Steel support dismantling system
By combining a lifter frame and a hoisting platform installed on the forklift fork, the problem of difficult steel support removal was solved, enabling safe and efficient removal of the steel support.
Patent Information
- Application Number
- CN202420285967.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-06
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-02-06
AI Technical Summary
During subway station construction, steel supports are difficult to remove, especially since large lifting equipment cannot enter the construction site and forklifts cannot reach the height of the steel supports, making removal impossible.
Design a steel support dismantling system, including a lifting platform and a detachable extension frame, to achieve efficient dismantling of the steel support by combining the forklift fork with the extension frame.
The safe and effective dismantling of steel supports within a limited space was achieved by using a combination of forklifts and extension frames, overcoming equipment limitations and meeting construction requirements.
Smart Images

Figure CN221989985U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of steel support removal, and in particular relates to a steel support removal system. Background Art
[0002] The cover-and-cut method is often used in the construction of subway stations. During the construction of the structural side walls using sequential construction, it is necessary to replace the support. According to the design requirements, the replacement of the support can only be carried out when the concrete strength of the side wall reaches the strength required by the design. Due to site restrictions, large lifting equipment is difficult to enter the construction site, so forklifts are actually used to remove the steel supports. In a certain construction project, the maximum length of the steel support (replacement support, steel replacement support) is 23.55m, the total weight is 12.5t, and the second replacement support bottom is 4.62m away from the middle plate of the negative second floor; but the maximum lifting height of the forklift's front fork is 4.0m, but this results in the forklift not being able to meet the replacement support height requirements, and the steel support removal construction in the station cannot be realized. Utility Model Content
[0003] The utility model aims to overcome the shortcomings of the prior art and provide a steel support dismantling system, which can realize the dismantling of the steel support by using a forklift.
[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0005] A steel support removal system comprises a hoisting platform and two forklifts that can travel on the hoisting platform. A heightening frame for removing the steel support is detachably mounted on the front fork of the forklift; the support height of the heightening frame is not less than 2m.
[0006] Furthermore, the heightening frame includes two bottom tubes arranged in parallel, with columns erected at both ends of the length of the bottom tube, a support column is horizontally fixed between the two columns of the same bottom tube; and a plurality of reinforcing columns are fixed between the columns of different bottom tubes.
[0007] Furthermore, the reinforcement column includes a first reinforcement column and a second reinforcement column; the bottom surface of the first reinforcement column is fixedly connected to the two bottom tubes respectively, and the side surfaces of the first reinforcement column are fixedly connected to the side surfaces of the two columns respectively; the top surface of the second reinforcement column is fixedly connected to the bottom surfaces of the two support columns respectively; and the side surfaces of the second reinforcement column are fixedly connected to the side surfaces of the two columns respectively.
[0008] Furthermore, a notch is provided at one end of the bottom tube, and the front fork of the forklift extends into the bottom tube through the notch; and a gap between the front fork and the notch is fixed by a wooden wedge.
[0009] Furthermore, the two forklifts are arranged on the lifting platform at an interval, and the two forklifts lower the steel support synchronously.
[0010] Furthermore, the hoisting platform is lifted by an elevator and set up on the middle plate of the negative second floor, and the maximum lifting height of the elevator is 7m.
[0011] Furthermore, the hoisting platform is constructed using I20a I-beams and 20mm thick steel plates, with an I-beam spacing of 500mm and a platform width of 2.6m.
[0012] Furthermore, the thick steel plates and I-beams are welded and connected by 100mm welds every 1m; the joints between the thick steel plates are welded and connected by 200mm long A10 steel bars every 1m.
[0013] The beneficial effects of the utility model are:
[0014] The utility model hoisting platform integrally lifts the forklift and the heightening frame, and by installing the heightening frame on the front fork of the forklift, the forklift with the heightening frame is lifted up to reach the height of the steel support, thereby realizing the removal of the steel support in a limited space. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. Among them:
[0016] Figure 1 It is a schematic diagram of the main structure of the height-raising frame according to an embodiment of the utility model.
[0017] Figure 2 It is a side structural schematic diagram of the height-raising frame according to an embodiment of the utility model.
[0018] Figure 3 The implementation process of the utility model embodiment is shown in FIG. Figure 1 .
[0019] Figure 4 The implementation process of the utility model embodiment is shown in FIG. Figure 2 .
[0020] Figure 5 The implementation process of the utility model embodiment is shown in FIG. Figure 3 .
[0021] Figure 6 The figure is a schematic diagram of the top structure of the lifting platform according to the embodiment of the utility model.
[0022] In the figure, 1-bottom pipe, 2-first reinforcement column, 3-upright column, 4-second reinforcement column, 5-support column, 6-elevation frame, 7-forklift, 8-steel support, 9-bottom support, 10-lifting platform. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the protection scope of the present invention.
[0024] In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the present invention. The terms "connected" and "connection" used in the present invention should be understood in a broad sense. For example, they can be fixed connections or detachable connections; they can be directly connected or indirectly connected through intermediate components. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0025] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments.
[0026] like Figure 3 As shown, a steel support removal system comprises a hoisting platform 10, two forklifts 7 that can travel on the hoisting platform 10, and a heightening frame 6 for removing steel supports 8 is detachably mounted on the front fork of the forklift 7; the support height of the heightening frame 6 is not less than 2m; the height of the 2m heightening frame 6 is greater than the difference between the distance between the bottom of the second steel support 8 and the middle plate of the negative second floor and the maximum lifting height of the front fork of the forklift 7, which can provide sufficient redundancy to ensure the safety of the operation; the higher height of the heightening frame 6 can also meet different removal height requirements;
[0027] The forklift 7 uses two 10t forklifts 7; the hoisting platform 10 provides a support platform for the forklift 7, and the hoisting platform 10 is also used to lift the forklift 7 up and down and the steel support 8.
[0028] Further, such as Figures 1 to 4As shown, the heightening frame 6 includes two parallel bottom tubes 1, columns 3 are erected at both ends of the length of the bottom tube 1, and a support column 5 is horizontally fixed between the two columns 3 of the same bottom tube 1; a number of reinforcing columns are fixed between the columns 3 of different bottom tubes 1; specifically, the reinforcing columns include a first reinforcing column 2 and a second reinforcing column 4; the bottom surfaces of the first reinforcing columns 2 are fixedly connected to the two bottom tubes 1 respectively, and the side surfaces of the first reinforcing columns 2 are fixedly connected to the side surfaces of the two columns 3 respectively; the top surfaces of the second reinforcing columns 4 are fixedly connected to the bottom surfaces of the two support columns 5 respectively; the side surfaces of the second reinforcing columns 4 are fixedly connected to the side surfaces of the two columns 3 respectively; in a specific example, the heightening frame 6 is formed by welding No. 28 channel steel, the distance from the upper surface of the support column 5 to the root of the column 3 is 2 meters, the length of the bottom tube 1 is 1400mm, the spacing between the two bottom tubes 1 is 1200mm, the first reinforcing column 2 is welded to the inner side of the column 3, and the spacing between the two first reinforcing columns 2 is 900mm.
[0029] Further, such as Figure 1 A notch is provided at one end of the bottom tube 1, and the front fork of the forklift 7 extends into the bottom tube 1 through the notch; the gap between the front fork and the notch is fixed by a wooden wedge to ensure that the forklift 7 is stable and does not shake after lifting the heightening frame 6.
[0030] Further, such as Figures 3 to 6 As shown, the hoisting platform 10 is lifted by an elevator and set up on the middle plate of the negative second floor. The maximum lifting height of the elevator is 7m. The elevator can adopt conventional lifting equipment such as a small winch, crawler crane, etc.
[0031] Furthermore, the hoisting platform 10 is constructed with I20a I-beams and 20mm thick steel plates, with an I-beam spacing of 500mm and a platform width of 2.6m. When constructing the hoisting platform 10, the I-beams are laid first. The length of the I20a I-beams is 9 meters, and the two ends are mounted on the negative second floor middle plate, and the I-beams are fixed with expansion screws on both sides of each I-beam end; after the I-beams are installed, 20mm steel plates are laid on top, and the thick steel plates and I-beams are welded and connected with 100mm welds every 1m to ensure the connection stability between the steel plates and the I-beams; the joints between the thick steel plates are welded and connected with 200mm long A10 steel bars every 1m to ensure the integrity of the platform; at the same time, steel pipes are used to set up edge protection at the air-facing points to prevent operators from falling.
[0032] The working process of this new type of application is as follows:
[0033] 1. Process the heightening frame 6 and set up the hoisting platform 10; after the hoisting platform 10 is set up, a joint acceptance is required and it can only be used after passing the acceptance;
[0034] 2. Lifting by forklift 7 and lifting frame 6:
[0035] Use a 100t crawler crane to lift the forklift 7 and the heightening frame 6. The forklift 7 is lifted to the lifting platform 10 and can be operated only after it is stabilized. During the operation of the forklift 7, a special person is in charge. After the forklift 7 moves to the middle plate, the heightening frame 6 is lifted and the heightening frame 6 is transported to the working surface by the forklift 7.
[0036] 3. Steel support 8 pressure relief:
[0037] The operator stands on the lifting platform to relieve the pressure on the steel support 8. The lifting platform can be a scissor-type aerial work platform or other types of aerial work platforms in the prior art. After the lifting platform reaches the working position, the lifting platform is braked into place, and measures such as using wooden wedges to support the wheels of the lifting platform are taken to ensure that the lifting platform does not produce horizontal displacement.
[0038] 4. Try to mention:
[0039] After the steel support 8 is depressurized, use the forklift 7 to test lift the steel support 8, and arrange a special person to give signal command through the intercom to ensure that the two forklifts 7 move in unison; the forklift 7 slowly raises the steel support 8 by 100mm and then holds the force for 3 minutes. After the state is stable, check the forklift 7 to see if there are any unsafe factors such as rear wheel tilting. If there is any abnormality, stop the test lift immediately; if Figure 3 This is a schematic diagram of a steel support 8, at which point the steel support 8 is separated from the bottom bracket 9;
[0040] 5. Removal of steel connecting beam and bottom support 9:
[0041] After the trial lifting of the forklift 7 is completed, the gas cutter starts to cut the steel connecting beam and the bottom bracket 9 through the lifting platform; during the operation, the forklift 7 must keep applying an upward lifting force to the steel support 8 to prevent the steel support 8 from suddenly falling when the bottom bracket 9 is removed, and the instantaneous excessive gravity causes the forklift 7 to overturn;
[0042] 6. Removal of steel support 8:
[0043] ① After the steel connecting beam and the bottom support 9 are removed, the signal commander instructs the forklift 7 to lower the steel support 8 at the same time; the lowering process is divided into two times. The first time, the forklift 7 lifts the heightening frame 6 and the steel support 8 in the heightening frame 6 and places them on the middle plate surface, then removes the wooden wedge, pulls out the front fork from the heightening frame 6, and then lowers the steel support 8 for the second time; the second time, the two forklifts 7 lift the steel support 8 at the same time, lift the steel support 8 out of the heightening frame 6, and then place it on the middle plate to dismantle and decompose the steel support 8; Figure 4 This is a schematic diagram after the steel support 8 is lowered for the first time; Figure 5 This is a schematic diagram after the steel support 8 is lowered for the second time;
[0044] ② After the steel support 8 is lowered to the ground, the construction workers begin to dismantle the steel support 8;
[0045] ③ After the steel support 8 is disassembled, it is transported by forklift 7 to the lifting hole lifting platform 10. The maximum single section length is 6m and the weight is 2t. It is transferred to the ground by crawler crane and hoisted using 18mm diameter steel wire rope. The crawler crane is 3m away from the edge of the foundation pit and the operating radius is 12.5m. Figure 6 This is a schematic diagram of the crawler crane's position;
[0046] ④ During the dismantling and lowering of the steel support 8 and the steel connecting beam, arrange special personnel to patrol the operation area to ensure that there are no irrelevant personnel present.
[0047] The lifting platform 10 of the utility model lifts the forklift 7 and the heightening frame 6 as a whole, and by installing the heightening frame 6 on the front fork of the forklift 7, the forklift 7 with the heightening frame 6 can lift the steel support 8 after being lifted, so that the steel support 8 can be removed in a limited space.
[0048] It is to be understood that the above description is only exemplary and the embodiments of the present application do not limit this. The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model shall be within the scope of protection of the pending claims of the present utility model.
Claims
1. A steel support removal system, characterized in that: It comprises a lifting platform (10) and two forklifts (7) that can travel on the lifting platform (10), wherein a heightening frame (6) for removing a steel support (8) is detachably mounted on the front fork of the forklift (7); the supporting height of the heightening frame (6) is not less than 2 m; The heightening frame (6) comprises two bottom tubes (1) arranged in parallel, with columns (3) erected at both ends of the length of the bottom tube (1), a support column (5) being horizontally fixed between the two columns (3) of the same bottom tube (1); a plurality of reinforcing columns being fixed between the columns (3) of different bottom tubes (1); a notch being arranged at one end of the bottom tube (1), and the front fork of the forklift (7) extending into the bottom tube (1) through the notch.
2. The steel support removal system according to claim 1, characterized in that: The reinforcing column comprises a first reinforcing column (2) and a second reinforcing column (4); the bottom surface of the first reinforcing column (2) is fixedly connected to the two bottom tubes (1) respectively, and the side surface of the first reinforcing column (2) is fixedly connected to the side surfaces of the two upright columns (3) respectively; the top surface of the second reinforcing column (4) is fixedly connected to the bottom surfaces of the two supporting columns (5) respectively; and the side surfaces of the second reinforcing column (4) are fixedly connected to the side surfaces of the two upright columns (3) respectively.
3. The steel support removal system according to claim 1, characterized in that: The gap between the front fork and the notch is fixed by a wooden wedge.
4. The steel support removal system according to claim 1, characterized in that: The two forklifts (7) are arranged on the lifting platform (10) at an interval, and the two forklifts (7) lower the steel support (8) synchronously.
5. The steel support removal system according to claim 1, characterized in that: The hoisting platform (10) is lifted by a lift and then erected on the middle plate of the negative second floor. The maximum lifting height of the lift is 7m.
6. The steel support removal system according to claim 1, characterized in that: The hoisting platform (10) is constructed using I20a I-beams and 20mm thick steel plates, with the I-beam spacing being 500mm and the platform width being 2.6m.
7. The steel support removal system according to claim 6, characterized in that: The thick steel plates and I-beams are welded together with a 100mm weld every 1m; the joints between thick steel plates are welded together with a 200mm long A10 steel bar every 1m.