Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

170results about How to "Reduce construction" patented technology

Power distribution network source network storage resource collaborative planning method, system, equipment and medium

The invention provides a power distribution network source network storage resource collaborative planning method, system and device, and a medium. The method comprises the following steps: pre-constructing a source network storage collaborative planning model; the source network storage collaborative planning model comprises an upper-layer planning model taking the minimization of the annual comprehensive construction cost of the power distribution network as an optimization target and a lower-layer operation model taking the maximization of the photovoltaic consumption amount as an optimization target; solving the source network storage collaborative planning model through a pelican optimization algorithm to obtain an energy storage optimal configuration strategy of the power distribution network; the energy storage optimal configuration strategy comprises the position and capacity of each energy storage device. According to the method, the problems of unbalanced supply and demand and difficulty in real-time balance of electric power caused by insufficient photovoltaic consumption capability after large-scale distributed photovoltaic access to the power distribution network can be effectively solved, the photovoltaic consumption capability is improved, the voltage offset of the power grid can be reduced, and continuous and stable operation of an electric power system is further ensured.
Owner:STATE GRID ECONOMIC TECH RES INST CO LTD +1

Underground coal mine automatic masonry robot and using method

The invention discloses an underground coal mine automatic masonry robot and a using method. The robot comprises a power vehicle body, a power battery, a cement mortar stirring storage tank, a cement mortar pump station, a rear brick transferring mechanism, a front brick transferring mechanism, a brick transferring conveying belt mechanism, a brick bearing platform mechanism, a brick bearing platform lifting mechanism and a brick masonry executing mechanism. The power battery, the cement mortar stirring storage tank and the cement mortar pump station are arranged above the power vehicle body in parallel; the rear / front brick transfer mechanism is arranged at the rear / front end of the power vehicle body; the brick masonry executing mechanism is arranged in front of the power vehicle body through the brick bearing platform mechanism and the brick bearing platform lifting mechanism in sequence. According to the invention, unmanned and automatic building of the closed wall is realized, and the problems existing in manual building of the closed wall are solved; the construction of a scaffold is omitted, so that the operation risk is reduced; cement mortar is prefabricated, stored and automatically conveyed, and the field working environment is improved; the bricks are automatically taken and placed, the construction period is shortened, and the construction efficiency is improved.
Owner:LIAONING TECHNICAL UNIVERSITY

Double-layer bolt prefabricated pipe piece, pipe piece joint and construction method

The invention relates to a double-layer bolt prefabricated duct piece, a duct piece connector and a construction method, the double-layer bolt prefabricated duct piece connector comprises a steel fiber concrete duct piece connector and a double-layer connecting assembly, and a first-layer connecting structure and a second-layer connecting structure are arranged in the steel fiber concrete duct piece connector; the connecting end of the first-layer connecting structure and the connecting end of the second-layer connecting structure are connected through a reinforcing component in a main body zigzag mode, so that stress of the first-layer connecting structure and the second-layer connecting structure is borne, the first-layer connecting structure comprises a first hole channel of an arc-shaped structure, and the second-layer connecting structure comprises a second hole channel of an arc-shaped structure. The second-layer connecting structure comprises a second pore channel of an arc-shaped structure, the first pore channel and the second pore channel are arranged in the mode that the curvature center positions are approximate and are spaced from each other, and the curvature of the first pore channel is smaller than that of the second pore channel. The reinforcing component protects the weak area of the hand hole, replaces the effect of a gasket, and meanwhile, the double-layer connecting assembly is connected together, so that a relatively strong reinforcing effect is achieved.
Owner:SHENZHEN METRO GROUP +1

Continuous and coordinated propelling method for common well of front furnace and rear furnace in underground coal gasification mining

ActiveCN119393112AReduce the number of wells drilledreduce workloadConstructionsFluid removalSyngasThermodynamics
The invention discloses a coal underground gasification mining front and rear furnace common well continuous coordination propulsion method which comprises the following steps: S1, constructing a gas inlet well and a gas outlet well of a first furnace, and performing gas injection fracturing on a gasification to-be-mined area of the first furnace by using the gas outlet well; s2, coal seam combustion gasification operation is conducted on the gasification to-be-mined area of the first furnace, and synthesis gas is collected through a gas outlet well of the first furnace; meanwhile, a gas outlet well of the second furnace is used for conducting gas injection fracturing on the gasification to-be-mined area of the second furnace; s3, the combustion space area of the first furnace is made to be idle for cooling, meanwhile, the second furnace conducts combustion gasification operation, and the third furnace conducts gas injection fracturing operation; each furnace is subjected to a flow process of gas injection fracturing, combustion gasification, idle cooling and CO2 storage well closing treatment; and S4, completing each flow process in sequence. The upper furnace and the lower furnace carry out difference node follow-up according to the flow process by one flow node, the upper furnace and the lower furnace carry out well sharing, the number of drilled wells is reduced, geological damage is relieved, and the mining efficiency is improved.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Digital jet printing detection method and system

The invention provides a digital jet printing detection method and system. The method comprises the following steps: acquiring a first drive board digital signal of a digital nozzle; acquiring image single-column data based on the first drive board digital signal; obtaining a first verification image based on the image single-column data and a preset original image parameter; and verification is carried out based on the first verification image and the original image, and testing of digital jet printing is realized. The digital jet printing detection method and system provided by the invention can effectively improve the test efficiency and the detection quality of the digital jet printing system by simulating and replacing a method that a traditional digital jet printing system needs to build an actual ink path system in a test stage before leaving a factory, reduce time, manpower and material resource costs, and improve the test efficiency and the detection quality of the digital jet printing system. And a large number of repeated tests on the digital jet printing system can be further evaluated and detected.
Owner:GUANGZHOU MICROEMBEDDED IDENTIFY TECH CO LTD

Coal underground combustion gasification and carbon dioxide storage mining treatment method

The invention discloses a coal underground combustion gasification and carbon dioxide sequestration mining treatment method. The method comprises the steps that S1, gas injection fracturing is conducted, specifically, fracturing gas is introduced through a gas outlet well to enable a coal seam corresponding to a gasification to-be-mined area to form a fracturing seam net; s2, combustion gasification: taking the bottom end of a gas inlet shaft of the furnace to mountain gas and the bottom end as a mining direction, discharging gas from the furnace, and discharging synthesis gas; and S3, sealing and closing the well: injecting carbon dioxide serving as displacement gas into the space to be sealed through the gas inlet well, collecting mixed gas through the gas outlet well, and then injecting high-pressure CO2 gas into the space to be sealed for sealing treatment. According to gas injection fracturing of a single furnace, a horizontal fracturing gas injection channel is adopted for carrying out gas injection fracturing treatment on the gasification to-be-mined area of the furnace located above to form a fracturing crack net, the upper furnace well and the lower furnace well can be jointly subjected to difference node follow-up according to the flow process and the difference of one flow node, and the sealing difficulty of the well and a combustion space area is reduced; and the mining efficiency is improved.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Construction method of upper-span bridge middle pier in highway widening and traffic keeping state

The invention provides a construction method for a middle pier of an overpass bridge in a widening and traffic keeping state of an expressway. The construction method comprises the following steps: dividing a site; issuing traffic information; traffic layout; adjusting a marked line; performing protection installation; mechanically entering the field; breaking and removing a middle division belt; pile foundation construction; constructing a bearing platform; constructing a bent cap in a bracket erection process form; carrying out support edge protection construction; and erecting the prefabricated box girder. By means of the construction method, construction of the upper-span bridge middle piers can be orderly, effectively and rapidly conducted in the state that the two sides of the expressway are widened and traffic is guaranteed, the expressway quality and safety acceptance standards are met, the requirements for whole-line staged traffic guiding and changing nodes and efficient construction are met, the traffic pressure on the existing expressway is reduced, and traffic safety is guaranteed.
Owner:THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU

Offshore suspension type rocket launching platform structure

The invention relates to the technical field of launching platforms, and discloses an offshore suspension type rocket launching platform structure which comprises a ship body assembly, overturning assemblies, a floating assembly, a feeding assembly and a launching assembly, the overturning assemblies are symmetrically hinged to the two sides of the ship body assembly, and the floating assembly is connected with the overturning assemblies through a stabilizing assembly; the feeding assemblies are symmetrically arranged on the top of the ship body assembly, and the launching assembly is installed in the middle of the ship body assembly. A first overturning frame is installed on the floating assembly, a second overturning frame is rotationally connected to the middle of the first overturning frame, a third overturning frame is rotationally connected to the middle of the second overturning frame, propellers are installed in the middle of the third overturning frame, and the propellers are installed on the first overturning frame in a four-corner distribution mode; the problems that in the prior art, an existing offshore suspension type rocket launching platform is poor in stability due to fluctuation of seawater, and the launching angle cannot be adjusted are solved.
Owner:LUDONG UNIVERSITY +1

Flow guide structure meeting construction water requirement

ActiveCN222161155USolve the construction water problem during dry seasonreduce construction costsWater-power plantsHydro energy generationWater useCofferdam
The utility model discloses a diversion structure giving consideration to construction water requirements, which comprises a diversion tunnel, a cofferdam, a water retaining weir and a water delivery system, the cofferdam is arranged in front of the cofferdam for retaining water, an inlet of the diversion tunnel is arranged in front of the cofferdam, and the elevation of the cofferdam consists of a storage water level and a tunnel drainage upstream heap height. The water conveying system comprises a water pump, a water supply pipeline and a high-position water tank, the water pump is arranged on the periphery of the top of the cofferdam, and water is conveyed to the high-position water tank through the water supply pipeline. The retaining water level is controlled through the retaining weir stoplog gate baffle, the construction water use requirement and the flood season water passing requirement are met, the retaining weir stoplog gate can be used for diversion tunnel lower gate blocking in the later period, the construction cost can be effectively reduced, and the technical structure is simple, convenient to construct, low in cost, wide in application range and suitable for popularization and application. The problem of construction water consumption in the dry season of an existing reservoir project can be effectively solved.
Owner:POWERCHINA HUADONG ENG CORP LTD +1

Full-electronic interlocking system

The invention discloses a full-electronic interlocking system. The full-electronic interlocking system comprises a safety cloud platform of a double 2-vote-2 architecture, the safety cloud platform of the double 2-vote-2 architecture comprises two groups of 2-vote-2 safety architectures, and each group of 2-vote-2 safety architectures is composed of two safety devices; the security equipment comprises a security cloud management platform, the security cloud management platform comprises a plurality of virtualization environments and is used for realizing full-electronic interlocking master control, and the full-electronic interlocking master control communicates with each other through a communication link in the security cloud management platform; the security cloud management platform also carries out unified management on hardware resources and is used for realizing input and output control of the full-electronic interlocking system. According to the invention, the full-electronic interlocking main control part and the safety cloud platform are integrated, so that the safety operation requirement of the full-electronic interlocking system is met, and the construction and periodic operation cost is reduced at the same time.
Owner:BEIJING URBAN CONSTR INTELLIGENT CONTROL TECH CO LTD

Ordered charging and discharging control method for electric vehicle based on improved differential evolution algorithm

The invention discloses an electric vehicle ordered charging and discharging control method based on an improved differential evolution algorithm. The method comprises the following steps: constructing a probability model of an electric vehicle charging behavior through a Monte Carlo method; demand analysis and electric vehicle dispatching feasibility judgment are carried out by acquiring power grid information and charging electric vehicle information; considering the power grid operation safety risk and the user credit rating, and formulating a dynamic electricity price; establishing a charging and discharging control model by taking minimization of the comprehensive cost of the user and the construction cost of the power grid as a target; and an improved differential evolution algorithm is adopted to solve the model to obtain the optimal electricity price and the optimal charging and discharging strategy, so that the operation efficiency and the economical efficiency of the power system are improved. The method effectively overcomes the defects of flexibility and cost of an existing electricity price strategy and the defects of dynamic electricity price making in the aspect of user credit, can effectively cope with power grid load fluctuation, and promotes coordinated development of the electric vehicle and the power grid.
Owner:NANJING INST OF TECH

Integrated desulfurization and decarbonization blast furnace gas treatment system

An integrated desulfurization and decarbonization blast furnace gas treatment system comprises an adsorption device, a post-adsorption cyclone separator and a screening device or a two-stage desorption device. The adsorption device comprises a first adsorption material inlet, a second adsorption material inlet and a blast furnace gas inlet which are formed in the lower part or the bottom, and an outlet formed in the upper part or the top. And the post-adsorption cyclone separator is provided with an inlet, a gas outlet and a solid outlet. And an outlet of the adsorption device is connected with an inlet of the post-adsorption cyclone separator. And a solid outlet of the post-adsorption cyclone separator is connected to the screening device or the two-stage desorption device. Two adsorption materials are conveyed into the adsorption device at the same time to achieve synchronous removal of sulfur and carbon, separation of the two adsorption materials is achieved through the screening device, and then separation of two desorption gases is achieved, or separation of the two desorption gases is achieved through the two-stage desorption device, so that the separation difficulty of the desorption gases H2S and CO2 is greatly reduced, and the separation efficiency of the desorption gases H2S and CO2 is improved. And the treatment process of pollution reduction and carbon reduction of the blast furnace gas is effectively simplified.
Owner:ZHONGYE-CHANGTIAN INT ENG CO LTD

Deep foundation pit supporting device and construction method

The deep foundation pit supporting device comprises an outer side cast-in-place pile, a middle cast-in-place pile and an inner side cast-in-place pile which are sequentially arranged from outside to inside, the height of the inner side cast-in-place pile and the height of the middle cast-in-place pile are the same and smaller than the height of the outer side cast-in-place pile, and the outer side cast-in-place pile is used for being arranged on the outer side of the outermost side wall of an underground structure. The inner side cast-in-place pile is used for being arranged on the outer side of the innermost side wall of an underground structure, an inclined strut is arranged between the top beam of the top of the outer side cast-in-place pile and the top beam of the top of the inner side cast-in-place pile, a connecting beam is arranged between the top beam of the inner side cast-in-place pile and the top beam of the top of the middle cast-in-place pile, and the connecting beam extends to the outer side cast-in-place pile and is fixed to the outer side cast-in-place The supporting device is good in stability, and the supporting requirement of a foundation pit with the excavation depth larger than 10 m is met.
Owner:QINGJIAN GRP CO LTD +1

Winding mechanism and pipeline hanger deflection angle measuring device

The utility model relates to the technical field of pipeline support hanger management, in particular to a winding mechanism and a pipeline hanger deflection angle measuring device, and the winding mechanism comprises a measuring assembly which comprises a side plate, an angle dial arranged on the side wall of the side plate and a heavy hammer assembly arranged on the side wall of the angle dial; the rolling assembly comprises a rotary knob arranged at the end of the heavy hammer assembly and a limiting piece arranged at the end of the rotary knob, the limiting piece is connected with an angle dial through a bearing, and the hanging bracket assembly comprises a hanging bracket body arranged on the side wall of the sideboard and a roof wall body arranged at the top end of the hanging bracket body. The deviation angle of the hanging bracket is measured through attachment of the heavy hammer assembly and the pipeline, the problem of accurate measurement of the deviation angle of the hanging bracket is solved, human errors caused by visual inspection are avoided, the telescopic assembly can conduct measurement in a long distance, the building and dismantling cost of a scaffold is reduced, and meanwhile industrial safety and mistaken touch risks introduced in the working process are reduced.
Owner:HUANENG NUCLEAR ENERGY TECH RES INST CO LTD +1

Data service network site selection method in fuzzy environment

The invention discloses a data service network site selection method in a fuzzy environment. The method comprises the following steps: acquiring a data service network in the fuzzy environment; the data service network comprises an intelligent community, a data analysis station, a communication base station and a data service center; minimizing data transmission consumption in the data service network as an optimization target of data service network site selection, and setting constraint conditions for the optimization target to form a data service network site selection optimization model; converting the data service network site selection optimization model to obtain a converted optimization model; and determining an optimality condition of the converted optimization model, and solving the converted optimization model by adopting a neurodynamics algorithm to obtain an optimal location of the data service network site selection. According to the method, the optimal data service network site selection position can be effectively found, and the communication load of the data service network in the fuzzy environment is improved.
Owner:CHONGQING UNIVERSITY OF SCIENCE AND TECHNOLOGY

Tunnel wall-attached annular frame type three-dimensional supporting structure

ActiveCN222121530UPlay the role of closing the slopeEnsure structural protection safetyUnderground chambersClimate change adaptationArchitectural engineeringTunnel wall
The utility model relates to the technical field of tunnel entry construction, in particular to a tunnel wall-attaching annular frame type three-dimensional supporting structure. Comprising pile foundations, slope surface protectors and a supporting body, the pile foundations are arranged on a slope toe and located on the two sides of a tunnel portal, the slope surface protectors are arranged along a slope surface, the supporting body is erected on the pile foundations and arranged around the tunnel portal, and the supporting body is attached to the inner wall of the slope surface and connected with the slope surface protectors. The upper portion of the slope surface basically maintains the original state and is simply cleaned when necessary, the long-term natural stability of the slope surface is maintained, the pile foundation is arranged at the slope toe, the slope closing effect is achieved, and a hole construction site can be formed; the pile foundation, the slope protection and the support body can form an integral support framework, so that the structural protection safety is ensured, and the integral support framework can be used as a foundation for subsequent support.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD

A radio signal positioning and navigation system and method for a pan-space-based platform

The present invention relates to a radio signal positioning navigation system and method for a pan-space-based platform, which belongs to the field of radio navigation communication, and includes: a pan-space-based platform navigation signal broadcasting part, a time-space reference calibration part and a user terminal fusion positioning part; the pan-space-based platform navigation signal broadcasting part includes a ubiquitous space-based platform and a payload; the time-space reference calibration part includes a time-space reference calibration network and a time-space reference refinement processing center cloud node; the user terminal fusion positioning part includes a pan-space-based platform navigation signal receiver and a general self-organizing network communication device. The system construction and operation and maintenance complexity of the present invention are low, the system has strong anti-interference and anti-strike capabilities, the system mechanism is flexible, and the battlefield adaptability is strong.
Owner:AEROSPACE INFORMATION RES INST CAS

A device and method for eliminating air columns from underground reservoirs used in abandoned mines

The present invention relates to the technical field of abandoned mine transformation, and provides an air column elimination device for underground water reservoirs used in abandoned mines, including a three-way pipe fitting, a float device is provided directly below the lower port of the three-way pipe fitting, the float will block the port when receiving buoyancy, and fall off the port after the buoyancy is eliminated, and the other two ports of the three-way pipe fitting are respectively connected to ventilation pipes. A method for eliminating air columns in underground water reservoirs used in abandoned mines is also disclosed, and the steps are as follows: one side of the ventilation pipe leads to the top plate position at the highest point of the tunnel, and the other side of the ventilation pipe leads to the return air connection lane of the abandoned mine mining area, and the three-way pipe fitting is located at the lowest point of the ventilation pipe. The beneficial effects are: low cost, can effectively solve the problem of offsetting the air column of the reservoir, and ensure the storage capacity of the underground water reservoir of the abandoned mine.
Owner:HENAN POLYTECHNIC UNIV

Communication control method and device, computer equipment, readable storage medium and program product

The invention relates to a communication control method and device, computer equipment, a readable storage medium and a program product, which are applied to a control unit, are arranged in a system in which a ground terminal and a low-altitude terminal coexist, and are used for dynamically combining a cellular unit and a cellular-free unit in the system. The control unit is in communication connection with all cellular base stations on a flight path of the low-altitude terminal; the method comprises the following steps: determining a target cellular base station meeting requirements from adjacent cellular base stations according to network performance index values of the adjacent cellular base stations located around a low-altitude terminal and sent by the low-altitude terminal; adjusting the type of the target cellular base station to a mixed base station comprising a cellular unit and a non-cellular unit; wherein the ground terminal is served by the cellular unit, the low-altitude terminal is served by the non-cellular unit, and wireless resources are dynamically shared between the cellular unit and the non-cellular unit in the hybrid base station. By adopting the method, the same-frequency interference when the ground network and the low-altitude network coexist can be reduced.
Owner:CHINA TELECOM CORP LTD TECHNOLOGY INNOVATION CENTER +1

A method for constructing a top-casting formwork for building a wall

The present application relates to a construction method for a top-casting formwork for building a wall, which belongs to the technical field of formwork engineering, and includes the following steps: when building a wall, multiple blocks located at the top of the wall are arranged at intervals along the length direction of the wall, and installation holes for installing fixing screws are reserved between adjacent blocks; fixing screws are installed in multiple installation holes respectively, and the two ends of the fixing screws extend out of the edges of both sides of the wall respectively; formworks are arranged on both sides of the wall, and the formworks include a bottom formwork, and a side formwork is fixedly connected to one end of the bottom formwork, and the end face of the bottom formwork away from the side formwork abuts against the wall, and the bottom formwork is fixed on the fixing screw, and the bottom formwork is located on the side of the fixing screw close to the root of the wall. The present application improves the time-consuming and labor-intensive technical problem of opening a hole in the wall and installing a fixing screw to fix the formwork, and improves the construction efficiency of the top-casting.
Owner:BEIJING CHONGJIAN ENG +1

Combined electric appliance four-station isolating switch

The invention, which relates to the technical field of the composite apparatus, discloses a four-station isolation switch of a composite apparatus, comprising a housing provided with a right port, a lower port, an upper port and a side port; wherein the right port is provided with a first static contact, the lower port is provided with a second static contact, the upper port is provided with an isolation moving contact seat, the side port is a transmission input end and is provided with a transmission cover plate, and the transmission cover plate is provided with an outer transmission shaft; a first moving contact and a second moving contact are arranged on the isolating moving contact seat, and a first rack and a second rack are respectively arranged at the tail ends of the first moving contact and the second moving contact; a gear shaft is further installed in the isolating movable contact seat, a gear is installed outside the gear shaft, one end of the gear shaft is connected with an insulating rod, the other end of the insulating rod is connected with the outer transmission shaft, and when the outer transmission shaft axially moves, the gear can be synchronously driven to move, and the gear is meshed with the first rack or the second rack. The overall construction progress is accelerated, and the construction cost is reduced.
Owner:SHANDONG TAIKAI HIGH VOLTAGE SWITCH

Impact-drop test system based on buoyancy principle and test method thereof

The invention discloses an impact-drop test system based on a buoyancy principle and a test method thereof, and relates to the field of impact resistance tests of engineering structures. The problems that an existing impact / drop test system is high in construction and maintenance cost and complex in safety problem, the form of a hammer head in an impact test is single, and an impact / drop test of a complex model or a prototype which is large in danger, large in height and large in size cannot be carried out are solved. According to the invention, large-height lifting of a large-mass and large-size complex model in a large impact / drop test is realized by using the balloon type floating load tool, so that the whole test system is movable; the specific form of the floating load tool comprises but is not limited to a hot-air balloon, a balloon filled with light gas and provided with a heating device and an air bag closed balloon with the height controlled through the inflation amount according to test requirements, the lifting height is not limited to the maximum design value given by the method, and the falling position is accurately controlled by combining track calculation software. The impact-drop test device is used for impact-drop tests.
Owner:HARBIN INST OF TECH

Multi-source data fusion method and device, electronic equipment and storage medium

The invention provides a multi-source data fusion method and device, electronic equipment and a storage medium, and the method comprises the steps: recognizing and connecting different types and formats of data sources according to a user input or configuration file; performing corresponding data format conversion and mapping operation according to the data source, and converting original data into a JSON document; importing the JSON document into a search data analysis engine, and creating a corresponding index or updating an existing index; and performing retrieval, aggregation and analysis operation on multi-source data through the search data analysis engine to obtain a target data result. The fusion method is based on the search data analysis engine, the characteristics of high performance, high expandability, high fault tolerance and the like of the search data analysis engine are utilized, and effective fusion of large-scale, diversified and dynamically changing data sources can be achieved.
Owner:UNICLOUD TECH CO LTD

Modularized efficient energy distribution unit

The utility model provides a modularized high-efficiency energy distribution unit. The modularized efficient energy distribution unit comprises a water distribution main pipe, an emergency ball valve and a first electromagnetic valve are arranged at the bottom of the water distribution main pipe, a pressure sensor is installed on the first electromagnetic valve, a first ball valve is installed on the pressure sensor, a pressure difference adjusting valve is connected to the water distribution main pipe, and a second ball valve is installed on the pressure difference adjusting valve. The differential pressure adjusting valve is connected with a water collecting main pipe, the top of the water distributing main pipe is connected with one ends of two first three-way pipes, the other ends of the first three-way pipes are connected with one ends of second three-way pipes, and the other ends of the second three-way pipes are connected with one ends of connecting pipes. And the other end of the connecting pipe is connected with one end of a low-resistance angle type filter. The modularized high-efficiency energy distribution unit provided by the utility model has the advantages that the PUE can be reduced, the problems of hydraulic balance of end equipment and limited installation space of an end ring pipe are effectively solved, the energy consumption is saved, the safety is improved, the construction and use cost is saved, and the cooling energy required by IT equipment can be stably and reliably provided to a target area.
Owner:SHAANXI XIANFENG TONGDA ENERGY EQUIP CO LTD

Laser based on single-frequency optical oscillation and laser output method

The invention discloses a laser based on single-frequency continuous light oscillation and a laser output method, and the laser comprises a first reference laser which generates a first wavelength laser; the second reference laser generates second wavelength laser, and the second wavelength laser is single-frequency continuous light; the frequency multiplication module is coupled with the first reference laser and is used for converting the first wavelength laser into an up-conversion signal; and the sum frequency module is respectively coupled with the frequency multiplication module and the second reference laser, and is used for carrying out sum frequency on the second wavelength laser and the up-conversion signal to generate a target wavelength laser output signal of 184.13-283.81 nm. According to the laser structure provided by the invention, components are convenient to construct, the power requirement for reference light is low, the conversion efficiency is high during frequency conversion, time matching does not need to be carried out on various reference light during frequency sum, and deep ultraviolet band laser can be output as continuous light or pulsed light.
Owner:SHANGHAI PRECILASERS TECH CO LTD

Water-power engineering underground system wastewater treatment system based on recyclable utilization mode

The utility model provides a water-power engineering underground system wastewater treatment system based on a recyclable utilization mode. The water-power engineering underground system wastewater treatment system comprises an adjusting tank, a vertical flow sedimentation tank, a middle water tank, a double-medium filter, an activated carbon filter, a clean water tank, a sludge tank, a plate-and-frame filter press and a pipeline mixer, and the adjusting tank, the middle water tank, the clean water tank and the sludge tank are all constructed by adopting recyclable steel structures. The utility model provides a water-power engineering underground system wastewater treatment system based on a recyclable utilization mode, which fully considers the characteristics of complex construction conditions of a proposed site of water-power engineering, short service life of the wastewater treatment system, single wastewater pollutant type and the like, realizes complete equipment of a treatment process, realizes steel structure modularization of a building form, and improves the construction efficiency. Therefore, the system use efficiency is effectively improved, and the system construction and demolition work amount is reduced.
Owner:POWERCHINA BEIJING ENG CORP

Construction method of bridge closure section

The invention provides a construction method of a bridge closure section, which comprises the following steps that a cable crane is moved to a hoisting position in a no-load manner, and a transport ship transports a beam section to a position below the hoisting position; the secondary closure section is lifted to the position higher than the designed elevation through a cable loading crane, the traction system is used for pulling the secondary closure section to swing towards the side span side so as to be close to the side span beam section, and the secondary closure section is connected with a sling and is temporarily connected with the adjacent beam section; after installation of other secondary closure sections is completed, the cable loading crane lifts the main closure section from the transport ship to the position flush with the installed beam section, and the main closure section is connected with a permanent sling; and a three-way adjusting device is installed at the top of the transition pier, the position of the side span beam section adjusted through the three-way adjusting device is connected with the closure section on a construction site, and therefore closure of the bridge is completed. The main cable of the suspension bridge is matched with the cable loading crane and the winch to complete bridge closure, the construction efficiency is high, temporary supporting is not needed, and construction of supports on a construction site is reduced.
Owner:ROAD & BRIDGE SOUTH CHINA ENG CO LTD +1

A directional relay network system for unmanned aerial logistics and a coordination method thereof

The application discloses a kind of unmanned vehicle logistics directional relay network system and its coordination method, belong to intelligent logistics and unmanned vehicle application technical field, the system includes: multiple cellular airspace units, cellular airspace unit is constituted continuous grid in service area;Deployed in the center of each cellular airspace unit one micro hub, as the ground logistics node of corresponding unit;Wherein, each micro hub includes one terminal nest and at least two relay nests;Terminal nest is used to provide the storage and withdrawal interface of user goods;Each relay nest is arranged around terminal nest, and each relay nest is pre-allocated and fixedly responsible for the bidirectional goods transfer task between the unit where the micro hub is located and a particular adjacent unit;Terminal nest and each relay nest are connected by internal logistics transmission device 103.The application fundamentally simplifies scheduling and management complexity by deep coordination of cellular airspace grid, heterogeneous node division of labor, directional routing rules and high automation.
Owner:ZHEJIANG UNIV +1

Smoking behavior identification method based on multi-source perception and particle size fingerprint analysis

The invention discloses a smoking behavior recognition method based on multi-source perception and particle size fingerprint analysis, which comprises the following steps: arranging a particulate matter sensor module, continuously collecting a multi-channel particle size spectrum in a target space in a non-optical mode, and generating a high-resolution particle size distribution sequence according to time; an infrared sensor module is arranged to monitor entering and leaving states of personnel in real time; the short-term change of the concentration distribution of the particulate matters with different particle sizes is calculated through a parameterization formula, and the accurate judgment of the smoking event is realized in combination with the personnel state and the PM2.5 speed increase in the same period. According to the invention, the infrared sensing data stream and the particulate matter concentration data stream are deeply analyzed, and the on-site state of personnel and the specific fluctuation mode of cigarette smoke are accurately identified; through cross cooperation verification of multi-dimensional features, interference of water vapor, mosquito-repellent incense and non-artificial smoke sources can be effectively eliminated, and unification of high detection precision and low false alarm rate is achieved. According to the method, imaging equipment is completely abandoned, and the risk of privacy disclosure is avoided from the source.
Owner:NANJING MEDICAL UNIV