Online maintenance device for spray gun of urea pyrolyzing furnace
By introducing a sealing valve and a sealing chamber into the online maintenance device for the urea pyrolysis furnace spray gun, and using the sealing air pipe to form a stable airflow seal, the problem of high-temperature gas leakage when the urea spray gun is blocked is solved, ensuring maintenance safety.
Patent Information
- Application Number
- CN202323455723.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-18
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2033-12-18
AI Technical Summary
In existing SCR flue gas denitrification technology, when the urea spray gun is clogged, there is a problem with the compressed air sealing being weak, which leads to high-temperature gas leakage and endangers the safety of maintenance personnel.
An online maintenance device for the spray gun of a urea pyrolysis furnace was designed, including a sealing valve and a sealing chamber. A stable airflow seal is formed through the sealing air pipe to prevent high-temperature gas leakage.
This technology effectively seals the high-temperature gas inside the pyrolysis furnace during online maintenance of urea spray guns, preventing personal injury to maintenance personnel and ensuring the safe operation of the system.
Smart Images

Figure CN222019489U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of SCR flue gas denitration, in particular to an online maintenance device for a urea pyrolysis furnace spray gun. Background Art
[0002] At present, the most widely used denitrification process in the flue gas of thermal power plants in my country is the SCR (selective catalytic reduction) denitrification process. The commonly used reducing agents in this process are liquid ammonia, ammonia water and urea. Since liquid ammonia is a hazardous chemical, its transportation and storage are very strict; and the transportation, storage and operation costs of ammonia water are relatively high; urea, as a safe and environmentally friendly denitrification reducing agent, is increasingly widely used. The urea ammonia production process can be divided into urea pyrolysis and urea hydrolysis. Urea pyrolysis ammonia production is to spray urea solution into a high-temperature pyrolysis furnace, and completely decompose it into gaseous ammonia and carbon dioxide under heating at a certain temperature (about 650°C) and an appropriate residence time in the pyrolysis furnace.
[0003] Urea solution is sprayed into the pyrolysis furnace through a spray gun under the atomization of compressed air. When the temperature in the pyrolysis furnace is lower than the temperature required for the pyrolysis reaction or the urea solution contains impurities, the incomplete pyrolysis of urea crystals or impurities will block the urea solution spray gun. In order to ensure the continuous operation of the denitrification system, when the urea solution spray gun is blocked, the urea solution spray gun needs to be pulled out of the pyrolysis furnace online for maintenance. Since the pyrolysis furnace is under positive pressure and the medium is high-temperature gas of about 650°C during operation, when the spray gun is pulled out online, the high-temperature gas in the pyrolysis furnace will leak, causing personal injury to the maintenance personnel.
[0004] Patent CN210171175U discloses a device for online replacement or maintenance of the spray gun of a urea pyrolysis reactor, which uses compressed air and a gate valve to realize online maintenance or replacement of the urea solution spray gun. However, the contact space between the compressed air and the sleeve of this structure is small, the compressed air is not tightly sealed, and the gate valve is located between the compressed air pipe and the pyrolysis furnace. If the gate valve is operated without tight sealing, it will also pose a certain risk of personal injury to the maintenance personnel. Utility Model Content
[0005] In order to overcome the deficiencies of the prior art, the utility model provides an online maintenance device for a urea pyrolysis furnace spray gun, which solves the problems existing in the prior art such as weak sealing of compressed air and certain risk of personal injury to maintenance personnel.
[0006] The technical solution adopted by the utility model to solve the above problems is:
[0007] An online maintenance device for a urea pyrolysis furnace spray gun comprises a first flange, a second flange, a first connecting pipe, a sealing valve, a second connecting pipe, a sealing chamber, a spray gun and a sealing air connecting pipe connected to the sealing chamber.
[0008] As a preferred technical solution, the number of sealed air pipes is 1 to 4, and when there is 1, it is arranged at the top of the sealed chamber, and when there are more than 1, they are evenly distributed along the circumference of the sealed chamber.
[0009] As a preferred technical solution, a portion of the second connecting pipe located inside the sealing chamber is provided with a hole.
[0010] As a preferred technical solution, the cross-sectional shape of the hole is circular.
[0011] As a preferred technical solution, the length L2 of the area where the hole is located is 100-300 mm.
[0012] As a preferred technical solution, the hole center distance l = 15 ~ 50mm.
[0013] As a preferred technical solution, the hole diameter D=8-20 mm.
[0014] As a preferred technical solution, one end of the sealed chamber is a large-diameter end, and the other end of the sealed chamber is a small-diameter end, and the cross-sectional diameter of the large-diameter end is larger than the cross-sectional diameter of the small-diameter end.
[0015] As a preferred technical solution, the inner wall of the small-diameter end of the sealed chamber is connected to the outer wall of the second connecting pipe, and the diameter of the large-diameter end of the sealed chamber is 1.5 to 2 times the cross-sectional diameter of the second connecting pipe.
[0016] As a preferred technical solution, the angle between the small-diameter end of the sealing chamber and the second connecting pipe in the horizontal direction ranges from 20° to 50°.
[0017] Compared with the prior art, the utility model has the following beneficial effects:
[0018] The utility model can achieve almost zero leakage of positive pressure high temperature gas in the pyrolysis furnace to the outside during online maintenance of the urea solution spray gun through the joint action of the sealing valve and the sealing chamber with sealing air, thereby meeting the online maintenance of the urea solution spray gun and preventing personal injury to maintenance personnel caused by high temperature gas. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the structure of the utility model;
[0020] Figure 2 This is a diagram of the hole arrangement on the second connecting pipe.
[0021] Markings and their corresponding names in the attached drawings: 1—first flange; 2—second flange; 3—first connecting pipe; 4—sealing valve; 5—second connecting pipe; 6—sealing chamber; 7—sealing air connecting pipe; 8—reinforcement ring; 9—spray gun; 10—hole. DETAILED DESCRIPTION
[0022] The present invention will be further described in detail below in conjunction with the embodiments and drawings, but the implementation manner of the present invention is not limited thereto.
[0023] Example 1
[0024] like Figure 1 to Figure 2 As shown, the purpose of the utility model is to provide a safe and effective online maintenance device for a urea pyrolysis furnace spray gun, by which a blocked spray gun can be repaired online during the normal operation of the pyrolysis furnace, and personal injury to maintenance personnel caused by leakage of high-temperature gas can be avoided.
[0025] The utility model of the urea pyrolysis furnace spray gun online maintenance device is shown in Figure 1 It is mainly composed of a first connecting pipe 3, a second connecting pipe 5, a first flange 1, a second flange 2, a sealing valve 4, a sealing chamber 6, a sealing air connecting pipe 7, and a reinforcement ring 8.
[0026] The first connecting pipe 3, the second connecting pipe 5, the first flange 1, the second flange 2, the sealing valve 4, the sealing chamber 6 and the spray gun 9 are arranged in a colinear manner.
[0027] The first flange 1 and the second flange 2 are connected by bolts, the second flange 2 and the first connecting pipe 3 are welded, the first connecting pipe 3, the second connecting pipe 5 and the sealing valve 4 are flange-connected or welded, the second connecting pipe 5 and the sealing chamber 6 are welded, the second connecting pipe 5 and the pyrolysis furnace are welded, and the reinforcement ring 8 of the second connecting pipe 5 is welded to the outer wall of the pyrolysis furnace.
[0028] A sealed air connection pipe 7 is provided on the sealed chamber 6, and the sealed air connection pipe 7 is connected to the sealed chamber 6 by welding.
[0029] The number of the sealed air pipes 7 is 1 to 4. When there is 1, it can be arranged at the top of the sealed chamber 6. When there are more than 1, they are evenly distributed along the circumferential direction of the sealed chamber 6.
[0030] The second connecting pipe 5 is provided with holes in the pipeline inside the sealing chamber 6. The holes 10 are circular holes and are arranged in a square pattern (e.g. Figure 2 The four holes in the upper right corner of the middle form the four vertices of a square with a side length of l) or an equilateral triangle arrangement, with hole 10 arranged as shown in Figure 2 , the opening length (the length of the area where the hole 10 is located) L2 = 100-300 mm, the center distance of the hole 10 l = 15-50 mm, and the diameter of the hole 10 D = 8-20 mm. The sealing air enters the second connecting pipe 5 from the opening of the second connecting pipe 5 along the surroundings in the sealing chamber 6, forming a more stable airflow seal, which better prevents the high-temperature gas in the pyrolysis furnace from leaking out.
[0031] The sealing valve 4 is arranged on the side of the sealing air pipe 7 away from the pyrolysis furnace. The sealing valve is operated after the sealing air has formed a stable airflow seal, thereby reducing the risk of personal injury to maintenance personnel.
[0032] The diameters of the first connecting pipe 3 and the second connecting pipe 5 are determined so as to ensure that the spray gun can be withdrawn as a whole.
[0033] The specifications of the first flange 1 and the second flange 2 match those of the first connecting pipe 3 and the second connecting pipe 5 .
[0034] The specification of the reinforcement ring 8 matches that of the second connecting pipe 5 .
[0035] The inner wall of the small-diameter end of the sealed chamber 6 is connected to the outer wall of the second connecting pipe 5, and the diameter of the large-diameter end of the sealed chamber 6 is determined by 1.5 to 2 times the specification of the second connecting pipe 5. The angle between the small-diameter end of the sealed chamber 6 and the second connecting pipe 5 in the horizontal direction ranges from 20° to 50°.
[0036] The installation position of the sealing chamber 6 is outside the thermal insulation layer of the pyrolysis furnace.
[0037] The specification of the sealed air connection pipe 7 is determined according to 1 / 2 to 1 / 5 of the specification of the second connection pipe 5 .
[0038] When the urea solution spray gun needs to be repaired online, first stop the spray gun that needs to be repaired online according to the operation requirements of the urea solution spray gun, then open the sealing air connected to the sealing air pipe 7, gradually withdraw the urea solution spray gun to the sealing valve 4, and then close the sealing valve 4. At this time, the high-temperature gas in the pyrolysis furnace has been completely sealed, and the first flange 1 and the second flange 2 can be loosened to completely pull the spray gun 9 out of the pyrolysis furnace for maintenance.
[0039] After the inspection is completed, the spray gun is inserted into the first pipe 3, the sealing air connected to the sealing air pipe 7 is opened, the sealing valve 4 is opened, and then the spray gun is inserted into the appropriate position in the pyrolysis furnace, and finally the bolts between the first flange 1 and the second flange 2 are tightened and sealed, and then the sealing air is closed.
[0040] Example 2
[0041] like Figure 1 to Figure 2 As shown, as a further optimization of Example 1, based on Example 1, this embodiment also includes the following technical features:
[0042] Taking a urea pyrolysis project as an example, combined with Figure 1 and Figure 2 The instructions are as follows:
[0043] The pyrolysis furnace of this embodiment is circular, with a diameter of 1200 mm and a heat preservation thickness of 300 mm.
[0044] The first flange 1 and the second flange 2 are connected by bolts, the second flange 2 and the first connecting pipe 3 are welded, the first connecting pipe 3, the second connecting pipe 5 and the sealing valve 4 are welded, the second connecting pipe 5 and the sealing chamber 6 are welded, the second connecting pipe 5 and the pyrolysis furnace are welded, and the reinforcement ring 8 of the second connecting pipe 5 is welded to the outer wall of the pyrolysis furnace.
[0045] A sealed air connection pipe 7 is provided on the sealed chamber 6, and the sealed air connection pipe 7 is connected to the sealed chamber 6 by welding.
[0046] Two sealing air connection pipes 7 are provided, which are respectively arranged at the top and bottom of the sealing chamber 6 and are arranged symmetrically. The sealing air is the compressed air of the power plant with a pressure of 0.4-0.6MPa.
[0047] The second connecting pipe 5 is opened in the pipeline inside the sealed chamber 6. The opening is a circular hole arranged in a square. The opening length L2=150, the hole center distance l=20mm, and the hole diameter D=10mm. Compressed air enters the second connecting pipe 5 from the opening of the second connecting pipe 5 along the periphery in the sealed chamber 6.
[0048] The sealing valve 4 is arranged on the side of the sealing air pipe 7 away from the pyrolysis furnace. The sealing valve is operated after the compressed air has formed a stable airflow seal, thereby reducing the risk of personal injury to maintenance personnel.
[0049] The specifications of the first connecting pipe 3 and the second connecting pipe 5 are DN100.
[0050] The specifications of the first flange 1 and the second flange 2 are DN100.
[0051] The specification of the reinforcing ring 8 is DN100.
[0052] The specification of the large-diameter end of the sealing chamber 6 is DN200.
[0053] The specification of the sealed air connection pipe 7 is DN25.
[0054] When the urea solution spray gun needs to be repaired, first turn off the urea solution feed, purge with atomizing compressed air for 10 to 20 minutes, then turn off the atomizing compressed air, open the sealed compressed air connected to the sealed air pipe 7, gradually withdraw the urea solution spray gun to the sealing valve 4, and then close the sealing valve 4. At this time, the high-temperature gas in the pyrolysis furnace has been completely sealed, loosen the first flange 1 and the second flange 2, and completely pull the spray gun 9 out of the pyrolysis furnace for maintenance.
[0055] After the inspection is completed, the spray gun is inserted into the first pipe 3, the sealed compressed air connected to the sealed air pipe 7 is opened, the sealing valve 4 is opened, and then the spray gun is inserted into the appropriate position in the pyrolysis furnace, and finally the bolts between the first flange 1 and the second flange 2 are tightened and sealed, and then the sealed compressed air is closed.
[0056] In the utility model, the sealing air can be selected from compressed air for instruments, compressed air for miscellaneous purposes or other gas medium at room temperature with a pressure higher than 0.1 MPa.
[0057] As described above, the utility model can be implemented well.
[0058] The above is only a preferred embodiment of the utility model and does not limit the utility model in any form. According to the technical essence of the utility model, within the spirit and principles of the utility model, any simple modification, equivalent replacement and improvement made to the above embodiment still falls within the protection scope of the technical solution of the utility model.
Claims
1. An online maintenance device for a urea pyrolysis furnace spray gun, characterized in that: The invention comprises a first flange (1), a second flange (2), a first connecting pipe (3), a sealing valve (4), a second connecting pipe (5), a sealing chamber (6), and a spray gun (9) which are connected in sequence, and also comprises a sealing air connecting pipe (7) connected to the sealing chamber (6).
2. The urea pyrolysis furnace spray gun online maintenance device according to claim 1, characterized in that: The number of the sealed air pipes (7) is 1 to 4. When there is 1, the sealed air pipes are arranged at the top of the sealed chamber (6). When there are more than 1, the sealed air pipes are evenly distributed in the circumferential direction of the sealed chamber (6).
3. The urea pyrolysis furnace spray gun online maintenance device according to claim 1, characterized in that: The portion of the second connecting pipe (5) located inside the sealing chamber (6) is provided with a hole (10).
4. The urea pyrolysis furnace spray gun online maintenance device according to claim 3, characterized in that: The cross-sectional shape of the hole (10) is circular.
5. The on-line maintenance device for the urea pyrolysis furnace spray gun according to claim 4, characterized in that: The length of the area where the hole (10) is located is L2 = 100 to 300 mm.
6. The on-line maintenance device for a urea pyrolysis furnace spray gun according to claim 4, characterized in that: The center distance of the holes (10) is l=15-50 mm.
7. The on-line maintenance device for a urea pyrolysis furnace spray gun according to claim 4, characterized in that: The hole (10) has a diameter D of 8 to 20 mm.
8. The urea pyrolysis furnace spray gun online maintenance device according to claim 1, characterized in that: One end of the sealed chamber (6) is a large-diameter end, and the other end of the sealed chamber (6) is a small-diameter end. The cross-sectional diameter of the large-diameter end is larger than the cross-sectional diameter of the small-diameter end.
9. The urea pyrolysis furnace spray gun online maintenance device according to claim 8, characterized in that: The inner wall of the small-diameter end of the sealed chamber (6) is connected to the outer wall of the second connecting pipe (5), and the diameter of the large-diameter end of the sealed chamber (6) is 1.5 to 2 times the cross-sectional diameter of the second connecting pipe (5).
10. The urea pyrolysis furnace spray gun online maintenance device according to claim 8 or 9, characterized in that: The angle between the small-diameter end of the sealing chamber (6) and the second connecting pipe (5) in the horizontal direction is in the range of 20°-50°.