Water-power engineering underground system wastewater treatment system based on recyclable utilization mode
By designing a recyclable wastewater treatment system in the underground system of hydropower engineering, combining the modular building of steel structures and complete treatment processes, the existing system construction and demolition problems are solved, the use efficiency and engineering benefits are improved, and it is suitable for complex sites. and hydropower engineering projects with short service years.
Patent Information
- Application Number
- CN202420151608.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-22
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-01-22
AI Technical Summary
The existing wastewater treatment system for underground hydropower engineering projects has problems such as large construction and demolition projects, high cost and low use efficiency, and the service life is short, making it difficult to meet the conditions for complex site construction and treatment needs of single pollutants.
A system based on recycling mode was designed, using adjustment tank, vertical flow sedimentation tank, intermediate tank, dual medium filter, activated carbon filter, clean water tank, sludge tank and plate frame filter press, combined with steel structure module To improve the efficiency of system use and reduce engineering volume.
It effectively improves the efficiency of the system, reduces the construction and demolition project volume, significantly improves the engineering efficiency, and is suitable for hydropower projects with complex sites and short service years.
Smart Images

Figure CN222007431U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of wastewater treatment, and in particular relates to a wastewater treatment system for an underground system of a hydropower project based on a recyclable utilization mode. Background Art
[0002] During the construction of the underground system of the hydropower project, in order to reduce the adverse effects of groundwater leakage on the stability of the surrounding rock, it is necessary to use a combination of drainage ditches, temporary sump pits and drainage pumping stations to remove underground seepage. The underground seepage water contains a high amount of sand. If it is discharged directly without treatment, it will pollute the water environment and damage the ecosystem. It must be treated to meet the standards before being discharged.
[0003] Therefore, it is necessary to build a corresponding wastewater treatment system for the underground system of hydropower projects. The wastewater treatment system for the underground system of hydropower projects belongs to the water environment protection measures during the construction period of the underground system of hydropower projects. It has the characteristics of complex construction conditions of the proposed site, short service life of the wastewater treatment system, and single type of wastewater pollutants. Therefore, it is the focus of wastewater treatment work to adopt economical, effective, reasonable and feasible measures to achieve treatment standards. In the prior art, the wastewater treatment system for the underground system of hydropower projects is a concrete building, which has problems such as large system construction and demolition work, high cost, and low efficiency. Utility Model Content
[0004] In view of the defects of the prior art, the utility model provides a wastewater treatment system for underground systems of hydropower projects based on a recyclable utilization mode, which can effectively solve the above problems.
[0005] The technical solution adopted by the utility model is as follows:
[0006] The utility model provides a wastewater treatment system for an underground system of a hydropower project based on a recyclable utilization mode, comprising a regulating tank (1), a vertical flow sedimentation tank (2), an intermediate water tank (3), a dual-medium filter (4), an activated carbon filter (5), a clear water tank (6), a sludge tank (7), a plate and frame filter press (8) and a pipeline mixer (9);
[0007] The outlet pipe of the regulating tank (1) is connected to the first water inlet end of the pipeline mixer (9); the second water inlet end of the pipeline mixer (9) is connected to the flocculant delivery pipe; the drainage end of the pipeline mixer (9) is connected to the water inlet end of the vertical flow sedimentation tank (2); the top clean water outlet of the vertical flow sedimentation tank (2) is connected to the water inlet end of the intermediate water tank (3) through a water delivery pipe; the drainage end of the intermediate water tank (3) is connected to the water inlet end of the dual-medium filter (4) through a water delivery pipe; the drainage end of the dual-medium filter (4) is connected to the water inlet end of the activated carbon filter (5) through a water delivery pipe; the drainage end of the activated carbon filter (5) is connected to the clean water tank (6) through a water delivery pipe; the bottom mud outlet of the vertical flow sedimentation tank (2) is connected to the sludge tank (7) through a sludge discharge pipe; the interior of the sludge tank (7) is connected to the plate and frame filter press (8) through a sludge delivery pipe;
[0008] The regulating tank (1), the intermediate water tank (3), the clean water tank (6) and the sludge tank (7) are all constructed of recyclable steel structures.
[0009] Preferably, the drainage end of the clean water tank (6) is connected to the backwash ports of the dual-media filter (4) and the activated carbon filter (5), respectively; the backwash water of the dual-media filter (4) and the activated carbon filter (5) is connected to the regulating tank (1) through a water supply pipeline.
[0010] Preferably, a plurality of submersible mixers are arranged at the bottom of the regulating tank (1).
[0011] Preferably, the dual-media filter (4) uses a combination of quartz sand and anthracite as filter material.
[0012] Preferably, the recyclable steel structure building comprises a metal corrugated sheet roof (10), a metal corrugated sheet wall (11), a portal steel frame column (12), a door and window frame column (13), a wall purlin (14), an inter-column support (15) and a roof purlin (16);
[0013] The portal steel frame column (12) is formed by connecting ground steel (12-1), right wall steel (12-2), right roof steel (12-3), left roof steel (12-4) and left wall steel (12-5) end to end; a plurality of portal steel frame columns (12) are arranged in parallel, and the ground steel (12-1) of each portal steel frame column (12) is fixed to the ground foundation by a hinge bolt; between two adjacent portal steel frames, a plurality of portal steel frame columns (12) are connected to the ground foundation by a hinge bolt; The right wall profile steels (12-2) and the left wall profile steels (12-5) of the portal steel frame columns (12) are connected and fixed by means of inter-column supports (15); the wall purlins (14) are arranged on the outside of the right wall profile steels (12-2) and the outside of the left wall profile steels (12-5) of each portal steel frame column (12), and the metal corrugated sheet wall (11) is installed on the outside of the wall purlins (14);
[0014] The roof purlin (16) is arranged outside the right roof steel (12-3) and the left roof steel (12-4) of each portal steel frame column (12), and the metal corrugated sheet roof (10) is installed outside the roof purlin (16);
[0015] The door and window frame columns (13) are installed at the door and window opening positions of each door-type steel frame column (12).
[0016] Preferably, the metal corrugated sheet roof (10) and the metal corrugated sheet wall (11) are both made of metal corrugated insulation sheets.
[0017] Preferably, the metal corrugated sheet roof (10) comprises an outer plate, an inner plate and an internal glass wool insulation layer.
[0018] Preferably, the metal profiled plate wall (11) comprises an outer plate, an inner plate and an internal rock wool board insulation layer.
[0019] The utility model provides a wastewater treatment system for underground hydropower projects based on a recyclable utilization mode, which has the following advantages:
[0020] The utility model provides a wastewater treatment system for an underground system of a hydropower project based on a recyclable utilization mode, which fully considers the characteristics of complex construction conditions of the proposed site of the hydropower project, short service life of the wastewater treatment system, single type of wastewater pollutants, etc. The treatment process realizes complete equipment, and the building form realizes modular steel structure, thereby effectively improving the system utilization efficiency and reducing the system construction and demolition engineering workload. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A structural diagram of a wastewater treatment system for an underground system of a hydropower project based on a recyclable utilization mode provided by the utility model;
[0022] Figure 2A working principle diagram of a wastewater treatment system for underground systems of hydropower projects based on a recyclable utilization mode provided by the utility model;
[0023] Figure 3 The main structure view of the steel structure building of the underground system wastewater treatment system provided by the utility model;
[0024] Figure 4 This is an internal structural view of the steel structure building of the underground system wastewater treatment system provided by the utility model. DETAILED DESCRIPTION
[0025] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model; it is obvious that the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the utility model without making creative work are within the scope of protection of the utility model.
[0026] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top / bottom" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0027] In the description of the present utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "set / connected", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0028] The utility model provides a wastewater treatment system for an underground system of a hydropower project based on a recyclable utilization mode, which fully considers the characteristics of complex construction conditions of the proposed site of the hydropower project, short service life of the wastewater treatment system, single type of wastewater pollutants, etc. The treatment process realizes complete equipment, and the building form realizes modular steel structure, thereby effectively improving the system utilization efficiency and reducing the system construction and demolition engineering workload.
[0029] refer to Figure 1 and Figure 2The utility model provides a wastewater treatment system for underground hydropower projects based on a recyclable utilization mode, including a regulating tank 1, a vertical flow sedimentation tank 2, an intermediate water tank 3, a dual-media filter 4, an activated carbon filter 5, a clear water tank 6, a sludge tank 7, a plate and frame filter press 8 and a pipeline mixer 9;
[0030] The outlet pipe of the regulating tank 1 is connected to the first water inlet end of the pipeline mixer 9; the second water inlet end of the pipeline mixer 9 is connected to the flocculant delivery pipe; the drainage end of the pipeline mixer 9 is connected to the water inlet end of the vertical flow sedimentation tank 2; the top clean water outlet of the vertical flow sedimentation tank 2 is connected to the water inlet end of the intermediate water tank 3 through the water delivery pipe; the drainage end of the intermediate water tank 3 is connected to the water inlet end of the dual-medium filter 4 through the water delivery pipe; the drainage end of the dual-medium filter 4 is connected to the water inlet end of the activated carbon filter 5 through the water delivery pipe; the drainage end of the activated carbon filter 5 is connected to the clean water tank 6 through the water delivery pipe; the bottom mud outlet of the vertical flow sedimentation tank 2 is connected to the sludge tank 7 through the sludge discharge pipe; the interior of the sludge tank 7 is connected to the plate and frame filter press 8 through the sludge delivery pipe;
[0031] In addition, the drainage end of the clean water tank 6 is connected to the backwash ports of the dual-media filter 4 and the activated carbon filter 5 respectively; the backwash water of the dual-media filter 4 and the activated carbon filter 5 is connected to the regulating tank 1 through a water pipeline.
[0032] The utility model provides a wastewater treatment system for underground systems of hydropower projects based on a recyclable utilization mode, and its working principle is:
[0033] The underground system wastewater flows into the vertical flow sedimentation tank 2 through the regulating tank 1. The supernatant in the vertical flow sedimentation tank 2 enters the intermediate water tank 3 after adding flocculant through the pipeline mixer 9. The water in the intermediate water tank 3 enters the dual-media filter 4 after being pressurized. After being filtered by the dual-media filter 4, it flows into the activated carbon filter 5. The effluent after being filtered by the activated carbon filter 5 enters the clear water tank 6. The clear water in the clear water tank 6 is reused according to actual needs.
[0034] The sludge generated by the operation of the vertical flow sedimentation tank 2 enters the sludge tank 7, and the sludge in the sludge tank 7 is processed by the plate and frame filter press 8 to form a mud cake which is transported to the landfill.
[0035] When the dual-media filter 4 and the activated carbon filter 5 are in operation, the water transported from the clean water tank 6 is used as backwash water for regular backwashing, and the wastewater generated by backwashing flows back to the regulating tank 1 and is then treated by the wastewater treatment system.
[0036] The utility model provides a wastewater treatment system for underground systems of hydropower projects based on a recyclable utilization mode, which has the following structural features:
[0037] As the project is located in the cold northern region, all treatment units are placed indoors. The building area is 805㎡, the building volume is 900m3, and there are 4 sets of main equipment.
[0038] Regulating tank 1: used to regulate water quantity and quality, with a hydraulic retention time of 6 hours. Due to the large fluctuations in the influent water quality, multiple submersible mixers are installed at the bottom of regulating tank 1, for example, 4 submersible mixers are installed to prevent siltation and hardening at the bottom.
[0039] Vertical flow sedimentation tank 2: used to remove large suspended solids, surface load 2.5m3 / (㎡·h). Complete set of equipment, easy to disassemble and install. The equipment is 6.4m long, 3.2m wide and 5.5m high. The hydropower project is located in the mountainous area. In order to facilitate transportation in the mountainous area, the width is required to be less than 4m.
[0040] Intermediate water tank 3: used for regulating and lifting, the effective volume can provide the pump with 20 minutes of lifting capacity. Among them, the steel plate is welded on site. The equipment is 2.7m long, 2.4m wide and 3.0m high. The hydropower project is located in the mountainous area. In order to facilitate transportation in the mountainous area, the length of the steel plate is required to be no more than 2.5m.
[0041] Dual media filter 4: used to remove small suspended solids, filtration rate 10m / h, single-layer quartz sand filter material or anthracite and quartz sand double-layer filter material. Complete set of equipment, easy to disassemble and install. Considering the high concentration of suspended solids in the influent, a combination of quartz sand and anthracite is used as filter material. The equipment has a diameter of 2.4m and a height of 3.9m. The hydropower project is located in the mountainous area. In order to facilitate transportation in the mountainous area, the diameter is required to be less than 2.5m.
[0042] Activated carbon filter 5: Considering that the raw water occasionally contains oil, an activated carbon filter is installed to remove the occasional oil, with a filtration rate of 10m / h and activated carbon filter material. It is a complete set of equipment, which is easy to disassemble and install. The equipment has a diameter of 2.4m and a height of 3.9m. The hydropower project is located in the mountainous area. In order to facilitate transportation in the mountainous area, the diameter is required to be less than 2.5m.
[0043] Clean water tank 6: used to store clean water, with a hydraulic retention time of 2-3 hours.
[0044] Sludge pool 7: used to store sludge, with a sludge retention time of 12 hours. The adjustment volume of the sludge pool should be determined by calculation based on the sludge discharge method, sludge discharge water volume and outflow conditions of the sedimentation tank, but should not be less than the sludge discharge water volume of the largest sedimentation tank at one time.
[0045] Plate and frame filter press 8: used for sludge dewatering. Processing capacity 3800kg / h.
[0046] In the present invention, the regulating tank 1, the intermediate water tank 3, the clean water tank 6 and the sludge tank 7 are all made of recyclable steel structures. Figure 3 and Figure 4 The recyclable steel structure building includes a metal corrugated sheet roof 10, a metal corrugated sheet wall 11, a portal steel frame column 12, a door and window frame column 13, a wall purlin 14, an inter-column support 15 and a roof purlin 16;
[0047] The portal steel frame column 12 is formed by connecting the ground steel 12-1, the right wall steel 12-2, the right roof steel 12-3, the left roof steel 12-4 and the left wall steel 12-5 end to end. A plurality of portal steel frame columns 12 are arranged in parallel, and the ground steel 12-1 of each portal steel frame column 12 is fixed to the ground foundation by hinge bolts. The right wall steel 12-2 and the left wall steel 12-5 of two adjacent portal steel frame columns 12 are connected and fixed by inter-column supports 15. The wall purlin 14 is arranged outside the right wall steel 12-2 and the left wall steel 12-5 of each portal steel frame column 12, and the metal corrugated plate wall 11 is installed outside the wall purlin 14.
[0048] A roof purlin 16 is arranged outside the right roof steel 12-3 of each portal steel frame column 12, and outside the left roof steel 12-4, and a metal corrugated sheet roof 10 is installed outside the roof purlin 16;
[0049] Door and window frame columns 13 are installed at the door and window opening positions of each door-type steel frame column 12.
[0050] The metal profiled sheet roof 10 and the metal profiled sheet wall 11 both use metal profiled insulation board. The metal profiled sheet roof 10 includes an outer plate, an inner plate and an inner glass wool insulation layer. The metal profiled sheet wall 11 includes an outer plate, an inner plate and an inner rock wool insulation layer.
[0051] The design idea of the recyclable steel structure building of the underground system wastewater treatment system is as follows: the portal steel frame column 12 is made of five pieces of steel sections, fixed on the foundation by hinged bolts, the portal steel frame columns 3 are connected and fixed by column supports 15, and wall purlins 14 and roof purlins 16 are arranged around and on the top of the portal steel frame column 12 as wall and roof supports; the roof and exterior walls respectively use metal corrugated sheet roof 10 and metal corrugated sheet wall 11 as roof and wall, which are connected and fixed with the roof purlin 16 and wall purlin 14 by self-tapping screws.
[0052] The construction design of this utility model adopts a single-layer portal steel frame structure, and the walls and roofs are made of metal corrugated insulation boards. The main structures are assembled on site, and the connection method is mostly bolted. The single structure is small in size and can be processed and formed in the factory, and transported to the construction site in blocks for assembly and splicing. The steel structure building adopted by this utility model is easy to install, disassemble and transport. The main design elements are as follows:
[0053] Metal corrugated sheet roof 10: Double-layer corrugated steel sheet insulation roof, outer sheet thickness 0.6mm, inner sheet thickness 0.6mm, internal glass wool insulation layer thickness 100mm. The roof is made of multiple insulation panels spliced on site, and the panels are fixed and connected with self-tapping screws. The width of a single panel is 1m, the length does not exceed 5m, and the weight does not exceed 70kg, which is easy to install, disassemble and transport.
[0054] Metal corrugated sheet wall 11: Double-layer corrugated steel sheet insulation roof, outer sheet thickness 0.8mm, inner sheet thickness 0.6mm, internal rock wool board insulation layer thickness 100mm. The wall is made of multiple insulation boards spliced on site, and the boards are fixed and connected with self-tapping screws. The width of a single board is 1m, the length does not exceed 5m, and the weight does not exceed 120kg, which is easy to install, disassemble and transport.
[0055] Portal steel frame column 12: Made of H900~400×280×8×18 steel and Q355C material, the steel frame column is made of five independent steel parts spliced on site, connected by bolted connecting plates. The length of a single independent steel piece does not exceed 7m, the width does not exceed 1m, and the weight does not exceed 820kg, which is easy to install, disassemble and transport.
[0056] Door and window frame column 13: 2C180×70×20×2.2 steel, Q355C material, connected by bolts, the length of a single door and window frame column does not exceed 7m, the weight does not exceed 75kg, and it is easy to install, disassemble and transport.
[0057] Wall purlin 14: Made of C180×70×20×2.2 steel, Q355C material, connected by bolts. The length of a single purlin does not exceed 6m, and the weight does not exceed 35kg, making it easy to install, disassemble and transport.
[0058] Inter-column support 15: It is made of 2L80×5 steel, Q355C material, and is connected by bolts. The length of a single inter-column support does not exceed 7m, and the weight does not exceed 35kg, which is easy to install, disassemble and transport.
[0059] Roof purlin 16: Made of C180×70×20×2.2 steel, Q355C material, connected by bolts, the length of a single purlin does not exceed 6m, and the weight does not exceed 35kg, making it easy to install, disassemble and transport.
[0060] The utility model provides a wastewater treatment system for underground systems of hydropower projects based on a recyclable utilization mode, which can be designed using the following process:
[0061] 1. Determine the scale and process of wastewater treatment
[0062] During the excavation of the underground system cavern, the construction wastewater and underground seepage water were considered to be mixed and treated in the early stage. The peak daily wastewater volume was about 200-2000m3 / d, and the SS concentration was about 2000mg / L. It was planned to be treated and used comprehensively. After the excavation was completed, the lining was completed, the cavern working surface was stable, there was basically no seepage, and the wastewater treatment system was dismantled.
[0063] After treatment, the mixed drainage of the underground system is intended to be used as construction water for the underground system and the lower reservoir. The wastewater treatment targets are SS ≤ 100 mg / L and turbidity ≤ 10 NTU.
[0064] The underground system drainage adopts the method of drainage ditch, water collection well and water pump to extract the water in the cave from the construction channel openings such as traffic tunnel, ventilation tunnel and water diversion tunnel. A wastewater collection tank is set at each channel opening to collect the drainage and enter the wastewater treatment system through pipes.
[0065] The underground system drainage enters the wastewater treatment system regulating tank, and after the water quantity and quality are adjusted, it enters the coagulation sedimentation tank to remove large suspended particles. Then, after being lifted through the intermediate water tank, it enters the filtration tank to remove small suspended particles, and finally enters the clear water tank for storage, and the effluent is reused according to on-site needs.
[0066] 2. Monomer process parameters and monomer building structure requirements
[0067] (1) Regulating tank 1: used to regulate water quantity and quality, with a hydraulic retention time of 4-6 hours.
[0068] (2) Vertical flow sedimentation tank 2: used to remove large suspended solids, sedimentation time 0.5-2.0h, surface hydraulic load 1.5-4.5m3 / (㎡·h). Complete set of equipment.
[0069] (3) Intermediate water tank 3: used for regulating and lifting, the effective volume can provide the pump with a lifting capacity of more than 20 minutes.
[0070] (4) Dual-media filter 4 and activated carbon filter 5: used to remove small suspended solids and oily substances, with a filtration rate of 7-12 m / h, and anthracite, quartz sand double-layer filter media and activated carbon filter media.
[0071] (5) Clean water tank 6: used to store clean water, the effective volume should meet the regulation requirements for reuse.
[0072] (6) Sludge tank 7: used to store sludge. The regulating volume of sludge tank 7 shall be determined by calculation according to the sludge discharge method, sludge discharge water volume and outflow condition of the sludge discharge tank, but shall not be less than the sludge discharge water volume of the largest sedimentation tank at one time.
[0073] (7) Plate and frame filter press 8: Dewater the sludge generated during the treatment process. The selection of the dewatering machine should be determined based on the properties of the concentrated sludge water and the moisture content requirements of the dewatered sludge cake. The output of the dewatering machine and the requirements for the solid content of the inlet are determined through tests or operating experience.
[0074] 3. On the basis of meeting the effluent quality standards, the wastewater treatment unit process and building structure design method are optimized, the treatment process is realized as a complete set of equipment, and the building form is realized as a modular steel structure.
[0075] (1) The vertical flow sedimentation tank 2, dual-media filter 4, activated carbon filter 5, and plate-and-frame filter press 8 are all in the form of complete sets of equipment. They are installed indoors to ensure the equipment is in good operating condition and to facilitate recycling.
[0076] (2) The regulating tank 1, the intermediate water tank 3, the clean water tank 6, and the sludge tank 7 are constructed in the form of steel structure modules to facilitate recycling or steel recovery.
[0077] 4. Clarify the technical requirements for recycling of major complete sets of equipment and steel structure components to ensure the operability of recycling.
[0078] (1) The technical requirements for recycling of complete sets of equipment are as follows:
[0079] a. After the system service life is reached, the complete set of equipment must be inspected in accordance with the relevant requirements of "Technical Conditions for Water Treatment Equipment" (NB / T10790), "Technical Requirements for Environmental Protection Products - Multilayer Filter Media" (HJ / T 248), and "Technical Requirements for Environmental Protection Products - Chamber Filter Presses and Plate and Frame Filter Presses" (HJ / T 248), and a test report must be issued. After passing the inspection, it can be transported to other project sites as a recyclable complete set of equipment.
[0080] b. After the construction and installation of the recyclable complete set of equipment is completed at other project sites, the equipment installation project acceptance and wastewater treatment facility completion acceptance shall be carried out in accordance with the relevant requirements of the "Acceptance Procedures for Environmental Protection Facilities of Hydropower Projects" (NB / T 10229), and after passing the acceptance, it will enter the service period of other projects.
[0081] (2) The recycling of steel structure buildings meets the national industry standards and the technical requirements are as follows:
[0082] a. After the system service life is reached, the steel structure building needs to be reliably appraised in accordance with the reliability appraisal procedures in the "Industrial Building Reliability Appraisal Standard" (GB50144), the reliability level is assessed, an appraisal report is issued, and treatment measures are proposed for those with low safety and usability evaluation levels. After passing the appraisal, it can be used as a recyclable steel component and transported to other project sites.
[0083] b. After the construction and installation of recyclable steel components are completed at other project sites, they must undergo civil engineering acceptance in accordance with the relevant requirements of the "Acceptance Procedures for Environmental Protection Facilities of Hydropower Projects" (NB / T 10229) and the "Code for Acceptance of Construction Quality of Steel Structure Engineering" (GB 50205). After passing the acceptance, they will enter the service period of other projects.
[0084] The utility model provides a wastewater treatment system for underground systems of hydropower projects based on a recyclable mode. Through the analysis of the wastewater treatment characteristics of underground systems of hydropower projects and the construction conditions of the proposed site, the wastewater treatment process design and the architectural structure design are optimized to form a wastewater treatment system for underground systems of hydropower projects with a recyclable mode. The utility model fully considers the complex construction conditions of the proposed site of the hydropower project, the short service life of the wastewater treatment system, and the single type of wastewater pollutants. The treatment process realizes the complete set of equipment, and the architectural form realizes the modularization of steel structure, which solves the problems of low system utilization rate, difficult construction and demolition of engineering projects formed by traditional design methods. The utility model can effectively treat underground system wastewater, improve the efficiency of system use, reduce the amount of system construction and demolition engineering, and the engineering benefits are significant.
[0085] The above is only a preferred embodiment of the present invention. It should be pointed out that ordinary technicians in this technical field can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications should also be considered as the protection scope of the present invention.
Claims
1. A wastewater treatment system for underground hydropower projects based on a recyclable mode, characterized in that: It includes a regulating tank (1), a vertical flow sedimentation tank (2), an intermediate water tank (3), a dual-media filter (4), an activated carbon filter (5), a clean water tank (6), a sludge tank (7), a plate and frame filter press (8) and a pipeline mixer (9); The outlet pipe of the regulating tank (1) is connected to the first water inlet end of the pipeline mixer (9); the second water inlet end of the pipeline mixer (9) is connected to the flocculant delivery pipe; the drainage end of the pipeline mixer (9) is connected to the water inlet end of the vertical flow sedimentation tank (2); the top clean water outlet of the vertical flow sedimentation tank (2) is connected to the water inlet end of the intermediate water tank (3) through a water delivery pipe; the drainage end of the intermediate water tank (3) is connected to the water inlet end of the dual-medium filter (4) through a water delivery pipe; the drainage end of the dual-medium filter (4) is connected to the water inlet end of the activated carbon filter (5) through a water delivery pipe; the drainage end of the activated carbon filter (5) is connected to the clean water tank (6) through a water delivery pipe; the bottom mud outlet of the vertical flow sedimentation tank (2) is connected to the sludge tank (7) through a sludge discharge pipe; the interior of the sludge tank (7) is connected to the plate and frame filter press (8) through a sludge delivery pipe; The regulating tank (1), the intermediate water tank (3), the clean water tank (6) and the sludge tank (7) are all constructed of recyclable steel structures.
2. A wastewater treatment system for underground hydropower projects based on a recyclable mode according to claim 1, characterized in that: The drainage end of the clean water tank (6) is connected to the backwash ports of the dual-media filter (4) and the activated carbon filter (5), respectively; the backwash water of the dual-media filter (4) and the activated carbon filter (5) is connected to the regulating tank (1) through a water supply pipeline.
3. The wastewater treatment system for underground hydropower projects based on a recyclable utilization mode according to claim 1 is characterized in that: A plurality of submersible mixers are arranged at the bottom of the regulating tank (1).
4. The wastewater treatment system for underground hydropower projects based on a recyclable utilization mode according to claim 1 is characterized in that: The dual-medium filter (4) uses a combination of quartz sand and anthracite as filter material.
5. The wastewater treatment system for underground hydropower projects based on a recyclable mode according to claim 1 is characterized in that: The recyclable steel structure building comprises a metal corrugated sheet roof (10), a metal corrugated sheet wall (11), a portal steel frame column (12), a door and window frame column (13), a wall purlin (14), an inter-column support (15) and a roof purlin (16); The portal steel frame column (12) is formed by connecting ground steel (12-1), right wall steel (12-2), right roof steel (12-3), left roof steel (12-4) and left wall steel (12-5) end to end; a plurality of portal steel frame columns (12) are arranged in parallel, and the ground steel (12-1) of each portal steel frame column (12) is fixed to the ground foundation by a hinge bolt; between two adjacent portal steel frames, a plurality of portal steel frame columns (12) are connected to the ground foundation by a hinge bolt; The right wall profile steels (12-2) and the left wall profile steels (12-5) of the portal steel frame columns (12) are connected and fixed by means of inter-column supports (15); the wall purlins (14) are arranged on the outside of the right wall profile steels (12-2) and the outside of the left wall profile steels (12-5) of each portal steel frame column (12), and the metal corrugated sheet wall (11) is installed on the outside of the wall purlins (14); The roof purlin (16) is arranged outside the right roof steel (12-3) and the left roof steel (12-4) of each portal steel frame column (12), and the metal corrugated sheet roof (10) is installed outside the roof purlin (16); The door and window frame columns (13) are installed at the door and window opening positions of each door-type steel frame column (12).
6. A wastewater treatment system for underground hydropower projects based on a recyclable utilization model according to claim 5, characterized in that: The metal profiled plate roof (10) and the metal profiled plate wall (11) are both made of metal profiled insulation plates.
7. A wastewater treatment system for underground hydropower projects based on a recyclable mode according to claim 6, characterized in that: The metal profiled sheet roof (10) comprises an outer plate, an inner plate and an inner glass wool insulation layer.
8. A wastewater treatment system for underground hydropower projects based on a recyclable utilization mode according to claim 6, characterized in that: The metal profiled plate wall surface (11) comprises an outer plate, an inner plate and an inner rock wool board insulation layer.