Removal system for design benchmark accident deposition source item in containment

By designing automatic monitoring and spray removal systems in nuclear power plants, the problem of low removal efficiency of deposition source items in containment in nuclear power accidents is solved, and the reduction of radiation dose and equipment reliability after design benchmark accidents is achieved.

CN221977609UActive Publication Date: 2024-11-08CHINA NUCLEAR POWER DESIGN COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420233680.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-11-08
Estimated Expiration
2034-01-30

AI Technical Summary

Technical Problem

The prior art cannot effectively remove the deposition source items in the containment shell in nuclear power accidents, resulting in the impact of radioactive material deposition on equipment and nuclear safety, especially in the design benchmark accidents.

Method used

A system including a spray device, a pressure monitoring device, a dose monitoring device and an instrument-controlled cabinet was designed. By monitoring the pressure and irradiation dose in the containment shell, the spray device can be automatically triggered, and the erosion and removal of deposition in the area above the operating platform is realized. Source item.

Benefits of technology

It improves the reduction of radiation dose in the containment after the design benchmark accident, reduces the safety risks after the nuclear power plant accident, and enhances the reliability of the equipment in the accident.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221977609U_ABST
    Figure CN221977609U_ABST
Patent Text Reader

Abstract

The utility model discloses a system for removing a deposition source item of a design basis accident in a containment. The system comprises a spraying device, a pressure monitoring device arranged on the containment, a dose monitoring device arranged on the containment and an instrument control cabinet arranged outside the containment, the instrument control cabinet is in communication connection with the spraying device, the pressure monitoring device and the dosage monitoring device, and controls the spraying device to be turned on or turned off according to a received pressure signal and / or a received dosage signal. According to the system for removing the deposition source item in the design benchmark accident in the containment, the pressure monitoring device and the dose monitoring device are in communication connection with the instrument control cabinet, and the spraying rotating shaft is automatically triggered by monitoring the pressure and the radioactive accumulated dose in the containment after the design benchmark accident; therefore, an area above an operation platform in the containment is scoured, and deposition source items deposited on the operation platform and the surface of equipment are removed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of nuclear power, in particular to a system for removing design basis accident sediment source items in a containment. Background Art

[0002] Nuclear power accidents may lead to high radioactive consequences, especially in the containment where the reactor core and the primary circuit are located. When a breach occurs in the primary circuit pipeline, a large amount of radioactive materials in the core and the primary circuit are released into the containment, becoming radioactive source items. Since the initial temperature and pressure of the primary circuit fluid are relatively high (generally the operating temperature and pressure are 310℃ and 15.5MPa), most of the source items initially exist in the form of gas or aerosol, with aerosol being the main form. Under the action of natural effects such as gravity sedimentation, diffusion phoresis, and thermophoresis, the aerosol is deposited on the surface of civil structures and equipment in the containment, forming a deposition source item. The deposition source item has significant radioactive consequences on the structure and equipment, which may damage the performance of related equipment and affect the accident handling and nuclear safety of the nuclear power plant. Therefore, it is necessary to configure a design basis accident deposition source item removal system in the containment to reduce the radioactivity in the containment after the nuclear power accident to a certain extent and improve the safety of the nuclear power plant after the accident.

[0003] Under the design basis accident in the containment, the area most significantly affected by the deposition source term is the area above the containment operating platform (the area above the containment platform is a relatively open space, which is conducive to the accumulation and deposition of the source term). The more reliable way to remove the deposition source term is to use liquid flushing.

[0004] In the current nuclear power equipment, the removal of design basis accident deposition source items mainly relies on natural mechanisms (condensation flushing), and the removal efficiency is low. Although some designs are equipped with containment spray systems, which can play a role in removing deposition source items, the current spray systems are mainly used to reduce the pressure inside the containment, and are manually started by the operator according to the containment pressure and the water temperature parameters of the replacement material water tank inside the containment. They are only used for design extension conditions and are not started under design basis accidents, so the deposition source items under design basis accidents cannot be removed. The probability of a design basis accident is higher than that of a design extension condition, and the number of equipment involved that needs to perform safety functions is also greater. Therefore, it is extremely necessary to design a special reference accident to remove deposition source items. Utility Model Content

[0005] The technical problem to be solved by the utility model is to provide a system for removing design basis accident sediment source items in a containment.

[0006] The utility model solves the technical problem by adopting a technical solution: providing a system for removing the design basis accident deposition source term in a containment, comprising a spraying device for spraying the inside of the containment to remove the deposition source term, a pressure monitoring device installed on the containment for monitoring the pressure inside the containment, a dose monitoring device installed on the containment for monitoring the irradiation dose inside the containment, and an instrumentation and control cabinet arranged outside the containment;

[0007] The instrument control cabinet is respectively connected to the spray device, the pressure monitoring device and the dosage monitoring device for communication, and controls the spray device to be turned on or off according to the received pressure signal and / or dosage signal.

[0008] Preferably, the spray device comprises a displacement material water tank arranged at the bottom of the containment shell, a spray unit arranged at the top of the containment shell, a spray pump arranged outside the containment shell, a first pipeline and a second pipeline;

[0009] The first pipeline is connected between the inlet end of the spray pump and the displacement material water tank, and a spray isolation valve is provided on the first pipeline; the second pipeline is connected between the outlet end of the spray pump and the spray unit; the spray pump and the spray isolation valve are both communicatively connected to the instrumentation and control cabinet.

[0010] Preferably, the spray unit comprises a spray ring pipe and a plurality of spray heads arranged on the spray ring pipe.

[0011] Preferably, the number of the nozzles is ≥50.

[0012] Preferably, a plurality of the spray heads are arranged at equal distances on the spray ring pipe.

[0013] Preferably, the spray ring pipe is a circular spray pipe arranged to correspond to the inner circumference shape of the top of the containment vessel.

[0014] Preferably, the spray device further comprises a spare spray water tank connected to the first pipeline.

[0015] Preferably, the spare spray water tank is connected to the first pipeline through a spare pipeline.

[0016] Preferably, a backup isolation valve is provided on the backup pipeline.

[0017] Preferably, the spray device further comprises a heat exchanger arranged on the second pipeline.

[0018] The utility model discloses a system for removing deposition source items in a design basis accident in a containment, which is connected to an instrumentation and control cabinet through a pressure monitoring device and a dose monitoring device. By monitoring the pressure and the accumulated radioactive dose in the containment after a design basis accident, a spray shaft is automatically triggered to flush the area above the operating platform in the containment, thereby removing deposition source items deposited on the operating platform and the surface of the equipment.

[0019] The utility model can be applied to remove the deposited radiation source item in the area above the operating platform in the containment after the design basis accident, so as to reduce the radiation dose in the containment after the design basis accident. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:

[0021] Figure 1 The utility model is a schematic diagram of the connection structure of a system for removing a design basis accident sediment source term in a containment vessel according to an embodiment of the present invention. DETAILED DESCRIPTION

[0022] In order to have a clearer understanding of the technical features, purposes and effects of the present utility model, the specific implementation methods of the present utility model are now described in detail with reference to the accompanying drawings.

[0023] like Figure 1 As shown, a system for removing design basis accident deposition source items in a containment according to an embodiment of the utility model may include a spray device, a pressure monitoring device 10, a dose monitoring device 20, and an instrumentation and control cabinet 30. The spray device is used to spray the inside of the containment 100 to remove the deposition source items. The pressure monitoring device 10 is used to monitor the pressure in the containment 100, and the dose monitoring device 20 is used to monitor the irradiation dose in the containment 100. The instrumentation and control cabinet 30 is respectively connected to the spray device, the pressure monitoring device 10, and the dose monitoring device 20 for communication.

[0024] When the pressure monitoring device 10 monitors the pressure in the containment 100 , the monitored pressure signal is transmitted to the instrumentation and control cabinet 30 ; when the dose monitoring device 20 monitors the irradiation dose in the containment 100 , the monitored dose signal is also transmitted to the instrumentation and control cabinet 30 .

[0025] In particular, the pressure monitoring device 10 and the dose monitoring device 20 monitor the pressure and irradiation dose (radioactive cumulative dose) in the containment after the design basis accident respectively. The instrumentation and control cabinet 30 is preset with the corresponding pressure parameter range and dose parameter range, and can process the received pressure signal and dose signal and convert them into corresponding parameters and compare them with the preset parameter range, so as to judge whether the pressure and dose in the containment 100 exceed the preset range, and output the control signal according to a certain control logic, so as to control the opening or closing of the spray device. Among them, for the monitoring results of the dose monitoring device 20, the instrumentation and control cabinet 30 needs to integrate the collected instantaneous irradiation dose rate data and convert it into the irradiation cumulative dose.

[0026] The pressure monitoring device 10 may be a pressure meter, and the dosage monitoring device 20 may be a dosage meter.

[0027] Specifically, the spray device may include a displacement material water tank 40, a spray unit 50, a spray pump 60, a first pipeline 71 and a second pipeline 72. The displacement material water tank 40 is arranged at the inner bottom of the containment 100 as the primary source of the spray liquid. The spray unit 50 is arranged at the inner top of the containment 100 and is also located above the operating platform in the containment 100. The spray unit 50 is used to spray the spray liquid. The spray pump 60 is arranged outside the containment 100 as the power source of the spray device.

[0028] The first pipe 71 is connected between the inlet end of the spray pump 60 and the replacement material water tank 40, and the second pipe 72 is connected between the outlet end of the spray pump 60 and the spray unit 50. After the spray pump 60 is started, the spray liquid in the replacement material water tank 40 is pumped out through the first pipe 71, and transported to the spray unit 50 through the second pipe 72. The spray unit 50 then sprays the spray liquid into the containment shell 100 at the top of the containment shell 100 to perform deposition source item removal.

[0029] A spray isolation valve 73 is provided on the first pipeline 71 , and the opening and closing of the first pipeline 71 is controlled by the spray isolation valve 73 .

[0030] The spray pump 60 and the spray isolation valve 73 are both connected to the instrumentation and control cabinet 30. When the instrumentation and control cabinet 30 sends a start control signal to the spray pump 60 and the spray isolation valve 73, the spray pump 60 starts and the spray isolation valve 73 opens. When the instrumentation and control cabinet 30 sends a stop control signal to the spray pump 60 and the spray isolation valve 73, the spray pump 60 stops running and the spray isolation valve 73 closes.

[0031] In a preferred embodiment, the spray unit 50 includes a spray ring pipe 51 and a plurality of spray heads 52 arranged on the spray ring pipe 51; after the spray device is started, the spray liquid is sprayed into the containment 100 through the spray ring pipe 51 and the spray heads 52. In order to spray as much area above the operating platform as possible, the size of the spray ring pipe 51 can be enlarged, and the spray heads 52 can be arranged on the spray ring pipe 51 in a more and dense manner to increase the spray coverage range, so that the spray coverage rate of the operating platform reaches at least 90%, thereby improving the removal range of the deposition source term.

[0032] The spray ring pipe 51 is preferably arranged along the inner circumference of the top of the containment shell 100 , for example, in a circular shape, etc. No less than 50 spray heads 52 are arranged on the spray ring pipe 51 , and are arranged at equal intervals on the spray ring pipe 51 .

[0033] When working, the total spray flow rate of the spray device shall not be less than 600 cubic meters per hour.

[0034] The displacement material water tank 40 is arranged at the bottom of the containment 100. In the long period after the accident, the fluid released into the containment 100 by spraying is re-collected in the displacement material water tank 40 by gravity for spraying injection again, forming a long-term fluid circulation.

[0035] Furthermore, the spray device may also include a spare spray water tank 80, which is connected to the first pipeline 71 through a spare pipeline. A spare isolation valve 81 is provided on the spare pipeline to control the connection or isolation between the spare pipeline and the first pipeline 71. The spare isolation valve 81 can be opened and closed manually, or can be remotely opened and closed by the instrumentation and control cabinet 30.

[0036] Since the environmental conditions inside the containment 100 after the accident are relatively complex, when the water inlet of the replacement material water tank 40 inside the containment 100 is blocked, the spray device can draw water from the spare spray water tank 80 to perform spraying and sediment source removal, thereby improving the reliability of system operation.

[0037] The spraying device may further include a heat exchanger 90 disposed on the second pipe 72. The heat exchanger 90 is used to cool the spraying liquid flowing through the second pipe 72. When the utility model is used to perform the function of simply removing the deposition source term, the heat exchanger 90 is selectively operated, that is, the heat exchange work may not be performed; when the utility model performs the functions of spraying and removing the deposition source term, the operation of the heat exchanger 90 helps to achieve temperature and pressure reduction in the containment 100.

[0038] In the design of nuclear power plants, the design basis accident conditions that require the operation of the deposition source removal system are mainly accidents with medium and large breaks in the primary pipeline. In this case, the fuel assemblies in the core may be partially damaged, and a large amount of radioactive materials in the core and the primary pipeline may be released into the containment through the breaks, resulting in a harsh radioactive environment and a large deposition source. The typical characteristics of accidents with medium and large breaks in the primary pipeline are high containment pressure and high cumulative radiation dose. On the contrary, if only the containment pressure is high, it may be caused by a break in the secondary pipeline (steam pipeline, water supply pipeline), and there is no need to operate the deposition source removal system; if only the cumulative radiation dose in the containment is high, it may be caused by a small break in the primary pipeline. The total amount of deposition source in this accident is less than that in medium and large breaks, and the related risks are controllable. Considering that the start of the containment spray will also have a significant adverse impact on the structure and equipment in the containment, the deposition source removal system is not operated in the case of a small break in the primary pipeline.

[0039] In addition, according to the design principles of nuclear power plants, if the system needs to be put into operation within 24 hours after the design basis accident, the design and manufacture of the system need to meet higher safety principles and require a higher cost. Considering that the radiation dose is gradually accumulated, the cumulative radiation effect in the long-term stage after the accident (24 hours later) is more significant. In order to control the cost of the implementation of this utility model, the spray device is set in this utility model to be put into operation 24 hours after the design basis accident occurs.

[0040] Without being restricted by cost, the design basis accident deposition source item removal system in the containment of the utility model can make the start of spraying no longer restricted by 24 hours through the instrumentation and control logic setting of the instrumentation and control cabinet 30, and can be directly started when the containment pressure and the cumulative radiation dose are significantly higher than the normal operating range of the nuclear power plant.

[0041] In summary, the utility model is suitable for achieving the removal of local deposition source items in the containment under the design basis accident of a nuclear power plant, reducing the risk of excessive cumulative radiation dose in the containment under the design basis accident, lowering the requirements for the radiation resistance of accident mitigation related equipment, improving the reliability of equipment operation under accidents, and reducing the safety risks after nuclear power plant accidents.

[0042] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A system for removing design basis accident sediment source term in containment, characterized in that: It includes a spray device for spraying the inside of the containment to remove the deposition source, a pressure monitoring device installed on the containment to monitor the pressure inside the containment, a dose monitoring device installed on the containment to monitor the irradiation dose inside the containment, and an instrumentation and control cabinet installed outside the containment; The instrument control cabinet is respectively connected to the spray device, the pressure monitoring device and the dosage monitoring device for communication, and controls the spray device to be turned on or off according to the received pressure signal and / or dosage signal.

2. The system for removing the design basis accident sediment source term in the containment according to claim 1, characterized in that: The spray device comprises a replacement material water tank arranged at the bottom of the containment shell, a spray unit arranged at the top of the containment shell, a spray pump arranged outside the containment shell, a first pipeline and a second pipeline; The first pipeline is connected between the inlet end of the spray pump and the displacement material water tank, and a spray isolation valve is provided on the first pipeline; the second pipeline is connected between the outlet end of the spray pump and the spray unit; the spray pump and the spray isolation valve are both communicatively connected to the instrumentation and control cabinet.

3. The system for removing the design basis accident sediment source term in the containment according to claim 2, characterized in that: The spray unit comprises a spray ring pipe and a plurality of spray heads arranged on the spray ring pipe.

4. The system for removing the design basis accident sediment source term in the containment according to claim 3, characterized in that: The number of the nozzles is ≥50.

5. The system for removing the design basis accident sediment source term in the containment according to claim 3, characterized in that: A plurality of the spray heads are arranged at equal intervals on the spray ring pipe.

6. The system for removing the design basis accident sediment source term in the containment according to claim 3, characterized in that: The spray ring pipe is a circular spray pipe arranged corresponding to the inner circumference shape of the top of the containment shell.

7. The system for removing the design basis accident sediment source term in the containment according to claim 2, characterized in that: The spray device also includes a spare spray water tank connected to the first pipeline.

8. The system for removing the design basis accident sediment source term in the containment according to claim 7, characterized in that: The standby spray water tank is connected to the first pipeline via a standby pipeline.

9. The system for removing the design basis accident sediment source term in the containment according to claim 8, characterized in that: The standby pipeline is provided with a standby isolation valve.

10. The system for removing design basis accident deposit source term in containment according to any one of claims 2 to 9, characterized in that: The spray device also includes a heat exchanger arranged on the second pipeline.