reversely impacts the bottom end of the recoil joint 10, and the generated vibration force is transmitted to the stuck and buried part of the sampling drill 7 through the digging rod 2 and the drill rod 5, thereby weakening the formation stress to achieve the effect of releasing the jam.
[0040] Drilling method using the utility model:
[0041] (1) Site preparation
[0042] Plane the ground (area 0.4 m×0.8 m) at the engineering point for installation of the base 303 and clean the working environment;
[0043] (2) Equipment installation
[0044] ① The base 303 is placed on the ground at the engineering site, and the direction of the manpower pull rope is selected to be on the axis line of the base 303;
[0045] ② Insert the orifice pipe 304 into the straightening sleeve 303-3, center the engineering point, and use the impact hammer 6 to hit the top of the orifice pipe 304. Insert the bottom of the pipe into the ground for about 0.20 m, and the installation of the base 303 is stable.
[0046] ③ Put the bottom end of the lower carbon tube 302-2 of the vertical tube 302 on the outside of the support tube 303-2, and then lock its rotation direction with the through pin 303-4;
[0047] ④ After the upper end of the sampling drill 7 is connected to the digging rod 2, it is inserted into the orifice pipe 304, and the impact hammer 6 is lifted by the rope, and is suspended from the top of the digging rod 2 into the pipe, ready to drill a hole;
[0048] (3) Drilling
[0049] ① One person straightens the mast support 3 and the digging rod 2, and another person pulls the rope to start drilling;
[0050] ② When the rock sample is full or difficult to drill, it is necessary to promptly remove the drill and withdraw the rock sample, and then continue drilling until the hole depth reaches about 0.5 m;
[0051] ③ Straighten the mast-type support 3, and then use the impact hammer 6 to hit the top of the orifice pipe 304 to make the mast-type support 3 stable under force;
[0052] (4) Drilling in the topsoil and fully weathered layers
[0053] ① According to the hole depth, calculate the number of drill rods 5 required, and then connect the sampling drill 7, drill rod 5, and digging rod 2 in sequence and put them into the borehole;
[0054] ② In order to facilitate rapid manpower in drilling and lowering, when drilling, the drill rod 5 can be screwed into the thread by hand, and it is not necessary to tighten it with the hanging rod 8; when drilling, it is not necessary to pull the rods one by one, and 2 to 4 rods can be pulled out in a row like the "Gannan Drill" (the weight of a single drill rod is 1.0kg);
[0055] ③ The hole section of the previous drilling will have a residual hole wall shrinkage problem after the drill is pulled out, so necessary hole diameter trimming should be performed before the next drilling. The operation method is similar to the "Gannan Drilling" drilling process, that is: each time the drill is drilled, the drill rod 5 is rotated clockwise until the sampling drill 7 is raised and lowered smoothly;
[0056] ④ During normal drilling, one person pulls the rope and the other person holds the frame; the stroke height of the impact hammer 6 is adjusted according to the single-click footage, generally 0.8-1.5 m; the sampling drill 7 can accommodate a rock sample of 0.55 m in length, and the footage per round generally does not exceed 0.35 m, otherwise the rock sample jacking will cause difficulty in withdrawing the core;
[0057] (5) Pole pulling and sampling
[0058] ① When starting the drill, first pull out the impact hammer 6 from the drill rod 5, then use the rod puller 4 to pull out the sampling drill 7; when the rod puller 2 tends to fall back due to its own gravity, it can be pulled out quickly by manpower;
[0059] ② Generally, the outer diameter of the columnar rock sample is smaller than the inner diameter of the sample storage tube 703, and it can slide down from the upper end pipe joint of the sample storage tube 703 inverted; when the rock sample is stuck in the tube, it can be handled by gently knocking the upper end pipe joint 702 with a wooden stick; and it can be tightly knocked with iron tools such as a hanging rod 8;
[0060] (6) Rock sample preparation
[0061] The rock samples are packed in boxes or arranged on sampling cloth in order; after removing the waste soil, drilling cataloging and rock sample collection can be carried out according to specification requirements.
[0062] (7) Sampling drilling in semi-weathered layers
[0063] ① Determine the drilling position of the weathering crust stratum according to the mineral composition, physical properties and difficulty of impact drilling of the rock and soil; when the borehole enters the interface of the semi-weathered layer, connect the sampling drill 7, the drill rod 5 and the digging rod 2 in sequence and drop them into the bottom of the hole;
[0064] ② The core drilling tool 9 is suspended from the top of the digging rod 2 into the bottom of the hole under the traction of the traction rope 1; the core drilling tool 9 is pulled up to perform periodic impact drilling on the bottom of the hole;
[0065] ③ When the impact drilling speed is significantly reduced, the core drilling tool 9 is taken out, the threaded pair at the bottom of the hammer body 602 is opened, and the small hole penetration rock sample slides upside down from the impact pipe joint 901;
[0066] ④ When the small hole reaches a certain depth (generally about 0.5 m), use impact hammer 6 to expand the hole and drill for sampling; extend the hole in this cyclic alternating drilling method until the bottom plate of the ore body in the semi-weathered layer is exposed (based on the analysis of on-site samples).
[0067] The directional words such as up, down, left, right, top, and bottom mentioned in the specification are defined based on the illustrated positions of the components and their relative positions. The use of the directional words should not limit the scope of protection requested in this application.
[0068] Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of this utility model should be included in the protection scope of this utility model.
Claims
1. A rope-type human impact sampling drill, characterized by: The invention comprises a base (303), wherein a pipe seat hole and a straightening sleeve hole are respectively arranged on the base (303), wherein the axis lines are in a vertical direction; a pipe seat (303-5) is fixed in the pipe seat hole, and a straightening sleeve (303-3) is fixed in the straightening sleeve hole; a support pipe (303-2) is fixed on the outer diameter of the pipe seat (303-5), a vertical pipe (302) is arranged on the outer surface of the support pipe (303-2), an annular protective sleeve (303-1) is fixed on the inner lower part of the support pipe (303-2), and a through pin (303-4) is inserted along the radial direction of the protective sleeve (303-1); a pulley (301-2) is installed on the top end of the vertical pipe (302), and a traction rope (1) is arranged on the pulley (301-2); the axis line of the through pin (303-4) and the axis line of the pulley (301-2) are located on the same vertical plane and parallel to the horizontal plane of the base (303); An orifice tube (304) is arranged inside the straightening sleeve (303-3), and the orifice tube (304) comprises a sleeve (304-2) and an orifice seat (304-1) fixed to the top of the sleeve (304-2); the inner cavity of the orifice seat (304-1) is a stepped hole with a small diameter at the top and a large diameter at the bottom, and four "U"-shaped grooves are evenly distributed on the top tube wall; a radial through hole for assembly and disassembly is opened at the contact portion between the sleeve (304-2) and the orifice seat (304-1); the inner diameter of the sleeve (304-2) is the same as the upper small diameter of the orifice seat (304-1); the outer diameter of the sleeve (304-2) is the same as the inner diameter of the straightening sleeve (303-3); A pick rod (2) is inserted into the orifice tube (304), and the pick rod (2) comprises a steel tube (203). A tubular pick rod female joint (201) and a tubular pick rod male joint (202) are respectively fixed at the upper and lower ends of the steel tube (203); two rows of through holes are symmetrically arranged on the wall of the steel tube (203), and a hanging rod (8) can be inserted into the through holes; The pick rod male joint (202) at the lower end of the pick rod (2) is connected to the drill rod female joint (501) on the drill rod (5); the drill rod (5) comprises a carbon tube (503); a tubular drill rod female joint (501) and a tubular drill rod male joint (502) are respectively fixed at the upper and lower ends of the carbon tube (503); radial through holes for assembly and disassembly are provided at the contact portions between the upper and lower ends of the carbon tube (503) and the drill rod female joint (501) and the drill rod male joint (502); The drill pipe male joint (502) at the lower end of the drill pipe (5) is connected to the upper internal thread of the sampling drill tool (7). The sampling drill tool (7) comprises a sample storage tube (703). A drill bit (704) is fixed to the lower end of the sample storage tube (703). The upper end is fixed to the lower end of the pipe joint (702). The upper end of the pipe joint (702) is connected to the lower external thread of the reducer (701). The reducer (701) is a hollow structure with a large diameter at the top and a small diameter at the bottom. An anvil ring (705) is placed on the inner step. The lower part has an external thread. The upper part has an internal thread connected to the drill pipe male joint (502). The wall in the middle part has two symmetrically arranged skylight holes. The bottom end of the drill bit (704) is evenly distributed with more than 6 "U"-shaped tooth grooves. The connecting part of the reducer (701) and the pipe joint (702) is provided with a radial through hole for assembly and disassembly. One end of the traction rope (1) is connected to the lifting joint (601) of the impact hammer (6) via the center line of the digging rod (2) and the center line of the drill rod (5); the impact hammer (6) comprises a solid hammer body (602), the upper and lower ends of which are provided with internal threads, which are respectively connected to the external threads at the lower end of the lifting joint (601) and the external threads at the upper end of the hammer head (603); the lifting joint (601) is a hollow structure, and a bolt for hanging the traction rope (1) is provided in the middle; the lifting joint (601), the hammer body (602), and the hammer head (603) are all provided with radial through holes for assembly and disassembly; or one end of the traction rope (1) is connected to the lifting joint (601) of the impact hammer (6) via the center line of the digging rod (2) and the center line of the drill rod (5). ), the impact hammer (6) comprises a solid hammer body (602), the upper and lower ends of which are provided with internal threads, which are respectively connected to the external threads at the lower end of the lifting joint (601) and the upper end of the impact pipe joint (901); the lifting joint (601) is a hollow structure, and a bolt for hanging a traction rope (1) is provided in the middle; the impact pipe joint (901) is a hollow structure, the lower end of the impact pipe joint (901) is fixed to the upper end of the impact pipe (903), the lower end of the impact pipe (903) is fixed to the core drill bit (902), and the bottom end of the core drill bit (902) is uniformly distributed with more than four "U"-shaped tooth grooves; a radial through hole for assembly and disassembly is provided at the plug-in portion of the impact pipe joint (901) and the impact pipe (903); It also includes a hanging rod (8), which is a solid body and consists of two sections, a thick section and a thin section. The thin section of the hanging rod (8) is inserted into the through hole of the steel pipe (203) on the pulling rod (2) to serve as a front fulcrum for pulling out the sampling drill tool (7); It also includes a lever-pulling device (4), the lever-pulling device (4) including a lever (401) made of a carbon fiber tube material and a lever head (402); the lever head (402) includes two parallel stainless steel plates, one end of the two parallel stainless steel plates is connected by a stainless steel end plate, a stainless steel tube seat is fixed in the center of the stainless steel end plate, and one end of the lever (401) is fixed in the tube seat; one side of the two parallel stainless steel plates is provided with a pair of symmetrical lower slots (403), and the other side is provided with a pair of symmetrical lower slots (403). A pair of symmetrical upper slots (404) are opened on the side, and the distance between the upper slot (404) and the lower slot (403) along the axis of the pry bar (401) is equal to the center distance between the pipe seat (303-5) and the straightening sleeve (303-3); the upper slot (404) and the lower slot (403) are respectively clamped on the lower surfaces of the two ends of the hanging rod (8) inserted into the through hole of the upper steel pipe (203) of the pry bar (2) and the upper surfaces of the two ends of the through pin (303-4) at the lower part of the vertical pipe (302).
2. A rope-type human impact sampling drill according to claim 1, characterized in that: The base (303) comprises a bottom plate (303-6) made of carbon fiber composite material and a fixing plate (303-7) made of steel, wherein the bottom plate (303-6) is at the top and the fixing plate (303-7) is at the bottom and fixed together by bolts; the pipe seat (303-5) and the straightening sleeve (303-3) are respectively welded to the fixing plate (303-7).
3. The rope-type human impact sampling drill according to claim 1 is characterized in that: The vertical tube (302) comprises an upper carbon tube (302-1) and a lower carbon tube (302-2) made of carbon fiber composite material, the bottom end of the upper carbon tube (302-1) with a small diameter is inserted into the top end of the lower carbon tube (302-2) with a large diameter, the insertion portion has more than two groups of radial bolt holes, and the insertion portion is fixed by bolts.
4. The rope-type human impact sampling drill according to claim 1 is characterized in that: The pulley (301-2) is installed on the top of the upper carbon tube (302-1) through a pulley frame (301-1); the pulley frame (301-1) is processed on a cylinder, a square hole (301-4) is processed in the middle, and a cylindrical concave hole (301-3) is processed at the bottom; the top of the upper carbon tube (302-1) is inserted into the concave hole (301-3) at the bottom of the pulley frame (301-1) and fixed; the pulley (301-2) is installed in the square hole (301-4) of the pulley frame (301-1) through a shaft and a rolling bearing.
5. The rope-type human impact sampling drill according to claim 1 is characterized in that: It also includes a recoil joint (10), which is a hollow cylinder having large and small outer ends, the large outer end having straight knurling on its surface, and the small outer end having an external thread that is screwed into a pull rod female joint (201) or a drill rod female joint (501); an axial notch is provided on the recoil joint (10).
