Horizontal connecting joint for shear wall of precast concrete box-type house
The horizontal connection node for the shear wall of precast concrete box house using threaded connection solves the problems of complexity and poor adaptability of traditional connection nodes, and achieves an efficient and simplified construction process and reliable connection effect.
Patent Information
- Application Number
- CN202420418105.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-05
AI Technical Summary
In traditional prefabricated construction technology, the connection nodes of precast concrete box houses are complex, making it difficult to achieve efficient construction. Furthermore, the grouting connection method with steel sleeves requires long-term curing and equipment, limiting its applicability, and it is especially unsuitable for winter construction.
The horizontal connection node for the shear wall of the precast concrete box house with threaded connection achieves the connection between the upper and lower structures through tensile sleeves, tensile embedded parts and tensile connectors, which simplifies the construction process, avoids wet work and is adaptable to various climatic conditions.
It improves construction and installation efficiency, simplifies component manufacturing and mold costs, enhances connection reliability, and adapts to construction needs under different climatic conditions.
Smart Images

Figure CN222009212U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a connection node, in particular to a horizontal connection node for a shear wall, and belongs to the technical field of assembled concrete buildings. Background Art
[0002] As the number of domestic construction workers continues to decrease, and the country continues to pay attention to resource conservation and environmental protection awareness, more and more projects in the construction industry use prefabricated construction technology. In projects such as responding to emergencies and post-disaster reconstruction, the rapid and large-scale construction of temporary or permanent houses is a major task facing our country. Traditional prefabricated construction technology has a large number of components and complex connection nodes, making it difficult to solve the problem of efficient construction. Prefabricated concrete box houses are a new type of prefabricated construction technology. The prefabricated concrete box modules produced in the factory can be assembled on site to complete the construction of the house. It has the advantages of fast speed, high quality and controllable cost. In order to ensure structural safety and improve construction efficiency, the connection nodes between prefabricated concrete box modules are a key issue that needs to be solved in the construction of this type of house.
[0003] At present, the horizontal joints of prefabricated wall panels of prefabricated buildings are usually connected by steel sleeve grouting, and the longitudinal force-bearing steel bars of the wall panels are connected by grouting anchoring. This method not only requires the provision of grouting-related equipment and tools and materials, but also requires a long maintenance period before the next step can be carried out, and is not suitable for winter construction. Utility Model Content
[0004] In view of this, the utility model provides a horizontal connection node for shear walls of precast concrete box-type houses. The connection node is used at the horizontal joints of shear walls of precast concrete box-type houses. The connection node can realize the connection of upper and lower structures by threaded connection, which simplifies the operation method at the construction site; at the same time, no wet operation is involved during the connection, thereby improving the construction and installation efficiency, and is not affected by the external low temperature environment on the construction organization; in addition, the embedded parts of the connection node have no protruding steel bars, which simplifies the difficulty of component manufacturing and reduces the mold manufacturing cost.
[0005] The technical solution of the utility model is: a horizontal connection node for a shear wall of a prefabricated concrete box-type house, comprising: a tensile sleeve, a tensile embedded part and a tensile connector;
[0006] The tensile sleeve is pre-buried in the lower structure, and an internal threaded hole is provided on the upper part of the tensile sleeve;
[0007] The tensile embedded part is embedded in the groove on the inner side of the upper structure, and includes a steel bottom plate and a cavity structure with an opening on one side fixed to the steel bottom plate, wherein the opening of the cavity structure faces the inner side of the upper structure; there is a set distance between the lower end surface of the steel bottom plate and the bottom surface of the upper structure;
[0008] The tensile connector includes: a tensile screw, a leveling nut, a leveling washer, a fastening washer and a fastening nut; the leveling nut and the leveling washer are sleeved on the tensile screw; when connecting the upper structure and the lower structure, the lower part of the tensile screw is threadedly connected with the internal threaded hole of the tensile sleeve; the upper part passes through the through hole in the center of the steel bottom plate in the tensile embedded part, so that the leveling washer contacts the bottom surface of the steel bottom plate;
[0009] A fastening washer and a fastening nut are mounted on the portion of the tensile screw that passes through the steel bottom plate, and the fastening nut is pressed against the steel bottom plate through the fastening washer.
[0010] Preferably, the anti-tensile connector further comprises a stop nut threadedly connected to the anti-tensile screw rod, and the stop nut is located above the fastening nut.
[0011] Preferably: the tensile sleeve comprises: a threaded sleeve and a shear-resistant steel bar;
[0012] The threaded sleeve is a structure with an internal threaded hole at the upper part, and a through hole is radially arranged at the lower part of the threaded sleeve for penetrating the shear steel bar;
[0013] The axis of the threaded sleeve is perpendicular to the top surface of the lower structure, and the shear steel bar is parallel to the length direction of the lower structure.
[0014] Preferably: the cavity structure in the tensile embedded part is formed by connecting a steel side plate, a steel top plate and a steel back plate;
[0015] The steel side plates, steel top plate and steel back plate are all rectangular steel plates, the two opposite sides of the steel back plate are welded with steel side plates vertically connected thereto, and the top plate vertically connected thereto is welded between the two steel side plates at the top of the steel back plate;
[0016] The lower ends of the steel side plates and the steel back plate are welded to the steel bottom plate.
[0017] Preferably, the length of the steel bottom plate is greater than that of the steel top plate, so that the steel bottom plate forms flanges at both ends of the cavity structure, and more than four anchoring steel bars are symmetrically arranged on the flanges at both ends.
[0018] Preferably, the anchor steel bars are arranged vertically, and their length is not less than the height of the steel side plates.
[0019] Beneficial effects:
[0020] (1) In the horizontal connection node for shear walls of the utility model, no wet work is involved during the installation of the upper structure, and efficient installation work can be achieved only through the tensile connector. It also has the function of leveling the upper structure, which can simplify the installation work at the construction site and shorten the construction and installation period of prefabricated concrete box-type houses and prefabricated shear wall panels.
[0021] Furthermore, in the horizontal connection node for the shear wall of the utility model, the tensile embedded parts in the upper structure and the pre-buried tensile sleeves in the lower structure have no reinforcement, which is convenient for the production, storage and transportation of prefabricated components.
[0022] (2) In the horizontal connection node for shear walls of the present invention, the transverse shear reinforcement bars are arranged at the bottom of the tensile sleeve to improve the anchoring performance of the tensile sleeve embedded in the lower structure.
[0023] (3) In the horizontal connection node for shear wall of the utility model, the anchoring steel bars are arranged in the tensile embedded parts to enhance the anchoring capacity of the tensile embedded parts, thereby improving the connection reliability of the connection node.
[0024] (4) In the horizontal connection node for shear wall of the utility model, a retaining nut is provided in the tensile connector, which can prevent the fastening nut from loosening under repeated loads, thereby improving the connection reliability of the tensile connector. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a front view of a horizontal connection node for a shear wall of the utility model;
[0026] Figure 2 It is a side view of a horizontal connection node for a shear wall of the utility model;
[0027] Figure 3 It is a schematic diagram of the tensile sleeve;
[0028] Figure 4 It is the front view of the tensile embedded part;
[0029] Figure 5 It is the side view of the tensile embedded part;
[0030] Figure 6 It is a schematic diagram of the structure of the tensile connector.
[0031] Among them: 1- tensile sleeve; 2- tensile embedded parts; 3- tensile connector; 4- lower structure; 5- upper structure; 6- lower operation port; 7- upper operation port;
[0032] 11-threaded sleeve; 12-shear steel bar; 21-steel bottom plate; 22-steel side plate; 23-steel top plate; 24-steel back plate; 25-anchor steel bar; 31-tensile screw; 32-leveling nut; 33-leveling gasket; 34-fastening gasket; 35-fastening nut; 36-stop nut. DETAILED DESCRIPTION
[0033] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.
[0034] The present embodiment provides a horizontal connection node for shear walls of a precast concrete box-type house. The connection node is used at the horizontal joints between modules of the precast concrete box-type house. It can complete the efficient connection of longitudinal stress-bearing steel bars without reinforcing bars in both the upper structure and the lower structure. The connection node has a simple structure and is easy to construct. During the installation of the upper structure, no wet work is involved. The connection node has a leveling function and can meet the requirements of efficient on-site construction.
[0035] The upper and lower parts of the precast concrete box-type house connected by the horizontal connection node are respectively the lower structure 4 and the upper structure 5; the lower structure 4 can be a cast-in-place foundation structure, or a single precast wall panel or a shear wall of a precast concrete box-type house; the upper structure 5 can be a single precast wall panel or a shear wall of a precast concrete box-type house.
[0036] Several such connection nodes are evenly spaced in the horizontal joint between the lower structure 4 and the upper structure 5 along the length direction of the joint.
[0037] like Figure 1 and Figure 2 As shown, the connection node includes: a tensile sleeve 1, a tensile embedded part 2 and a tensile connector 3;
[0038] The tensile sleeve 1 is embedded in the lower structure 4; Figure 3 As shown, the tensile sleeve 1 includes: a threaded sleeve 11 and a shear steel bar 12; the threaded sleeve 11 is a structure with an internal thread hole at the upper part, and the diameter and depth of the internal thread meet the connection with the tensile connector 3; the threaded sleeve 11 is provided with a through hole in the radial direction at the lower part, which is used to penetrate the shear steel bar 12; preferably, the lengths of the two ends of the shear steel bar 12 extending out of the threaded sleeve 11 are the same; the shear steel bar 12 is a high-strength steel bar with a set length, preferably HRB400 grade steel bar, and the length and diameter meet the preset anchoring requirements of the tensile sleeve 1. After pre-embedding, the upper end face of the threaded sleeve 11 is flush with the top surface of the lower structure 4; thus, after the embedded part is set in the lower structure 4, there is no reinforcement on the top. When pre-embedding, ensure that the axis of the threaded sleeve 11 is perpendicular to the top surface of the lower structure 4, and the shear steel bar 12 is parallel to the length direction of the lower structure 4.
[0039] The tensile embedded part 2 is embedded in the inner side of the bottom of the upper structure 5, that is, a groove is provided on the inner side of the upper structure 5 for embedding the tensile embedded part 2; Figure 4 and Figure 5As shown, the tensile embedded parts include: a steel bottom plate 21, a steel side plate 22, a steel top plate 23, a steel back plate 24 and anchoring steel bars 25; wherein the steel side plates 22, the steel top plate 23 and the steel back plate 24 are all rectangular steel plates, and the edges are welded to form a cavity structure with one side and a bottom opening (that is, the two opposite sides of the steel back plate 24 are welded to the steel side plates 22 vertically connected thereto, and the steel top plate 23 vertically connected thereto is welded between the two steel side plates 22 on the top of the steel back plate 24); then the bottom opening of the cavity structure is welded to the steel bottom plate 21; the length of the steel bottom plate 21 is greater than that of the steel top plate 23, and the cavity structure is welded to the middle position of the upper end surface of the steel bottom plate 21, so that flanges are formed at both ends of the steel bottom plate 21; the thickness of the steel bottom plate 21 is greater than that of the steel side plates 22, the steel top plate 23 and the steel back plate 24; the width of the steel bottom plate 21 (the dimension along the wall panel thickness direction) is the same as the width of the steel top plate 23. A through hole is provided in the middle of the steel bottom plate 21 .
[0040] A group of anchor steel bars 25 are symmetrically welded on the flanges at both ends of the steel bottom plate 21; as an example, two anchor steel bars 25 are vertically welded on the flanges at both ends of the steel bottom plate 21 along the thickness direction of the wall; as an example, the anchor steel bars 25 are HRB400 grade steel bars, and the length meets the set anchoring requirements and is not less than the height of the steel side plate 22.
[0041] like Figure 2 As shown, after the tensile embedded part 2 is embedded in the upper structure 5, one end of the steel top plate 23 connected to the steel back plate 24 is located inside the wall, and the other end is flush with the inner side of the wall plate; and there is a set distance between the lower end surface of the steel bottom plate 21 and the bottom surface of the upper structure 5, and a groove is processed at the corresponding position to form a lower operation opening 6 (as an example, the width of the lower operation hole is consistent with the distance between the two steel side plates 22; the depth of the lower operation hole is the same as the width of the steel bottom plate 21); and the steel bottom plate 21 is parallel to the bottom surface of the upper structure 5, that is, after the embedded part is set in the upper structure 5, there are no ribs at the bottom. The side opening of the tensile embedded part 2 faces the inner side of the upper structure 5, serving as the upper operation opening 7.
[0042] The tensile connector 3 is used to connect the upper structure 5 and the lower structure 4 on site. Figure 6As shown, the tensile connector 3 includes: a tensile screw 31, a leveling nut 32, a leveling gasket 33, a fastening gasket 34, a fastening nut 35 and a stop nut 36; the tensile screw 31 is a full-length outer sleeve wire steel screw (that is, the outer circumference has an external thread throughout the entire length), and its length and outer diameter meet the connection requirements with the tensile sleeve 1 and the tensile embedded part 2. The leveling nut 32 and the leveling gasket 33 are installed in the middle position of the tensile screw 31, and mainly play the role of leveling the upper structure 5 (wherein the leveling gasket 33 is located above the leveling nut 32); when connecting the upper structure 5 and the lower structure 4, the lower part of the tensile screw 31 is threadedly connected with the internal threaded hole of the tensile sleeve 1; after the upper part of the tensile screw 31 passes through the threaded hole in the center of the steel base plate 21 in the tensile embedded part 2, the fastening gasket 34, the fastening nut 35 and the stop nut 36 are installed on its outside from bottom to top in sequence, so that the leveling gasket 33 and the fastening gasket 34 clamp the steel base plate 21; wherein the fastening gasket 34 and the fastening nut 35 are used to press the tensile embedded part 2 after the upper structure 5 is installed in place; the stop nut 36 is provided to prevent the fastening nut 35 from loosening under repeated load, thereby improving the connection reliability of the tensile connector 3. By adjusting the position of the leveling nut 32 on the tensile screw 31, the upper structure 5 can be adjusted to a specified elevation; and by adjusting the position of the leveling nut 32 in each connection node in the horizontal joint on the corresponding tensile screw 31, the upper structure 5 can be leveled so that the verticality of the upper structure 5 meets the set requirements.
[0043] The installation process of the horizontal connection node is as follows:
[0044] (1) When the lower structure 4 is a cast-in-place structure, the tensile sleeve 1 is connected and fixed to the steel frame of the lower structure 4 and cast together with the concrete of the lower structure 4, and cured to the design strength; when the lower structure 4 is a prefabricated component, before the prefabricated component is made, the tensile sleeve 1 is fixed to the component production mold; after the lower structure 4 is installed in place, check and clean the internal thread of the tensile sleeve 1 to avoid blockage;
[0045] (2) The lower end of the tensile screw 31 is threadedly connected to the tensile sleeve 1, and the screwing depth of the tensile screw 31 meets the design requirements. Then, the leveling nut 32 and the leveling gasket 33 are installed in sequence from the top of the tensile screw 31 to a position close to the top surface of the lower structure 4;
[0046] (3) Lift the upper structure 5 and transport it to within 300 mm above the lower structure 4, align the through hole of the steel bottom plate 21 in the tensile embedded part 2 with the tensile screw 31 and lower it (the through hole of the steel bottom plate 21 is slightly larger than the outer diameter of the tensile screw 31 and can be directly penetrated) until the steel bottom plate 21 is supported on the leveling gasket 33;
[0047] (4) Adjust the position of the leveling nut 32 from the lower operating port 6 to position the upper structure 5 to the specified elevation and verticality;
[0048] (5) Install the fastening gasket 34 and the fastening nut 35 on the top of the tension screw 31 from the upper operation port 7 in sequence, and use a torque wrench to rotate the fastening nut 35 until the fastening gasket 34 is pressed against the steel base plate 21;
[0049] (6) Install the stop nut 36 on the top of the tension screw 31 from the upper operation port 7 until the stop nut 36 is in close contact with the fastening nut 35. At this point, the joint node installation is completed;
[0050] The gap between the upper structure 5 and the lower structure 4 as well as the lower operation opening 6 and the upper operation opening 7 can be sealed and filled with masonry mortar after the structure is installed.
[0051] Although the utility model has been described in detail above with general descriptions and specific embodiments, it is obvious to those skilled in the art that some modifications or improvements can be made to the utility model. Therefore, these modifications or improvements made without departing from the spirit of the utility model are within the scope of protection claimed by the utility model.
Claims
1. Horizontal connection node for shear wall of prefabricated concrete box-type house, characterized by: include: Tensile sleeves, tensile embedded parts and tensile connectors; The tensile sleeve is pre-buried in the lower structure, and an internal threaded hole is provided on the upper part of the tensile sleeve; The tensile embedded part is embedded in the groove on the inner side of the upper structure, and includes a steel bottom plate and a cavity structure with an opening on one side fixed to the steel bottom plate, wherein the opening of the cavity structure faces the inner side of the upper structure; There is a set distance between the lower end surface of the steel bottom plate and the bottom surface of the upper structure; The tensile connector includes: a tensile screw, a leveling nut, a leveling washer, a fastening washer and a fastening nut; the leveling nut and the leveling washer are sleeved on the tensile screw; when connecting the upper structure and the lower structure, the lower part of the tensile screw is threadedly connected with the internal threaded hole of the tensile sleeve; the upper part passes through the through hole in the center of the steel bottom plate in the tensile embedded part, so that the leveling washer contacts the bottom surface of the steel bottom plate; A fastening washer and a fastening nut are mounted on the portion of the tensile screw that passes through the steel bottom plate, and the fastening nut is pressed against the steel bottom plate through the fastening washer.
2. The horizontal connection node for shear wall of prefabricated concrete box-type house according to claim 1, characterized in that: The tensile connector also includes a stop nut threadedly connected to the tensile screw rod, and the stop nut is located above the fastening nut.
3. The horizontal connection node for shear wall of prefabricated concrete box-type house according to claim 1 or 2, characterized in that: The tensile sleeve comprises: a threaded sleeve and a shear-resistant steel bar; The threaded sleeve is a structure with an internal threaded hole at the upper part, and a through hole is radially arranged at the lower part of the threaded sleeve for penetrating the shear steel bar; The axis of the threaded sleeve is perpendicular to the top surface of the lower structure, and the shear steel bar is parallel to the length direction of the lower structure.
4. The horizontal connection node for shear wall of prefabricated concrete box-type house according to claim 1 or 2, characterized in that: The cavity structure in the tensile embedded part is formed by connecting a steel side plate, a steel top plate and a steel back plate; The steel side plates, steel top plate and steel back plate are all rectangular steel plates, the two opposite sides of the steel back plate are welded with steel side plates vertically connected thereto, and the top plate vertically connected thereto is welded between the two steel side plates at the top of the steel back plate; The lower ends of the steel side plates and the steel back plate are welded to the steel bottom plate.
5. The horizontal connection node for shear wall of prefabricated concrete box-type house according to claim 4, characterized in that: The length of the steel bottom plate is greater than that of the steel top plate, so that the steel bottom plate forms flanges at both ends of the cavity structure, and more than four anchoring steel bars are symmetrically arranged on the flanges at both ends.
6. The horizontal connection node for shear wall of prefabricated concrete box-type house according to claim 5, characterized in that: The anchor steel bars are arranged vertically, and their length is not less than the height of the steel side plates.