Underground cavity drill rod detection verification equipment
By using the underground hollow drilling verification equipment with a scale scale engraved on the drilling probe rod and a coordinate display is set on the pressure rod, the time-consuming and labor-intensive problem of traditional drilling verification is solved, real-time reading of the ruler and recording the drilling coordinates is realized, and the improvement of the Work efficiency and safety.
Patent Information
- Application Number
- CN202420253741.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-02
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-02-02
AI Technical Summary
The traditional kinerant detection verification method is time-consuming and labor-intensive, and it is impossible to read the depth of the inlet and record the drilling coordinates in real time. Especially when verifying underground voids and de-employment, it requires repeated operations, which increases work burden and accident risk.
An underground hollow drilling verification equipment including a drilling probe rod and a pressure rod is designed. The drilling probe rod is engraved with a scale along the length direction, and a coordinate display is provided on the outer surface of the pressure rod, which can record the drilling coordinates in real time and pass the locking switch. It also has a cavity structure to achieve convenient operation of the drill probe rod.
It realizes the reading of the inlet depth at any time and the real-time recording of drilling coordinates during the drilling process, which reduces working steps, improves working efficiency and reduces operational difficulty.
Smart Images

Figure CN222012985U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of drilling detection, in particular to underground cavity drilling detection verification equipment. Background Art
[0002] At present, ground penetrating radar technology has been widely used in the field of non-destructive detection of road defects. In the real-time process of road inspection projects, suspected voids, voids and other defects screened out through data analysis need to be verified by drilling and probing, and the coordinates of the verification points need to be recorded.
[0003] The traditional working method is to point the tapered tip of the drill rod toward the inside of the borehole after penetrating the hardened layer of the road surface, and use the impact force of the reciprocating pressure rod hitting the drill rod to hammer the metal drill rod into the ground. When a certain depth is reached, the rod is taken out to measure the footage to prevent it from being hammered too deep and damaging the underground pipeline. This method of taking out the measurement is time-consuming and labor-intensive, and the depth of the drilling footage cannot be grasped in real time, especially for voids and voids developed above the pipeline. It is necessary to take out and measure repeatedly to prevent construction accidents. This not only greatly increases the workload of the verification personnel, but also requires recording the drilling coordinates after the verification. Utility Model Content
[0004] Based on this, the main purpose of the utility model is to provide an underground cavity drilling verification device that can read the footage at any time and record the drilling coordinates in real time.
[0005] An underground cavity drilling and verification device comprises a drilling and probing rod and a pressure rod. The pressure rod is sleeved on one end of the drilling and probing rod. The drilling and probing rod is vertically engraved with a scale. A coordinate display is arranged on the outer surface of the pressure rod.
[0006] Furthermore, the minimum scale of the ruler is 1 cm.
[0007] Furthermore, the scale is marked with scale values every 10 cm.
[0008] Furthermore, the drill probe rod is provided with a tip away from the other end, and the scale is marked with the tip apex as a starting point.
[0009] Furthermore, the tip is conical.
[0010] Furthermore, the pressure rod has an inner cavity, one end portion of the drill probe rod is placed in the inner cavity, and the pressure rod can move vertically relative to the drill probe rod.
[0011] Furthermore, it also includes a locking switch, a mounting hole is provided on the side wall of the pressure rod, the mounting hole is connected to the inner cavity, the locking switch can pass through the mounting hole into the inner cavity, and removing the locking switch can allow one end of the drill probe rod to extend into the inner cavity.
[0012] Furthermore, the drill probe rod is made of high manganese steel.
[0013] Beneficial effects of the utility model:
[0014] The present application uses an underground cavity drilling verification device with scale marks engraved along the length direction of the drilling rod, which can read the penetration depth at any time during the drilling process. In addition, a coordinate display is provided on the outer surface of the pressure rod, which can record the drilling coordinates in real time, integrate multiple work steps, and improve work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0016] Figure 1 This is a schematic diagram of the overall structure of the underground cavity drilling verification equipment;
[0017] Figure 2 This is the overall structural cross-section of the underground cavity drilling verification equipment;
[0018] Figure 3 This is an enlarged view of the drilling end of the underground cavity drilling verification equipment;
[0019] Parts names and serial numbers in the figure: 1-pressure rod; 11-coordinate display; 12-lock switch; 2-drilling rod; 21-ruler scale.
[0020] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back...) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0023] In addition, the descriptions of "first", "second", etc. in the present utility model are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, "and / or" in the full text includes three solutions. Taking A and / or B as an example, it includes technical solution A, technical solution B, and technical solution that satisfies both A and B; in addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present utility model.
[0024] refer to Figure 1 The utility model provides an underground cavity drilling verification device, including a drilling rod 2 and a pressure rod 1. The pressure rod 1 is sleeved on one end of the drilling rod 2. A scale 21 is vertically engraved on the drilling rod 2. A coordinate display 11 is provided on the outer surface of the pressure rod 1. The coordinate display 11 adopts the Glacier 610 outdoor handheld navigator.
[0025] The present application uses an underground cavity drilling verification device engraved with a scale 21, which can read the penetration depth at any time during the drilling process, without repeatedly taking out the drilling rod 2 for measurement, thereby reducing the workload of the verification personnel. In addition, a coordinate display 11 is provided on the outer surface of the pressure rod 1, which can record the drilling coordinates in real time, integrate multiple work steps, and improve work efficiency.
[0026] refer to Figure 2 In the first embodiment, the pressure rod 1 has an inner cavity 13, one end of the inner cavity 13 has an opening, and the other end is closed, one end of the probe rod 2 is placed in the inner cavity 13, and the pressure rod 1 can move vertically relative to the probe rod 2. The vertical direction is the direction perpendicular to the ground during the operation of the underground cavity probe verification equipment. The pressure rod 1 vertically reciprocates and hits the top of the probe rod 2, so as to achieve the drilling target. In other embodiments, a guide groove is provided on the side of the pressure rod 1, and the probe rod 2 is provided with a guide rail. The guide groove and the guide rail are slidably matched. The guide groove includes a bottom surface. When the pressure rod 1 moves downward relative to the probe rod 2, the bottom surface will hit the top of the probe rod 2, thereby achieving the drilling target.
[0027] In order to facilitate reading and not affect the gripping position when the pressure rod 1 moves up and down, in this embodiment, the coordinate display 11 is arranged at the closed end of the pressure rod 1.
[0028] Specifically, an underground cavity drilling verification device also includes a locking switch 12. A mounting hole 14 is provided on the side wall of the pressure rod 1 near the opening. The mounting hole 14 is connected to the inner cavity 13. The locking switch 12 can pass through the mounting hole 14 and enter the inner cavity 13. In the present embodiment, the locking switch 12 is a bolt. During the operation of the drilling probe rod 2, the locking switch 12 is opened so that the bolt at least withdraws from the inner cavity 13. The pressure rod 1 reciprocates up and down and hits one end of the drilling probe rod 2. The drilling probe rod 2 is subjected to the impact force of the pressure rod 1 reciprocating up and down and hitting the drilling probe rod 2, thereby achieving the goal of drilling. After the drilling probe rod 2 completes its operation, one end of the drilling probe rod 2 partially extends into the inner cavity, and then the bolt is tightened to limit the up and down movement of the drilling probe rod 2, thereby reducing the length of the equipment and limiting the drilling probe rod 2 and the pressure rod together for easy carrying and storage.
[0029] refer to Figure 3 , the other end of the drill probe rod 2 is a tip, and the scale scale 21 takes the tip vertex as the starting point. In the present embodiment, the tip is conical. When the road cavity drill is verified, when one end of the rod drill 2 is conical, the conical tip is pointed to the ground, and the pressure rod 1 is reciprocated up and down. The gravity of the pressure rod 1 and the impact force of the pressure rod 1 moving up and down to hit the drill probe rod 2 can make it easier to smash the drill probe rod 2 into the ground through the conical tip. In other embodiments, the tip can also be a three-sided or four-sided pyramid.
[0030] Specifically, the smallest scale of the ruler scale 21 is 1 cm.
[0031] Specifically, the ruler scale 21 is engraved with circular scales every 10 cm and marked with scale values; the setting of the circular scale can better identify the position of the scale value, and when drilling deep into the ground, the value can be read faster.
[0032] Specifically, the probe rod 2 is made of high manganese steel. During road cavity probing verification, the greater strength of the probe rod 2 can reduce the difficulty of drilling holes on the ground, reduce the operation time, and increase the service life of the probe rod 2.
[0033] Working principle: When in use, the conical tip of the drill probe rod 2 is placed vertically at the position to be detected, and the user moves the pressure rod 1 up and down, and uses the gravity of the pressure rod 1 and the impact force of the pressure rod 1 moving up and down to hit the drill probe rod 2 to achieve the goal of drilling. When the target position is reached, the value of the scale 21 on the drill probe rod 1 can be read at any time. At the same time, the display 11 outside the pressure rod 1 can also locate and record the drilling coordinates in real time.
[0034] The above are only preferred embodiments of the present invention, and do not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the utility model concept, or directly / indirectly used in other related technical fields are included in the patent protection scope of the present invention.
Claims
1. An underground cavity drilling verification device, characterized in that: include: A drill probe rod and a pressure rod, wherein the pressure rod is sleeved on one end of the drill probe rod, the drill probe rod is engraved with scale marks along the length direction, and a coordinate display is arranged on the outer surface of the pressure rod.
2. The underground cavity drilling verification equipment according to claim 1, characterized in that: The minimum scale of the ruler is 1 cm.
3. An underground cavity drilling verification device according to claim 2, characterized in that: The scale of the ruler is marked with scale values every 10 cm.
4. The underground cavity drilling verification equipment according to claim 1, characterized in that: The other end of the drill probe rod is a tip, and the scale scale takes the tip vertex as a starting point.
5. The underground cavity drilling verification equipment according to claim 4, characterized in that: The tip is conical.
6. The underground cavity drilling verification equipment according to claim 1, characterized in that: The pressure rod has an inner cavity, one end portion of the drill probe rod is placed in the inner cavity, and the pressure rod can move vertically relative to the drill probe rod.
7. The underground cavity drilling verification equipment according to claim 6, characterized in that: It also includes a locking switch. A mounting hole is provided on the side wall of the pressure rod. The mounting hole is connected to the inner cavity. The locking switch can pass through the mounting hole into the inner cavity. Removing the locking switch can allow one end of the drill probe rod to extend into the inner cavity.
8. The underground cavity drilling verification equipment according to claim 1, characterized in that: The drill probe rod is made of high manganese steel.
