Shear wall structure

By introducing U-shaped installation base, embedded plate, installation of channel steel, fixing components and waterproof components into the shear wall structure, the installation process is simplified and the fixing effect is improved, solving the complex and cumbersome steps of the existing shear wall installation. Problem, fast and firm installation and waterproofing effect are achieved.

CN221989626UActive Publication Date: 2024-11-12FACTORY MENTOR JOINT ENG (SHANGHAI) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420121980.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-18
Publication Date
2024-11-12
Estimated Expiration
2034-01-18

AI Technical Summary

Technical Problem

The installation process of existing shear walls is complicated and cumbersome, especially when the steel bars are bent and grouting process, it requires multiple connections and removal of supporting steel pipes, resulting in low installation efficiency and troublesome operation.

Method used

A shear wall structure including U-shaped mounting base, embedded plate, installation channel steel, fixed components and waterproof components was designed. The positioning of the crane, the installation channel steel is connected to the channel steel, the fixing of the fixed components, and the grouting channel is filled. The installation process of the waterproof coating of sand and waterproof components simplifies installation steps and improves fixation.

Benefits of technology

It realizes the rapid and simple installation of shear walls, enhances the fixing effect, reduces water leakage, and improves installation efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989626U_ABST
    Figure CN221989626U_ABST
Patent Text Reader

Abstract

The utility model discloses a shear wall structure, and relates to the field of house building, the shear wall structure comprises a shear wall body, the lower end of the shear wall body is provided with a mounting base, the mounting base is U-shaped, the lower end of the shear wall body extends into the mounting base, and the lower end of the mounting base is fixedly provided with two symmetrically arranged pre-embedded plates; two symmetrically arranged mounting strips are fixed on the inner wall of the mounting base, two symmetrically arranged mounting channel steels are embedded in the shear wall body, the mounting strips are matched with the mounting channel steels, and a fixing assembly and a waterproof assembly are arranged between the shear wall body and the mounting base. When the shear wall is installed, the shear wall body corresponds to the installation base, then the shear wall body is pushed to enable the installation channel steel to be correspondingly connected with the installation strips, the installation channel steel and the installation strips are fixed through the fixing assemblies, the shear wall is fixed in advance, then mortar is poured through the grouting channel, the shear wall body is installed and fixed, the installation process is simple, and the installation efficiency is high. The mounting efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of housing construction, and in particular to a shear wall structure. Background Art

[0002] Shear wall, also known as wind-resistant wall, earthquake-resistant wall or structural wall, is a wall in a house or structure that mainly bears horizontal and vertical loads caused by wind loads or earthquakes to prevent structural shear damage. It is also called earthquake-resistant wall. In prefabricated buildings, shear walls are generally prefabricated reinforced concrete walls, which need to be connected to the floor.

[0003] The shear wall mentioned in the existing Chinese public patent (authorization announcement number: CN204001407U) includes an inner leaf wall panel, an insulation board and an outer leaf wall panel sequentially arranged on the inner leaf wall panel, wherein the inner leaf wall panel, the insulation board and the outer leaf wall panel are composited to form an integrated structure; and further includes a connecting piece, wherein the connecting piece is inserted between the insulation board, the outer leaf wall panel and the inner leaf wall panel to connect the insulation board, the outer leaf wall panel and the inner leaf wall panel. The prefabricated shear wall of the utility model is an integrated structural wall body composited by the inner leaf wall panel, the insulation board and the outer leaf wall panel, which has strong earthquake resistance, structural strength and shear resistance, and is suitable for ground floor and high-rise buildings; wherein, the connecting piece is inserted between the insulation board, the inner leaf wall panel and the outer leaf wall panel, so that the insulation board, the inner leaf wall panel and the outer leaf wall panel are more closely combined to improve safety.

[0004] However, when installing the existing prefabricated shear walls, it is necessary to connect the installation holes at the bottom of the shear walls with the steel bars reserved on the floor one by one. When the steel bars are bent, they need to be straightened before installation. After installation, the steel pipes need to be connected to the shear walls and the floor with bolts, and the two sides of the shear walls need to be supported. Finally, grouting is performed. The whole installation process is relatively complicated and the steps are cumbersome. After the shear walls are firmly fixed, the supporting steel pipes need to be removed, which is troublesome. Utility Model Content

[0005] The purpose of the present application is to solve the problem of complicated installation process and cumbersome steps of the shear wall proposed in the above background technology, and the present application provides a shear wall structure.

[0006] In order to achieve the above-mentioned purpose, this application specifically adopts the following technical solutions:

[0007] A shear wall structure comprises a shear wall body, wherein a mounting base is arranged at the lower end of the shear wall body, the mounting base is U-shaped, the lower end of the shear wall body extends into the interior of the mounting base, two symmetrically arranged embedded plates are fixed to the lower end of the mounting base, two symmetrically arranged mounting strips are fixed to the inner wall of the mounting base, two symmetrically arranged mounting channel steels are embedded in the shear wall body, the mounting strips are adapted to the mounting channel steels, and a fixing component and a waterproof component are arranged between the shear wall body and the mounting base.

[0008] By adopting the above technical solution, when installing the shear wall body, the shear wall body is adjusted to a position corresponding to the embedded installation base by using a crane, and then the installation channel steel on the shear wall body is connected to the installation bar accordingly to achieve preliminary positioning of the shear wall body, and then fixed by using a fixing assembly to achieve installation and fixation of the shear wall body, the installation process is simple, and the fixing effect is good.

[0009] Furthermore, the fixing assembly includes a fixing rod fixed inside the mounting base, a fixing groove is opened on the shear wall body, a fixing hole is configured at the bottom of the fixing groove, the fixing rod passes through the fixing hole and the fixing groove, and a fixing sleeve is threadedly connected to the end of the fixing rod, and the fixing sleeve is located inside the fixing groove.

[0010] By adopting the above technical solution, when installing the shear wall body, the fixing rod will pass through the fixing hole and then be fixed by the fixing sleeve. The fixing process is simple and the fixing effect is good.

[0011] Furthermore, grouting channels are opened inside the shear wall body, and the grouting channels are symmetrically arranged.

[0012] By adopting the above technical solution, mortar can be poured into the grouting channel, thereby further improving the fixing effect between the shear wall and the base and the floor.

[0013] Furthermore, a plurality of through holes are formed at the bottom of the mounting base, and the through holes are arranged in a straight line array.

[0014] By adopting the above technical solution, during grouting, the mortar will flow onto the floor through the through holes, thereby improving the fixing effect between the mortar and the floor.

[0015] Furthermore, the waterproof component includes an angle steel plate arranged on the side of the installation base, the angle steel plates are two and symmetrically arranged, the angle steel plates are L-shaped, the shear wall body and the angle steel plates are both provided with a waterproof coating, the shear wall body is provided with a snap-in groove, the side of the angle steel plate is fitted with the bottom of the snap-in groove, and the angle steel plate and the shear wall body are connected by fixing bolts.

[0016] By adopting the above technical solution, after the shear wall body is installed, the waterproof effect of the bottom of the shear wall body can be improved by using the angle steel plate in combination with the waterproof coating, thereby reducing water leakage.

[0017] Furthermore, the embedded plate is provided with a plurality of reinforcement grooves, and the reinforcement grooves are arranged in a straight line array.

[0018] By adopting the above technical solution, the contact area between the embedded plate and the concrete can be increased by utilizing the reinforcement groove, thereby improving the fixing effect between the embedded plate and the floor.

[0019] Furthermore, the surfaces of the mounting base, embedded plate, fixing rod and fixing sleeve are all provided with corrosion-resistant coating.

[0020] By adopting the above technical solution, anti-corrosion paint is applied to the installation base, embedded plate, fixing rod and fixing sleeve in advance, which can improve the anti-corrosion effect of parts.

[0021] In summary, the present application includes at least one of the following beneficial effects:

[0022] 1. In the present application, when installing the shear wall, the shear wall body is moved to a position corresponding to the installation base, and then the shear wall body is pushed to make the installation channel steel and the installation strip correspondingly connected, and fixed by using the fixing assembly to realize the pre-fixation of the shear wall, and then the mortar is poured through the grouting channel to realize the installation and fixation of the shear wall body, the installation process is simple, and the installation efficiency is improved.

[0023] 2. In this application, after the shear wall body is installed inside the mounting base, the angle steel plate is connected to the shear wall body and the mounting base, and then waterproof paint is applied on the angle steel plate and the shear wall body to form a waterproof coating. The angle steel plate and the waterproof coating can improve the waterproof effect of the bottom of the shear wall body and reduce water leakage. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a first three-dimensional structural schematic diagram of the shear wall body in this application;

[0025] Figure 2 It is a second three-dimensional structural schematic diagram of the shear wall body in this application;

[0026] Figure 3 This application Figure 1 The enlarged schematic diagram at A in the middle;

[0027] Figure 4 This application Figure 2 The enlarged schematic diagram of point B in the middle;

[0028] Figure 5 This application Figure 2 The enlarged schematic diagram at C in the middle;

[0029] Figure 6 It is a partial cross-sectional view of the shear wall in this application.

[0030] Description of reference numerals:

[0031] 1. Shear wall body; 2. Installation base; 3. Embedded plate; 4. Installation strip; 5. Installation channel steel; 6. Fixing assembly; 7. Grouting channel; 8. Through hole; 9. Waterproof assembly; 10. Reinforcement groove; 61. Fixing rod; 62. Fixing sleeve; 63. Fixing hole; 64. Fixing groove; 91. Angle steel plate; 92. Waterproof coating; 93. Fixing bolt; 94. Snap-in groove. DETAILED DESCRIPTION

[0032] The following is combined with Figure 1-6 This application is described in further detail.

[0033] The embodiment of the present application discloses a shear wall structure.

[0034] Reference Figure 1-Figure 3 A shear wall structure includes a shear wall body 1. A mounting base 2 is arranged at the lower end of the shear wall body 1. The mounting base 2 is U-shaped. The lower end of the shear wall body 1 extends into the mounting base 2. Two symmetrically arranged embedded plates 3 are fixed to the lower end of the mounting base 2. Two symmetrically arranged mounting strips 4 are fixed to the inner wall of the mounting base 2. Two symmetrically arranged mounting channel steels 5 are embedded on the shear wall body 1. The mounting strips 4 are adapted to the mounting channel steels 5. A fixing component 6 and a waterproof component 9 are arranged between the shear wall body 1 and the mounting base 2. When pouring the floor, place the installation base 2 at the position where the prefabricated shear wall needs to be installed, and then start pouring the floor. After pouring, the embedded plate 3 at the lower end of the installation base 2 will be connected to the floor. When the shear wall body 1 needs to be installed after the floor maintenance time is reached, use a crane to adjust the shear wall body 1 to the position corresponding to the installation base 2, and then push the shear wall body 1 to make the installation channel steel 5 and the installation strip 4 correspondingly connected to achieve the initial limit of the shear wall body 1, and then use the fixing component 6 to fix it to achieve the installation and fixation of the shear wall body 1. The installation process is simple and the fixing effect is good. After the shear wall body 1 is installed, the waterproof component 9 can be used to improve the waterproof effect of the bottom of the shear wall body 1 and reduce water leakage.

[0035] Reference Figure 3 and Figure 4The fixing assembly 6 includes a fixing rod 61 fixed inside the mounting base 2, a fixing groove 64 is provided on the shear wall body 1, a fixing hole 63 is configured at the bottom of the fixing groove 64, the fixing rod 61 passes through the fixing hole 63 and the fixing groove 64, and a fixing sleeve 62 is threadedly connected to the end of the fixing rod 61, and the fixing sleeve 62 is located inside the fixing groove 64. When installing the shear wall body 1, the fixing rod 61 is connected to the position of the fixing hole 63, and then the fixing sleeve 62 is connected to the fixing rod 61 with the help of a wrench to fix the shear wall body 1. The fixing process is simple and easy to operate, and the fixing can be improved by cooperating with the mounting strip 4 and the mounting channel steel 5, so that the shear wall is fixed more firmly.

[0036] Reference Figure 4 and Figure 5 A grouting channel 7 is provided inside the shear wall body 1, and the grouting channel 7 is symmetrically arranged. A plurality of through holes 8 are provided at the bottom of the mounting base 2, and the through holes 8 are arranged in a straight line array. After the shear wall body 1 is fixed inside the mounting base 2 by using the fixing assembly 6, the pre-mixed mortar is poured into the shear wall body 1 through the grouting channel 7, so that the mortar remains at the bottom of the shear wall and passes through the through holes 8 on the mounting base 2 to contact the floor. When the mortar solidifies, it can improve the fixing effect between the shear wall body 1 and the mounting base 2 and the floor, and the fixing is more firm.

[0037] Reference Figure 3 and Figure 4 The waterproof component 9 includes an angle steel plate 91 arranged on the side of the installation base 2. There are two angle steel plates 91 and they are symmetrically arranged. The angle steel plates 91 are L-shaped. The shear wall body 1 and the angle steel plates 91 are both provided with a waterproof coating 92. The shear wall body 1 is provided with a snap-in groove 94. The side of the angle steel plate 91 fits with the bottom of the snap-in groove 94. The angle steel plate 91 and the shear wall body 1 are connected by fixing bolts 93. The surfaces of the installation base 2, the embedded plate 3, the fixing rod 61, and the fixing sleeve 62 are all provided with a corrosion-resistant coating. After the shear wall body 1 is installed inside the installation base 2, the angle steel plate 91 is fitted with the shear wall body 1 and the installation base 2, and fixed with the fixing bolts 93. Then, a waterproof coating is applied to the angle steel plate 91 and the shear wall body 1 to form a waterproof coating 92. The waterproof coating is an acrylic waterproof coating. The angle steel plate 91 cooperates with the waterproof coating 92 to improve the waterproof effect of the bottom of the shear wall body 1 and reduce water leakage. At the same time, by pre-coating the installation base 2, the embedded plate 3, the fixing rod 61, and the fixing sleeve 62 with anti-corrosion paint, the anti-corrosion paint is an epoxy resin anti-corrosion paint, which can improve the anti-corrosion effect of the parts and improve the use effect.

[0038] Reference Figure 1 and Figure 2The embedded plate 3 is provided with a plurality of reinforcing grooves 10, which are arranged in a straight line array. When pouring concrete to fix the embedded plate 3, the concrete will enter the reinforcing grooves 10, thereby increasing the contact area between the embedded plate 3 and the concrete, thereby improving the firmness.

[0039] Working principle: When pouring the floor, place the installation base 2 at the position where the prefabricated shear wall needs to be installed, and then start pouring the floor. After pouring, the embedded plate 3 at the lower end of the installation base 2 will be connected to the floor. When the shear wall body 1 needs to be installed after the floor maintenance time is reached, use a crane to adjust the shear wall body 1 to the position corresponding to the installation base 2, and then push the shear wall body 1 so that the installation channel steel 5 is connected to the installation strip 4, and the fixing rod 61 is connected to the position of the fixing hole 63, and then use a wrench to fix the fixing sleeve The tube 62 is connected to the fixing rod 61 correspondingly to realize the pre-fixation of the shear wall body 1, and then the pre-mixed mortar is poured into the shear wall body 1 through the grouting channel 7, so that the mortar remains at the bottom of the shear wall and passes through the through hole 8 on the mounting base 2 to contact the floor, completing the installation of the shear wall body 1, and then the angle steel plate 91 is fitted with the shear wall body 1 and the mounting base 2, and fixed with fixing bolts 93, and then waterproof paint is applied on the angle steel plate 91 and the shear wall body 1 to form a waterproof coating 92.

Claims

1. A shear wall structure, comprising a shear wall body (1), characterized in that: A mounting base (2) is provided at the lower end of the shear wall body (1), the mounting base (2) is U-shaped, the lower end of the shear wall body (1) extends into the interior of the mounting base (2), two symmetrically arranged embedded plates (3) are fixed to the lower end of the mounting base (2), two symmetrically arranged mounting strips (4) are fixed to the inner wall of the mounting base (2), two symmetrically arranged mounting channel steels (5) are embedded in the shear wall body (1), the mounting strips (4) are matched with the mounting channel steels (5), and a fixing component (6) and a waterproof component (9) are provided between the shear wall body (1) and the mounting base (2).

2. A shear wall structure according to claim 1, characterized in that: The fixing assembly (6) comprises a fixing rod (61) fixed inside the mounting base (2); a fixing groove (64) is provided on the shear wall body (1); a fixing hole (63) is formed at the bottom of the fixing groove (64); the fixing rod (61) passes through the fixing hole (63) and the fixing groove (64); a fixing sleeve (62) is threadedly connected to the end of the fixing rod (61); and the fixing sleeve (62) is located inside the fixing groove (64).

3. A shear wall structure according to claim 1, characterized in that: Grouting channels (7) are provided inside the shear wall body (1), and the grouting channels are symmetrically arranged.

4. A shear wall structure according to claim 1, characterized in that: A plurality of through holes (8) are provided at the bottom of the mounting base (2), and the through holes (8) are arranged in a straight line array.

5. The shear wall structure according to claim 1, characterized in that: The waterproof component (9) comprises an angle steel plate (91) arranged on the side of the installation base (2); the angle steel plates (91) are two and symmetrically arranged; the angle steel plates (91) are L-shaped; the shear wall body (1) and the angle steel plates (91) are both provided with a waterproof coating (92); the shear wall body (1) is provided with a clamping groove (94); the side of the angle steel plate (91) is in contact with the bottom of the clamping groove (94); and the angle steel plate (91) and the shear wall body (1) are connected via fixing bolts (93).

6. A shear wall structure according to claim 1, characterized in that: The embedded plate (3) is provided with a plurality of reinforcement grooves (10), and the reinforcement grooves (10) are arranged in a straight line array.

7. A shear wall structure according to claim 2 or 5, characterized in that: The surfaces of the mounting base (2), the embedded plate (3), the fixing rod (61), and the fixing sleeve (62) are all provided with a corrosion-resistant coating.