Pipeline support for building construction

Through the combined structure of the extension rod and the lifting assembly, the problems of inconvenient adjustment of the height of the pipeline bracket and insufficient stability in the prior art are solved, and flexible adjustment and stability improvement of the height of the pipeline bracket are achieved.

CN222011155UInactive Publication Date: 2024-11-15安徽宏都建设工程集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420805799.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing pipeline brackets cannot effectively adjust the height of pipelines of different sizes, causing the support rod to pressure the outer wall of the bolts, causing the bolt to deform, reducing the stability of the bracket and shortening the service life.

Method used

Using a combined structure of extension rod, lifting component and electric push rod, the vertical lifting movement of extension rod and the telescopic movement of electric push rod are driven by the lifting component, to adjust the height of the pipeline bracket, replace the rotation method of the bolt, and reduce the staff's Workload and reinforce the stability of the bracket.

Benefits of technology

It realizes flexible adjustment of the height of the pipeline bracket, reduces the amount of operation of the staff, and improves the stability and service life of the bracket.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222011155U_ABST
    Figure CN222011155U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pipeline supporting, and discloses a pipeline support for building construction, which comprises an upper clamping plate, extension rods are mounted on the left side and the right side of the upper clamping plate, an electric push rod is fixedly mounted at the upper end of the upper clamping plate, and a lifting assembly for controlling the upper clamping plate to lift is arranged on the inner wall of the lower end of each extension rod. The outer wall of the extension rod is movably sleeved with a fixing rod, and the lower end of the upper clamping plate is movably connected with a lower clamping plate used for supporting a pipeline. According to the pipeline support, the extension rod, the fixing rod, the lifting assembly, the first clamping plate and the second clamping plate are matched, telescopic movement of the extension rod is achieved through the lifting assembly, and the problem that the height of the pipeline support is changed through connection of a bolt and a through hole in the disclosed technical content is effectively solved; the mode that the lifting assembly drives the extension rod to ascend and descend in the vertical direction is adopted, the height adjusting step of the pipeline support is simplified, and meanwhile the stability of the pipeline support in the using process is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline supports, in particular to a pipeline support for building construction. Background Art

[0002] At construction sites, it is usually necessary to lay cables, branch pipes, and water pipes. Brackets are usually used to support the pipelines to prevent the pipelines from being placed on the ground at random, resulting in a messy ground at the construction site.

[0003] However, the existing pipeline supports cannot fix pipelines of different sizes, thereby reducing the scope of use of the device and cannot adjust the height between the pipeline and the ground. Therefore, in order to facilitate the height of the pipeline support, some technologies have proposed related lifting structures to assist in adjusting the height of the pipeline support. For example, there is a utility model patent with a publication number of CN220286774U, which proposes a quick-type pipeline support for construction. Through the setting of a clamping mechanism, pipelines of different sizes can be clamped and fixed. The matching setting between the fixed sleeve, the support rod and the cross plate can support the clamping mechanism, and also adjust the height of the pipeline according to on-site requirements, thereby increasing the scope of use of the device. The device has a simple structure, is easy to manufacture, has a low production cost, and is suitable for large-scale applications.

[0004] From the above disclosed technical content, theoretically speaking, the implementation of the relevant technical structure is conducive to the adjustment of the height of the pipeline support. However, according to the description in the above disclosed technical content, by changing the connection method of the bolt and the through hole, the support rod can be extended and retracted inside the fixed pipe sleeve, so as to adjust the height of the pipeline support. The bolt connects the support rod and the fixed pipe sleeve. At this time, the bolt is installed horizontally inside the support rod and the fixed pipe sleeve. As the use time and number of uses of the pipeline support continue to increase, the support rod is installed on the outside of the bolt, so that the support rod will exert downward pressure on the outer wall of the bolt, and even cause deformation of the horizontal bolt. The deformed bolt will reduce its stability to the support rod and the fixed pipe sleeve, and even shorten the service life of the bolt. Utility Model Content

[0005] In view of the deficiencies in the prior art, the utility model provides a pipeline support for construction, which has the advantages of facilitating adjustment of the height of the pipeline support, reducing the workload of staff, and reinforcing the stability of the pipeline support, thereby solving the problems raised in the above-mentioned background technology.

[0006] The utility model provides the following technical solutions: a pipeline support for construction, comprising an upper clamping plate, extension rods are installed on both sides of the upper clamping plate, an electric push rod is fixedly installed on the upper end of the upper clamping plate, the inner wall of the lower end of the extension rod is provided with a lifting assembly for controlling the lifting of the upper clamping plate, the outer wall of the extension rod is movably sleeved with a fixing rod, the lower end of the upper clamping plate is movably connected with a lower clamping plate for supporting the pipeline, the inner walls of the upper clamping plate and the lower clamping plate are fixedly connected with springs, and the outer ends of the springs are fixedly installed with limiting plates.

[0007] Preferably, guide rods located on the left and right sides of the electric push rod are fixedly mounted on the upper end surface of the upper clamping plate, and a disc is fixedly connected to one end of the guide rod away from the upper clamping plate.

[0008] Preferably, a mounting plate is fixedly installed on the upper end of the extension rod, a rectangular block is fixedly connected to the end of the mounting plate away from the extension rod, protrusions are fixedly installed on the front and rear sides of the rectangular block, rollers are evenly installed on the outer wall of the lower end of the extension rod, and the outer wall of the roller is fixedly connected to the inner wall of the fixing rod.

[0009] Preferably, reinforcement plates are fixedly mounted on both the front and rear sides of the fixing rod, and the lower end of the reinforcement plate is fixedly connected to a base.

[0010] Preferably, the lifting assembly includes a ball screw, the outer wall of the ball screw is threadedly sleeved with a ball nut, the outer wall of the ball nut is evenly distributed with short rods, and one end of the short rod away from the ball nut is fixedly connected to the inner wall of the extension rod.

[0011] Preferably, the lower end of the ball screw on the right side is fixedly installed with a No. 1 synchronization component located inside the base, the lower end of the No. 1 synchronization component away from one end of the ball screw on the right side is fixedly connected to the No. 2 synchronization component, and the upper surface of the left end of the No. 2 synchronization component is fixedly connected to the lower end of the ball screw on the left side, the right end of the lower bottom surface of the No. 2 synchronization component is fixedly connected to a rotating shaft, the lower end of the rotating shaft is fixedly installed with a rotating motor, and a reducer is provided on the output shaft of the rotating motor, and the lower end of the rotating motor is fixedly connected to the bottom surface of the inner wall of the base.

[0012] Preferably, a positioning plate is fixedly installed on the upper end of the electric push rod, and locking blocks are fixedly connected to the left and right sides of the lower end surface of the positioning plate. The inner wall of the locking block is provided with a groove, and the inner wall of the groove is movably engaged with the outer wall of the protrusion. A supporting plate is fixedly installed on the lower end of the electric push rod, and the inner wall of the support plate is movably sleeved with the outer wall of the guide rod. The lower end of the output shaft of the electric push rod passes through the upper end of the support plate and is fixedly connected to the upper end surface of the upper clamping plate. A cross plate is fixedly installed on the lower end of the support plate, and the upper end surface of the cross plate is fixedly connected to the lower end of the lower clamping plate.

[0013] Compared with the prior art, the utility model has the following beneficial effects:

[0014] 1. The utility model realizes the telescopic movement of the extension rod by cooperating among the extension rod, the fixed rod, the lifting assembly, the first clamping plate and the second clamping plate, and utilizes the setting of the lifting assembly, thereby effectively solving the problem of changing the height of the pipeline support by connecting the bolts and the through holes in the above-mentioned public technical content. The lifting assembly is used to drive the extension rod to move up and down in the vertical direction, which simplifies the height adjustment steps of the pipeline support and also strengthens the stability of the pipeline support when in use.

[0015] 2. The utility model realizes the adjustment of the distance between the No. 1 clamping plate and the No. 2 clamping plate through the cooperation between the No. 1 clamping plate, the No. 2 clamping plate and the electric push rod, and utilizes the setting of the electric push rod, which effectively solves the problem of the need to rotate the screw rod in the above-mentioned public technical content to adjust the position of the lower pressure plate. The telescopic movement of the output shaft inside the electric push rod drives the movement of the No. 1 clamping plate, which replaces the rotation method of the rotating screw rod in the above-mentioned public technical content, reduces the workload of the staff on the rotating screw rod, thereby facilitating the adjustment of the distance between the No. 1 clamping plate and the No. 2 clamping plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of the utility model;

[0017] Figure 2 It is a cross-sectional view of the fixing rod of the utility model;

[0018] Figure 3 It is a bottom view of the groove of the utility model;

[0019] Figure 4 It is a front view of the limiting plate of the utility model;

[0020] Figure 5 For this utility model Figure 2 A magnified view of point A;

[0021] Figure 6 It is a bottom view of the ball nut of the utility model.

[0022] In the figure: 1. upper clamping plate; 2. extension rod; 3. fixing rod; 4. lifting assembly; 401. ball screw; 402. ball nut; 403. short rod; 5. lower clamping plate; 6. spring; 7. limit plate; 8. electric push rod; 9. guide rod; 10. disc; 11. mounting plate; 12. rectangular block; 13. bump; 14. roller; 15. reinforcement plate; 16. base; 17. No. 1 synchronization assembly; 18. No. 2 synchronization assembly; 19. rotating shaft; 20. rotating motor; 21. positioning plate; 22. locking block; 23. groove; 24. support plate; 25. cross plate. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] See also Figure 1 and Figure 4 A pipeline support for construction includes an upper clamping plate 1, and extension rods 2 are installed on both sides of the upper clamping plate 1. The telescopic movement of the extension rods 2 is used to provide power for adjusting the height of the pipeline support. An electric push rod 8 is fixedly installed on the upper end of the upper clamping plate 1. The telescopic movement of the output shaft inside the electric push rod 8 can adjust the distance between the upper clamping plate 1 and the lower clamping plate 5. The inner wall of the lower end of the extension rod 2 is provided with a lifting component 4 for controlling the lifting of the upper clamping plate 1. The movement of the lifting component 4 provides power for the lifting movement of the extension rod 2 in the vertical direction, thereby adjusting the height of the pipeline support. The outer wall of the extension rod 2 is movably connected with a fixing rod 3, and the installation of the fixing rod 3 provides space for the telescopic movement of the extension rod 2. The lower end of the upper splint 1 is movably connected with a lower splint 5 for supporting the pipeline. The installation of the lower splint 5 plays a supporting role for the pipeline. The inner walls of the upper splint 1 and the lower splint 5 are fixedly connected with a spring 6. The setting of the spring 6 serves to connect the upper and lower limit plates 7 with the inner walls of the upper splint 1 and the lower splint 5 respectively. The outer end of the spring 6 is fixedly installed with a limit plate 7, and the limit plate 7 clamps the pipeline between the upper splint 1 and the lower splint 5.

[0025] The upper end surface of the upper clamping plate 1 is fixedly mounted with guide rods 9 located on the left and right sides of the electric push rod 8. The setting of the guide rods 9 serves to connect the upper clamping plate 1 with the support plate 24. The end of the guide rods 9 away from the upper clamping plate 1 is fixedly connected with a disc 10.

[0026] See also Figure 2 and Figure 3 A mounting plate 11 is fixedly installed on the upper end of the extension rod 2. The installation of the mounting plate 11 serves to connect the extension rod 2 with the rectangular block 12. A rectangular block 12 is fixedly connected to one end of the mounting plate 11 away from the extension rod 2. The setting of the rectangular block 12 provides support and a platform for the installation of the protrusion 13. Protrusions 13 are fixedly installed on the front and rear sides of the rectangular block 12. Rollers 14 are evenly installed on the outer wall of the lower end of the extension rod 2. The rolling of the rollers 14 on the inner wall of the fixed rod 3 reinforces the stability of the telescopic movement of the extension rod 2 inside the fixed rod 3, and the outer wall of the roller 14 is fixedly connected to the inner wall of the fixed rod 3.

[0027] Reinforcement plates 15 are fixedly installed on both the front and rear sides of the fixing rod 3. The setting of the reinforcement plate 15 serves to connect the fixing rod 3 with the base 16. The lower end of the reinforcement plate 15 is fixedly connected to the base 16. The installation of the base 16 provides support and platform for the installation of the fixing rod 3 and the reinforcement plate 15.

[0028] See also Figure 6 and Figure 5 The lifting component 4 includes a ball screw 401, and a ball nut 402 is threadedly sleeved on the outer wall of the ball screw 401. The threaded sleeve connection method enables the circular rotation of the ball screw 401 to provide power for the vertical lifting movement of the ball nut 402. Short rods 403 are evenly distributed on the outer wall of the ball nut 402. The setting of the short rod 403 serves to connect the ball nut 402 and the extension rod 2, and the end of the short rod 403 away from the ball nut 402 is fixedly connected to the inner wall of the extension rod 2.

[0029] The lower end of the ball screw 401 on the right side is fixedly installed with a No. 1 synchronization component 17 located inside the base 16, and the rotation of the No. 1 synchronization component 17 provides power for the rotation of the ball screw 401 on the right side. The lower end of the No. 1 synchronization component 17 away from the end of the ball screw 401 on the right side is fixedly connected with the No. 2 synchronization component 18, and the rotation of the No. 2 synchronization component 18 provides power for the rotation of the ball screw 401 on the right side, and the upper surface of the left end of the No. 2 synchronization component 18 is fixedly connected to the lower end of the ball screw 401 on the left side, and the lower bottom surface of the No. 2 synchronization component 18 The right end is fixedly connected with a rotating shaft 19, and the setting of the rotating shaft 19 serves to connect the rotating motor 20 with the second synchronous assembly 18 and the first synchronous assembly 17. The lower end of the rotating shaft 19 is fixedly installed with a rotating motor 20, and the installation of the rotating motor 20 provides power for the rotation of the rotating shaft 19, and a reducer is provided on the output shaft of the rotating motor 20. The setting of the reducer serves to adjust the speed of the output shaft of the rotating motor 20. The lower end of the rotating motor 20 is fixedly connected to the bottom surface of the inner wall of the base 16, and the installation of the base 16 provides support and platform for the installation of the rotating motor 20.

[0030] A positioning plate 21 is fixedly installed on the upper end of the electric push rod 8, and the left and right sides of the lower end surface of the positioning plate 21 are fixedly connected with a clamping block 22. The installation of the clamping block 22 provides space for the opening of the groove 23. The inner wall of the clamping block 22 is provided with a groove 23. The clamping connection between the groove 23 and the protrusion 13 limits the installation position of the clamping block 22 and the rectangular block 12, and the inner wall of the groove 23 is movably clamped with the outer wall of the protrusion 13. A support plate 24 is fixedly installed on the lower end of the electric push rod 8. The setting of the support plate 24 is The installation of the electric push rod 8 provides support and a platform, and the inner wall of the support plate 24 is movably connected to the outer wall of the guide rod 9. The movement of the guide rod 9 in the support plate 24 reinforces the stability of the lifting and lowering movement of the upper clamping plate 1. The lower end of the output shaft of the electric push rod 8 passes through the upper end of the support plate 24 and is fixedly connected to the upper end surface of the upper clamping plate 1. A cross plate 25 is fixedly installed on the lower end of the support plate 24. The installation of the cross plate 25 provides support for the installation of the lower clamping plate 5, and the upper end surface of the cross plate 25 is fixedly connected to the lower end of the lower clamping plate 5.

[0031] Working principle: When in use, first, pass the pipeline through the space between the upper clamping plate 1 and the lower clamping plate 5, then turn on the power of the electric push rod 8, and use the telescopic movement of the internal output shaft of the electric push rod 8 to drive the upper clamping plate 1 to move in the direction of the lower clamping plate 5, until the upper and lower limit plates 7 play a clamping role on the surface of the pipeline, then turn on the power of the rotating motor 20, and the turning on of the rotating motor 20 drives the rotation of the No. 1 synchronous component 17 and the No. 2 synchronous component 18 at the same time through the connection of the rotating shaft 19, and the rotation of the No. 1 synchronous component 17 and the No. 2 synchronous component 18 respectively drives the rotation of the ball screw 401 on the right and the ball screw 401 on the left. Due to the threaded connection between the ball screw 401 and the ball nut 402, the ball When the screw rod 401 rotates in a circle, it drives the ball nut 402 to move up and down in the vertical direction. When the ball nut 402 moves, it drives the extension rods 2 on the left and right sides to move telescopically inside the fixed rod 3 through the connection of the short rod 403. When the extension rod 2 moves, the stability of the lifting and lowering movement of the extension rod 2 is reinforced by the installation of the roller 14. When the extension rod 2 moves, the upper clamping plate 1 and the lower clamping plate 5 are driven to move up and down through the engagement of the protrusion 13 and the engaging block 22, thereby achieving the effect of adjusting the height of the pipeline. Finally, after the height of the pipeline is adjusted to an appropriate height, the power supply of the rotating motor 20 can be turned off. When the pipeline bracket is not in use, the groove 23 is separated from the protrusion 13, and the positioning plate 21 can be removed from the extension rod 2.

[0032] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. At the same time, in the drawings of the present utility model, the fill pattern is only for distinguishing the layers, without any other limitation.

[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pipeline support for construction, comprising an upper clamping plate (1), wherein extension rods (2) are installed on both left and right sides of the upper clamping plate (1), characterized in that: An electric push rod (8) is fixedly mounted on the upper end of the upper clamping plate (1); a lifting assembly (4) for controlling the lifting of the upper clamping plate (1) is disposed on the inner wall of the lower end of the extension rod (2); a fixing rod (3) is movably sleeved on the outer wall of the extension rod (2); a lower clamping plate (5) for supporting the pipeline is movably connected to the lower end of the upper clamping plate (1); springs (6) are fixedly connected to the inner walls of the upper clamping plate (1) and the lower clamping plate (5); and a limiting plate (7) is fixedly mounted on the outer end of the spring (6).

2. A pipeline support for construction according to claim 1, characterized in that: The upper end surface of the upper clamping plate (1) is fixedly mounted with guide rods (9) located on the left and right sides of the electric push rod (8), and one end of the guide rod (9) away from the upper clamping plate (1) is fixedly connected with a disc (10).

3. A pipeline support for construction according to claim 1, characterized in that: A mounting plate (11) is fixedly mounted on the upper end of the extension rod (2); a rectangular block (12) is fixedly connected to one end of the mounting plate (11) away from the extension rod (2); protrusions (13) are fixedly mounted on both the front and rear sides of the rectangular block (12); rollers (14) are evenly mounted on the outer wall of the lower end of the extension rod (2); and the outer wall of the roller (14) is fixedly connected to the inner wall of the fixed rod (3).

4. A pipeline support for construction according to claim 1, characterized in that: Reinforcement plates (15) are fixedly mounted on both the front and rear sides of the fixing rod (3), and the lower end of the reinforcement plate (15) is fixedly connected to a base (16).

5. The pipeline support for construction according to claim 1, characterized in that: The lifting assembly (4) comprises a ball screw (401), the outer wall of the ball screw (401) being threadedly sleeved with a ball nut (402), the outer wall of the ball nut (402) being evenly distributed with short rods (403), and one end of the short rod (403) away from the ball nut (402) being fixedly connected to the inner wall of the extension rod (2).

6. A pipeline support for construction according to claim 5, characterized in that: The lower end of the ball screw (401) on the right side is fixedly mounted with a first synchronization component (17) located inside the base (16); the lower end of the first synchronization component (17) away from one end of the ball screw (401) on the right side is fixedly connected with a second synchronization component (18); the upper surface of the left end of the second synchronization component (18) is fixedly connected to the lower end of the ball screw (401) on the left side; the right end of the lower bottom surface of the second synchronization component (18) is fixedly connected with a rotating shaft (19); the lower end of the rotating shaft (19) is fixedly mounted with a rotating motor (20); a reducer is arranged on the output shaft of the rotating motor (20); and the lower end of the rotating motor (20) is fixedly connected to the bottom surface of the inner wall of the base (16).

7. The pipeline support for construction according to claim 1, characterized in that: A positioning plate (21) is fixedly mounted on the upper end of the electric push rod (8), and a clamping block (22) is fixedly connected to the left and right sides of the lower end surface of the positioning plate (21). A groove (23) is provided on the inner wall of the clamping block (22), and the inner wall of the groove (23) is movably clamped with the outer wall of the protrusion (13). A support plate (24) is fixedly mounted on the lower end of the electric push rod (8), and the inner wall of the support plate (24) is movably sleeved with the outer wall of the guide rod (9). The lower end of the output shaft of the electric push rod (8) passes through the upper end of the support plate (24) and is fixedly connected to the upper end surface of the upper clamping plate (1). A cross plate (25) is fixedly mounted on the lower end of the support plate (24), and the upper end surface of the cross plate (25) is fixedly connected to the lower end of the lower clamping plate (5).