Adjustable building foundation pit construction supporting device
By introducing adjustment mechanism and water-absorbing pads into the construction support device of the building foundation pit, the problems of difficulty in adjusting the support angle and poor stability in the prior art are solved, and flexible angle adjustment and stability of the support plate are achieved, ensuring construction safety .
Patent Information
- Application Number
- CN202420633853.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-29
AI Technical Summary
The existing building foundation pit construction support devices cannot adjust the support angle according to actual conditions, and the support stability is poor in humid soil environment, which poses safety risks.
An adjustable building foundation pit construction support device including a mounting plate, an adjustment mechanism, a water-absorbing pad and a conical ground insert is designed. The angle of the support plate is adjusted through the adjustment mechanism, and the support stability is improved through the water-absorbing pad and a conical ground insert. .
It realizes flexible angle adjustment and stability improvement of the support plate, reduces the impact of the external environment on the support device, and improves construction safety.
Smart Images

Figure CN222008937U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to an adjustable building foundation pit construction support device. Background Art
[0002] The foundation pit is a soil pit excavated at the foundation design location according to the base elevation and foundation plane dimensions. During the construction of the foundation pit, support devices are required to support and reinforce the periphery of the foundation pit to ensure the safety of subsequent construction.
[0003] In an adjustable support device for foundation pits used in construction engineering with publication number CN217378922U, it includes a support frame, a mounting frame is installed on the top of the support frame, an adjustable support assembly is installed at one end of the mounting frame, and the adjustable support assembly at least includes a support plate, a moving rod, an extrusion screw, a mounting block and a manual telescopic rod, a support plate is arranged at one end of the mounting frame, a moving rod is arranged inside the mounting frame, an extrusion screw is arranged at one end of the moving rod, mounting blocks are arranged at both ends of the mounting frame, a manual telescopic rod is arranged at one end of the mounting block, and a cleaning assembly is arranged at the bottom of the support frame. Compared with the prior art, the beneficial effect of the utility model is that the position of the support plate can be adjusted, thereby facilitating support at different positions, without the need for staff to adjust the entire device, reducing The labor intensity of the staff is reduced, thereby increasing the application range of the support device, and it is convenient to support the corner position, thereby ensuring the support effect. The above-mentioned existing technology has the following defects when used: the above-mentioned existing technology can only adjust the support plate horizontally when used, so as to support different positions, but cannot support foundation pits with different inclination angles, so it is necessary to make support devices with different inclination angles, which increases the cost of use and reduces the practical performance of the device. Moreover, when using the above-mentioned existing technology, the support frame is directly placed at the position where support is required to perform the support operation. Due to different geology, the soil is moist in some places, which causes the support frame to be displaced, thereby affecting the support effect and posing certain safety hazards. Utility Model Content
[0004] The purpose of the utility model is to provide an adjustable building foundation pit construction support device to solve the problems proposed in the above background technology that the existing building foundation pit construction support device is inconvenient to adjust the support angle according to actual practical conditions and the support stability is poor.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an adjustable building foundation pit construction support device, comprising a mounting plate, a mounting groove is arranged inside the mounting plate, and an adjustment mechanism is arranged inside the mounting groove, a connecting groove is arranged inside the mounting plate of the mounting groove, and a water absorbent pad is arranged inside the connecting groove, a water absorbent pipe is evenly arranged at the bottom end of the connecting groove, a cover plate is installed at the top of the connecting groove, and slide grooves are arranged on both sides of the cover plate, and slide bars are arranged inside the slide grooves, handles are installed on both sides of the top of the cover plate, limiting grooves are arranged on both sides of the top of the mounting plate, conical ground plugs are evenly installed at the bottom end of the mounting plate, a support plate is installed on one side of the mounting plate, and a hinge shaft passes through the bottom end of the support plate, a fixing block is installed on one side of the support plate, and a support rod is installed on one side of the fixing block.
[0006] When using an adjustable building foundation pit construction support device of the present technical solution, during use, by providing an adjustment mechanism in cooperation with the limit groove and the hinge shaft, it is convenient for the staff to adjust the support angle of the support plate according to actual practical conditions, and by providing a conical insertion of the water absorption pipe and the water absorption pad in cooperation, it is convenient to improve the stability of the support plate supported by the mounting plate, and reduce the influence of the external environment on the mounting plate and the support plate.
[0007] Preferably, the adjustment mechanism includes an adjustment rod, and the adjustment rod is arranged inside the mounting groove, the outer sides of both ends of the adjustment rod are sleeved with adjustment bevel gears, and one side of the adjustment bevel gear is meshed with a linkage bevel gear, a threaded rod passes through the interior of the linkage bevel gear, and a threaded block is sleeved on the outer side of the threaded rod.
[0008] Preferably, an internal thread groove is provided inside the threaded block, an external thread is provided on the outside of the threaded rod, and the threaded block is threadedly connected to the threaded rod.
[0009] Preferably, two linkage bevel gears are provided, and the two linkage bevel gears are symmetrically distributed.
[0010] Preferably, the water absorption pipes are provided in a plurality of groups, the plurality of groups of water absorption pipes are distributed at equal intervals, and the interiors of the plurality of groups of water absorption pipes are filled with activated carbon particles.
[0011] Preferably, the water absorbent pad is arranged inside the connecting groove, and the material of the water absorbent pad is sponge material.
[0012] Preferably, the slide bar slides inside the slide groove, and the cover plate is slidably connected to the slide groove and the mounting plate via the slide bar.
[0013] Compared with the prior art, the utility model has the following beneficial effects: the adjustable building foundation pit construction support device can not only adjust the support angle according to the actual practical situation, but also improve the stability of the support;
[0014] By screwing the adjusting rod, a group of linked bevel gears are driven to rotate in cooperation with the adjusting bevel gear, thereby driving a group of threaded rods to rotate synchronously, and a group of threaded blocks and the support rods are driven to move horizontally under the action of the threaded rods, and the support plate is pushed to move in cooperation with the hinge shaft, thereby achieving the purpose of adjusting the support angle of the support plate. Through the above operation, it is convenient for the staff to adjust the support angle of the support plate, thereby improving the flexibility of the device to cope with different usage conditions;
[0015] The mounting plate is initially installed and fixed by striking the conical ground plug downwards, and the conical ground plug moves while driving the water suction pipe to move downward synchronously, so that the water suction pipe is synchronously inserted into the foundation pit, and the water near the mounting plate is adsorbed to the water absorption pad through the water absorption pipe for storage. The water absorbed by the water absorption pad increases its own weight, thereby improving the stability of the mounting plate installation, and then improving the supporting effect of the mounting plate on the supporting plate. The above operations can reduce the impact of external factors on the mounting plate, thereby improving the stability of the support, and then ensuring the safety of subsequent construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 This is a schematic diagram of the main cross-sectional structure of the utility model;
[0018] Figure 2 It is a schematic diagram of the cross-sectional structure of the utility model in a top view;
[0019] Figure 3 For the utility model Figure 2 Schematic diagram of the structure at A in the middle;
[0020] Figure 4 It is a schematic diagram of the top view structure of the utility model;
[0021] Figure 5 It is a schematic diagram of the overall three-dimensional structure of the utility model.
[0022] Explanation of the reference numerals in the figure: 1. Mounting plate; 2. Mounting groove; 3. Conical ground plug; 4. Suction pipe; 5. Suction pad; 6. Hinge shaft; 7. Connecting groove; 8. Support plate; 9. Fixing block; 10. Support rod; 11. Handle; 12. Cover plate; 13. Adjustment mechanism; 1301. Threaded block; 1302. Threaded rod; 1303. Adjustment bevel gear; 1304. Adjustment rod; 1305. Linkage bevel gear; 14. Slide bar; 15. Limiting groove; 16. Slide groove. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] See also Figure 1-5 , the utility model provides an embodiment: an adjustable building foundation pit construction support device, including a mounting plate 1, a mounting groove 2 is arranged inside the mounting plate 1, and an adjustment mechanism 13 is arranged inside the mounting groove 2;
[0025] The adjustment mechanism 13 includes an adjustment rod 1304, and the adjustment rod 1304 is arranged inside the mounting groove 2, the outer sides of both ends of the adjustment rod 1304 are sleeved with adjustment bevel gears 1303, and one side of the adjustment bevel gear 1303 is meshed with a linkage bevel gear 1305, the interior of the linkage bevel gear 1305 is penetrated by a threaded rod 1302, and the outer side of the threaded rod 1302 is sleeved with a threaded block 1301;
[0026] The thread block 1301 is provided with an internal thread groove inside, and the thread rod 1302 is provided with an external thread outside, and the thread block 1301 and the thread rod 1302 are threadedly connected;
[0027] There are two linkage bevel gears 1305, and the two linkage bevel gears 1305 are symmetrically distributed;
[0028] Specifically, Figure 2 , 3 As shown, when in use, by screwing the adjusting rod 1304, a group of adjusting bevel gears 1303 are driven to make a selection movement, and the threaded block 1301 is driven to make a horizontal movement under the cooperation of the linkage bevel gear 1305 and the threaded rod 1302, and the supporting angle of the supporting plate 8 is adjusted under the action of the hinge shaft 6, thereby improving the flexibility of the device;
[0029] A connecting groove 7 is provided inside the mounting plate 1 of the mounting groove 2, and a water-absorbing pad 5 is installed inside the connecting groove 7;
[0030] The water-absorbing pad 5 is arranged inside the connecting groove 7, and the material of the water-absorbing pad 5 is sponge material;
[0031] Specifically, Figure 1 , 2 As shown, when in use, the water-absorbing pad 5 can absorb the moisture near the mounting plate 1, thereby ensuring the dryness near the mounting plate 1 and improving the stability of the mounting plate 1 supporting the support plate 8;
[0032] The bottom end of the connecting groove 7 is evenly provided with a water suction pipe 4;
[0033] There are multiple groups of water suction pipes 4, which are distributed at equal intervals, and the inside of the multiple groups of water suction pipes 4 is filled with activated carbon particles;
[0034] Specifically, Figure 1 As shown, when in use, multiple groups of water absorption pipes 4 can be provided to absorb the moisture near the mounting plate 1, and the impurities in the absorbed moisture can be prevented from clogging the water absorption pipes 4 by filling with activated carbon;
[0035] A cover plate 12 is installed at the top of the connecting groove 7, and slide grooves 16 are arranged on both sides of the cover plate 12, and slide bars 14 are installed inside the slide grooves 16;
[0036] The slide bar 14 slides inside the slide groove 16, and the cover plate 12 is slidably connected to the slide groove 16 and the mounting plate 1 through the slide bar 14;
[0037] Handles 11 are installed on both sides of the top of the cover plate 12, limiting grooves 15 are provided on both sides of the top of the mounting plate 1, and conical ground plugs 3 are evenly installed at the bottom of the mounting plate 1. A support plate 8 is installed on one side of the mounting plate 1, and a hinge shaft 6 runs through the bottom of the support plate 8. A fixing block 9 is installed on one side of the support plate 8, and a support rod 10 is installed on one side of the fixing block 9;
[0038] Specifically, Figure 2 , 4 As shown in FIG. 5 , when in use, the slide bar 14 slides inside the slide groove 16 to guide the moving cover plate 12, thereby preventing the cover plate 12 from being displaced.
[0039] Working principle: When the utility model is in use, first, the mounting plate 1 is placed in the foundation pit that needs to be supported, and the mounting plate 1 is fixed inside the foundation pit by striking downward the conical ground plug 3, so that the mounting plate 1 is preliminarily installed and fixed, and then the conical ground plug 3 is struck downward while driving the water suction pipe 4 to make a synchronous downward movement, so that the water suction pipe 4 is synchronously inserted into the inside of the foundation pit, and the moisture near the mounting plate 1 is adsorbed by the water suction pipe 4. The inside of the water suction pipe 4 is filled with activated carbon to prevent the impurities in the adsorbed moisture from causing the water suction pipe 4 to be blocked, and the adsorbed moisture is stored through the water absorption pad 5. On the one hand, the water near the mounting plate 1 can be adsorbed and preserved by the water absorption pad 5, and on the other hand, the water absorbed by the water absorption pad 5 increases its own weight, thereby increasing the stability of the installation of the mounting plate 1, and then preventing the mounting plate 1 from being displaced by the influence of the external environment;
[0040] Then, after the mounting plate 1 is fixed, a group of adjusting bevel gears 1303 are driven to rotate by screwing the adjusting rod 1304, thereby driving the linkage bevel gear 1305 to rotate synchronously. The linkage bevel gear 1305 rotates and drives the threaded rod 1302 to rotate synchronously at the same time. The threaded rod 1302 rotates and drives a group of threaded blocks 1301 to move horizontally at the same time, thereby driving the support rod 10 to move horizontally synchronously. When the support rod 10 moves horizontally, it pushes the support plate 8 to move with the cooperation of the hinge shaft 6, thereby adjusting the support angle of the support plate 8. The above operation is convenient for the staff to adjust the support angle of the support plate 8 according to the actual usage situation, thereby improving the practicability of the device.
[0041] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0042] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0043] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the utility model.
Claims
1. An adjustable building foundation pit construction support device, comprising a mounting plate (1), characterized in that: The mounting plate (1) is provided with a mounting groove (2) inside, and an adjusting mechanism (13) is provided inside the mounting groove (2); the mounting plate (1) of the mounting groove (2) is provided with a connecting groove (7) inside, and a water absorbing pad (5) is installed inside the connecting groove (7); the bottom end of the connecting groove (7) is evenly provided with a water absorbing pipe (4); the top end of the connecting groove (7) is provided with a cover plate (12), and both sides of the cover plate (12) are provided with a slide groove (16), and the inside of the slide groove (16) is evenly provided with a water absorbing pipe (4); A slide bar (14) is installed, handles (11) are installed on both sides of the top of the cover plate (12), limiting grooves (15) are arranged on both sides of the top of the mounting plate (1), a conical ground plug (3) is evenly installed at the bottom end of the inside of the mounting plate (1), a support plate (8) is installed on one side of the mounting plate (1), and a hinge shaft (6) passes through the bottom end of the support plate (8), a fixing block (9) is installed on one side of the support plate (8), and a support rod (10) is installed on one side of the fixing block (9).
2. The adjustable building foundation pit construction support device according to claim 1, characterized in that: The adjustment mechanism (13) comprises an adjustment rod (1304), and the adjustment rod (1304) is arranged inside the mounting groove (2), the outer sides of both ends of the adjustment rod (1304) are sleeved with adjustment bevel gears (1303), and one side of the adjustment bevel gear (1303) is meshed with a linkage bevel gear (1305), the interior of the linkage bevel gear (1305) is penetrated by a threaded rod (1302), and the outer side of the threaded rod (1302) is sleeved with a threaded block (1301).
3. The adjustable building foundation pit construction support device according to claim 2, characterized in that: The threaded block (1301) is provided with an internal thread groove inside, the threaded rod (1302) is provided with an external thread on the outside, and the threaded block (1301) and the threaded rod (1302) are threadedly connected.
4. The adjustable building foundation pit construction support device according to claim 2, characterized in that: Two linkage bevel gears (1305) are provided, and the two linkage bevel gears (1305) are symmetrically distributed.
5. The adjustable building foundation pit construction support device according to claim 1, characterized in that: The water absorption pipes (4) are provided in a plurality of groups, the plurality of groups of water absorption pipes (4) are distributed at equal intervals, and the interiors of the plurality of groups of water absorption pipes (4) are filled with activated carbon particles.
6. The adjustable building foundation pit construction support device according to claim 1, characterized in that: The water-absorbing pad (5) is arranged inside the connecting groove (7), and the material of the water-absorbing pad (5) is sponge material.
7. The adjustable building foundation pit construction support device according to claim 1, characterized in that: The slide bar (14) slides inside the slide groove (16), and the cover plate (12) is slidably connected to the slide groove (16) and the mounting plate (1) via the slide bar (14).